CN206070575U - A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing - Google Patents

A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing Download PDF

Info

Publication number
CN206070575U
CN206070575U CN201620931177.8U CN201620931177U CN206070575U CN 206070575 U CN206070575 U CN 206070575U CN 201620931177 U CN201620931177 U CN 201620931177U CN 206070575 U CN206070575 U CN 206070575U
Authority
CN
China
Prior art keywords
steel plate
stiffener
temporary support
pipeline section
immersed tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620931177.8U
Other languages
Chinese (zh)
Inventor
朱世友
贺维国
邢永辉
姜宝臣
李现森
范国刚
褚凯
曾珂
吕洋
李广涛
杜玲
余涛
周丽芳
朱斌
孙超
胡斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201620931177.8U priority Critical patent/CN206070575U/en
Application granted granted Critical
Publication of CN206070575U publication Critical patent/CN206070575U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing, it is related to prefabricated immersed tube pipeline section technical field in immersed tube tunnel;It includes U-shaped steel plate, rivet, lower temporary support, upper temporary support, ring ribbed stiffener, longitudinal stiffener, perforate, junction steel plate, structure roof, structure side wall and structure base slab;The both sides inner surface of described U-shaped steel plate is welded with ring ribbed stiffener, longitudinal stiffener and rivet, junction steel plate is welded with ring ribbed stiffener and longitudinal stiffener, junction steel plate is welded with one end of lower temporary support, the other end of lower temporary support is connected with the bottom of U-shaped steel plate, and the upper end of two lower temporary supports is connected with upper temporary support by junction steel plate;Perforate is provided with described ring ribbed stiffener and longitudinal stiffener;Structure roof, structure side wall and the structure base slab for being provided with concrete is poured in described U-shaped steel plate.This utility model avoids the excavation of dive basin;Avoid the excavation of Large Foundation Pit;Reduce floor space and port basin amount.

Description

A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing
Technical field
This utility model is related to prefabricated immersed tube pipeline section technical field in immersed tube tunnel, and in particular to a kind of box hat outsourcing it is heavy Pipe pipeline section preparation facilitiess.
Background technology
The pipeline section of immersed tube tunnel decides the success or failure of whole engineering, and at present, prefabrication of tube section is carried out in dry-docking, dry-docking side Case has mobile dock scheme, fixed dry-docking scheme and batch production dry-docking scheme.
Mobile dock scheme is exactly to build or rent large-scale partly latent to refute as packaged type dry-docking, is completed on mobile dock Pipeline section it is prefabricated, partly latent is refuted into dive in the basin built up near tunnel of haul using tugboat then, pipeline section is realized and is refuted The separation of ship, then section floating to tunnel location is completed into sinking mating operation.
Fixed dry-docking scheme is the Large Foundation Pit made near tunnel, bottom surface absolute altitude the eating according to section floating of foundation ditch Water depth is controlled.Pipeline section is made in fixed dry-docking, dock gate after the completion of tube manufacture, is opened, pipeline section haul is sunk to tunnel location Put.Fixed dry-docking is divided into axis dry-docking, side again and builds several classes such as dry-docking, independent dry-docking.
Batch production dry-docking to refer to and carry out technology arrangement according to continuous-flow type prefabricated production line, and all pre- manufacturings are 24 in the Factory Building Hour is carried out continuously, and after fixed pedestal upper, maintenance 3d, pushing tow, vacates and pour pedestal each sections forward, Xia Yijie The sections neighbor of Duan Yugang ejections is prefabricated.So piecewise prefabricated piecewise pushing tow, until complete whole sections pour, it is overall to push up It is pushed into shallow depressed place and carries out interim prestressed cable tensioning and form entirety, completes a fitting-out, be then shut off between shallow depressed place and pre-fabricated factory Sliding caisson, shallow depressed place pours water, and pipeline section floating moves to deep depressed place, finally opens deep depressed place transportation by driving to sinking scene.Denmark and Sweden etc. The workshop of immersed tube pipeline section is all had in country, and this pre-fabricated factory is adapted to Large-scale Super Long immersed tube tunnel(Or length can be obtained The region that phase stable pipeline section is ordered)Prefabrication of tube section.The built port Zhuhai and Macao bridge of Oresund Bridge immersed tube tunnel and China It is exactly using batch production dry-docking.
There is following defect in prior art:
(1)Mobile dock is only applicable to 4 tracks and following situation, more than 4 tracks as pipeline section is larger, fit Partly latent refute less, rent the difficulty refuted of partly latent larger;
(2)Mobile dock separates the dive basin for needing excavation deeper in order that pipeline section is refuted with partly latent, to navigation channel and environment Affect larger;
(3)Fixed dry-docking needs excavation Large Foundation Pit to carry out prefabricated tube section, and cost is higher and affects larger to surrounding enviroment;
(4)Batch production dry-docking floor space is larger, cost highest, is only suitable for Large-scale Super Long immersed tube tunnel.
Therefore, it is necessary to be improved to prior art.
Utility model content
The purpose of this utility model is the defect and deficiency for prior art, there is provided a kind of simple structure, design are closed Reason, the immersed tube pipeline section preparation facilitiess of box hat outsourcing easy to use.
For achieving the above object, the technical solution adopted in the utility model is:It comprising U-shaped steel plate, rivet, lower interim Support, upper temporary support, ring ribbed stiffener, longitudinal stiffener, perforate, junction steel plate, structure roof, structure side wall, structure base slab; The both sides inner surface of described U-shaped steel plate is welded with ring ribbed stiffener, longitudinal stiffener and rivet, and ring ribbed stiffener and longitudinal direction add Junction steel plate is welded with strength rib, junction steel plate is welded with one end of lower temporary support, the other end and the U-shaped steel of lower temporary support The bottom connection of plate, the upper end of two lower temporary supports is connected with upper temporary support by junction steel plate;Described ring is put more energy into Perforate is provided with rib and longitudinal stiffener;Structure roof, the structure side for being provided with concrete is poured in described U-shaped steel plate Wall and structure base slab.
Preferably, described ring ribbed stiffener is I-steel or steel plate.
Preferably, described longitudinal stiffener is I-steel.
When this utility model is operated, smooth location makes, construction steel plate job shop, outfitting quay one, outfitting quay two And slideway area, steel plate job shop include cut milling side workshop, sandblasting Painting Shop and lamellar body assembling area;U-shaped steel plate is 8mm steel Plate, after steel plate job shop cuts milling side and sandblasting application and lamellar body assembling welds ring ribbed stiffener, longitudinal direction in inner side and puts more energy into Rib and rivet, ring ribbed stiffener is HW250*250 I-steel or 10mm steel plates, and longitudinal stiffener is HW250*250 I-steel, ring There is perforate on ribbed stiffener and longitudinal stiffener and pass through for reinforcing bar during assembling reinforcement, the spacing of perforate is true by bar spacing It is fixed, steel plate is placed on slideway, assembly is welded into U-shaped, and lower temporary support is connected by junction steel plate with upper temporary support, afterwards The opposite side of junction steel plate is welded with ring ribbed stiffener, longitudinal stiffener;The assembling reinforcement on the inside of the U-shaped steel plate pours pipeline section two Each 4 meters of scopes are held to pour tunneling boring concrete, remainder pours base plate, whole mid-boards and bottom 4m side wall concretes;Two End is installed by steel end housing, steel end seal wall and guider;Pipeline section is slipped in water by jack and winch along slideway;By pipeline section support It is transported to that two outfitting quays carry out remaining side wall and concrete roof floading condition is poured;Temporary support is removed, and water tank component is led to Cross post-cast strip and interim manhole is arranged on inner tube segment;Post-cast strip concrete is poured, secondary fitting-out is carried out, afterwards by pipeline section support extremely Specified location carries out sinking.
After said structure, what this utility model was produced has the beneficial effect that:
1st, the excavation of dive basin can be avoided, therefore which can reduces the impact to environment, reduce construction costs, while not receiving Immersed tube tunnel of the restriction that partly latent is refuted suitable for all scales;
2nd, the excavation of Large Foundation Pit can be avoided, floor space is saved, training of channel amount during section floating is reduced, is reduced Construction costs;
3rd, floor space and port basin amount can be reduced, construction costs is reduced, while the method is heavy suitable for all scales Pipe tunnel.
Description of the drawings
Fig. 1 is the structure chart of this utility model transverse section;
Fig. 2 is the structural representation of this utility model welding temporary support, ribbed stiffener version and rivet;
Fig. 3 is the structure chart of this utility model vertical section;
Fig. 4 is A portions enlarged drawing in Fig. 1;
Fig. 5 is this specific embodiment construction site horizontal layout schematic diagram.
Description of reference numerals:
1st, slideway;2nd, U-shaped steel plate;3rd, rivet;41st, lower temporary support;42nd, upper temporary support;501st, ring ribbed stiffener; 502nd, longitudinal stiffener;503rd, perforate;6th, junction steel plate;7th, outfitting quay one;8th, outfitting quay two;9th, slideway area;10th, cut Milling side workshop;11st, sandblasting Painting Shop;12nd, lamellar body assembling area;13rd, structure roof;14th, structure side wall;15th, structure base slab.
Specific embodiment
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment Or accompanying drawing to be used is briefly described needed for description of the prior art, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, before creative labor is not paid Put, can be with according to these other accompanying drawings of accompanying drawings acquisition.
Referring to such as Fig. 1 --- shown in Fig. 5, this specific embodiment is adopted the following technical scheme that:It includes U-shaped steel plate 2, riveting Nail 3, lower temporary support 41, upper temporary support 42, ring ribbed stiffener 501, longitudinal stiffener 502, perforate 503, junction steel plate 6, Structure roof 13, structure side wall 14, structure base slab 15;The both sides inner surface of described U-shaped steel plate 2 is welded with ring ribbed stiffener 501st, longitudinal stiffener 502 and rivet 3, are welded with junction steel plate 6 on ring ribbed stiffener 501 and longitudinal stiffener 502, connect steel Plate 6 is welded with one end of lower temporary support 41, and the other end of lower temporary support 41 is connected with the bottom of U-shaped steel plate 2, is faced under two When support 41 upper end temporary support 42 is connected with by junction steel plate 6;Described ring ribbed stiffener 501 and longitudinal stiffener Perforate 503 is provided with 502;Structure roof 13, the structure side wall 14 for being provided with concrete is poured in described U-shaped steel plate 2 With structure base slab 15.
Preferably, described ring ribbed stiffener 501 is I-steel or steel plate.
Preferably, described longitudinal stiffener 502 is I-steel.
When this specific embodiment is operated, smooth location makes, construction steel plate job shop, outfitting quay 1, fitting-out code 28 and slideway area 9, steel plate job shop includes cutting milling side workshop 10, sandblasting Painting Shop 11 and lamellar body assembling area 12;U Shape steel plate 2 is 8mm steel plates, is added in inner side welding ring after steel plate job shop cuts milling side and sandblasting application and lamellar body assembling Strength rib 501, longitudinal stiffener 502 and rivet 3, ring ribbed stiffener 501 are HW250*250 I-steel or 10mm steel plates, and longitudinal direction adds Strength rib 502 is HW250*250 I-steel, has perforate 503 for colligation steel on ring ribbed stiffener 501 and longitudinal stiffener 502 During muscle, reinforcing bar passes through, and the spacing of perforate 503 is determined by bar spacing, and steel plate is placed on slideway 1, assembly be welded into it is U-shaped, under face When support and 41 be connected by junction steel plate 6 with upper temporary support 42, afterwards by the opposite side of junction steel plate 6 and ring ribbed stiffener 501st, longitudinal stiffener 502 is welded;The assembling reinforcement on the inside of the U-shaped steel plate pours each 4 meters of scopes in pipeline section two ends and pours tunneling boring and mixes Solidifying soil, remainder pour base plate, whole mid-boards and bottom 4m side wall concretes;Two ends install steel end housing, steel end seal wall and Guider;Pipeline section is slipped in water by jack and winch along slideway 1;Pipeline section is consigned to two outfitting quays and is remained Remaining side wall and concrete roof floading condition are poured;Temporary support is removed, and water tank component is passed through into post-cast strip and the installation of interim manhole In inner tube segment;Post-cast strip concrete is poured, secondary fitting-out is carried out, pipeline section support to specified location is carried out into sinking afterwards.
After said structure, what this specific embodiment was produced has the beneficial effect that:
1st, the excavation of dive basin can be avoided, therefore which can reduces the impact to environment, reduce construction costs, while not receiving Immersed tube tunnel of the restriction that partly latent is refuted suitable for all scales;
2nd, the excavation of Large Foundation Pit can be avoided, floor space is saved, training of channel amount during section floating is reduced, is reduced Construction costs;
3rd, floor space and port basin amount can be reduced, construction costs is reduced, while the method is heavy suitable for all scales Pipe tunnel.
Ultimate principle of the present utility model and principal character and advantage of the present utility model has been shown and described above.This The technical staff of industry is retouched in above-described embodiment and description it should be appreciated that this utility model is not restricted to the described embodiments That what is stated simply illustrates principle of the present utility model, on the premise of without departing from this utility model spirit and scope, this utility model Various changes and modifications are had also, these changes and improvements are both fallen within the range of claimed this utility model.This practicality is new The claimed scope of type is by appending claims and its equivalent thereof.

Claims (3)

1. immersed tube pipeline section preparation facilitiess of a kind of box hat outsourcing, it is characterised in that:It comprising U-shaped steel plate, rivet, lower interim Support, upper temporary support, ring ribbed stiffener, longitudinal stiffener, perforate, junction steel plate, structure roof, structure side wall, structure base slab; The both sides inner surface of described U-shaped steel plate is welded with ring ribbed stiffener, longitudinal stiffener and rivet, and ring ribbed stiffener and longitudinal direction add Junction steel plate is welded with strength rib, junction steel plate is welded with one end of lower temporary support, the other end and the U-shaped steel of lower temporary support The bottom connection of plate, the upper end of two lower temporary supports is connected with upper temporary support by junction steel plate;Described ring is put more energy into Perforate is provided with rib and longitudinal stiffener;Structure roof, the structure side for being provided with concrete is poured in described U-shaped steel plate Wall and structure base slab.
2. immersed tube pipeline section preparation facilitiess of a kind of box hat outsourcing according to claim 1, it is characterised in that:Described ring Ribbed stiffener is I-steel or steel plate.
3. immersed tube pipeline section preparation facilitiess of a kind of box hat outsourcing according to claim 1, it is characterised in that:Described longitudinal direction Ribbed stiffener is I-steel.
CN201620931177.8U 2016-08-24 2016-08-24 A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing Active CN206070575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620931177.8U CN206070575U (en) 2016-08-24 2016-08-24 A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620931177.8U CN206070575U (en) 2016-08-24 2016-08-24 A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing

Publications (1)

Publication Number Publication Date
CN206070575U true CN206070575U (en) 2017-04-05

Family

ID=58431259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620931177.8U Active CN206070575U (en) 2016-08-24 2016-08-24 A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing

Country Status (1)

Country Link
CN (1) CN206070575U (en)

Similar Documents

Publication Publication Date Title
CN102720140B (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN100497841C (en) Supporting leg type underground continuous wall construction method
JP2018162655A (en) Final joint of immersed tunnel as well as prefabrication method and installation method
CN101761092B (en) Construction method of movable side wall of large overall template of large-span deep foundation pit
CN107119711B (en) Connecting structure for large-range adjacent existing transfer station and construction method
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN103835300A (en) Inner-support-free double-wall locking mouth steel bushing box cofferdam construction method and cofferdam
CN110306593A (en) A kind of station construction method
CN108086354A (en) A kind of prefabricated assembled pipe gallery spliced with cast-in-place hidden girder and its construction method
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN111376374A (en) Floating-state manufacturing method for reinforced concrete immersed tube joint
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN106522275A (en) Construction process for shipping large sinking pipes by self-propelled semi-submerged ship
CN107620316B (en) Rock riverbed large-volume deepwater foundation construction method
CN203129183U (en) Nuclear power plant sea area drainage structure constructed in immersed tube method
CN104805857A (en) Detachable cyclic utilization bottomless steel jacket box and construction method thereof
CN102410031A (en) Underground space structure constructed by pile wall construction method
CN106120858B (en) A kind of immersed tube pipeline section floading condition production method of box hat outsourcing
CN103132465B (en) Underground box culvert constructing method closely attached to pile foundation bearing platform
CN110985042A (en) Urban comprehensive pipe gallery and underground shallow-buried underground tunnel combined supporting system and process
CN110565693A (en) immersed tube tunnel pipe section pouring method
CN111827349B (en) Method for quickly constructing underground structure of subway station by adopting combined structure technology
CN108952728B (en) A kind of headframe main body construction and self well digging freeze parallel construction system and method
CN206070575U (en) A kind of immersed tube pipeline section preparation facilitiess of box hat outsourcing
CN105298147A (en) Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180625

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.

TR01 Transfer of patent right