CN206069146U - A kind of Multifunctional construction platform - Google Patents

A kind of Multifunctional construction platform Download PDF

Info

Publication number
CN206069146U
CN206069146U CN201621057566.9U CN201621057566U CN206069146U CN 206069146 U CN206069146 U CN 206069146U CN 201621057566 U CN201621057566 U CN 201621057566U CN 206069146 U CN206069146 U CN 206069146U
Authority
CN
China
Prior art keywords
guardrail
platform
ceiling
multifunctional construction
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621057566.9U
Other languages
Chinese (zh)
Inventor
李�杰
林宏平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU GUANGRI LOGISTICS CO Ltd
Original Assignee
GUANGZHOU GUANGRI LOGISTICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU GUANGRI LOGISTICS CO Ltd filed Critical GUANGZHOU GUANGRI LOGISTICS CO Ltd
Priority to CN201621057566.9U priority Critical patent/CN206069146U/en
Application granted granted Critical
Publication of CN206069146U publication Critical patent/CN206069146U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides a kind of Multifunctional construction platform, the hoisting mechanism lifted including operating platform and to operating platform, the operating platform includes pedal, is arranged on the guardrail of pedal surrounding, it is additionally provided with the guardrail and increases platform, the platform that increases is stretched out outside the guardrail, and the diagonal brace being supported to the guardrail is additionally provided between the bottom for increasing platform and the guardrail.The Multifunctional construction platform that this utility model is provided, its convenient construction, and it is safe.

Description

A kind of Multifunctional construction platform
Technical field
This utility model is related to elevator technical field of construction, more particularly to a kind of Multifunctional construction platform.
Background technology
In traditional architecture industry, the installation of elevator is realized mostly using the method for scaffold is built in elevator hoistways. Although the installation of elevator can be realized using scaffold, build that scaffold is cumbersome, time-consuming more, work efficiency is not high, But also it is very dangerous.At present, also have using Elevator Installation Hanging Baskets to carry out elevator installation, i.e., fixed by lifting motor Steel wire rope on creep, so as to drive the operation platform that is connected on elevator to move, workmen may stand in operation platform On constructed, eliminate the time for building scaffold, and safety coefficient be higher.But, existing operation platform is safely Number is high not enough, and elevator is installed special operation platform and has been commonly used in the middle of elevator hoistways, and existing guardrail is conventional fence Mode, ceiling be it is common be hinged, even fixed installation.
Utility model content
Not enough based on more than, the technical problems to be solved in the utility model is to provide a kind of Multifunctional construction platform, its side Just construct, and it is safe.
In order to solve above technical problem, this utility model employs technical scheme below:
A kind of Multifunctional construction platform, including operating platform and the hoisting mechanism lifted by operating platform, the behaviour Include pedal, be arranged on the guardrail of pedal surrounding as platform, be additionally provided with the guardrail and increase platform, the platform that increases is stretched Go out outside the guardrail, be additionally provided with what the guardrail was supported between the bottom for increasing platform and the guardrail Diagonal brace.
Described increasing is provided with the breach passed through for the guide rail on hoistway inwall on platform.
With the guardrail by pin-hinges, the other end is bolted with the platform that increases for described diagonal brace one end.
Connection sleeve pipe at the top of the guardrail, is provided with ceiling at the top of described sleeve pipe.
The ceiling includes false ceiling and widens ceiling with the false ceiling two ends are connected.
The false ceiling includes the first false ceiling being hinged with the guardrail and the second false ceiling, and described first lives Dynamic ceiling forms inverted v-shaped with second false ceiling.
Be provided with bracing frame below the ceiling, support frame as described above include the support rail being fixed on the guardrail and The scalable pressure pin of ceiling, the scalable pressure pin and the support rail are widened in the support being connected with the support rail two ends Socket.
Be provided with upper frame at the top of the guardrail, the pedal surrounding is provided with underframe, the two ends of the upper frame into To being provided with the first Retractive leg, the two ends of the underframe have been arranged in pairs relative with the first Retractive leg in the vertical direction The second Retractive leg answered, the first Retractive leg and the second Retractive leg positioned at guardrail homonymy are connected by vertical rod;In the middle part of the guardrail Middle cross beam is provided with, by expansion link connection, the expansion link and wherein the middle cross beam casing between wherein the middle cross beam and the vertical rod Connect;Baseboard is provided with the first Retractive leg of underframe homonymy.
The hoisting mechanism includes the first main rope, the second main rope, the first elevator and the second elevator, described First main rope is arranged in first elevator, and second main rope is arranged in second elevator;Institute The first elevator and second hoist installation are stated on the operating platform.
Using above technical scheme, this utility model achieves following technique effect:
(1) arrange on the guardrail of this utility model Multifunctional construction platform and increase platform, increase platform widening and stretch out shield Marge, further can provide facility, and sound construction, high safety for construction;
(2) false ceiling of this utility model Multifunctional construction platform includes the first false ceiling and the second false ceiling, First false ceiling and the second false ceiling form the shape of falling V, smooth when being conducive to escape and open rapidly ceiling;
(3) ceiling is widened in false ceiling both sides connection, can expand the area coverage of ceiling, strengthens safety, under ceiling Scalable pressure pin is set, can be supported to widening ceiling, it is ensured that security performance.
Description of the drawings
Front views of the Fig. 1 for this utility model Multifunctional construction platform;
Left views of the Fig. 2 for this utility model Multifunctional construction platform;
Front views of the Fig. 3 for the operating platform of this utility model Multifunctional construction platform;
Top views of the Fig. 4 for the operating platform of this utility model Multifunctional construction platform;
Right views of the Fig. 5 for the operating platform of this utility model Multifunctional construction platform;
Structure charts of the Fig. 6 for the ceiling of the operating platform of this utility model Multifunctional construction platform.
Specific embodiment
As shown in figs 1 to 6, this utility model provide a kind of Multifunctional construction platform, including operating platform 1 and to behaviour Make the hoisting mechanism 2 lifted by platform 1, operating platform 1 includes pedal 11, is arranged on the guardrail 12 of 11 surrounding of pedal, guardrail Be additionally provided with 12 and increase platform 13, increase platform 13 and stretch out outside guardrail 12, increase the bottom of platform 13 and guardrail 12 it Between be additionally provided with the diagonal brace 14 being supported to guardrail 12.
As shown in figs 2-4, increase and on platform 13, be provided with the breach 131 passed through for the guide rail on hoistway inwall, prevent The platform 13 that increases for stretching out guardrail 12 is collided with each other with guide rail.14 one end of diagonal brace and guardrail 12 by pin-hinges, the other end with Increase platform 13 to be bolted, in transport, diagonal brace 14 can be pulled down with one end that platform 13 is connected is increased, diagonal brace 14 can hang down naturally, convenient to transport.
As shown in figure 5,12 top connection sleeve pipe 3 of guardrail, is provided with ceiling 4 at the top of sleeve pipe 3.Ceiling 4 includes false ceiling 41 and widen ceiling 42 with 41 two ends of false ceiling are connected.False ceiling 41 includes the first false ceiling being hinged with guardrail 12 411 and second false ceiling 412, the first false ceiling 411 and the second false ceiling 412 form inverted v-shaped, when being conducive to escape Open smoothly and rapidly ceiling 4.Bracing frame 5 is provided with below ceiling 4, bracing frame 5 includes that the support being fixed on guardrail 12 is horizontal The scalable pressure pin 52 of ceiling 42, scalable pressure pin 52 and support are widened in bar 51 and the support being connected with 51 two ends of support rail Cross bar 51 is socketed, and according to the extension elongation of the scalable pressure pin of the width adjusting of widening ceiling 42 52, scalable pressure pin 52 pairs is widened Ceiling 42 is supported.
As Figure 1-Figure 2, upper frame 6 is provided with the top of guardrail 12,11 surrounding of pedal is provided with underframe 7, upper frame 6 Two ends be arranged in pairs the first Retractive leg 61, the two ends of underframe 7 have been arranged in pairs with the first Retractive leg 61 in vertical direction Upper the second corresponding Retractive leg 71, the first Retractive leg 61 and the second Retractive leg 71 positioned at 12 homonymy of guardrail are connected by vertical rod 9 Connect;Middle cross beam 8 is provided with the middle part of guardrail 12, is connected by expansion link 81 between middle cross beam 8 and vertical rod 9, expansion link 81 and middle horizontal stroke Beam 8 is socketed;Baseboard is provided with the first Retractive leg 61 of 7 homonymy of underframe.Hoisting mechanism 2 includes the first main rope 21st, the second main rope 22, the first elevator 23 and the second elevator 24, the first main rope 21 are arranged on the first elevator 23 Interior, the second main rope 22 is arranged in the second elevator 24;It is flat that first elevator 23 and the second elevator 24 are arranged on operation On platform 1.
Finally it should be noted that:Preferred embodiment of the present utility model is these are only, is not limited to practical It is new, although being described in detail to this utility model with reference to embodiment, for a person skilled in the art, its according to So the technical scheme described in foregoing embodiments can be modified, or equivalent is carried out to which part technical characteristic and replace Change, but it is all within spirit of the present utility model and principle, and any modification, equivalent substitution and improvements made etc. all should be included Within protection domain of the present utility model.

Claims (9)

1. a kind of Multifunctional construction platform, including operating platform and the hoisting mechanism lifted to operating platform, its feature exist In:The operating platform includes pedal, is arranged on the guardrail of pedal surrounding, is additionally provided with and increases platform on the guardrail, described Increase platform to stretch out outside the guardrail, be additionally provided with to the guardrail between the bottom for increasing platform and the guardrail The diagonal brace being supported.
2. Multifunctional construction platform according to claim 1, it is characterised in that:It is described increase to be provided with platform supply hoistway The breach that guide rail on inwall is passed through.
3. Multifunctional construction platform according to claim 1, it is characterised in that:Described diagonal brace one end is passed through with the guardrail Pin-hinges, the other end are bolted with the platform that increases.
4. Multifunctional construction platform according to claim 1, it is characterised in that:Connection sleeve pipe at the top of the guardrail, it is described Cannula tip is provided with ceiling.
5. Multifunctional construction platform according to claim 4, it is characterised in that:The ceiling include false ceiling and with institute That states the connection of false ceiling two ends widens ceiling.
6. Multifunctional construction platform according to claim 5, it is characterised in that:The false ceiling includes and the guardrail The first false ceiling being hinged and the second false ceiling, first false ceiling form the word of falling V with second false ceiling Shape.
7. Multifunctional construction platform according to claim 5, it is characterised in that:Bracing frame is provided with below the ceiling, Support frame as described above includes the support rail being fixed on the guardrail and the support that is connected with the support rail two ends is widened The scalable pressure pin of ceiling, the scalable pressure pin are socketed with the support rail.
8. Multifunctional construction platform according to claim 1, it is characterised in that:Upper frame is provided with the top of the guardrail, The pedal surrounding is provided with underframe, and the two ends of the upper frame have been arranged in pairs the first Retractive leg, and the two of the underframe End is arranged in pairs second Retractive leg corresponding with the first Retractive leg in the vertical direction, positioned at the first of guardrail homonymy Retractive leg and the second Retractive leg are connected by vertical rod;Middle cross beam, wherein the middle cross beam and the vertical rod are provided with the middle part of the guardrail Between connected by expansion link, the expansion link connect with wherein the middle cross beam casing;Set on the first Retractive leg of underframe homonymy It is equipped with baseboard.
9. Multifunctional construction platform according to claim 1, it is characterised in that:The hoisting mechanism includes the first king wire Rope, the second main rope, the first elevator and the second elevator, first main rope are arranged on first elevator Interior, second main rope is arranged in second elevator;First elevator and second hoist installation On the operating platform.
CN201621057566.9U 2016-09-14 2016-09-14 A kind of Multifunctional construction platform Active CN206069146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621057566.9U CN206069146U (en) 2016-09-14 2016-09-14 A kind of Multifunctional construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621057566.9U CN206069146U (en) 2016-09-14 2016-09-14 A kind of Multifunctional construction platform

Publications (1)

Publication Number Publication Date
CN206069146U true CN206069146U (en) 2017-04-05

Family

ID=58438234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621057566.9U Active CN206069146U (en) 2016-09-14 2016-09-14 A kind of Multifunctional construction platform

Country Status (1)

Country Link
CN (1) CN206069146U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109761166A (en) * 2019-01-10 2019-05-17 苏州工业园区职业技术学院 A kind of intelligent elevated mechanism

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109761166A (en) * 2019-01-10 2019-05-17 苏州工业园区职业技术学院 A kind of intelligent elevated mechanism

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN104609281B (en) Home lift
CN201395931Y (en) Combined hanging basket for installing elevators
CN204310644U (en) A kind of single suspension centre cage guide installation and maintenance hanging basket
CN2923635Y (en) Single-column towing type elevator
CN206069146U (en) A kind of Multifunctional construction platform
CN209210319U (en) It drives a vehicle dedicated maintenance hanging basket
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN203173644U (en) Multifunctional lifting shaft working platform system
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN205100531U (en) Lift scaffold support body assembly
CN103359663B (en) seat basket
CN205397785U (en) Construction elevator attaches wall interval superelevation subassembly
CN204024104U (en) Fast-assembling modularization winding staircase
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN206494694U (en) A kind of Multi-layer electric hanging basket
CN201793300U (en) Elevator
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN204778117U (en) Novel foldable elevator cab rail guard
CN113718724A (en) Operating platform for replacing arc-shaped gate side water stop rubber and construction method thereof
CN206487128U (en) A kind of Guiding Support Elevating Scaffold
CN210342619U (en) Connecting piece of integral lifting scaffold
CN202644964U (en) Anti-dropping device of attached type hoisting scaffold
CN203308069U (en) Translational attached lifting scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant