CN206068902U - The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed - Google Patents
The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed Download PDFInfo
- Publication number
- CN206068902U CN206068902U CN201621016496.2U CN201621016496U CN206068902U CN 206068902 U CN206068902 U CN 206068902U CN 201621016496 U CN201621016496 U CN 201621016496U CN 206068902 U CN206068902 U CN 206068902U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- axis guide
- high temperature
- activity
- doubling glass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)
Abstract
The utility model discloses the loading and unloading guide rail platform that a kind of doubling glass high temperature precompressed is processed, X-axis guide rail is fixed including first, activity X-axis guide rail, second fixes X-axis guide rail, melt pit, mobile station and Y-axis guide rail, first fixation X-axis guide rail is fixed on ground, activity X-axis guide rail is fixed in mobile station, second fixation X-axis guide rail is fixed on the fire door of high temperature precompressed treatment furnace, melt pit is arranged on the first fixation X-axis guide rail and second and fixes between X-axis guide rail, Y-axis guide rail is fixed on the bottom ground of melt pit, during mobile station is arranged on melt pit and it is slidably mounted in Y-axis guide rail, X-axis guide rail is fixed with first respectively in the two ends of activity X-axis guide rail, second fixation X-axis guide rail detachably splices connection;For sending into doubling glass and transferring out high temperature precompressed treatment furnace, it is favorably improved the high temperature precompressed treatment effeciency of doubling glass, reduces spoilage of the doubling glass during the transfer of high temperature precompressed treatment process.
Description
Technical field
This utility model is related to glass post-processing technical field, and in particular to the dress that a kind of doubling glass high temperature precompressed is processed
Discharging guide rail platform.
Background technology
Doubling glass after the completion of production, due to there is air in its interlayer, has bubble appearance, causes doubling glass
Quality is affected.To remove the bubble in doubling glass interlayer, need doubling glass is sent in high temperature precompressed treatment furnace
High temperature precompressed process is carried out, the doubling glass after process transfers out high temperature precompressed treatment furnace again, and doubling glass workshop is big
If high temperature precompressed treatment furnace is sent into and transferred out to the doubling glass of batch by manually, not only inefficiency, and is moving
Fragile doubling glass during sending.Therefore, it is to improve the high temperature precompressed treatment effeciency of doubling glass, reduce doubling glass in height
Spoilage during warm precompressed treatment process transfer, it is necessary to design a kind of loading and unloading of doubling glass high temperature precompressed process and lead
Rail platform.
The content of the invention
For the deficiencies in the prior art, this utility model aims to provide a kind of high temperature precompressed for being favorably improved doubling glass
Treatment effeciency, the doubling glass high temperature precompressed process for reducing doubling glass spoilage during the transfer of high temperature precompressed treatment process
Loading and unloading guide rail platform.
For achieving the above object, this utility model is adopted the following technical scheme that:
The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed, including first fix X-axis guide rail, activity X-axis guide rail, the
Two fix X-axis guide rail, melt pit, mobile station and Y-axis guide rail, and the first fixation X-axis guide rail is fixed on ground, movable X
Axis rail is fixed in mobile station, and the second fixation X-axis guide rail is fixed on the fire door of high temperature precompressed treatment furnace, melt pit
It is arranged on the first fixation X-axis guide rail and second to fix between X-axis guide rail, Y-axis guide rail is fixed on the bottom ground of melt pit,
During mobile station is arranged on melt pit and it is slidably mounted in Y-axis guide rail, X-axis is fixed with first respectively in the two ends of activity X-axis guide rail
Guide rail, the second fixation X-axis guide rail detachably splice connection.
Further, the melt pit is drilled with connecting hole on the inwall of the first fixation X-axis guide rail side, and activity X-axis is led
One end of rail and the first fixation X-axis guide rail splicing is fixedly installed the first adapter sleeve, and activity X-axis guide rail connects by shank is interspersed
Be connected on the first adapter sleeve, connecting hole X-axis guide rail splicing is fixed with first.
Further, the activity X-axis guide rail is fixedly installed second with one end of the second fixation X-axis guide rail splicing and is connected
Set, the second fixation X-axis guide rail are fixedly installed the 3rd adapter sleeve with one end of activity X-axis guide rail splicing, and activity X-axis guide rail passes through
Interspersed being connected on the second adapter sleeve, the 3rd adapter sleeve of shank fixes X-axis guide rail splicing with second.
Further, gag lever post, gag lever post and ground are fixedly installed perpendicular to Y-axis guide rail on the end of the Y-axis guide rail
Spacing is left between the inwall in hole.
Further, the mobile station offers mounting groove, mounting groove position positioned at the end of the second fixation X-axis guide rail side
In the lower section of activity X-axis guide rail end, on mounting groove, locating piece is mounted with positioned at activity X-axis guide rail both sides.
This utility model has the advantages that:
The loading and unloading guide rail platform that the precompressed of this utility model doubling glass high temperature is processed, for doubling glass is sent to high temperature
High temperature precompressed process is carried out in precompressed treatment furnace and doubling glass is transferred into out high temperature precompressed treatment furnace again after processing, contribute to carrying
Damage of the high temperature precompressed treatment effeciency, reduction doubling glass of high doubling glass during the transfer of high temperature precompressed treatment process
Rate.
Description of the drawings
Fig. 1 is the overall structure diagram of the loading and unloading guide rail platform that the precompressed of this utility model doubling glass high temperature is processed;
Fig. 2 is overall knot of the loading and unloading guide rail platform of this utility model doubling glass high temperature precompressed process under another angle
Structure schematic diagram;
Fig. 3 is the partial enlargement structural representation of the loading and unloading guide rail platform that the precompressed of this utility model doubling glass high temperature is processed
Figure.
In figure:1st, first fix X-axis guide rail;2nd, activity X-axis guide rail;3rd, second fix X-axis guide rail;4th, melt pit;5th, it is mobile
Platform;6th, Y-axis guide rail;21st, the first adapter sleeve;22nd, shank;23rd, the second adapter sleeve;24th, the 3rd adapter sleeve;40th, connecting hole;
51st, mounting groove;52nd, locating piece;61st, gag lever post.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the utility model will be further described, in order to clearer reason
The claimed technological thought of solution this utility model.
The loading and unloading guide rail platform that the precompressed of this utility model doubling glass high temperature is processed as Figure 1-3, including the first fixation X
Axis rail 1, activity X-axis guide rail 2, second fix X-axis guide rail 3, melt pit 4, mobile station 5 and Y-axis guide rail 6, and described first fixes X-axis
Guide rail 1 is fixed on ground, and activity X-axis guide rail 2 is fixed in mobile station 5, and second fixes X-axis guide rail 3 installs solid
It is scheduled on the fire door of high temperature precompressed treatment furnace, melt pit 4 is arranged on the first fixation X-axis guide rail 1 and second and fixes between X-axis guide rail 3,
Y-axis guide rail 6 is fixed on the bottom ground of melt pit 4, during mobile station 5 is arranged on melt pit 4 and is slidably mounted on Y-axis guide rail
On 6, the two ends of activity X-axis guide rail 2 are fixed 3 detachable splicing of X-axis guide rail respectively and are connected with the first fixation X-axis guide rail 1, second.
Specifically, melt pit 4 is drilled with connecting hole 40, activity X-axis guide rail 2 on the inwall of the first 1 side of fixation X-axis guide rail
The first adapter sleeve 21 is fixedly installed with one end of the first fixation splicing of X-axis guide rail 1, activity X-axis guide rail 2 is worn by shank 22
Insert to be connected on the first adapter sleeve 21, connecting hole 40 and splice with the first fixation X-axis guide rail 1.
One end of activity X-axis guide rail 2 and the second fixation splicing of X-axis guide rail 3 is fixedly installed the second adapter sleeve 23, and second is solid
The one end for determining X-axis guide rail 3 with the splicing of activity X-axis guide rail 2 is fixedly installed the 3rd adapter sleeve 24, and activity X-axis guide rail 2 passes through grafting
Interspersed being connected on the second adapter sleeve 23, the 3rd adapter sleeve 24 of bar 22 is spliced with the second fixation X-axis guide rail 3.
To avoid mobile station 5 that the crater wall of melt pit 4 is collided in moving process, perpendicular to Y-axis on the end of Y-axis guide rail 6
Guide rail 6 is fixedly installed gag lever post 61, leaves spacing between 4 inwall of gag lever post 61 and melt pit.
Mobile station 5 offers mounting groove 51 positioned at the end of the second 3 side of fixation X-axis guide rail, and mounting groove 51 is located at activity X
The lower section of 2 end of axis rail, is mounted with locating piece 52 positioned at 2 both sides of activity X-axis guide rail on mounting groove 51.
Operation principle of the present utility model is:High temperature precompressed is carried out in doubling glass to be sent to high temperature precompressed treatment furnace
Mobile station 5 is pushed to the first fixation X-axis guide rail 1 and second and is fixed between X-axis guide rail 3 by before processing, and the two of activity X-axis guide rail 2
Hold respectively with the first to fix the fixation of X-axis guide rail 1, second X-axis guide rail 3 to splice and fixed, manually fix X-axis guide rail 1, live along first
Doubling glass is sent to high temperature precompressed by the glass frame that dynamic X-axis guide rail 2, second is fixed 3 propelling loading of X-axis guide rail and has doubling glass
In treatment furnace;After the completion of pending, the two ends of dismounting activity X-axis guide rail 2 and the first fixation X-axis guide rail 1, second are fixed X-axis and are led
The connection of rail 3, the glass frame that will be loaded with doubling glass shift mobile station 5 onto along the second fixation X-axis guide rail 3, activity X-axis guide rail 2
On, then promote mobile station 5 glass frame of doubling glass to be will be loaded with along the movement of Y-axis guide rail 6 again and transfer out, for by doubling glass
Glass carries out high temperature precompressed process and after processing transfers out doubling glass at high temperature precompressed again in being sent to high temperature precompressed treatment furnace
Reason stove, is favorably improved the high temperature precompressed treatment effeciency of doubling glass, reduces doubling glass in the transfer of high temperature precompressed treatment process
During spoilage.
For a person skilled in the art, technical scheme that can be as described above and design, make other each
Plant corresponding change and deform, and all these changes and deforms the guarantor that should all belong to this utility model claim
Within the scope of shield.
Claims (5)
1. the loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed, it is characterised in that:Fix X-axis guide rail (1), live including first
Dynamic X-axis guide rail (2), second fix X-axis guide rail (3), melt pit (4), mobile station (5) and Y-axis guide rail (6), and described first fixes X-axis
Guide rail (1) is fixed on ground, and activity X-axis guide rail (2) is fixed in mobile station (5), and second fixes X-axis guide rail
(3) it is fixed on the fire door of high temperature precompressed treatment furnace, melt pit (4) is arranged on the first fixation X-axis guide rail (1) and second and fixes
Between X-axis guide rail (3), Y-axis guide rail (6) is fixed on the bottom ground of melt pit (4), and mobile station (5) is arranged on melt pit (4)
In and be slidably mounted in Y-axis guide rail (6), the two ends of activity X-axis guide rail (2) fix with first respectively X-axis guide rail (1), the
Two fix X-axis guide rail (3) detachably splicing connection.
2. the loading and unloading guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 is processed, it is characterised in that:The melt pit
(4) connecting hole (40) is drilled with the inwall of the first fixation X-axis guide rail (1) side, activity X-axis guide rail (2) fixes X with first
One end that axis rail (1) splices is fixedly installed the first adapter sleeve (21), and activity X-axis guide rail (2) is interspersed by shank (22)
Be connected on the first adapter sleeve (21), connecting hole (40) X-axis guide rail (1) splicing is fixed with first.
3. the loading and unloading guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 is processed, it is characterised in that:The activity
One end that X-axis guide rail (2) is spliced with the second fixation X-axis guide rail (3) is fixedly installed the second adapter sleeve (23), and second fixes X-axis
Guide rail (3) is fixedly installed the 3rd adapter sleeve (24) with one end that activity X-axis guide rail (2) is spliced, and activity X-axis guide rail (2) passes through
Interspersed being connected on the second adapter sleeve (23), the 3rd adapter sleeve (24) of shank (22) fixes X-axis guide rail (3) splicing with second.
4. the loading and unloading guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 is processed, it is characterised in that:The Y-axis
The inwall of gag lever post (61), gag lever post (61) and melt pit (4) is fixedly installed on the end of guide rail (6) perpendicular to Y-axis guide rail (6)
Between leave spacing.
5. the loading and unloading guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 is processed, it is characterised in that:The movement
Platform (5) offers mounting groove (51) positioned at the end of the second fixation X-axis guide rail (3) side, and mounting groove (51) is led positioned at activity X-axis
The lower section of rail (2) end, is mounted with locating piece (52) positioned at activity X-axis guide rail (2) both sides on mounting groove (51).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621016496.2U CN206068902U (en) | 2016-08-31 | 2016-08-31 | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621016496.2U CN206068902U (en) | 2016-08-31 | 2016-08-31 | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206068902U true CN206068902U (en) | 2017-04-05 |
Family
ID=58435803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621016496.2U Expired - Fee Related CN206068902U (en) | 2016-08-31 | 2016-08-31 | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206068902U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106144597A (en) * | 2016-08-31 | 2016-11-23 | 佛山市世诚同创玻璃建材有限公司 | The handling material guide rail platform that doubling glass high temperature precompressed processes |
-
2016
- 2016-08-31 CN CN201621016496.2U patent/CN206068902U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106144597A (en) * | 2016-08-31 | 2016-11-23 | 佛山市世诚同创玻璃建材有限公司 | The handling material guide rail platform that doubling glass high temperature precompressed processes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204430786U (en) | Full-automatic photovoltaic frame production line | |
CN104266863B (en) | Full-automatic temperature-measurement sampling device outside furnace and method thereof | |
CN206068902U (en) | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed | |
CN207658669U (en) | A kind of magazine elevating mechanism of material-transporting system | |
CN106743229A (en) | A kind of full-automatic remote-controlled charging vehicle | |
CN104860719B (en) | Continuous glaze-spraying production line for ceramic sanitary ware | |
CN204603756U (en) | A kind of sensor automatic assembling device | |
CN110252679A (en) | A kind of wisdom production line based on artificial intelligence | |
CN204724632U (en) | For the pipe lining device of the online annealing operation of copper pipe | |
CN106144597A (en) | The handling material guide rail platform that doubling glass high temperature precompressed processes | |
CN207712838U (en) | A kind of die station conveyer | |
CN211109571U (en) | Automatic centering mechanism for high-temperature formed part | |
CN203704667U (en) | Annular furnace tube blank conveyance and guide buffer device | |
CN203428442U (en) | Casting grinding tool transferring device | |
CN106044125A (en) | Discharging mechanism for two-way screw adapters | |
CN207643705U (en) | A kind of molding machine for fiberglass products | |
CN205413996U (en) | Automatic alignment device for elevator guide rail | |
CN203491081U (en) | Automatic pulling device of guide pin of network transformer | |
CN203491080U (en) | Guide pin pulling device of network transformer | |
CN208545084U (en) | Fractionation combined console for the assembling of boiler furnace dry bottom hopper | |
CN209027299U (en) | A kind of positioning device | |
CN204689903U (en) | A kind of continous way ceramic sanitary appliance glaze spraying production line | |
CN205420483U (en) | Heat treating mesh belt furnace | |
CN205270298U (en) | Automatic change cleaning equipment | |
CN216444530U (en) | Hub bearing lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170405 Termination date: 20210831 |
|
CF01 | Termination of patent right due to non-payment of annual fee |