CN106144597A - The handling material guide rail platform that doubling glass high temperature precompressed processes - Google Patents
The handling material guide rail platform that doubling glass high temperature precompressed processes Download PDFInfo
- Publication number
- CN106144597A CN106144597A CN201610783826.9A CN201610783826A CN106144597A CN 106144597 A CN106144597 A CN 106144597A CN 201610783826 A CN201610783826 A CN 201610783826A CN 106144597 A CN106144597 A CN 106144597A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- axis guide
- high temperature
- activity
- axis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G49/00—Conveying systems characterised by their application for specified purposes not otherwise provided for
- B65G49/05—Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles
- B65G49/06—Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles for fragile sheets, e.g. glass
- B65G49/062—Easels, stands or shelves, e.g. castor-shelves, supporting means on vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B32—LAYERED PRODUCTS
- B32B—LAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
- B32B37/00—Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding
- B32B37/06—Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding characterised by the heating method
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B32—LAYERED PRODUCTS
- B32B—LAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
- B32B37/00—Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding
- B32B37/10—Methods or apparatus for laminating, e.g. by curing or by ultrasonic bonding characterised by the pressing technique, e.g. using action of vacuum or fluid pressure
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B35/00—Transporting of glass products during their manufacture, e.g. hot glass lenses, prisms
- C03B35/14—Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands
- C03B35/20—Transporting hot glass sheets or ribbons, e.g. by heat-resistant conveyor belts or bands by gripping tongs or supporting frames
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2249/00—Aspects relating to conveying systems for the manufacture of fragile sheets
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Joining Of Glass To Other Materials (AREA)
Abstract
The invention discloses the handling material guide rail platform that a kind of doubling glass high temperature precompressed processes, X-axis guide rail is fixed including first, activity X-axis guide rail, second fixes X-axis guide rail, melt pit, mobile station and Y-axis guide rail, first fixes X-axis guide rails assembling fixes on the ground, activity X-axis guide rails assembling is fixing on a mobile station, second fixes X-axis guide rails assembling is fixed on the fire door of high temperature precompressed process stove, melt pit is arranged on first and fixes X-axis guide rail and second and fix between X-axis guide rail, Y-axis guide rails assembling is fixed on the ground, bottom of melt pit, mobile station is arranged in melt pit and is slidably mounted on Y-axis guide rail, X-axis guide rail is fixed with first respectively in the two ends of activity X-axis guide rail, second fixes X-axis guide rail detachably splices connection;Process stove for doubling glass is sent into and transferred out high temperature precompressed, be favorably improved the high temperature precompressed treatment effeciency of doubling glass, reduce doubling glass spoilage during high temperature precompressed treatment process is transferred.
Description
Technical field
The present invention relates to glass post-processing technical field, be specifically related to the handling material that a kind of doubling glass high temperature precompressed processes
Guide rail platform.
Background technology
Doubling glass is after production completes, and owing to there is air in its interlayer, has bubble and occurs, cause doubling glass
Quality is affected.For removing the bubble in doubling glass interlayer, need that doubling glass is sent to high temperature precompressed and process in stove
Carrying out high temperature precompressed process, the doubling glass after process is transferred out high temperature precompressed again and is processed stove, and doubling glass workshop is big
If the doubling glass of batch processes stove, not only inefficiency by manually sending into and transfer out high temperature precompressed, and is moving
Fragile doubling glass during sending.Therefore, for improving the high temperature precompressed treatment effeciency of doubling glass, reducing doubling glass at height
Spoilage during temperature precompressed treatment process transfer, it is necessary to the handling material designing a kind of doubling glass high temperature precompressed process is led
Rail platform.
Summary of the invention
For the deficiencies in the prior art, it is desirable to provide a kind of high temperature precompressed being favorably improved doubling glass processes
Efficiency, the reduction doubling glass dress that the doubling glass high temperature precompressed of spoilage processes during high temperature precompressed treatment process is transferred
Discharging guide rail platform.
For achieving the above object, the present invention adopts the following technical scheme that
The handling material guide rail platform that doubling glass high temperature precompressed processes, fixes X-axis guide rail, activity X-axis guide rail, second solid including first
Determining X-axis guide rail, melt pit, mobile station and Y-axis guide rail, described first fixes X-axis guide rails assembling fixes on the ground, and activity X-axis is led
Rail is fixed in mobile station, and second fixes X-axis guide rails assembling is fixed on the fire door of high temperature precompressed process stove, and melt pit is arranged
Fixing X-axis guide rail and second first and fix between X-axis guide rail, Y-axis guide rails assembling is fixed on the ground, bottom of melt pit, mobile
Platform is arranged in melt pit and is slidably mounted on Y-axis guide rail, the two ends of activity X-axis guide rail fix with first respectively X-axis guide rail,
Second fixes X-axis guide rail detachably splices connection.
Further, described melt pit is positioned on the first inwall fixing X-axis guide rail side and is drilled with connecting hole, and activity X-axis is led
Rail and first is fixed one end of X-axis guide rail splicing and is fixedly installed the first adapter sleeve, and activity X-axis guide rail is interted even by shank
It is connected on the first adapter sleeve, connecting hole and fixes the splicing of X-axis guide rail with first.
Further, described activity X-axis guide rail and second fix X-axis guide rail splicing one end be fixedly installed the second connection
Set, second one end fixing X-axis guide rail and the splicing of activity X-axis guide rail is fixedly installed the 3rd adapter sleeve, and activity X-axis guide rail passes through
Interspersed being connected on the second adapter sleeve, the 3rd adapter sleeve of shank fixes the splicing of X-axis guide rail with second.
Further, the end of described Y-axis guide rail is perpendicular to Y-axis guide rail and is fixedly installed gag lever post, gag lever post and ground
Spacing is left between the inwall in hole.
Further, described mobile station is positioned at the second end fixing X-axis guide rail side and offers mounting groove, mounting groove position
In the lower section of activity X-axis rail end, mounting groove is positioned at activity X-axis guide rail both sides and is mounted with locating piece.
There is advantages that
The handling material guide rail platform that doubling glass high temperature precompressed of the present invention processes, processes for doubling glass is sent to high temperature precompressed
After stove carrying out high temperature precompressed process and processing, doubling glass is transferred out high temperature precompressed again and processes stove, be favorably improved doubling glass
The high temperature precompressed treatment effeciency of glass, reduction doubling glass spoilage during high temperature precompressed treatment process is transferred.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the handling material guide rail platform that doubling glass high temperature precompressed of the present invention processes;
Fig. 2 is that the overall structure signal under another angle of the guide rail platform is expected in the handling that doubling glass high temperature precompressed of the present invention processes
Figure;
Fig. 3 is the partial enlargement structural representation of the handling material guide rail platform that doubling glass high temperature precompressed of the present invention processes.
In figure: 1, first fix X-axis guide rail;2, activity X-axis guide rail;3, second X-axis guide rail is fixed;4, melt pit;5, mobile
Platform;6, Y-axis guide rail;21, the first adapter sleeve;22, shank;23, the second adapter sleeve;24, the 3rd adapter sleeve;40, connecting hole;
51, mounting groove;52, locating piece;61, gag lever post.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment, the invention will be further described, in order to clearer understands this
The technological thought that invention is claimed.
The handling material guide rail platform that doubling glass high temperature precompressed the most of the present invention processes, fixes X-axis including first and leads
Rail 1, activity X-axis guide rail 2, second fix X-axis guide rail 3, melt pit 4, mobile station 5 and Y-axis guide rail 6, and described first fixes X-axis guide rail
1 is fixed on ground, and activity X-axis guide rail 2 is fixed in mobile station 5, and second fixes X-axis guide rail 3 is fixed on
High temperature precompressed processes on the fire door of stove, and melt pit 4 is arranged on first and fixes X-axis guide rail 1 and second and fix between X-axis guide rail 3, Y-axis
Guide rail 6 is fixed on the ground, bottom of melt pit 4, and mobile station 5 is arranged in melt pit 4 and is slidably mounted on Y-axis guide rail 6
On, the two ends of activity X-axis guide rail 2 are fixed X-axis guide rail 1 respectively, second are fixed X-axis guide rail 3 and detachably splice and be connected with first.
Concrete, melt pit 4 is positioned on the first inwall fixing X-axis guide rail 1 side and is drilled with connecting hole 40, activity X-axis guide rail 2
Being fixedly installed the first adapter sleeve 21 with first one end fixing X-axis guide rail 1 splicing, activity X-axis guide rail 2 is worn by shank 22
Insert and be connected to fix X-axis guide rail 1 with first on the first adapter sleeve 21, connecting hole 40 and splice.
Activity X-axis guide rail 2 and second one end fixing X-axis guide rail 3 splicing are fixedly installed the second adapter sleeve 23, and second is solid
The one end determining X-axis guide rail 3 and the splicing of activity X-axis guide rail 2 is fixedly installed the 3rd adapter sleeve 24, and activity X-axis guide rail 2 passes through grafting
Bar 22 interts and is connected to fix X-axis guide rail 3 with second on the second adapter sleeve the 23, the 3rd adapter sleeve 24 and splices.
For avoiding mobile station 5 to collide the hole wall of melt pit 4 in moving process, the end of Y-axis guide rail 6 is perpendicular to Y-axis
Guide rail 6 is fixedly installed gag lever post 61, leaves spacing between gag lever post 61 and melt pit 4 inwall.
Mobile station 5 is positioned at the second end fixing X-axis guide rail 3 side and offers mounting groove 51, and mounting groove 51 is positioned at movable X
The lower section of axis rail 2 end, mounting groove 51 is positioned at activity X-axis guide rail 2 both sides and is mounted with locating piece 52.
The operation principle of the present invention is: carry out high temperature precompressed process in doubling glass is sent to high temperature precompressed process stove
Before, mobile station 5 being pushed to first and fixes X-axis guide rail 1 and second and fix between X-axis guide rail 3, the two ends of activity X-axis guide rail 2 are divided
Not and first do not fix X-axis guide rail 1, second fix X-axis guide rail 3 and splice and fix, manually X-axis guide rail 1, movable X are fixed along first
Axis rail 2, second fix X-axis guide rail 3 propelling loading and have the glass frame of doubling glass to be sent at high temperature precompressed by doubling glass
In reason stove;Pending complete after, the two ends and first of dismounting activity X-axis guide rail 2 are fixed X-axis guide rail 1, second are fixed X-axis guide rail 3
Connection, will be loaded with the glass frame of doubling glass along second fixing X-axis guide rail 3, activity X-axis guide rail 2 is shifted onto in mobile station 5,
Promote mobile station 5 to move along Y-axis guide rail 6 the most again to will be loaded with the glass frame of doubling glass and transfer out, for by doubling glass
After being sent to high temperature precompressed process stove carries out high temperature precompressed process and processes, doubling glass is transferred out high temperature precompressed again to process
Stove, be favorably improved doubling glass high temperature precompressed treatment effeciency, reduce doubling glass transferred in high temperature precompressed treatment process
Spoilage in journey.
For a person skilled in the art, can technical scheme as described above and design, make other each
Plant corresponding change and deformation, and all these changes and deforms the protection model that all should belong to the claims in the present invention
Within enclosing.
Claims (5)
1. the handling material guide rail platform that the precompressed of doubling glass high temperature processes, it is characterised in that: include that first fixes X-axis guide rail (1), work
Dynamic X-axis guide rail (2), second fixing X-axis guide rail (3), melt pit (4), mobile station (5) and Y-axis guide rail (6), described first fixes X-axis
Guide rail (1) is fixed on ground, and activity X-axis guide rail (2) is fixed in mobile station (5), and second fixes X-axis guide rail
(3) being fixed on high temperature precompressed and process on the fire door of stove, melt pit (4) is arranged on first and fixes X-axis guide rail (1) and second fixing
Between X-axis guide rail (3), Y-axis guide rail (6) is fixed on the ground, bottom of melt pit (4), and mobile station (5) is arranged on melt pit (4)
In and be slidably mounted on Y-axis guide rail (6), the two ends of activity X-axis guide rail (2) fix with first respectively X-axis guide rail (1),
Two fix X-axis guide rail (3) detachably splices connection.
2. the handling material guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 processes, it is characterised in that: described melt pit
(4) being positioned on the first inwall fixing X-axis guide rail (1) side and be drilled with connecting hole (40), X is fixed in activity X-axis guide rail (2) and first
One end that axis rail (1) splices is fixedly installed the first adapter sleeve (21), and activity X-axis guide rail (2) is interted by shank (22)
It is connected to the first adapter sleeve (21), connecting hole (40) and above fixes X-axis guide rail (1) splicing with first.
3. the handling material guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 processes, it is characterised in that: described activity
X-axis guide rail (2) is fixed, with second, one end that X-axis guide rail (3) splices and is fixedly installed the second adapter sleeve (23), and second fixes X-axis
One end that guide rail (3) and activity X-axis guide rail (2) are spliced is fixedly installed the 3rd adapter sleeve (24), and activity X-axis guide rail (2) is passed through
Interspersed the second adapter sleeve (23), the 3rd adapter sleeve (24) of being connected to of shank (22) above fixes X-axis guide rail (3) splicing with second.
4. the handling material guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 processes, it is characterised in that: described Y-axis
It is perpendicular to Y-axis guide rail (6) on the end of guide rail (6) and is fixedly installed the inwall of gag lever post (61), gag lever post (61) and melt pit (4)
Between leave spacing.
5. the handling material guide rail platform that doubling glass high temperature precompressed as claimed in claim 1 processes, it is characterised in that: described movement
Platform (5) is positioned at the second end fixing X-axis guide rail (3) side and offers mounting groove (51), and mounting groove (51) is positioned at activity X-axis leads
The lower section of rail (2) end, mounting groove (51) is positioned at activity X-axis guide rail (2) both sides and is mounted with locating piece (52).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610783826.9A CN106144597A (en) | 2016-08-31 | 2016-08-31 | The handling material guide rail platform that doubling glass high temperature precompressed processes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610783826.9A CN106144597A (en) | 2016-08-31 | 2016-08-31 | The handling material guide rail platform that doubling glass high temperature precompressed processes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106144597A true CN106144597A (en) | 2016-11-23 |
Family
ID=57345374
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610783826.9A Pending CN106144597A (en) | 2016-08-31 | 2016-08-31 | The handling material guide rail platform that doubling glass high temperature precompressed processes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106144597A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007186319A (en) * | 2006-01-16 | 2007-07-26 | Murata Mach Ltd | Conveying system |
US20080053594A1 (en) * | 2004-11-09 | 2008-03-06 | Tamglass Ltd. Oy | Method and Apparatus for Laminating Glass Sheets |
CN201250013Y (en) * | 2007-08-31 | 2009-06-03 | 大福自动输送机(天津)有限公司 | Electric, double-orbit, hanging and complete conveying equipment |
EP2557059A1 (en) * | 2011-08-09 | 2013-02-13 | Robert Bosch Gmbh | Convoyeur comprenant une unité transversale de levage avec rouleaux de transport |
CN103382843A (en) * | 2013-07-30 | 2013-11-06 | 上海交通大学 | Construction device and construction method for preventing tube push bench and tube joint from rotating by pull rod |
CN203625245U (en) * | 2013-12-16 | 2014-06-04 | 重庆天腾玻璃有限公司 | Laminated glass production line |
CN203794126U (en) * | 2014-04-28 | 2014-08-27 | 浙江德瑞摩擦材料有限公司 | Clutch facing conveyor |
CN203889543U (en) * | 2014-05-14 | 2014-10-22 | 上海永乾机电有限公司 | Logistics operating line |
CN206068902U (en) * | 2016-08-31 | 2017-04-05 | 佛山市世诚同创玻璃建材有限公司 | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed |
-
2016
- 2016-08-31 CN CN201610783826.9A patent/CN106144597A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080053594A1 (en) * | 2004-11-09 | 2008-03-06 | Tamglass Ltd. Oy | Method and Apparatus for Laminating Glass Sheets |
JP2007186319A (en) * | 2006-01-16 | 2007-07-26 | Murata Mach Ltd | Conveying system |
CN201250013Y (en) * | 2007-08-31 | 2009-06-03 | 大福自动输送机(天津)有限公司 | Electric, double-orbit, hanging and complete conveying equipment |
EP2557059A1 (en) * | 2011-08-09 | 2013-02-13 | Robert Bosch Gmbh | Convoyeur comprenant une unité transversale de levage avec rouleaux de transport |
CN103382843A (en) * | 2013-07-30 | 2013-11-06 | 上海交通大学 | Construction device and construction method for preventing tube push bench and tube joint from rotating by pull rod |
CN203625245U (en) * | 2013-12-16 | 2014-06-04 | 重庆天腾玻璃有限公司 | Laminated glass production line |
CN203794126U (en) * | 2014-04-28 | 2014-08-27 | 浙江德瑞摩擦材料有限公司 | Clutch facing conveyor |
CN203889543U (en) * | 2014-05-14 | 2014-10-22 | 上海永乾机电有限公司 | Logistics operating line |
CN206068902U (en) * | 2016-08-31 | 2017-04-05 | 佛山市世诚同创玻璃建材有限公司 | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102909600B (en) | Cantilever servo manipulator | |
CN102610442B (en) | Relay part generation device having double-guide rails | |
CN203936736U (en) | Vertical refractory brick grinding system | |
CN104444338A (en) | Steel ball receiving tank | |
CN103128593A (en) | Delivery method and delivery equipment of workpiece on production line for aluminum tube and aluminum bar | |
CN103990681B (en) | The vertical spinning mechanism that running roller two swaying direction is adjustable | |
CN103832194B (en) | Auto-compensation CNC engraving machine | |
CN108857351B (en) | Intelligent locking system for sleeper sleeve | |
CN106144597A (en) | The handling material guide rail platform that doubling glass high temperature precompressed processes | |
CN206068902U (en) | The loading and unloading guide rail platform that the precompressed of doubling glass high temperature is processed | |
CN106425661A (en) | Full-automatic lock cylinder deburring tool | |
CN206010041U (en) | A kind of deburring mechanism of full-automatic lock core burr removal fixture | |
CN105158940A (en) | Synchronous blade working feed device for liquid crystal screen detaching machine | |
CN211109571U (en) | Automatic centering mechanism for high-temperature formed part | |
CN106181430A (en) | A kind of lathe with inclined guide rails | |
CN106270255A (en) | It is applied to the jacking device for discharging of nut processing | |
CN203006506U (en) | Tire stacking and unstacking dual-purpose machine | |
CN205413996U (en) | Automatic alignment device for elevator guide rail | |
CN110626797A (en) | Fixed angle material loading manipulator mechanism | |
CN210499122U (en) | Automatic fastening machine of motor rotor shaft | |
CN209027299U (en) | A kind of positioning device | |
CN203950622U (en) | A kind of assembly fixture of toughened glass insulator | |
CN202861076U (en) | Square trowel bending device | |
CN216180501U (en) | Quick-moving coordinate shaft type truss robot | |
CN203491080U (en) | Guide pin pulling device of network transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161123 |