CN206056584U - A kind of mark post of engineering survey - Google Patents
A kind of mark post of engineering survey Download PDFInfo
- Publication number
- CN206056584U CN206056584U CN201621050996.8U CN201621050996U CN206056584U CN 206056584 U CN206056584 U CN 206056584U CN 201621050996 U CN201621050996 U CN 201621050996U CN 206056584 U CN206056584 U CN 206056584U
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- mark post
- level indicator
- expansion link
- engineering survey
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of mark post of engineering survey, including housing, sleeve pipe, level indicator and pedal, the upper end of the housing is provided with handle, the upper surface of the housing is inlaid with compass, casing cover and expansion link are fixed with below the housing, and the top outer of expansion link is provided with casing cover, burr is inlaid with described sleeve pipe, the bottom of described sleeve pipe is provided with pointed cone, the level indicator is connected with expansion link, the upper end of the level indicator is provided with accumulator, intercom is fixed with below the level indicator, switch is provided with the downside of the intercom, the pedal is connected with sleeve pipe by rotator.The mark post of the engineering survey, it is provided with handle, may act as aiding in the crutch of walking after mark post shrinks, be provided with level indicator, it is ensured that mark post is disposed vertically in measurement, it is provided with intercom, in telemeasurement, can be exchanged with companion, be improved measurement efficiency, it is allowed to preferably measure operation, survey crew is using more convenient.
Description
Technical field
This utility model is related to engineering survey equipment technical field, specially a kind of mark post of engineering survey.
Background technology
Engineering survey be the design of architectural engineering construction, construction and manage etc. measure in the stage operation theory,
The general name of methods and techniques, in recent years, as the step of Process of Urbanization Construction is constantly accelerated, for the workload of engineering survey also exists
Progressively increase, so as to the demand also more and more higher of engineering survey equipment, as a example by the mark post required for engineering survey, mark post is to survey
The aid of amount data, mark post pattern on the market is various, but the mark post nowadays sold also to there are some more or less
Shortcoming, be such as not provided with handle, it is impossible to mark post shrink after serve as auxiliary walking crutch, be not provided with level indicator,
When measuring operation, it is impossible to ensure whether mark post is disposed vertically well, be not provided with intercom, in telemeasurement,
Cannot be exchanged with companion, practicality is not high, result in Production requirement cannot improve, it is impossible to the demand that satisfaction is used,
It is badly in need of improving the technology of mark post on market, is allowed to preferably measure operation, preferably serves engineering survey staff.
Utility model content
The purpose of this utility model is to provide a kind of mark post of engineering survey, to solve to propose in above-mentioned background technology
The crutch that can not serve as auxiliary walking, cannot ensure that mark post is disposed vertically and cannot be with Peer approach in telemeasurement
The problems such as.
For achieving the above object, this utility model provides following technical scheme:A kind of mark post of engineering survey, including shell
Body, sleeve pipe, level indicator and pedal, the upper end of the housing are provided with handle, and the upper surface of the housing is inlaid with compass,
Be fixed with casing cover and expansion link below the housing, and the top outer of expansion link be provided with casing cover, described sleeve pipe with
Expansion link is connected, and burr is inlaid with described sleeve pipe, and the surface of described sleeve pipe is provided with fastener, and the bottom of described sleeve pipe sets
Pointed cone is equipped with, the level indicator is connected with expansion link, the upper end of the level indicator is provided with accumulator, under the level indicator
Side is fixed with intercom, and switch is provided with the downside of the intercom, and the pedal is connected with sleeve pipe by rotator.
Preferably, bore of the bore of described sleeve pipe lid more than sleeve pipe, and the inner surface of casing cover is corresponding with burr.
Preferably, the telescopic distance range of the expansion link is 0-1.5m.
Preferably, the accumulator is lithium battery, and is demountable structure.
Preferably, the rotatable angular range of the rotator is 0-90 °.
Compared with prior art, the beneficial effects of the utility model are:The mark post of the engineering survey, is provided with handle,
Mark post may act as the crutch for aiding in walking after shrinking, be provided with level indicator, when operation is measured, can be good at ensureing mark post
It is disposed vertically, is provided with intercom, in telemeasurement, can be exchanged with companion, improve measurement efficiency, practicality compares
Height, is allowed to preferably measure operation, preferably serves engineering survey staff.
Description of the drawings
Fig. 1 is this utility model structure expanded schematic diagram;
Fig. 2 is this utility model structure both shrinks schematic diagram.
In figure:1st, handle, 2, housing, 3, casing cover, 4, expansion link, 5, sleeve pipe, 6, pointed cone, 7, compass, 8, accumulator,
9th, level indicator, 10, intercom, 11, switch, 12, burr, 13, fastener, 14, rotator, 15, pedal.
Specific embodiment
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only this utility model a part of embodiment, rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment for being obtained, belongs to the scope of this utility model protection.
Fig. 1-2 is referred to, this utility model provides a kind of technical scheme:A kind of mark post of engineering survey, including handle
1st, housing 2, casing cover 3, expansion link 4, sleeve pipe 5, pointed cone 6, compass 7, accumulator 8, level indicator 9, intercom 10, switch 11,
Burr 12, fastener 13, rotator 14 and pedal 15, the upper end of housing 2 are provided with handle 1, may act as after mark post shrinks
The crutch of auxiliary walking, the upper surface of housing 2 are inlaid with compass 7, and the lower section of housing 2 is fixed with casing cover 3 and expansion link 4,
And the top outer of expansion link 4 is provided with casing cover 3,4 telescopic distance range of expansion link is 0-1.5m, can be according to reality
Situation adjusts the length of mark post, and practicality is higher, and sleeve pipe 5 is connected with expansion link 4, and burr 12, sleeve pipe are inlaid with sleeve pipe 5
Bore of the bore of lid 3 more than sleeve pipe 5, and the inner surface of casing cover 3 is corresponding with burr 12, casing cover 3 firmly can be consolidated
It is scheduled on sleeve pipe 5, the surface of sleeve pipe 5 is provided with fastener 13, and the bottom of sleeve pipe 5 is provided with pointed cone 6, level indicator 9 and expansion link 4
It is connected, the upper end of level indicator 9 is provided with accumulator 8, accumulator 8 is lithium battery, and is demountable structure, service life compares
It is long, and dismounting charging is more convenient, the lower section of level indicator 9 is fixed with intercom 10, in telemeasurement, can enter with companion
Row exchange, improves measurement efficiency, and the downside of intercom 10 is provided with switch 11, and pedal 15 passes through rotator 14 and 5 phase of sleeve pipe
Connection, 14 rotatable angular range of rotator are 0-90 °, pointed cone 6 can be more easily plugged into mud using pedal 15
In soil, fixed pole is more convenient, is allowed to preferably measure operation.
Operation principle:In the mark post using the engineering survey, fastener 13 is unclamped, casing cover is unpluged by handle 1
3, expansion link 4 is drawn high to suitable length, tighten fastener 13, pull open pedal 15, step on pedal 15 with foot, pointed cone 6 enters
Enter in soil, the vertical position of expansion link 4 is adjusted by eye-level instrument 9, at the same time, open switch 11, by intercom
10 carry out communication with other staff, and auxiliary carries out engineering survey operation, when without measurement, unclamp fastener 13,
Shrink expansion link 4, casing cover 3 is fixed on sleeve pipe 5 by burr 12, pulling pedal 15 makes which be attached on sleeve pipe 5, when
When rugged section measures operation, grasp handle 1 and can work as crutch use, when walking disorientation, guide can be passed through
7 investigation of pin, here it is the whole process of the mark post work of the engineering survey.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
Be appreciated that these embodiments can be carried out various changes in the case of without departing from principle of the present utility model and spirit, repair
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of mark post of engineering survey, including housing (2), sleeve pipe (5), level indicator (9) and pedal (15), its feature exist
In:The upper end of the housing (2) is provided with handle (1), and the upper surface of the housing (2) is inlaid with compass (7), the housing
(2) casing cover (3) and expansion link (4) are fixed with below, and the top outer of expansion link (4) is provided with casing cover (3), it is described
Sleeve pipe (5) is connected with expansion link (4), and burr (12) is inlaid with described sleeve pipe (5), and the surface of described sleeve pipe (5) is provided with
Fastener (13), the bottom of described sleeve pipe (5) are provided with pointed cone (6), and the level indicator (9) is connected with expansion link (4), described
The upper end of level indicator (9) is provided with accumulator (8), is fixed with intercom (10), the intercom below the level indicator (9)
(10) switch (11) is provided with the downside of, the pedal (15) is connected with sleeve pipe (5) by rotator (14).
2. the mark post of a kind of engineering survey according to claim 1, it is characterised in that:The bore of described sleeve pipe lid (3)
More than the bore of sleeve pipe (5), and the inner surface of casing cover (3) is corresponding with burr (12).
3. the mark post of a kind of engineering survey according to claim 1, it is characterised in that:The expansion link (4) is scalable
Distance range be 0-1.5m.
4. the mark post of a kind of engineering survey according to claim 1, it is characterised in that:The accumulator (8) is lithium electricity
Pond, and be demountable structure.
5. the mark post of a kind of engineering survey according to claim 1, it is characterised in that:The rotator (14) is rotatable
Angular range be 0-90 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621050996.8U CN206056584U (en) | 2016-08-31 | 2016-08-31 | A kind of mark post of engineering survey |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621050996.8U CN206056584U (en) | 2016-08-31 | 2016-08-31 | A kind of mark post of engineering survey |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206056584U true CN206056584U (en) | 2017-03-29 |
Family
ID=58370226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621050996.8U Expired - Fee Related CN206056584U (en) | 2016-08-31 | 2016-08-31 | A kind of mark post of engineering survey |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206056584U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113029116A (en) * | 2021-03-10 | 2021-06-25 | 湖北三鑫金铜股份有限公司 | Method for improving underground geological logging precision |
CN114826310A (en) * | 2022-03-11 | 2022-07-29 | 吴琼 | Natural resource is built storehouse and is used field exploration management system |
-
2016
- 2016-08-31 CN CN201621050996.8U patent/CN206056584U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113029116A (en) * | 2021-03-10 | 2021-06-25 | 湖北三鑫金铜股份有限公司 | Method for improving underground geological logging precision |
CN114826310A (en) * | 2022-03-11 | 2022-07-29 | 吴琼 | Natural resource is built storehouse and is used field exploration management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206056584U (en) | A kind of mark post of engineering survey | |
CN204649191U (en) | A kind of Sopwith staff | |
CN204202617U (en) | Testing apparatus for verticality | |
CN206638226U (en) | A kind of ground investigation total powerstation | |
CN210513159U (en) | Remote sensing survey and drawing sign pole | |
CN204929098U (en) | Portable panorama investigation appearance | |
CN205208083U (en) | Three -legged support of fixed levelling rod | |
CN206440276U (en) | Automatic keep vertically engineering survey sighting rod | |
CN203083498U (en) | Rapid electric pole burial depth measuring ruler | |
CN211925305U (en) | Support frame for observing hydrology and water resources | |
CN209783587U (en) | Prism device suitable for underground centering and leveling | |
CN206616923U (en) | A kind of concurrent | |
CN205881111U (en) | Reinforced earth retaining wall alarm system that inclines | |
CN206531509U (en) | A kind of architectural engineering multifunctional measuring mark post | |
CN205449056U (en) | Be used for highway slope measuring device | |
CN204068023U (en) | Ground connection pricker assembling and disassembling device | |
CN204925321U (en) | Insulating measuring device of an aluminium cell tobacco pipe | |
CN205066632U (en) | Building works survey chi | |
CN206161010U (en) | Self -luminous sighting rod that engineering survey was used | |
CN204594452U (en) | A kind of new multi-purpose measures Sopwith staff | |
CN204422232U (en) | Convenient adjustable dirigibility testing apparatus | |
CN215575105U (en) | Detection device for land reclamation | |
CN213902339U (en) | Land levelness measuring device for city planning | |
CN220082707U (en) | Building level fixing device | |
CN216551961U (en) | Deep foundation pit collapse prevention monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20180831 |
|
CF01 | Termination of patent right due to non-payment of annual fee |