CN204299131U - A kind of finishing scaffold with spud pile - Google Patents
A kind of finishing scaffold with spud pile Download PDFInfo
- Publication number
- CN204299131U CN204299131U CN201420777070.3U CN201420777070U CN204299131U CN 204299131 U CN204299131 U CN 204299131U CN 201420777070 U CN201420777070 U CN 201420777070U CN 204299131 U CN204299131 U CN 204299131U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- spud pile
- scaffold
- cable
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a kind of finishing scaffold with spud pile, comprise vertical rod (1), bracing frame (3), it is characterized in that: vertical rod (1) is provided with cable-stayed type connector (4), cable-stayed type connector (4) is fixedly hinged in vertical rod (1) for one end, and the other end and the upper slide rail (7) of vertical rod (1) are slidably connected; Keep spud pile (5) in vertical rod (1) bottom, spud pile (5) is connected at vertical rod internal activity by pedal (6).The utility model is while providing and putting, support decorating apparatus, and scaffold can be fixed on complicated landform especially soft geology, slope, the utility model is simple for structure, is easy to promote the use of.
Description
Technical field
The utility model relates to decoration technology field, particularly relates to a kind of finishing scaffold with spud pile.
Background technology
One of indispensable instrument in building operations during scaffold, fitting-out work, scaffold has the advantages such as highly versatile, in current family, hotel, various business hall and outdoor fitment process, the moveable scaffold of normal needs carries out putting of finishing material, equipment etc., but these scaffolds often structure is too simple, bulky, heavy, install, carrying and dismounting all dumb, convenient.
And at fitment process, be unfavorable for putting of common scaffold if any extreme terrain, and general scaffold cannot be fixed, and is easily shifted, be unfavorable for putting and using of decorating apparatus; And general scaffold material is comparatively light, when above user stands in, other people are often needed to assist to fix; Existing scaffold is only provided with pulley and pulley brake block in bottom, cutting under the complicated landform such as slope, can not carry out stably fastness function.
Utility model content
The utility model is for above-mentioned problems of the prior art, provide a kind of finishing scaffold with spud pile, while providing and putting, support decorating apparatus, scaffold can be fixed on complicated landform especially soft geology, slope, the utility model is simple for structure, is easy to promote the use of.
For realizing the utility model object, the technical solution adopted in the utility model is as follows:
A kind of finishing scaffold with spud pile, comprise vertical rod (1), bracing frame (3), it is characterized in that: vertical rod (1) is provided with cable-stayed type connector (4), cable-stayed type connector (4) is fixedly hinged in vertical rod (1) for one end, and the other end and the upper slide rail (7) of vertical rod (1) are slidably connected; Keep spud pile (5) in vertical rod (1) bottom, spud pile (5) is connected at vertical rod internal activity by pedal (6).
Further, described spud pile (5) lower end is fixing most advanced and sophisticated (2).
Further, described spud pile (5) is provided with and is fixedly connected with hole slot (7), vertical rod (1) bottom is provided with the hole in same aperture, can be fixedly connected with the above-mentioned hole slot (7) that is connected by fixed connecting piece (8) with hole by between spud pile (5) with vertical rod (1).
Further, the adjacent two pieces of described cable-stayed type connector (4) is for being rotationally connected.
Further, support frame as described above (3) is provided with level gauge (9).
Bracing frame can be laid backing plate and carry out operation thereon for user.
The utility model, in complicated landform particularly soft geology, steps on the pedal of vertical rod bottom by pin, spud pile is inserted the effect that fixing feet hand cradle is played in underground; In the complicated landform such as slope, by the level of simple horizontal instrument determination scaffold that bracing frame is arranged, regulate the depth of spud pile, by fixed connecting piece, spud pile height is fixed, thus ensure that and the staff's level on scaffold also can be made to carry out operation in the complicated landform such as slope.
The beneficial effects of the utility model show:
One, the utility model ease of assembly, carry, provide a kind of on the ground such as soft geology, slope reliable scaffold fixed form.
Two, the utility model cost is low, and conveniently carries out the replacement of parts.
Three, the utility model saves scaffold and fixes required manpower, is more conducive to saving the engineering time.
Accompanying drawing explanation
Fig. 1 is the perspective view of a kind of finishing scaffold with spud pile of the utility model.
Fig. 2 is the spud pile part isometric structural representation of a kind of finishing scaffold with spud pile of the utility model.
In figure, 1 vertical rod, 2 is fixing most advanced and sophisticated, 3 bracing frames, 4 cable-stayed type connectors, 5 spud piles, 6 pedals, 7 slide rails, 8 fixed connecting pieces, 9 level gauges.
Detailed description of the invention
As shown in Fig. 1, Fig. 2, a kind of finishing scaffold with spud pile, comprise vertical rod 1, bracing frame 3, it is characterized in that: vertical rod 1 is provided with cable-stayed type connector 4, cable-stayed type connector 4 is fixedly hinged in vertical rod 1 for one end, and in the other end and vertical rod 1, slide rail 7 is slidably connected; Vertical rod 1 keeps spud pile 5 in bottom, and spud pile 5 is connected at vertical rod internal activity by pedal 6.
Spud pile 5 lower end is fixing most advanced and sophisticated 2.
Spud pile 5 is provided with and is fixedly connected with hole slot 7, and vertical rod 1 bottom is provided with the hole in same aperture, inserts vertical rod 1 bottom hole and is connected hole slot 7 with on above-mentioned spud pile, be fixedly connected with between spud pile 5 with vertical rod 1 by fixed connecting piece 8.
The adjacent two pieces of described cable-stayed type connector 4 is for being rotationally connected.
Support frame as described above 3 is provided with level gauge 9.
Bracing frame can be laid backing plate and carry out operation thereon for user.
Claims (5)
1. the finishing scaffold with spud pile, comprise vertical rod (1), bracing frame (3), it is characterized in that: vertical rod (1) is provided with cable-stayed type connector (4), cable-stayed type connector (4) is fixedly hinged in vertical rod (1) for one end, and the other end and the upper slide rail (7) of vertical rod (1) are slidably connected; Keep spud pile (5) in vertical rod (1) bottom, spud pile (5) is connected at vertical rod internal activity by pedal (6).
2. a kind of finishing scaffold with spud pile according to claim 1, is characterized in that: spud pile (5) lower end is fixing most advanced and sophisticated (2).
3. a kind of finishing scaffold with spud pile according to claim 1, it is characterized in that: spud pile (5) is provided with and is fixedly connected with hole slot (7), vertical rod (1) bottom is provided with the hole in same aperture, can be fixedly connected with the above-mentioned hole slot (7) that is connected by fixed connecting piece (8) with hole by between spud pile (5) with vertical rod (1).
4. a kind of finishing scaffold with spud pile according to claim 1, is characterized in that: the adjacent two pieces of described cable-stayed type connector (4) is for being rotationally connected.
5. a kind of finishing scaffold with spud pile according to claim 1, is characterized in that: support frame as described above (3) is provided with level gauge (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420777070.3U CN204299131U (en) | 2014-12-11 | 2014-12-11 | A kind of finishing scaffold with spud pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420777070.3U CN204299131U (en) | 2014-12-11 | 2014-12-11 | A kind of finishing scaffold with spud pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204299131U true CN204299131U (en) | 2015-04-29 |
Family
ID=53104679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420777070.3U Expired - Fee Related CN204299131U (en) | 2014-12-11 | 2014-12-11 | A kind of finishing scaffold with spud pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204299131U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110242032A (en) * | 2019-06-26 | 2019-09-17 | 黄明誉 | A kind of architectural engineering support device |
-
2014
- 2014-12-11 CN CN201420777070.3U patent/CN204299131U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110242032A (en) * | 2019-06-26 | 2019-09-17 | 黄明誉 | A kind of architectural engineering support device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204299131U (en) | A kind of finishing scaffold with spud pile | |
CN104389416A (en) | Decoration scaffold with fixed piles | |
CN104389418A (en) | Decoration scaffold with convenient staircase | |
CN204234122U (en) | A kind of Novel physical chemical experiment lift test-tube stent | |
CN211435015U (en) | Plum blossom stake is used in lion dance training that possesses raising and lowering functions | |
CN205777530U (en) | A kind of support for basement single side formwork | |
CN203702522U (en) | Movable type integrated water pump test bench | |
CN204930924U (en) | The collapsible easel of Environment Design | |
CN203484704U (en) | Simple movable-arm-type drilling device | |
CN203452394U (en) | Special support for line snapping for building wall construction | |
CN202829759U (en) | Skid-mounted equipment | |
CN208329551U (en) | A kind of finishing of adjustment height stilt device | |
CN200970973Y (en) | Teaching compasses | |
CN204299137U (en) | A kind of finishing scaffold of built-in stair | |
CN204299140U (en) | A kind of band facilitates the finishing scaffold of stair | |
CN210659169U (en) | Hotel fitment is with ground brick device of leveling | |
CN215820151U (en) | Drawing device for civil engineering | |
CN205640137U (en) | Tripod for construction | |
CN205038606U (en) | High formula can be finely tuned and key dish is calculated | |
CN205116726U (en) | Building templates link for civil engineering | |
CN204380198U (en) | Sucked type spring person stub pile prepared from wood | |
CN213806732U (en) | Combined supporting pile for civil engineering | |
CN212226458U (en) | High water conservancy and hydropower equipment support frame of stability | |
CN210807943U (en) | Coal mine electromechanical equipment stabilizing support | |
CN203396388U (en) | Vertical orientation auxiliary device for leveling rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150429 Termination date: 20151211 |
|
EXPY | Termination of patent right or utility model |