CN206054941U - A kind of adjustable supporting device of storage piping installation - Google Patents

A kind of adjustable supporting device of storage piping installation Download PDF

Info

Publication number
CN206054941U
CN206054941U CN201621041265.7U CN201621041265U CN206054941U CN 206054941 U CN206054941 U CN 206054941U CN 201621041265 U CN201621041265 U CN 201621041265U CN 206054941 U CN206054941 U CN 206054941U
Authority
CN
China
Prior art keywords
supporting leg
backing plate
piping installation
adjustable
storage piping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621041265.7U
Other languages
Chinese (zh)
Inventor
彭常飞
杜亮坡
孟庆鹏
许莉
傅伟庆
张志强
郑亚飞
李阳
李金国
赵振兴
邓鑫
唐颖浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Bureau Co Ltd
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China National Petroleum Corp
Priority to CN201621041265.7U priority Critical patent/CN206054941U/en
Application granted granted Critical
Publication of CN206054941U publication Critical patent/CN206054941U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

This utility model is related to a kind of adjustable supporting device of storage piping installation, belongs to oil storage and transportation technology field.A kind of adjustable supporting device of storage piping installation, including crossbeam and two supporting legs, crossbeam described in the top braces of supporting leg, the bottom connection foundation bolt connecting plate B of supporting leg;Wherein:The supporting leg includes supporting leg and lower supporting leg, is bolted between the upper supporting leg and lower supporting leg;It is sequentially provided with backing plate A, top nut, backing plate B, sleeve, backing plate C and lower nut between the upper supporting leg and lower supporting leg from top to bottom, stud sequentially passes through the backing plate A, top nut, backing plate B, sleeve, backing plate C and lower nut.And support meanss height adjustable described in the utility model, overcome the problem of pipe settlement, it is ensured that the safe operation of oil depot, and the support device structure is simple, it is convenient, economical and practical to operate.

Description

A kind of adjustable supporting device of storage piping installation
Technical field
This utility model is related to a kind of adjustable supporting device of storage piping installation, belongs to oil storage and transportation technology field.
Background technology
In order to promote the development of local economy, just like a raging fire the carrying out of domestic and international Oil Depot Construction.Storage tank is the weight of reservoir area Component units are wanted, its design and building technology reach its maturity.Storage tank settlement of foundation problem always is that reservoir area construction needs emphasis The problem for overcoming, particularly in coastal weak soil ground area, due to the uneven and property of ground geological state, the storage tank in reservoir area can be sent out The different degrees of sedimentation of life.Reservoir area construction both at home and abroad relies primarily on tank foundation piling to solve storage tank settlement issues, but wrong Comprehensive complicated pipe settlement is also a problem that can not be ignored, and sedimentation equally can bring high risks to pipeline, can cause pipe The geometry deformation and stress concentration of line, causes the excessive deformation mutually taken over tank skin, ultimately causes tank skin deformation and even reveals, this Directly influence the safe operation of reservoir area.If pipe settlement problem is adopted processed with the piling of storage tank identical, it will expend big Amount manpower and materials.At home and abroad in many oil depot engineering projects, complicated pipeline in reservoir area is organized into piping lane generally, so Process every a segment distance piling under piping lane afterwards, form pipe pier and support piping lane, do so effectively reduce settlement of foundation band The harm for coming, but the piping lane of a few km length needs hundreds of pipe pier, and each pipe pier is driven piles, and Financial cost is quite high.
Reservoir area pipeline adjustable support structure, can be according to ground in reservoir area used as a kind of supporting construction that can adjust height Sedimentation situation adjusts the height of supporting construction, effectively reduces the harm that settlement of foundation is brought to storage tank and pipeline, it is ensured that storehouse The safe operation of area's pipeline and storage tank.
Utility model content
To ensure the safe operation of oil depot, the settlement issues of pipeline are overcome, the purpose of this utility model is to provide a kind of The adjustable supporting device of storage piping installation, the cost of saving construction, production and operation that can be larger.
The purpose of this utility model is achieved through the following technical solutions:
A kind of adjustable supporting device of storage piping installation, including crossbeam and two supporting legs, the top braces institute of supporting leg State crossbeam, the bottom connection foundation bolt connecting plate B of supporting leg;Wherein:
The supporting leg includes supporting leg and lower supporting leg, is connected by bolt between the upper supporting leg and lower supporting leg Connect;Be sequentially provided between the upper supporting leg and lower supporting leg from top to bottom backing plate A, top nut, backing plate B, sleeve, backing plate C and Lower nut, stud sequentially pass through the backing plate A, top nut, backing plate B, sleeve, backing plate C and lower nut.
Further, the crossbeam mainly adopts shaped steel, preferably I-beam or channel-section steel.
Further, the crossbeam is provided with reinforcement A with the junction of supporting leg, and by being welded to connect.
Further, the upper supporting leg and lower supporting leg are hollow cylinder.
Further, the junction of the upper supporting leg and lower supporting leg is provided with guide pipe.
Further, the backing plate A, backing plate B and backing plate C are the hollow plectane concentric with the hollow cylinder section, The bolt of upper supporting leg and lower supporting leg junction is evenly arranged along the hollow cylinder periphery.
Further, the backing plate A is all provided with the junction of upper supporting leg, the backing plate C and the junction of lower supporting leg There is backing plate reinforcement B.
Further, be provided with external screw thread outside the stud, the top nut, sleeve, be equipped with lower nut with it is described The female thread that stud is engaged.
Further, the upper supporting leg is provided with connecting plate A with the junction of the crossbeam.
The beneficial effects of the utility model are:
The structurally simple, economical practicality of the adjustable supporting device.
That support meanss described in the utility model can be carried into is intricate in ton even upper ten tons of reservoir area, pass through whole storehouse The pipeline weight in area, and the support meanss height adjustable, overcome the problem of the pipe settlement caused because of settlement of foundation, so as to The safe operation of oil depot is ensure that, and support device structure described in the utility model is simple, it is convenient, economical and practical to operate, and saves Build, production and the cost for running.
Description of the drawings
Fig. 1 is the structural representation of adjustable supporting device described in the utility model;
Fig. 2 is the bolt distribution schematic diagram of upper supporting leg and lower supporting leg junction;
Fig. 3 is lower supporting leg and base plate connection structure schematic diagram;
Wherein, 1- crossbeams, supporting leg under 2-, 3- studs, 4- lower nuts, 5- reinforcement A, 6- connecting plate A are supported on 7- Lower limb, 8- backing plate A, 9- sleeves, 10- backing plate reinforcement B, 11- guide pipes, 12- foundation bolt connecting plate B, 13- backing plate B, 14- pads Plate C, 15- top nut.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with accompanying drawing and enforcement Example, is further elaborated to this utility model.It should be appreciated that specific embodiment described herein is only to explain this Utility model, is not used to limit this utility model.
A kind of adjustable supporting device of storage piping installation, as shown in figure 1, including crossbeam 1 and two supporting legs, supporting leg Crossbeam 1 described in top braces, the upper supporting leg 7 are provided with connecting plate A6 with the junction of the crossbeam 1, and the bottom of supporting leg connects Grounding leg bolt plate B12.The weight of piping lane or pipeline is acted on crossbeam 1, and crossbeam 1 mainly adopts shaped steel, preferably resists The i shaped steel or channel-section steel of curved better performances.Crossbeam 1 is supported by two supporting legs, and the position that supporting leg is located at crossbeam 1 is very heavy Will, comparatively ideal supporting leg active position can preferably improve the stressing conditions of crossbeam 1 and supporting leg junction, while also can Avoid crossbeam 1 from larger degree of disturbing occur, affect the stress of pipeline.Crossbeam 1 can be than larger, weldering with supporting leg junction stress in addition Meeting suitable reinforcement A5 can effectively improve intensity herein.
The supporting leg includes supporting leg 7 and lower supporting leg 2, passes through spiral shell between the upper supporting leg 7 and lower supporting leg 2 Tether and connect;It is sequentially provided with backing plate A8, top nut 15, backing plate B13, set between the upper supporting leg 7 and lower supporting leg 2 from top to bottom Cylinder 9, backing plate C14 and lower nut 4, stud 3 sequentially pass through the backing plate A8, top nut 15, backing plate B13, sleeve 9, backing plate C14 and Lower nut 4.It is provided with external screw thread outside the stud 3, the top nut 15, sleeve 9, is equipped with and the stud 3 in lower nut 4 The female thread being engaged.Adjusted between supporting leg 7 and lower supporting leg 2 by regulation stud 3 and top nut 15, lower nut 4 Distance, so as to realize the Height Adjustable of whole support meanss.
The upper supporting leg 7 and lower supporting leg 2 are hollow cylinder.The pipeline of even upper ten tons of ton is supported into, can be produced The Yin Yin effects of expanding with heat and contract with cold produce the tons of thrusts along pipeline direction that friction causes, therefore supporting leg can be preferably with hollow cylinder The moment of flexure that pipeline gravity and thrust cause is carried, while being also beneficial to the installation of bolt on supporting leg.Upper supporting leg, lower supporting leg Between mainly by bolt connection, the specification of bolt is required for carrying out mechanical analyses with the Intensity Design of number, bolt and backing plate, same When meet strength and stiffness requirement.
The junction of the upper supporting leg 7 and lower supporting leg 2 is provided with guide pipe 11.Between upper supporting leg 7 and lower supporting leg 2 Guide pipe ensure that the support meanss are not in larger deformation, and in case of exceptional circumstances, stud is susceptible to larger change Shape, the adjustable supporting device is just without support and adjustable function.Guide pipe can protect spiral shell to a certain extent Post and nut, while when support meanss height is adjusted, guide pipe is avoided that the inconsistent feelings of multiple bolt tense-lax situations occur Condition, prevents active force from concentrating to one or several bolt.
The backing plate A8, backing plate B13 and backing plate C14 are the hollow plectane concentric with the hollow cylinder section, upper The bolt of support leg 7 and lower 2 junction of supporting leg is evenly arranged along the hollow cylinder periphery.The backing plate A8 and upper supporting leg 7 Junction, the backing plate C14 be equipped with backing plate reinforcement B10, the backing plate reinforcement B10 with the junction of lower supporting leg 2 Also it is evenly arranged along the hollow cylinder periphery.
Seen according to the stressing conditions of whole support meanss, larger moment of flexure, foundation bolt specification at foundation bolt, can be produced Intensity requirement will be met with number, foundation bolt connection plate thickness, and the junction of foundation bolt connecting plate and upper supporting leg 7 It is provided with reinforcement C.
The adjustable supporting device specific implementation method of storage piping installation described in the utility model is as follows:
Step 1, checks whether settlement of foundation situation and the adjustable supporting device have supporting role to pipeline;
Step 2, for not passive support meanss, unscrews the lower nut of stud in two supporting legs one by one, and Lower nut displacement is made to be slightly larger than settling height;
Step 3, raises crossbeam and upper supporting leg using external force equipment, after tighten top nut one by one;
Step 4, after having tightened whole top nuts of two supporting legs, tightens lower nut, and removal external force is raised equipment, completed The regulation of this support means.
Wherein step 1 every few years or chance special circumstances are both needed to perform.
Preferred embodiment of the present utility model is the foregoing is only, this utility model is not limited to, for this For the technical staff in field, this utility model can have various modifications and variations.It is all it is of the present utility model spirit and principle Within, any modification, equivalent substitution and improvements made etc. are should be included within protection domain of the present utility model.

Claims (9)

1. a kind of adjustable supporting device of storage piping installation, it is characterised in that including crossbeam (1) and two supporting legs, described Crossbeam (1) described in the top braces of support leg, bottom connection foundation bolt connecting plate B (12) of the supporting leg;Wherein:
The supporting leg includes supporting leg (7) and lower supporting leg (2), leads between the upper supporting leg (7) and lower supporting leg (2) Cross bolt connection;Backing plate A (8), top nut are sequentially provided with from top to bottom between the upper supporting leg (7) and lower supporting leg (2) (15), backing plate B (13), sleeve (9), backing plate C (14) and lower nut (4), stud (3) sequentially pass through the backing plate A (8), upper spiral shell Female (15), backing plate B (13), sleeve (9), backing plate C (14) and lower nut (4).
2. the adjustable supporting device of storage piping installation according to claim 1, it is characterised in that the crossbeam (1) is work Word beam or channel-section steel.
3. the adjustable supporting device of storage piping installation according to claim 1, it is characterised in that the crossbeam (1) with The junction of support leg is provided with reinforcement A (5), and by being welded to connect.
4. the adjustable supporting device of storage piping installation according to claim 1, it is characterised in that the upper supporting leg (7) Hollow cylinder is with lower supporting leg (2).
5. the adjustable supporting device of storage piping installation according to claim 4, it is characterised in that the upper supporting leg (7) Guide pipe (11) is provided with the junction of lower supporting leg (2).
6. the adjustable supporting device of storage piping installation according to claim 4, it is characterised in that the backing plate A (8), pad Plate B (13) and backing plate C (14) are the hollow plectane concentric with the hollow cylinder section, upper supporting leg (7) and lower supporting leg (2) bolt of junction is evenly arranged along the hollow cylinder periphery.
7. the adjustable supporting device of storage piping installation according to claim 1, it is characterised in that the backing plate A (8) with it is upper The junction of supporting leg (7), the backing plate C (14) and the junction of lower supporting leg (2) are equipped with backing plate reinforcement B (10).
8. the adjustable supporting device of storage piping installation according to claim 1, it is characterised in that the stud (3) is outside It is provided with external screw thread, the top nut (15), sleeve (9), is equipped with the interior spiral shell being engaged with the stud (3) in lower nut (4) Stricture of vagina.
9. the adjustable supporting device of storage piping installation according to claim 1, it is characterised in that the upper supporting leg (7) Connecting plate A (6) is provided with the junction of the crossbeam (1).
CN201621041265.7U 2016-09-06 2016-09-06 A kind of adjustable supporting device of storage piping installation Active CN206054941U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621041265.7U CN206054941U (en) 2016-09-06 2016-09-06 A kind of adjustable supporting device of storage piping installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621041265.7U CN206054941U (en) 2016-09-06 2016-09-06 A kind of adjustable supporting device of storage piping installation

Publications (1)

Publication Number Publication Date
CN206054941U true CN206054941U (en) 2017-03-29

Family

ID=58371018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621041265.7U Active CN206054941U (en) 2016-09-06 2016-09-06 A kind of adjustable supporting device of storage piping installation

Country Status (1)

Country Link
CN (1) CN206054941U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013746A (en) * 2017-06-02 2017-08-04 马导利 Petroleum pipeline supports base device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013746A (en) * 2017-06-02 2017-08-04 马导利 Petroleum pipeline supports base device

Similar Documents

Publication Publication Date Title
CN205675087U (en) A kind of high-altitude pipe transporting mounting vehicle
CN205669629U (en) A kind of height adjustable support means of pipeline
CN201771687U (en) Internal brace stay used for preventing deformation of flange on wind power generation tower during transportation
CN105822841B (en) A kind of ground damping device of antimony glycol feedstock transportation pipeline
CN206054941U (en) A kind of adjustable supporting device of storage piping installation
CN202954557U (en) Scaffold wall connection part
CN103953061B (en) A kind of offshore wind farm jacket frame foundation structure
CN206034479U (en) Tower crane relay handling supporter device
CN102787695B (en) Core-sleeve combined pressure bar
CN205602588U (en) Tubular product conveyor
CN203487548U (en) Connecting structure of transformer substation steel bracket and concrete foundation joint
CN207526137U (en) A kind of adjusting locating rack
CN206943591U (en) A kind of petroleum pipeline support frame
CN207017252U (en) The pile tube of sawtooth pile crown
CN214069850U (en) Adjustable photovoltaic support upright post node
CN203808097U (en) Foundation structure of offshore wind-power pipe frame
CN205077474U (en) Structure is alleviated to platform elongated structure's vortex induced vibration
CN204979809U (en) Wind -powered electricity generation tower section of thick bamboo protective cradle
CN210104823U (en) Load conversion device for pile foundation torsion test
CN206245487U (en) A kind of steel pipe carries bearing
CN203374983U (en) Fixing device of concrete delivery pump pipeline
CN101942835A (en) Heavy-load composite function anchoring device for scaffold
CN208764475U (en) A kind of rapid rescue device
CN207405647U (en) Photovoltaic bracket installation foundation structure
CN207063498U (en) A kind of steel structural upright column bag card

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: CHINA PETROLEUM PIPELINE BUREAU

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee before: CHINA PETROLEUM PIPELINE BUREAU

Patentee before: China National Petroleum Corp.

Co-patentee before: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190926

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee before: CHINA PETROLEUM PIPELINE BUREAU

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

TR01 Transfer of patent right