CN206052692U - 一种灌注桩吊杆 - Google Patents
一种灌注桩吊杆 Download PDFInfo
- Publication number
- CN206052692U CN206052692U CN201620667816.4U CN201620667816U CN206052692U CN 206052692 U CN206052692 U CN 206052692U CN 201620667816 U CN201620667816 U CN 201620667816U CN 206052692 U CN206052692 U CN 206052692U
- Authority
- CN
- China
- Prior art keywords
- rod
- mobile jib
- secondary bar
- control hole
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种灌注桩吊杆,具体涉及一种可根据现场标高对吊杆安装高度进行调节,同时还可兼作抗浮杆的灌注桩吊杆。要解决的技术问题是现有的灌注桩施工增加钢筋用量、现场可调性差、施工工效低,本实用新型包括主杆和副杆,所述的主杆包括主杆杆体,主杆杆体侧壁上设置有副杆控制孔,主杆杆体的底部设有钢筋笼连接卡槽;所述的副杆包括副杆杆体,副杆杆体通过副杆控制孔与主杆杆体活动连接,相邻副杆控制孔之间的副杆杆体上设置有限位卡,所述的两根主杆杆体通过连接杆连接,连接杆的中间设有调节板,采用这样的技术方案后的本实用新型,便于施工,快速安装,拆作方便,可根据现场标高对吊杆安装高度进行调节,同时还可兼作抗浮杆。
Description
技术领域
本实用新型涉及一种吊杆,具体涉及一种操作简单,快速安装,拆卸方便的灌注桩吊杆。
背景技术
目前灌注桩施工,钢筋笼标高控制一般采用Ф12钢筋焊接钢筋笼,上做吊环,根据现场地平标高的不同在钢筋笼对称两侧焊接长度不同的吊筋。这种施工方法存在另行增加钢筋用量的情况,且需进行现场二次焊接作业,现场可调性差,不具备钢筋笼抗浮作用,并且施工工效低。
实用新型内容
本实用新型要解决的技术问题是现有的灌注桩施工增加钢筋用量、现场可调性差、施工工效低,提供一种可根据现场标高对吊杆安装高度进行调节,同时还可兼作抗浮杆的灌注桩吊杆。
为解决上述技术问题,本实用新型采用下述技术方案:一种可拆式灌注桩吊杆,包括主杆和副杆,所述的主杆包括主杆杆体,主杆杆体侧壁上设置有副杆控制孔,主杆杆体的底部设有钢筋笼连接卡槽;所述的副杆包括副杆杆体,副杆杆体通过副杆控制孔与主杆杆体活动连接,相邻副杆控制孔之间的副杆杆体上设置有限位卡,所述的两根主杆杆体通过连接杆连接,连接杆的中间设有调节板,所述的钢筋笼连接卡槽为水平槽,由主杆杆体最下端两个相邻的副杆控制孔组成。
所述的副杆杆体上设有副杆拉环。
所述的调节板上设有至少两根调节杆。
所述的主杆杆体为钢管结构。
采用上述结构的本实用新型,操作简单,便于施工,快速安装,拆作方便,并且可根据现场标高对吊杆安装高度进行调节,同时还可兼作抗浮杆。
附图说明
图1是本实用新型主视结构示意图;
图2是图1的A-A剖视结构示意图;
图3是本实用新型左视结构示意图;
图4是本实用新型使用状态结构图。
具体实施方式
如图1至图3所示,本实用新型包括主杆1和副杆2,所述的主杆1包括主杆杆体11,主杆杆体11侧壁上设置有副杆控制孔12,主杆杆体11的底部设有钢筋笼连接卡槽13;所述的副杆2包括副杆杆体21,副杆杆体21通过副杆控制孔12与主杆杆体11活动连接,相邻副杆控制孔12之间的副杆杆体21上设置有限位卡22,所述的两根主杆杆体11通过连接杆7连接,连接杆7的中间设有调节板14。所述的副杆控制孔12通过钢筋焊接在主杆杆体11上。限位卡的设置防止副杆从副杆控制孔12内掉落丢失,并防止副杆抽出过度,主杆1、副杆2做为一个整体,使用方便,防止零部件分离丢失,调节板14焊接在连接杆7上,吊装钢筋笼时方便平衡钢筋笼两边,不会出现一边高一边低的现象。
所述的钢筋笼连接卡槽13为水平槽,由主杆杆体11最下端两个相邻的副杆控制孔12组成。钢筋笼连接卡槽13由两个距离较近的副杆控制孔12组成,钢筋笼吊放至地面时将设置在钢筋笼主筋6上的加劲筋3卡入吊杆钢筋笼连接卡槽内,副杆插入副杆控制孔内,使吊杆固定在加劲筋上,在钢筋笼两侧各设置一根吊杆;混凝土浇筑后,将副杆向上提拉,再将主杆旋转90°以上,使加劲筋从吊杆钢筋笼连接卡槽中分离出来,即可将吊杆提拉出来。将吊杆提拉出来时,传统的斜槽需要主杆向下移动一定距离后钢筋笼才能从斜槽内移出来,主杆向下移动后并向上提拉时,容易钩住钢筋笼上的螺旋筋4,影响工作效率,本实用新型水平槽的设置避免了这一情况的发生,增大工作效率。
所述的副杆杆体21上设有副杆拉环23。
所述的调节板14上设有至少两根调节杆15。每相邻调节杆15之间的距离一定,钢筋笼采用汽车吊吊放,吊放至设计标高后,在吊杆调节板中的调节杆15之间插入固定钢管或其他杆件,将固定钢管或杆件平放在桩两侧平地或支座上;在混凝土浇筑过程中,如出现吊杆上移情况时,可在固定钢管上部调节板内的调节杆15之间再插入一根固定钢管,并用重物将新插入的固定钢管压住,以抵消混凝土浇筑中产生的浮力。
所述的主杆杆体11为钢管结构。杆体11采用Ф48钢管,调节板采用Ф12钢筋焊接,副杆杆体采用Ф12的钢筋,钢筋笼连接卡槽13采用Ф16钢管与主杆杆体11焊接。采用钢管制作主杆杆体11,与传统的钢筋结构相比,承重性好,不易变形,可以提拉较大吨位的钢筋笼5,并可将钢筋笼放至较深的位置。
Claims (2)
1.一种灌注桩吊杆,其特征在于:包括主杆(1)和副杆(2),所述的主杆(1)包括主杆杆体(11),主杆杆体(11)侧壁上设置有副杆控制孔(12),主杆杆体(11)的底部设有钢筋笼连接卡槽(13);所述的副杆(2)包括副杆杆体(21),副杆杆体(21)通过副杆控制孔(12)与主杆杆体(11)活动连接,相邻副杆控制孔(12)之间的副杆杆体(21)上设置有限位卡(22),所述的两根主杆杆体(11)通过连接杆(7)连接,连接杆(7)的中间设有调节板(14),所述的钢筋笼连接卡槽(13)为水平槽,由主杆杆体(11)最下端两个相邻的副杆控制孔(12)组成。
2.根据权利要求1所述的灌注桩吊杆,其特征在于:所述的主杆杆体(11)为钢管结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620667816.4U CN206052692U (zh) | 2016-06-30 | 2016-06-30 | 一种灌注桩吊杆 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620667816.4U CN206052692U (zh) | 2016-06-30 | 2016-06-30 | 一种灌注桩吊杆 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206052692U true CN206052692U (zh) | 2017-03-29 |
Family
ID=58375418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620667816.4U Expired - Fee Related CN206052692U (zh) | 2016-06-30 | 2016-06-30 | 一种灌注桩吊杆 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206052692U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736317A (zh) * | 2019-02-25 | 2019-05-10 | 中建四局第一建筑工程有限公司 | 一种冲孔灌注桩的空桩钢筋笼吊放装置 |
-
2016
- 2016-06-30 CN CN201620667816.4U patent/CN206052692U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109736317A (zh) * | 2019-02-25 | 2019-05-10 | 中建四局第一建筑工程有限公司 | 一种冲孔灌注桩的空桩钢筋笼吊放装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202466569U (zh) | 一种混凝土实心空心一体桩 | |
CN204675673U (zh) | 一种砌块层间施工物料垂直运输装置 | |
CN206034444U (zh) | 一种桩基钢筋笼活动吊筋 | |
CN203701123U (zh) | 一种浅海变直径单桩基础 | |
CN206052692U (zh) | 一种灌注桩吊杆 | |
CN206052691U (zh) | 一种可拆式灌注桩吊杆 | |
CN202882376U (zh) | 一种电梯井模板支撑平台 | |
CN205577187U (zh) | 预制钢管混凝土构造柱夯土墙 | |
CN201236340Y (zh) | 新型工具式吊筋 | |
CN201520971U (zh) | 一种基桩 | |
CN201605572U (zh) | 锥柱形夯锤 | |
CN203782863U (zh) | 一种框架式排水井 | |
CN203847334U (zh) | 预埋件 | |
CN207002010U (zh) | 钢筋笼吊装用可拆卸吊筋 | |
CN206625585U (zh) | 一种檩条安装的扁担装置 | |
CN206015664U (zh) | 一种内置插杆式活动吊筋 | |
CN204060109U (zh) | 750kV变电站钢管混凝土构架 | |
CN210369938U (zh) | 一种用于浇筑桩芯的可周转套筒 | |
CN207498938U (zh) | 一种适用于混凝土管桩、钢管桩的预制桩帽 | |
CN205369301U (zh) | 地铁换乘段盖挖逆作区间板撑的支撑结构 | |
CN105544551A (zh) | 一种超长灌注桩快速下放钢筋笼的施工方法 | |
CN207158082U (zh) | 一种堆放预制叠合楼板的双层货架 | |
CN206984028U (zh) | 一种提高混凝土预制件生产效率的手推车 | |
CN206309111U (zh) | 一种线杆定位安装组件 | |
CN205776293U (zh) | 一种圆柱形桩基 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170329 Termination date: 20200630 |
|
CF01 | Termination of patent right due to non-payment of annual fee |