CN206035463U - Defeated device of collection based on evaporate auto parts notes and oil gas measurement - Google Patents
Defeated device of collection based on evaporate auto parts notes and oil gas measurement Download PDFInfo
- Publication number
- CN206035463U CN206035463U CN201621010405.4U CN201621010405U CN206035463U CN 206035463 U CN206035463 U CN 206035463U CN 201621010405 U CN201621010405 U CN 201621010405U CN 206035463 U CN206035463 U CN 206035463U
- Authority
- CN
- China
- Prior art keywords
- metering
- steam
- turn
- formula
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Measuring Volume Flow (AREA)
- Pipeline Systems (AREA)
Abstract
The utility model discloses a defeated device of collection based on evaporate auto parts notes and oil gas measurement, including total pipeline, many wells formula multi -ported valve, steam metering device, the electrical control valve, adopt liquid electric changeover valve valve, measurement separator and the oily header of collection, total pipeline and many wells formula multi -ported valve intercommunication, steam metering device one end is through measurement branch pipe and total pipeline intercommunication, the steam metering device other end and many wells formula multi -ported valve intercommunication, many wells formula multi -ported valve and at least two individual well intercommunications, by steam branch pipeline intercommunication between every individual well and the many wells formula multi -ported valve, the electrical control valve position in the steam bleeder on the road, adopt liquid electric changeover valve valve position on album oil content bye -pass, measurement separator one end and individual well intercommunication, the measurement separator other end and the oily header of collection intercommunication, individual well and the oily header of collection intercommunication. The utility model discloses a defeated device of collection based on evaporate auto parts notes and oil gas measurement, the operational process simply, the repeated construction of defeated, the injection allocation pipeline of the biggest reduction individual well collection, effectively reduce the total cost of engineering.
Description
Technical field
The utility model is related to steam soak and develops oil fields technical field, more particularly to a kind of to be based on steam injection allocation and oil
The gathering and transporting device of gas metering.
Background technology
At present, the general many development schemes driven using steam of domestic and international viscous crude field exploitation.Typically to the oil in oily area
Well, first injects a number of steam by several times in batches, then carries out vexed well.When closed time reaches the predetermined time, will
The well switchs to recover the oil.The output object of oil well can be transported to measuring station by pipe special.
The development scheme driven using steam, typically builds multiple steam injection allocation stations and multiple collection in administrative oily area respectively
Defeated measuring station.The task that steam injection allocation station owner wants is to receive steam boiler (master station) to manage the defeated high-pressure and high-temperature steam for coming, and will be connect
By injection allocation manifold, through the flow-meter and flow control valve of individual well, (every mouthful of well is respectively mounted a stream to the steam for receiving
Amount measuring instrument and a set of flow control valve), distribute to the oil well administered by the station.The task of measuring station is completed to per mouthful
The oil-producing aerogenesis of oil well carries out necessary metering and manages defeated.
Due to many using steam injection allocation station in administrative oily area and oil gas metering station distributed points, jet chimney and oil extraction pipeline
Intersect laying, form complicated oily area's pipe network.
Utility model content
The utility model is completed to solve of the prior art not enough, and the purpose of this utility model is to provide one
Kind of operational process is simple, the defeated, repeated construction of injection allocation pipeline that reduces individual well collection to greatest extent, and causes complicated oily area
Pipe network is smooth in order, so as to effectively reduce project total cost based on steam injection allocation and the gathering and transporting device of oil gas metering.
It is of the present utility model a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, it is many including main pipe line, multiple well
Port valve, steam measurement device, electric control valve, adopt liquid dynamoelectric switching valve, metering-separating device and oil-collecting header, the main pipe line
Connect with multiple well multiple-way valve formula able to turn on or off, described steam measurement device one end can with the main pipe line by measuring arm
Open-close type is connected, and the steam measurement device other end is connected with multiple well multiple-way valve formula able to turn on or off, and the multiple well is more
Port valve is connected with least two individual wells formula able to turn on or off, by steam branched pipe between each described individual well and the multiple well multiple-way valve
Road connects, and the electric control valve is located on the steam branch line, and the liquid dynamoelectric switching valve of adopting is positioned at oil-collecting branched pipe
Lu Shang, described metering-separating device one end are connected with individual well formula able to turn on or off, the metering-separating device other end with it is described
The formula connection able to turn on or off of oil-collecting header, the individual well are connected with oil-collecting header formula able to turn on or off.
A kind of gathering and transporting device based on steam injection allocation and oil gas metering of the present utility model can also be:
The liquid dynamoelectric switching valve of adopting for triple valve, it is described adopt liquid dynamoelectric switching valve one pass by all metering system pipeline and
Metering-separating device formula connection able to turn on or off, the liquid dynamoelectric switching valve two-way of adopting are connected with oil-collecting header formula able to turn on or off
It is logical, it is described to adopt the threeway of liquid dynamoelectric switching valve and connect with branch line formula able to turn on or off.
The metering-separating device includes metering separator, gas phase flow rate meter and liquid phase flowmeter, the metering separator
Top is connected with gas phase flow rate meter formula able to turn on or off by separating gas phase pipeline, the gas phase flow rate meter and the oil-collecting header
Formula connection able to turn on or off, the metering separator bottom are connected with liquid phase flowmeter formula able to turn on or off by separating liquid phase pipeline,
The liquid phase flowmeter is connected with oil-collecting header formula able to turn on or off.
The metering separator bottom is provided with blowoff line, and described blowoff line one end is connected with the metering separator,
The blowoff line other end is connected with the oil-collecting header.
Blow-down pipe is provided with the top of the metering separator, and described blow-down pipe one end is connected with the metering separator,
The blow-down pipe other end and ft connection.
The steam measurement device includes steam-flow meter, and described steam-flow meter one end is by the metering arm and institute
Main pipe line formula connection able to turn on or off is stated, the steam-flow meter other end is connected with multiple well multiple-way valve formula able to turn on or off.
The main pipe line is provided with pressure transmitter, and the pressure transmitter is connected with the main pipe line.
Temperature transmitter is additionally provided with the main pipe line, and the temperature transmitter is connected with the main pipe line, the temperature
Transmitter is located at the rear portion of the pressure transmitter.
Thermometer is additionally provided with the main pipe line, the thermometer is connected with the main pipe line, the thermometer is located at institute
State the rear portion of temperature transmitter.
It is of the present utility model a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, it is many including main pipe line, multiple well
Port valve, steam measurement device, electric control valve, adopt liquid dynamoelectric switching valve, metering-separating device and oil-collecting header, the main pipe line
Connect with multiple well multiple-way valve formula able to turn on or off, described steam measurement device one end can with the main pipe line by measuring arm
Open-close type is connected, and the steam measurement device other end is connected with multiple well multiple-way valve formula able to turn on or off, and the multiple well is more
Port valve is connected with least two individual wells formula able to turn on or off, by steam branched pipe between each described individual well and the multiple well multiple-way valve
Road connects, and the electric control valve is located on the steam branch line, and the liquid dynamoelectric switching valve of adopting is positioned at oil-collecting branched pipe
Lu Shang, described metering-separating device one end are connected with individual well formula able to turn on or off, the metering-separating device other end with it is described
The formula connection able to turn on or off of oil-collecting header, the individual well are connected with oil-collecting header formula able to turn on or off.So, when steam injection station carrys out steam not
When needing metering, the path between main pipe line and multiple well multiple-way valve is opened, closed between main pipe line and steam measurement device
Path, opens the electric control valve on the individual well steam branch line, close on the individual well oil-collecting branch line to adopt liquid electronic
Switching valve, after main pipe line carrys out vapour, into after multiple well multiple-way valve, is reallocated to the individual well of required steam supply, so as to meet individual well note
The demand of vapour amount.When steam injection station carrys out steam needs metering, the path between main pipe line and multiple well multiple-way valve is opened, while beating
The path between main pipe line and steam measurement device is opened, the electric control valve on the individual well steam branch line is opened, closing should
Liquid dynamoelectric switching valve is adopted on individual well oil-collecting branch line, after main pipe line carrys out steam, a part of steam enters metering arm pipeline
And after steam measurement device enters multiple well multiple-way valve, then the individual well for needing metering is distributed to through multiple well multiple-way valve,
According to the data shown on steam measurement device, constantly adjustment needs the aperture size of the electric control valve on the individual well of metering,
Finally to meet the demand of steam injection amount, staff just can clearly can be known into the individual well by steam measurement device
Steam injection amount.The steam that another part main pipe line comes enters many wells by the path between main pipe line and multiple well multiple-way valve, steam
After formula multiple-way valve, required steam supply is reallocated to without the individual well that measures, so as to meet the demand of individual well steam injection amount, both can be with
Meet the individual well steam supply of needs metering, it is also possible to the individual well steam supply that satisfaction need not be measured.Steam injection is finished when carrying out adopting liquid, if
Adopt liquid need metering when, the electric control valve cut out on the individual well steam branch line is opened on the individual well oil-collecting branch line
Adopt liquid dynamoelectric switching valve, switching is adopted liquid dynamoelectric switching valve and goes to connect metering-separating device, carries out into after metering-separating device
The separation of gas phase and liquid phase, final Jing oil-collectings header are outer defeated.Steam injection is finished when carrying out adopting liquid, if adopt liquid and need not measure,
The electric control valve cut out on the individual well steam branch line, opens and adopts the electronic switching of liquid on the individual well oil-collecting branch line
Valve, will adopt liquid dynamoelectric switching valve and go to connect defeated outside oil-collecting header.One kind of the present utility model is based on steam injection allocation and oil gas metering
Gathering and transporting device, in terms of existing technologies, its operational process is simple, defeated, the injection allocation pipeline that reduces individual well collection to greatest extent
Repeated construction, and cause complicated oily area's pipe network smooth in order, so as to effectively reduce project total cost.
Description of the drawings
Fig. 1 is of the present utility model a kind of based on steam injection allocation and the structure chart of the gathering and transporting device of oil gas metering.
Fig. 2 is a kind of another structure chart of gathering and transporting device based on steam injection allocation and oil gas metering of the present utility model.
Figure number explanation
1 ... main pipe line 2 ... pressure transmitter 3 ... temperature transmitter
4 ... thermometers 6 ... measure arm 7 ... steam-flow meter
8 ... electric control valves 19 ... adopt liquid dynamoelectric switching valve 24 ... removes metering system pipeline
25 ... oil-collecting header 26 ... metering separators 27 ... separate gas phase pipeline
28 ... gas phase flow rate meter 29 ... liquid phase flowmeters 30 ... separate liquid phase pipeline
31 ... blowoff line 32 ... blow-down pipe 33 ... multiple well multiple-way valves
40 ... steam measurement device 50 ... metering-separating devices
Specific embodiment
Fig. 1-2 below in conjunction with the accompanying drawings is to of the present utility model a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering
It is described in further detail.
It is of the present utility model a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, Fig. 1-2 is refer to, including house steward
Line 1, multiple well multiple-way valve 33, steam measurement device 40, electric control valve 8, adopt liquid dynamoelectric switching valve 19, metering-separating device 50
With oil-collecting header 25, the main pipe line 1 connected with 33 formula able to turn on or off of the multiple well multiple-way valve, the steam measurement device 40 1
End is connected with the main pipe line 1 with formula able to turn on or off by measuring arm 6,40 other end of steam measurement device and many wells
33 formula able to turn on or off of formula multiple-way valve is connected, and the multiple well multiple-way valve 33 connected with least two individual wells formula able to turn on or off, described in each
Connected by steam branch line between individual well and the multiple well multiple-way valve 33, the electric control valve 8 is positioned at the steam point
On bye-pass, the liquid dynamoelectric switching valve 19 of adopting on the oil-collecting branch line, 50 one end of the metering-separating device with it is described
Individual well formula connection able to turn on or off, 50 other end of the metering-separating device are connected with 25 formula able to turn on or off of the oil-collecting header, the list
Well is connected with 25 formula able to turn on or off of the oil-collecting header.So, when steam injection station carrys out steam need not measure, open main pipe line 1 with
Path between multiple well multiple-way valve 33, the path closed between main pipe line 1 and steam measurement device 40, opens the individual well steam
Electric control valve 8 on branch line, what is closed on the individual well oil-collecting branch line adopt liquid dynamoelectric switching valve 19, main pipe line 1
After vapour, into after multiple well multiple-way valve 33, the individual well of required steam supply is reallocated to, so as to meet the demand of individual well steam injection amount.When
When steam injection station is carried out steam and needs metering, the path between main pipe line 1 and multiple well multiple-way valve 33 is opened, while opening main pipe line 1
With the path between steam measurement device 40, the electric control valve 8 on the individual well steam branch line is opened, the individual well collection is closed
Liquid dynamoelectric switching valve 19 is adopted on oil bye-pass, after main pipe line 1 carrys out steam, a part of steam enters 6 pipeline of metering arm simultaneously
After steam measurement device 40 enters multiple well multiple-way valve 33, then the list for needing metering is distributed to through multiple well multiple-way valve 33
Well, according to the data shown on steam measurement device 40, constantly adjustment needs the aperture of the electric control valve 8 on the individual well of metering
Size, finally to meet the demand of steam injection amount, staff just can clearly can know to enter by steam measurement device 40
The steam injection amount of the individual well.The steam of another part main pipe line 1 passes through the path between main pipe line 1 and multiple well multiple-way valve 33,
After steam enters multiple well multiple-way valve 33, individual well of the required steam supply without metering is reallocated to, so as to meet individual well steam injection
The demand of amount, can both meet the individual well steam supply of needs metering, it is also possible to the individual well steam supply that satisfaction need not be measured.When steam injection it is complete
When Bi Jinhang adopts liquid, if adopt liquid need metering when, the electric control valve 8 closed on the individual well steam branch line, open should
Adopt liquid dynamoelectric switching valve 19 on individual well oil-collecting branch line, switching is adopted liquid dynamoelectric switching valve 19 and goes to connect metering-separating device
50, into the separation of 50 laggard promoting the circulation of qi phase of metering-separating device and liquid phase, final Jing oil-collectings header 25 is outer defeated.Steam injection is finished to be carried out
When adopting liquid, if adopt liquid and need not measure, the electric control valve 8 cut out on the individual well steam branch line opens the individual well
Liquid dynamoelectric switching valve 19 is adopted on oil-collecting branch line, liquid dynamoelectric switching valve 19 will be adopted and go to connect oil-collecting header 25 outer defeated.This reality
With new a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, in terms of existing technologies, its operational process letter
It is single, reduce that individual well collection is defeated, the repeated construction of injection allocation pipeline to greatest extent, and cause that complicated oily area's pipe network is smooth to be had
Sequence, so that effectively reduce project total cost.
It is of the present utility model a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, Fig. 1-2 is refer to, is above being retouched
Can also be on the basis of the technical scheme stated:The liquid dynamoelectric switching valve 19 of adopting is triple valve, described to adopt liquid dynamoelectric switching valve
19 1 pass by metering system pipeline all is connected with 50 formula able to turn on or off of the metering-separating device, described to adopt liquid dynamoelectric switching valve 19
Two-way is connected with 25 formula able to turn on or off of the oil-collecting header, and described to adopt 19 threeway of liquid dynamoelectric switching valve able to turn on or off with the branch line
Formula is connected.So, when come liquid need metering when, switching adopt liquid dynamoelectric switching valve liquid in 19 future by go metering system pipeline enter
In metering-separating device 50, the separation of gas phase and liquid phase is carried out, and final Jing oil-collectings header is outer defeated.When carrying out liquid and need not measure,
Switching is adopted liquid dynamoelectric switching valve 19 and is connected with oil-collecting header 25, and being directly entered oil-collecting header 25 by individual well come liquid is carried out outward
It is defeated.When individual well is in steam injection state, liquid dynamoelectric switching valve 19 is adopted described in switching with the steam branch line in closing shape
State.Can also be:The metering-separating device 50 includes metering separator 26, gas phase flow rate meter 28 and liquid phase flowmeter 29, institute
State 26 top of metering separator and connected with 28 formula able to turn on or off of the gas phase flow rate meter by separating gas phase pipeline 27, the gas phase stream
Gauge 28 is connected with 25 formula able to turn on or off of the oil-collecting header, and 26 bottom of the metering separator is by separating liquid phase pipeline 30 and institute
The connection of 29 formula able to turn on or off of liquid phase flowmeter is stated, the liquid phase flowmeter 29 is connected with 25 formula able to turn on or off of the oil-collecting header.So,
Steam injection is finished when carrying out adopting liquid, if adopt liquid need metering when, the electric control valve 8 closed on the individual well steam branch line,
Open and adopt liquid dynamoelectric switching valve 19 on the individual well oil-collecting branch line, switching is adopted liquid dynamoelectric switching valve 19 and goes connection metering to separate
Device 26, carries out the separation of gas phase and liquid phase into metering separator 26, the gas phase on the separated gas phase pipeline of the gas after separation 27
Flowmeter 28 enters after measuring that oil-collecting header 25 is outer defeated, the liquid phase quality flow on the separated liquid phase pipeline of the liquid phase after separation 30
It is after 29 metering of meter, outer defeated also into oil-collecting header 25.Further preferred version is:26 bottom of the metering separator is provided with row
Dirty pipeline 31,31 one end of the blowoff line are connected with the metering separator 26,31 other end of the blowoff line with it is described
Oil-collecting header 25 is connected.So, when equipment needs cleaning or safeguards, blowoff line 31 is provided with 26 bottom of metering separator,
The sewage in metering separator 26, debris etc. can be discharged by blowoff line 31 by blowoff line 31, to ensure equipment
Normal operation.Can also be:Blow-down pipe 32,32 one end of the blow-down pipe and institute is provided with the top of the metering separator 26
State metering separator 26 to connect, 32 other end of the blow-down pipe and ft connection.So, if the pressure in metering separator 26
Power is excessive, can be exhausted by blow-down pipe 32, to ensure the normal operation of equipment.
It is of the present utility model a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, Fig. 1-2 is refer to, is above being retouched
Can also be on the basis of the technical scheme stated:The steam measurement device 40 includes steam-flow meter 7, the steam-flow meter
7 one end are connected with 1 formula able to turn on or off of the main pipe line by the metering arm 6, and 7 other end of the steam-flow meter is more with described
33 formula able to turn on or off of well formula multiple-way valve is connected.So, when steam injection station carrys out steam needs metering, main pipe line 1 and steam measurement are opened
Path between device 40, opens the electric control valve 8 on the individual well steam branch line, closes the individual well oil-collecting branch line
On adopt liquid dynamoelectric switching valve 19, after main pipe line 1 carrys out steam, a part of steam enters metering 6 pipeline of arm and through steam stream
After gauge 7 enters multiple well multiple-way valve 33, then the individual well for needing metering is distributed to through multiple well multiple-way valve 33, according to steam stream
The data shown on gauge 7, constantly adjustment need the aperture size of the electric control valve 8 on the individual well of metering, finally to meet
Need the demand of the steam injection amount of metering individual well, staff just can clearly can know into the list by steam-flow meter 7
The steam injection amount of well.The steam of another part main pipe line 1 is by the path between main pipe line 1 and multiple well multiple-way valve 33, steam
Into after multiple well multiple-way valve 33, individual well of the required steam supply without metering is reallocated to, so as to meet individual well steam injection amount
Demand, can both meet the individual well steam supply of needs metering, it is also possible to the individual well steam supply that satisfaction need not be measured.Can also be:Institute
State main pipe line 1 and be provided with pressure transmitter 2, the pressure transmitter 2 is connected with the main pipe line 1.So, pressure transmitter 2
Refer to be output as the pressure sensor of standard signal, be that a kind of pressure variations that receive are converted to standard output signals in proportion
Instrument, for detecting and measuring the pressure of steam in pipeline, staff can intuitively by knowing that pressure transmitter 2 understands
Carry out the pressure of steam in dawn main pipe line 1.Can also be:Temperature transmitter 3, the temperature pick-up is additionally provided with the main pipe line 1
Device 3 is connected with the main pipe line 1, and the temperature transmitter 3 is located at the rear portion of the pressure transmitter 2.So, temperature transmitter
3 is a kind of instrument that temperature variable is converted to transmissible normalization output signal, and arranging temperature transmitter 3 can be intuitively
In observation pipeline, the temperature change of steam, is staff's provides convenient.Further preferred version is:On the main pipe line 1
Thermometer 4 is additionally provided with, the thermometer 4 is connected with the main pipe line 1, after the thermometer 4 is located at the temperature transmitter 3
Portion.So, thermometer 4 is set, and staff can pass through the temperature data checked and observe on the thermometer 4, carry out control pipe
The temperature data of steam in road, to ensure that equipment is normally used.
It is above-mentioned only to the utility model in several specific embodiments be illustrated, but can not be used as of the present utility model
Protection domain, the equivalence changes or modification or equal proportion done by every design spirit according in the utility model amplify or contract
It is little etc., it is deemed to fall protection domain of the present utility model.
Claims (9)
1. a kind of based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:Lead to including main pipe line, multiple well more
Valve, steam measurement device, electric control valve, adopt liquid dynamoelectric switching valve, metering-separating device and oil-collecting header, the main pipe line with
Multiple well multiple-way valve formula connection able to turn on or off, described steam measurement device one end can be opened with the main pipe line by measuring arm
Enclosed is connected, and the steam measurement device other end is connected with multiple well multiple-way valve formula able to turn on or off, and the multiple well leads to more
Valve is connected with least two individual wells formula able to turn on or off, by steam branch line between each described individual well and the multiple well multiple-way valve
Connection, the electric control valve are located on the steam branch line, and the liquid dynamoelectric switching valve of adopting is positioned at oil-collecting branch line
On, described metering-separating device one end is connected with individual well formula able to turn on or off, the metering-separating device other end and the collection
The formula connection able to turn on or off of oily header, the individual well are connected with oil-collecting header formula able to turn on or off.
2. according to claim 1 based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:It is described to adopt liquid
Dynamoelectric switching valve is triple valve, and the liquid dynamoelectric switching valve one of adopting passes by metering system pipeline all with the metering-separating device
Formula able to turn on or off connection, the liquid dynamoelectric switching valve two-way of adopting are connected with oil-collecting header formula able to turn on or off, described to adopt that liquid is electronic to be cut
Change valve threeway to connect with branch line formula able to turn on or off.
3. according to claim 1 based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:The metering
Separator includes metering separator, gas phase flow rate meter and liquid phase flowmeter, and the metering separator top is by separating gas phase
Pipeline is connected with gas phase flow rate meter formula able to turn on or off, and the gas phase flow rate meter is connected with oil-collecting header formula able to turn on or off, institute
State metering separator bottom by separate liquid phase pipeline connect with liquid phase flowmeter formula able to turn on or off, the liquid phase flowmeter and
Oil-collecting header formula connection able to turn on or off.
4. according to claim 3 based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:The metering
Separator bottom is provided with blowoff line, and described blowoff line one end is connected with the metering separator, and the blowoff line is another
End is connected with the oil-collecting header.
5. according to claim 3 based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:The metering
Blow-down pipe is provided with the top of separator, and described blow-down pipe one end is connected with the metering separator, and the blow-down pipe is another
End and ft connection.
6. according to claim 1-5 any one claim based on steam injection allocation and the gathering and transporting device of oil gas metering,
It is characterized in that:The steam measurement device includes steam-flow meter, and described steam-flow meter one end is by the metering arm
Connect with main pipe line formula able to turn on or off, the steam-flow meter other end is connected with multiple well multiple-way valve formula able to turn on or off.
7. according to claim 1-5 any one claim based on steam injection allocation and the gathering and transporting device of oil gas metering,
It is characterized in that:The main pipe line is provided with pressure transmitter, and the pressure transmitter is connected with the main pipe line.
8. according to claim 7 based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:The house steward
Temperature transmitter is additionally provided with line, the temperature transmitter is connected with the main pipe line, the temperature transmitter is located at the pressure
The rear portion of power transmitter.
9. according to claim 8 based on steam injection allocation and the gathering and transporting device of oil gas metering, it is characterised in that:The house steward
Thermometer is additionally provided with line, the thermometer is connected with the main pipe line, after the thermometer is located at the temperature transmitter
Portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621010405.4U CN206035463U (en) | 2016-08-30 | 2016-08-30 | Defeated device of collection based on evaporate auto parts notes and oil gas measurement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621010405.4U CN206035463U (en) | 2016-08-30 | 2016-08-30 | Defeated device of collection based on evaporate auto parts notes and oil gas measurement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206035463U true CN206035463U (en) | 2017-03-22 |
Family
ID=58300350
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621010405.4U Withdrawn - After Issue CN206035463U (en) | 2016-08-30 | 2016-08-30 | Defeated device of collection based on evaporate auto parts notes and oil gas measurement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206035463U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106194137A (en) * | 2016-08-30 | 2016-12-07 | 北京大漠石油工程技术有限公司 | A kind of based on steam injection allocation and the gathering and transporting device of oil gas metering |
CN108487900A (en) * | 2018-04-27 | 2018-09-04 | 中国石油工程建设有限公司北京设计分公司 | A kind of continuous automatic well-selecting metering system and method |
CN108825191A (en) * | 2018-07-22 | 2018-11-16 | 江苏万兴石油装备有限公司 | A kind of temperature control type steam regulating device |
-
2016
- 2016-08-30 CN CN201621010405.4U patent/CN206035463U/en not_active Withdrawn - After Issue
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106194137A (en) * | 2016-08-30 | 2016-12-07 | 北京大漠石油工程技术有限公司 | A kind of based on steam injection allocation and the gathering and transporting device of oil gas metering |
CN106194137B (en) * | 2016-08-30 | 2019-07-16 | 北京大漠石油工程技术有限公司 | A kind of gathering and transporting device based on steam injection allocation and oil gas metering |
CN108487900A (en) * | 2018-04-27 | 2018-09-04 | 中国石油工程建设有限公司北京设计分公司 | A kind of continuous automatic well-selecting metering system and method |
CN108825191A (en) * | 2018-07-22 | 2018-11-16 | 江苏万兴石油装备有限公司 | A kind of temperature control type steam regulating device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206035463U (en) | Defeated device of collection based on evaporate auto parts notes and oil gas measurement | |
CN106195647B (en) | A kind of water supply pipe leak detection monitoring system and its monitoring method based on GPRS | |
CN102494810A (en) | Separate household heating measurement device of serial single-pipe connection type heating pipe network system and method | |
CN105569121A (en) | Intelligent water feed pipeline system with pressure flow monitoring recording and teletransmission function | |
CN203287064U (en) | Power plant heating steam supply flow measuring device based on heat balance | |
CN102032930A (en) | Shunting type coal gas flow measurement device and measurement method thereof | |
CN202661201U (en) | Heat allocation system for remote meter reading | |
CN202366913U (en) | Oil-collecting and ball-collecting integrated device | |
CN106194137B (en) | A kind of gathering and transporting device based on steam injection allocation and oil gas metering | |
CN106194106B (en) | A kind of multiple-way valve mixes liquid injection allocation metering device | |
CN202000985U (en) | Saturated steam regulate and control device | |
CN204827385U (en) | Wide -range individual well oil gas metering device | |
CN102262105B (en) | Dryness and flow measurement system for wet steam pipe network | |
CN202834761U (en) | Oil well produced liquid separating and measuring integrated device | |
CN103133871A (en) | Pipeline online dynamic smart detection system and detection method thereof | |
CN206053902U (en) | A kind of multiple-way valve mixes liquid injection allocation metering device | |
CN206420587U (en) | A kind of geothermal well productivity test device | |
CN204371306U (en) | A kind of oil well measurement structure | |
CN2854074Y (en) | Automatic metering transmission device of thickening oil heat production steam parameter | |
CN106106059A (en) | A kind of intelligent irrigation control system | |
CN202547737U (en) | Online power plant feedwater flow calibration device based on heat balance | |
CN209558041U (en) | A kind of well group drops back to pressure metering device | |
CN203323838U (en) | Steam-water fluid measuring instrument calibration device for oilfield steam injection | |
CN104421618A (en) | Multi-channel metering device used for urban gas pipeline network | |
CN201963282U (en) | Uniform dryness distributor for saturated vapor in oil field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |