CN206034310U - Quick crushing device of waste brick for bridge construction - Google Patents
Quick crushing device of waste brick for bridge construction Download PDFInfo
- Publication number
- CN206034310U CN206034310U CN201620988305.2U CN201620988305U CN206034310U CN 206034310 U CN206034310 U CN 206034310U CN 201620988305 U CN201620988305 U CN 201620988305U CN 206034310 U CN206034310 U CN 206034310U
- Authority
- CN
- China
- Prior art keywords
- spring
- plate
- fixed pulley
- frame
- bracing wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a waste brick crushing device especially relates to a quick crushing device of waste brick for bridge construction. The to -be -solved technical problem of the utility model is to provide a quick crushing device of waste brick for bridge construction of crushing even, crush thorough, simple structure. In order to solve the technical problem, the utility model provides a such quick crushing device of waste brick for bridge construction is including bottom plate, left side frame, first spring, broken frame, first deflector, second spring, first briquetting, right side frame, first fixed pulley, second fixed pulley, slide rail etc. Bottom plate top left side symmetry is equipped with first spring, and first spring top is equipped with broken frame, and bottom plate top left side is equipped with left side frame, left chord position in first spring left side. The utility model discloses even, the effect thorough, simple structure of crushing of crushing has been reached to, because the effect of conical tooth, fourth spring and third clamp plate, make the more thorough of waste brick crushing in the broken frame.
Description
Technical field
This utility model is related to a kind of useless brick and crushes device, more particularly to a kind of bridge construction quickly crushes dress with useless brick
Put.
Background technology
Bridge, refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. smoothly can pass through.It is modern for adapting to
The transportation industry of high speed development, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic needs and set up make
Current more easily building.Bridge is typically made up of superstructure, substructure, bearing and attached structure, top knot
Structure is across the primary structure of obstacle also known as bridge span structure;Substructure includes abutment, bridge pier and basis;Bearing is tied for spanning
Load transfer device set by the supporting of structure and bridge pier or abutment;Attached structure then refer to transition slab at bridge head, truncated cone banking, shore protection,
Training works etc..
Building is the general name of building and structures, be people in order to meet social life needs, utilize grasped thing
Matter technological means, and the artificial environment created with certain scientific law, edema due to wind pathogen theory and aesthetic principle.
With giving up, brick crushing device presence crushing is uneven, crush not thorough, baroque shortcoming for existing bridge construction,
Therefore need that a kind of crushing of research and development is uniform badly, crushing thoroughly, the bridge construction of simple structure quickly crush device with useless brick.
Utility model content
(1) technical problem to be solved
Crushing is uneven, it is not thorough to crush in order to overcome the useless brick crushing device of existing bridge construction to exist for this utility model
Bottom, baroque shortcoming, the technical problems to be solved in the utility model is to provide that a kind of crushing is uniform, crushing thoroughly, structure
Simple bridge construction quickly crushes device with useless brick.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model quickly crushes dress there is provided such a bridge construction with useless brick
Put, include base plate, left frame, the first spring, broken frame, the first guide plate, second spring, the first briquetting, right shelf, the first fixed cunning
Wheel, the second fixed pulley, slide rail, slide block, the first pressing plate, movable plate, the 3rd spring, the first bracing wire, push pedal, electric pushrod, second
Bracing wire, the 3rd fixed pulley, the 4th fixed pulley, L-shaped fix bar, the second guide plate, the second pressing plate and fixed plate, base plate top left side
The first spring is arranged with, the first spring top is provided with broken frame, and base plate top left side is provided with left frame, and left frame is located at the first spring
Left side, base plate top right side are provided with the first guide plate and right shelf, and the first guide plate is located on the left of right shelf, is provided with the first guide plate
First pilot hole, the first guide plate left upper portion are arranged with second spring, and second spring left end is provided with the first briquetting, the first pressure
Block right center is provided with the first bracing wire, is sequentially provided with the second fixed pulley and the first fixed pulley on the right side of right shelf from top to bottom, and right shelf is left
Side is sequentially provided with electric pushrod, slide rail and fixed plate from top to bottom, is provided with the first aperture and second orifice, the first aperture in right shelf
Below second orifice, the expansion link of electric pushrod is provided with push pedal, and on slide rail, slidingtype is provided with slide block, and slide block is provided with shifting
Dynamic plate, first is drawstring through the first pilot hole and the first aperture, further around crossing the first fixed pulley and the second fixed pulley, and through the
Two apertures, the first bracing wire are connected with the right side of movable plate, and slide rail top left side is provided with the first pressing plate, is arranged with the right side of the first pressing plate
3rd spring, the 3rd spring right-hand member are connected with the left of movable plate, and fixed plate left end is provided with the 4th fixed pulley, fixed plate top left side
The 3rd fixed pulley is provided with, fixed plate bottom left is provided with L-shaped fix bar, and L-shaped fix bar left end is provided with the second guide plate, and second leads
The second pilot hole is provided with plate, the second bracing wire is provided with the left of push pedal, and the second bracing wire bypasses the 3rd fixed pulley and the 4th fixed pulley,
And pass through the second pilot hole, the second end of pulling to be provided with the second pressing plate, the second pressing plate is located at directly over broken frame.
Preferably, conical tooth is also included, the second pressing plate bottom even is provided with conical tooth.
Preferably, the 4th spring and the 3rd pressing plate is also included, left frame right upper portion is arranged with the 4th spring, the 4th bullet
Spring right-hand member is provided with the 3rd pressing plate.
Preferably, base plate be high-quality steel, surface plating zinc layers.
Preferably, it is Q235 steel to crush frame material.
Preferably, right shelf material is rustless steel.
Operation principle:When needing to crush useless brick, workman pours useless brick into broken inframe first, then controls electricity
Dynamic push rod elongation, electric pushrod drive push pedal to left movement, and the second bracing wire is released, and the second pressing plate is transported downwards under gravity
Dynamic, the useless brick to crushing inframe is crushed, meanwhile, push pedal promotes movable plate by slide block to left movement, and the 3rd spring is pressed
First bracing wire is packed up by contracting, movable plate to left movement, and the first bracing wire pulls the first briquetting to move right, and second spring is compressed,
Control electric pushrod shrink, electric pushrod drive push pedal move right, the second bracing wire is packed up, the second bracing wire pull the second pressing plate to
Upper motion, meanwhile, movable plate is moved right by slide block in the presence of the 3rd spring is by elastic force, and the first bracing wire is released, and first
Briquetting to left movement, clashes into broken frame in the presence of second spring elastic force so that the useless brick of broken inframe is stirred, so anti-
Multiple, the second pressing plate moves up and down, and the useless brick crushing to crushing inframe is uniform, while the first briquetting constantly clashes into broken frame, makes
The useless brick that inframe must be crushed constantly is stirred, and is easy to crushing, when the useless brick crushing to crushing inframe is completed, and the second pressing plate and first
When briquetting returns to initial position, control electric pushrod quits work, and the useless brick that the crushing of broken inframe is completed is taken out i.e. by workman again
Can.
Because also including conical tooth, the second pressing plate bottom even is provided with conical tooth, and the useless brick crushing to crushing inframe is thorough
Bottom it is more abundant.
Because also including the 4th spring and the 3rd pressing plate, left frame right upper portion is arranged with the 4th spring, the 4th spring
Right-hand member is provided with the 3rd pressing plate, and when broken frame left wall is contacted with the 3rd pressing plate, the 4th spring is compressed, when broken frame left wall is left
During three pressing plates, broken frame is moved right in the presence of the 4th spring force, crushes frame double swerve so that broken inframe
It is more abundant that useless brick is uniformly crushed.
Because base plate is high-quality steel, surface plating zinc layers so that this device is not perishable, service life is improved.
Because broken frame material is Q235 steel, Q235 steel hardness is high and does not allow yielding, makes the service life of device longer.
Because right shelf material is rustless steel, rustless steel corrosion resistance and acid resistance are strong, can extend the service life of this device.
(3) beneficial effect
This utility model has reached that crushing is uniform, crushing thoroughly, the effect of simple structure, also, because conical tooth, the 4th
The effect of spring and the 3rd pressing plate so that more thorough, this utility model structure novelty of the useless brick crushing of broken inframe, practicality
By force, the labor intensity of workman can be reduced.
Description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is second main structure diagram of the present utility model.
Fig. 3 is the third main structure diagram of the present utility model.
Labelling in accompanying drawing for:1- base plates, the left framves of 2-, the first springs of 3-, 4- crush frame, the first guide plates of 5-, 6- first
Pilot hole, 7- second springs, the first briquettings of 8-, 9- right shelfs, the first apertures of 10-, the first fixed pulleys of 11-, the second fixed pulleys of 12-,
13- second orifices, 14- slide rails, 15- slide blocks, the first pressing plates of 16-, 17- movable plates, the 3rd springs of 18-, the first bracing wires of 19-, 20-
Push pedal, 21- electric pushrods, the second bracing wires of 22-, the 3rd fixed pulleys of 23-, the 4th fixed pulleys of 24-, the second pilot holes of 25-, 26-L shapes
Fix bar, the second guide plates of 27-, the second pressing plates of 28-, 29- fixed plates, 30- conical tooths, the 4th springs of 31-, the 3rd pressing plates of 32-.
Specific embodiment
With reference to the accompanying drawings and examples this utility model is further described.
Embodiment 1
A kind of bridge construction quickly crushes device with useless brick, as Figure 1-3, includes base plate 1, left frame 2, the first spring
3rd, frame 4, the first guide plate 5, second spring 7, the first briquetting 8, right shelf 9, the first fixed pulley 11, the second fixed pulley 12, cunning are crushed
Rail 14, slide block 15, the first pressing plate 16, movable plate 17, the 3rd spring 18, the first bracing wire 19, push pedal 20, electric pushrod 21, second
Bracing wire 22, the 3rd fixed pulley 23, the 4th fixed pulley 24, L-shaped fix bar 26, the second guide plate 27, the second pressing plate 28 and fixed plate
29,1 top left side of base plate is arranged with the first spring 3, and 3 top of the first spring is provided with broken frame 4, and 1 top left side of base plate is provided with
Left frame 2, left frame 2 are located on the left of the first spring 3, and 1 top right side of base plate is provided with the first guide plate 5 and right shelf 9, the first guide plate 5
On the left of right shelf 9, the first pilot hole 6 on the first guide plate 5, is provided with, 5 left upper portion of the first guide plate is arranged with the second bullet
Spring 7,7 left end of second spring are provided with the first briquetting 8, and 8 right center of the first briquetting is provided with the first bracing wire 19, from upper on the right side of right shelf 9
The second fixed pulley 12 and the first fixed pulley 11 is sequentially provided with, is sequentially provided with electric pushrod 21 from top to bottom, slides on the left of right shelf 9
Rail 14 and fixed plate 29, are provided with the first aperture 10 and second orifice 13 in right shelf 9, the first aperture 10 is located under second orifice 13
Side, the expansion link of electric pushrod 21 are provided with push pedal 20, and on slide rail 14, slidingtype is provided with slide block 15, and slide block 15 is provided with movable plate
17, the first bracing wire 19 passes through the first pilot hole 6 and the first aperture 10, further around the first fixed pulley 11 and the second fixed pulley 12 excessively, and
And passing through second orifice 13, the first bracing wire 19 to be connected with the right side of movable plate 17,14 top left side of slide rail is provided with the first pressing plate 16, the
The 3rd spring 18 is arranged with the right side of one pressing plate 16,18 right-hand member of the 3rd spring is connected with the left of movable plate 17,29 left end of fixed plate
The 4th fixed pulley 24 is provided with, 29 top left side of fixed plate is provided with the 3rd fixed pulley 23, and 29 bottom left of fixed plate is provided with L-shaped and fixes
Bar 26,26 left end of L-shaped fix bar are provided with the second guide plate 27, are provided with the second pilot hole 25 on the second guide plate 27, and push pedal 20 is left
Side is provided with the second bracing wire 22, and the second bracing wire 22 bypasses the 3rd fixed pulley 23 and the 4th fixed pulley 24, and passes through the second pilot hole
25,22 end of the second bracing wire is provided with the second pressing plate 28, and the second pressing plate 28 is located at directly over broken frame 4.
Conical tooth 30 is included also, 28 bottom even of the second pressing plate is provided with conical tooth 30.
4th spring 31 and the 3rd pressing plate 32 are included also, 2 right upper portion of left frame is arranged with the 4th spring 31, the 4th bullet
31 right-hand member of spring is provided with the 3rd pressing plate 32.
Base plate 1 be high-quality steel, surface plating zinc layers.
4 material of broken frame is Q235 steel.
9 material of right shelf is rustless steel.
Operation principle:When needing to crush useless brick, workman pours useless brick in broken frame 4 into first, then controls
Electric pushrod 21 extends, and electric pushrod 21 drives push pedal 20 to left movement, and the second bracing wire 22 is released, and the second pressing plate 28 is made in gravity
Move downward with, crush to crushing the useless brick in frame 4, meanwhile, push pedal 20 promotes movable plate 17 to pass through slide block 15 to the left
Motion, the 3rd spring 18 are compressed, and the first bracing wire 19 is packed up by movable plate 17 to left movement, and the first bracing wire 19 pulls the first briquetting
8 move right, and second spring 7 is compressed, and control electric pushrod 21 shrinks, and electric pushrod 21 drives push pedal 20 to move right, the
Two bracing wires 22 are packed up, and the second bracing wire 22 pulls the second pressing plate 28 to move upwards, meanwhile, movable plate 17 is in the 3rd spring 18 by elastic force
In the presence of moved right by slide block 15, the first bracing wire 19 is released, the first briquetting 8 in the presence of 7 elastic force of second spring to
Left movement, clashes into broken frame 4 so that the useless brick in broken frame 4 is stirred, and so repeatedly, the second pressing plate 28 moves up and down, to broken
Useless brick crushing in frame 4 is uniform, while the first briquetting 8 constantly clashes into broken frame 4 so that the useless brick in broken frame 4 is constantly turned over
It is dynamic, it is easy to crushing, when the useless brick crushing to crushing in frame 4 is completed, and the second pressing plate 28 and the first briquetting 8 return to initial position
When, control electric pushrod 21 quits work, and the useless brick that crushing in broken frame 4 is completed is taken out by workman again.
Because also including conical tooth 30,28 bottom even of the second pressing plate is provided with conical tooth 30, to crushing the useless brick in frame 4
Crushing is thoroughly more abundant.
Because also including the 4th spring 31 and the 3rd pressing plate 32,2 right upper portion of left frame is arranged with the 4th spring 31, the
Four springs, 31 right-hand member is provided with the 3rd pressing plate 32, and when broken 4 left wall of frame is contacted with the 3rd pressing plate 32, the 4th spring 31 is compressed,
When broken 4 left wall of frame leaves three pressing plates 32, broken frame 4 is moved right in the presence of 31 elastic force of the 4th spring, crushes frame 4
Double swerve so that it is more abundant that the useless brick in broken frame 4 is uniformly crushed.
Because base plate 1 is high-quality steel, surface plating zinc layers so that this device is not perishable, service life is improved.
Because broken 4 material of frame is Q235 steel, Q235 steel hardness is high and does not allow yielding, makes the service life of device more
It is long.
Because 9 material of right shelf is rustless steel, rustless steel corrosion resistance and acid resistance are strong, can extend the use longevity of this device
Life.
Embodiment described above only expresses preferred implementation of the present utility model, and its description is more concrete and detailed,
But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that common for this area
For technical staff, without departing from the inventive concept of the premise, some deformations, improvement and replacement can also be made, these are all
Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be defined by claims.
Claims (6)
1. a kind of bridge construction quickly crushes device with useless brick, it is characterised in that include base plate (1), left frame (2), the first bullet
Spring (3), broken frame (4), the first guide plate (5), second spring (7), the first briquetting (8), right shelf (9), the first fixed pulley (11),
Second fixed pulley (12), slide rail (14), slide block (15), the first pressing plate (16), movable plate (17), the 3rd spring (18), first are drawn
Line (19), push pedal (20), electric pushrod (21), the second bracing wire (22), the 3rd fixed pulley (23), the 4th fixed pulley (24), L-shaped are solid
Fixed pole (26), the second guide plate (27), the second pressing plate (28) and fixed plate (29), base plate (1) top left side are arranged with first
Spring (3), the first spring (3) top are provided with broken frame (4), and base plate (1) top left side is provided with left frame (2), and left frame (2) are located at the
On the left of one spring (3), base plate (1) top right side is provided with the first guide plate (5) and right shelf (9), and the first guide plate (5) is located at right shelf
(9) on the left of, the first pilot hole (6) on the first guide plate (5), is provided with, the first guide plate (5) left upper portion is arranged with the second bullet
Spring (7), second spring (7) left end are provided with the first briquetting (8), and the first briquetting (8) right center is provided with the first bracing wire (19), right shelf
(9) the second fixed pulley (12) and the first fixed pulley (11) are sequentially provided with the right side of from top to bottom, on the left of right shelf (9) from top to bottom successively
Electric pushrod (21), slide rail (14) and fixed plate (29) is provided with, the first aperture (10) and second orifice in right shelf (9), is provided with
(13), the first aperture (10) is located at below second orifice (13), and the expansion link of electric pushrod (21) is provided with push pedal (20), slide rail
(14) on, slidingtype is provided with slide block (15), and slide block (15) is provided with movable plate (17), and the first bracing wire (19) passes through the first pilot hole
(6) and the first aperture (10), further around the first fixed pulley (11) and the second fixed pulley (12) excessively, and passes through second orifice (13),
First bracing wire (19) is connected with the right side of movable plate (17), and slide rail (14) top left side is provided with the first pressing plate (16), the first pressing plate
(16) the 3rd spring (18) is arranged with the right side of, and the 3rd spring (18) right-hand member is connected with the left of movable plate (17), fixed plate (29)
Left end is provided with the 4th fixed pulley (24), and fixed plate (29) top left side is provided with the 3rd fixed pulley (23), and fixed plate (29) bottom is left
Side is provided with L-shaped fix bar (26), and L-shaped fix bar (26) left end is provided with the second guide plate (27), and the second guide plate is provided with (27)
Second pilot hole (25), is provided with the second bracing wire (22) on the left of push pedal (20), the second bracing wire (22) bypass the 3rd fixed pulley (23) and
4th fixed pulley (24), and the second pilot hole (25) is passed through, the second bracing wire (22) end is provided with the second pressing plate (28), the second pressure
Plate (28) is located at directly over broken frame (4).
2. a kind of bridge construction according to claim 1 quickly crushes device with useless brick, it is characterised in that also include cone
Shape tooth (30), the second pressing plate (28) bottom even are provided with conical tooth (30).
3. a kind of bridge construction according to claim 1 quickly crushes device with useless brick, it is characterised in that also include
Four springs (31) and the 3rd pressing plate (32), left frame (2) right upper portion are arranged with the 4th spring (31), the 4th spring (31) right-hand member
It is provided with the 3rd pressing plate (32).
4. a kind of bridge construction according to claim 1 quickly crushes device with useless brick, it is characterised in that base plate (1) is
High-quality steel, surface plating zinc layers.
5. a kind of bridge construction according to claim 1 quickly crushes device with useless brick, it is characterised in that broken frame (4)
Material is Q235 steel.
6. a kind of bridge construction according to claim 1 quickly crushes device with useless brick, it is characterised in that right shelf (9) material
Expect for rustless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620988305.2U CN206034310U (en) | 2016-08-30 | 2016-08-30 | Quick crushing device of waste brick for bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620988305.2U CN206034310U (en) | 2016-08-30 | 2016-08-30 | Quick crushing device of waste brick for bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206034310U true CN206034310U (en) | 2017-03-22 |
Family
ID=58304071
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620988305.2U Expired - Fee Related CN206034310U (en) | 2016-08-30 | 2016-08-30 | Quick crushing device of waste brick for bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206034310U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112641119A (en) * | 2020-12-25 | 2021-04-13 | 袁媛 | Promotion formula is pressed garlic and is trembled cleaning machine |
-
2016
- 2016-08-30 CN CN201620988305.2U patent/CN206034310U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112641119A (en) * | 2020-12-25 | 2021-04-13 | 袁媛 | Promotion formula is pressed garlic and is trembled cleaning machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107091680A (en) | A kind of overweight warning device of bridge | |
CN102979041A (en) | Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway | |
CN206034310U (en) | Quick crushing device of waste brick for bridge construction | |
CN107175198A (en) | A kind of Bridge guardrail casting and constructing concrete raw material fast screening devices | |
CN202323654U (en) | Stone grinding machine for bridge construction process | |
CN205995497U (en) | A kind of useless brick for building quickly crushes device | |
CN108589534A (en) | A kind of adjustable pavement tamper of bridge construction | |
CN107225485A (en) | A kind of bridge construction rust removing device for reinforcing steel bars | |
CN107225624B (en) | A kind of bridge construction sawing apparatus | |
CN206679886U (en) | Driver blade wafer separator | |
CN207827812U (en) | A kind of bridge mobile hoisting holder | |
CN100543228C (en) | Change railway switch construction technology and switch changing and laying equipment | |
CN205814276U (en) | A kind of bridge workman's shoes earth shakes off device | |
CN202700593U (en) | Zircon corundum brick crushing device | |
CN205653066U (en) | Take gantry crane of windrow dolly linkage | |
CN206911717U (en) | A kind of road bridge construction material screening plant | |
CN212884509U (en) | Novel mould sliding device | |
CN105019359B (en) | Steel girder erection structure and its erection method | |
CN207193734U (en) | A kind of overload protection device of bridge | |
CN106825590A (en) | A kind of iron silica magnetic particle core raw material pulverizer | |
CN202390100U (en) | Energy consumption buffer brake device for dynamic wind proofing of rail-mounted crane | |
CN207062816U (en) | A kind of bridge construction suggestion device | |
CN202925911U (en) | Vertical pre-stress rib tensioning auxiliary tool | |
CN206747862U (en) | A kind of battery pack fixing device of mobile pressing | |
CN206304802U (en) | A kind of useless building template quick crashing device for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170322 Termination date: 20170830 |