CN108589534A - A kind of adjustable pavement tamper of bridge construction - Google Patents
A kind of adjustable pavement tamper of bridge construction Download PDFInfo
- Publication number
- CN108589534A CN108589534A CN201810292603.1A CN201810292603A CN108589534A CN 108589534 A CN108589534 A CN 108589534A CN 201810292603 A CN201810292603 A CN 201810292603A CN 108589534 A CN108589534 A CN 108589534A
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- rod
- connecting plate
- bull stick
- right sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/22—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
- E01C19/30—Tamping or vibrating apparatus other than rollers ; Devices for ramming individual paving elements
- E01C19/32—Hand-held hand-actuated rammers or tampers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
Abstract
The present invention relates to a kind of pavement tamper more particularly to a kind of adjustable pavement tampers of bridge construction.The concrete density after pouring can be made uniform the technical problem to be solved in the present invention is to provide a kind of, improve the adjustable pavement tamper of bridge construction of bridge quality.The present invention provides the adjustable pavement tampers of such a bridge construction, include mounting plate, supporting rod, the first idler wheel, installs case, accumulator, mounting base, motor, bearing block etc.;All around four sides are respectively connected with supporting rod for mounting plate lower part, and supporting rod end is respectively connected with the first idler wheel, mounting plate upper side left part is equipped with installs case.Invention achieves the concrete density after pouring can be made uniform, the effect of bridge quality is improved.By the way that the first hammer ram and the second hammer ram is arranged, the first hammer ram and the second hammer ram road pavement can be tamped, can thus increase the area on primary compacting road surface, save the time to reach, improve the effect of compacting efficiency simultaneously.
Description
Technical field
The present invention relates to a kind of pavement tamper more particularly to a kind of adjustable pavement tampers of bridge construction.
Background technology
Bridge refers to being erected in rivers,lakes and seas, the structures for making traffic etc. that can smoothly pass through.It is modern high to adapt to
Speed development transportation industry, bridge be also extended to across mountain stream, unfavorable geology or meet other traffic need and set up make lead to
Capable more easily building.Bridge is generally made of superstructure, substructure, bearing and attached structure, superstructure
Also known as bridge span structure is across the primary structure of obstacle, and substructure includes abutment, bridge pier and basis, and bearing is bridge span structure
With the load transfer device of the bearing place setting of bridge pier or abutment, attached structure then refers to transition slab at bridge head, truncated cone banking, shore protection, leads
Flow engineering etc..
Bridge construction refers to building the process of bridge according to design content, refer mainly to bridge Construction Technology and construction organization,
The contents such as construction management, construction quality.In the work progress of modern bridge, it is required for casting concrete, concrete is due to being
Solid-liquid mixing, it is uneven when pouring, cause local density too big so that the time disunity of solidification, concrete
Inside configuration stress is destroyed, and the quality of bridge is influenced.
Therefore there is an urgent need for research and develop it is a kind of the concrete density after pouring can be made uniform, improve bridge quality bridge construction use
Adjustable pavement tamper.
Invention content
(1)Technical problems to be solved
It is uneven when the present invention is in order to overcome present bridge to pour, cause local density too big so that the time of solidification
The shortcomings that disunity, the inside configuration stress of concrete is destroyed, influences bridge quality, the technical problem to be solved in the present invention
Be to provide it is a kind of the concrete density after pouring can be made uniform, improve bridge quality bridge construction rammed with adjustable road surface
Real machine.
(2)Technical solution
In order to solve the above technical problem, the present invention provides the adjustable pavement tamper of such a bridge construction, packets
Included mounting plate, supporting rod, the first idler wheel, installs case, accumulator, mounting base, motor, bearing block, the first bull stick, belt pulley,
Flat belt, cam, sliding rail, sliding block, elevating lever, mounting rod, contact wheel, the first spring, the first hammer ram and the first in command, mounting plate
All around four sides are respectively connected with supporting rod for lower part, and supporting rod end is respectively connected with the first idler wheel, mounting plate upper side left part
Equipped with installs case, installs case is internally provided with accumulator, and mounting plate upper side or so two is equipped with mounting base, the mounting base in left side
Top is equipped with motor, is connected by electric wire between motor and accumulator, is equipped with bearing block at the top of the mounting base on right side, motor it is defeated
It is respectively connected with the first bull stick on shaft and in bearing block, is equipped with belt pulley on front side of the first bull stick, belt pulley is located at mounting base
Rear side, flat belt is wound between the belt pulley of the left and right sides, and the first bull stick rear portion is equipped with cam, is provided in the middle part of mounting plate logical
Hole, the mounting plate middle part left and right sides are equipped with sliding rail, and sliding rail is located in through-hole, and equal slidingtype is connected with sliding block on sliding rail, left and right
Elevating lever is connected between the sliding block of both sides, elevating lever is located on rear side of flat belt, and elevating lever passes through through-hole, and elevating lever top is equipped with
Mounting rod, the lower end at left and right sides of mounting rod are equipped with contact wheel, the contact wheel of the left and right sides respectively with the cam of the left and right sides
Distal end contacts, and left and right two is respectively connected with the first spring on the downside of mounting rod, and the end of the first spring is both connected on the upside of mounting plate,
First spring is in tensional state, and elevating lever end is connected with the first hammer ram, and right part is equipped with the first in command on the upside of mounting plate.
Preferably, further include having the second hammer ram, the first connecting plate, bolt, the second connecting plate, threaded rod, nut and flap,
Rotary type is connected with the second hammer ram at left and right sides of first hammer ram, and middle side part is respectively connected with first on the second hammer ram of the left and right sides
Connecting plate, the first connecting plate middle and upper part and middle part are provided with the first threaded hole, and lower part is respectively connected with second at left and right sides of elevating lever
Connecting plate, the second connecting plate are located at below mounting plate, and the second connecting plate left end in left side and the second connecting plate right end on right side are equal
It is connected with threaded rod, the mode being connected through a screw thread on threaded rod is connected with nut, is equipped with flap on the downside of nut, under flap
Portion and the first connecting plate top are provided with the second threaded hole, and the mode being connected through a screw thread in the second threaded hole is connected with bolt.
Preferably, further include having placing box, drawing liquid pump, hose, oscillating rod, second spring and nozzle, it is right on the downside of mounting plate
Portion is equipped with placing box, and right part is equipped with drawing liquid pump on the upside of mounting plate, is connected by electric wire between drawing liquid pump and accumulator, drawing liquid pump position
On the left of placing box, it is respectively connected with hose at left and right sides of drawing liquid pump, the hose on right side stretches into placing box, outer wall on front side of placing box
Right part rotary type is connected with oscillating rod, and oscillating rod lower right side is connected with second spring, before the end of second spring is connected to the right side
The supporting rod left part of side, oscillating rod lower end are equipped with nozzle, and the hose in left side is connect with nozzle.
Preferably, further include having the second bull stick, the second idler wheel and oscillating deck, the first bull stick front end on right side is connected with second
Bull stick, the second bull stick end are connected with the second idler wheel, and oscillating rod left upper portion is connected with oscillating deck, and oscillating deck is located at the second bull stick
Right side.
Preferably, further include having gooseneck, LED light and second handle, installs case top left side is connected with gooseneck, gooseneck
Pipe upper end is equipped with LED light, is connected by electric wire between LED light and accumulator, gooseneck left upper portion is connected with second handle.
Operation principle:Staff can grasp the first in command the equipment when tamping road surface using the equipment
It is pushed at bridge construction, is then turned on motor, motor can drive first bull stick in left side to rotate counterclockwise, the belt pulley in left side
It is rotated counterclockwise therewith with the cam in left side, the belt pulley in left side drives the belt pulley on right side to turn counterclockwise by flat belt again
Dynamic, the belt pulley on right side drives the cam on right side to rotate counterclockwise by first bull stick on right side again, when cam distalmost end with
When contact wheel detaches, the first spring contraction, under the action of the first spring force, mounting rod and elevating lever move downward, lifting
Bar drives the first hammer ram to move downward, and the first hammer ram can tamp downwards road surface, and cam is rotated further, mounting rod and elevating lever to
Upper movement, the first spring are stretched, and elevating lever drives the first hammer ram to move upwards.Motor constantly drives pulley rotation, can be with
So that the first hammer ram is constantly moved up and down, thus can road pavement tamped.Motor is closed after the completion of compacting and the equipment is moved
Move go back to original position.
Because further including having the second hammer ram, the first connecting plate, bolt, the second connecting plate, threaded rod, nut and flap, the
Rotary type is connected with the second hammer ram at left and right sides of one hammer ram, and middle side part is respectively connected with the first company on the second hammer ram of the left and right sides
Fishplate bar, the first connecting plate middle and upper part and middle part are provided with the first threaded hole, and lower part is respectively connected with the second company at left and right sides of elevating lever
Fishplate bar, the second connecting plate are located at below mounting plate, and the second connecting plate left end in left side and the second connecting plate right end on right side connect
It is connected to threaded rod, the mode being connected through a screw thread on threaded rod is connected with nut, flap, flap lower part are equipped on the downside of nut
It is provided with the second threaded hole with the first connecting plate top, the mode being connected through a screw thread in the second threaded hole is connected with bolt.Institute
The first hammer ram and the second hammer ram can be driven with elevating lever while being moved downward, and the area on compacting road surface can be thus increased, from
And reach and save the time, put forward efficient effect.Bolt is removed out of second threaded hole after the completion of compacting, is rotated up flap,
It is rotated up the second hammer ram for closing the left and right sides again, makes the first connecting plate bottom with right side at the top of first connecting plate in left side
Contact, is then screwed into the first threaded hole with bolt, can thus save space, be also easy to place the equipment, in this way can
The more convenient operation when needing to increase tamping area.
Because further including having placing box, drawing liquid pump, hose, oscillating rod, second spring and nozzle, right part is set on the downside of mounting plate
There are placing box, mounting plate upside right part to be equipped with drawing liquid pump, connected by electric wire between drawing liquid pump and accumulator, drawing liquid pump, which is located at, to be put
It sets on the left of case, hose is respectively connected at left and right sides of drawing liquid pump, the hose on right side stretches into placing box, outer wall right part on front side of placing box
Rotary type is connected with oscillating rod, and oscillating rod lower right side is connected with second spring, and the end of second spring is connected to forward right side
Supporting rod left part, oscillating rod lower end are equipped with nozzle, and the hose in left side is connect with nozzle.Will produce during tamping road surface compared with
Big dust, so needing when tamp road surface while depositing dust.Staff can be packed into suitable dustfall agent in placing box,
It is then turned on drawing liquid pump, drawing liquid pump can be pumped into dustfall agent in nozzle by hose, and dustfall agent is sprayed by nozzle again, to real
Existing depositing dust, the personnel of working at the same time can move left and right oscillating rod, and oscillating rod drives nozzle right to swing, can thus expand depositing dust
Range.Drawing liquid pump is closed after the completion of depositing dust and stops mobile oscillating rod.
Because further including having the second bull stick, the second idler wheel and oscillating deck, the first bull stick front end on right side is connected with second turn
Bar, the second bull stick end are connected with the second idler wheel, and oscillating rod left upper portion is connected with oscillating deck, and oscillating deck is located at the second bull stick right side
Side.So the second bull stick can be driven to rotate counterclockwise when first bar rotation on right side, when the second rolling of the second bull stick end
When wheel is contacted with oscillating deck, the second bull stick, which persistently rotates, to push oscillating rod to rotate clockwise by oscillating deck, second spring
It is stretched, when the second idler wheel is not contacted with oscillating deck, second spring resets, under the action of second spring elastic force, oscillating rod
It rotates counterclockwise.Oscillating rod constantly rotation can be such that nozzle right moves, and thus move oscillating rod without human hand to make nozzle
Movement, can reach labor-saving effect.
Because further including having gooseneck, LED light and second handle, installs case top left side is connected with gooseneck, gooseneck
Upper end is equipped with LED light, is connected by electric wire between LED light and accumulator, gooseneck left upper portion is connected with second handle.So
When using the equipment at night or inadequate light, LED light can be opened, then gooseneck is twisted to adjust by second handle
The position of whole LED light thus can make the equipment can adapt to different use environments, to enhance the practicality of the equipment
Property.Light can close LED light when more sufficient.
(3)Advantageous effect
Invention achieves the concrete density after pouring can be made uniform, the effect of bridge quality is improved.Pass through setting first
Hammer ram and the second hammer ram, the first hammer ram and the second hammer ram road pavement can be tamped simultaneously, can thus increase primary compacting
The area on road surface saves the time to reach, and improves the effect of compacting efficiency.By the way that LED light is arranged, enable the equipment in light
It is used under dark environment, has achieved the effect that enhance the equipment practicability.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Label in attached drawing be:1- mounting plates, 2- supporting rods, the first idler wheels of 3-, 4- installs cases, 5- accumulators, 6- installations
Seat, 7- motors, 8- bearing blocks, the first bull sticks of 9-, 10- belt pulleys, 11- flat belts, 12- cams, 13- through-holes, 14- sliding rails, 15-
Sliding block, 16- elevating levers, 17- mounting rods, 18- contact wheels, the first springs of 19-, the first hammer rams of 20-, the 201- first in command, 21-
Two hammer rams, the first connecting plates of 22-, the first threaded holes of 23-, 24- bolts, the second connecting plates of 25-, 26- threaded rods, 27- nuts,
28- flaps, the second threaded holes of 29-, 30- placing boxes, 31- drawing liquid pumps, 32- hoses, 33- oscillating rods, 34- second springs, 35- sprays
Head, the second bull sticks of 36-, the second idler wheels of 37-, 38- oscillating decks, 39- goosenecks, 40-LED lamps, 41- second handles.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of adjustable pavement tamper of bridge construction includes as shown in Figs. 1-5 mounting plate 1, the rolling of supporting rod 2, first
Wheel 3, installs case 4, accumulator 5, mounting base 6, motor 7, bearing block 8, the first bull stick 9, belt pulley 10, flat belt 11, cam 12,
Sliding rail 14, sliding block 15, elevating lever 16, mounting rod 17, contact wheel 18, the first spring 19, the first hammer ram 20 and the first in command 201,
All around four sides are respectively connected with supporting rod 2 to 1 lower part of mounting plate, and 2 end of supporting rod is respectively connected with the first idler wheel 3, mounting plate 1
Upper side left part is equipped with installs case 4, and installs case 4 is internally provided with accumulator 5, and 1 upper side of mounting plate or so two is equipped with installation
6 top of mounting base of seat 6, left side is equipped with motor 7, is connected by electric wire between motor 7 and accumulator 5, the mounting base 6 on right side is pushed up
Portion is equipped with bearing block 8, and the first bull stick 9 is respectively connected on the output shaft of motor 7 and in bearing block 8, and 9 front side of the first bull stick is equipped with
Belt pulley 10, belt pulley 10 are located at the rear side of mounting base 6, are wound with flat belt 11 between the belt pulley 10 of the left and right sides, first turn
9 rear portion of bar is equipped with cam 12, and 1 middle part of mounting plate is provided with through-hole 13, and the 1 middle part left and right sides of mounting plate is equipped with sliding rail 14, sliding
Rail 14 is located in through-hole 13, and equal slidingtype is connected with sliding block 15 on sliding rail 14, and lifting is connected between the sliding block 15 of the left and right sides
Bar 16, elevating lever 16 are located at 11 rear side of flat belt, and elevating lever 16 passes through through-hole 13,16 top of elevating lever to be equipped with mounting rod 17, peace
The lower end of 17 left and right sides of dress bar is equipped with contact wheel 18, and the contact wheel 18 of the left and right sides is remote with the cam of the left and right sides 12 respectively
End in contact, 17 downside left and right two of mounting rod are respectively connected with the first spring 19, and the end of the first spring 19 is both connected to mounting plate 1
Upside, the first spring 19 are in tensional state, and 16 end of elevating lever is connected with the first hammer ram 20, and 1 upside right part of mounting plate is equipped with
The first in command 201.
Embodiment 2
A kind of adjustable pavement tamper of bridge construction includes as shown in Figs. 1-5 mounting plate 1, the rolling of supporting rod 2, first
Wheel 3, installs case 4, accumulator 5, mounting base 6, motor 7, bearing block 8, the first bull stick 9, belt pulley 10, flat belt 11, cam 12,
Sliding rail 14, sliding block 15, elevating lever 16, mounting rod 17, contact wheel 18, the first spring 19, the first hammer ram 20 and the first in command 201,
All around four sides are respectively connected with supporting rod 2 to 1 lower part of mounting plate, and 2 end of supporting rod is respectively connected with the first idler wheel 3, mounting plate 1
Upper side left part is equipped with installs case 4, and installs case 4 is internally provided with accumulator 5, and 1 upper side of mounting plate or so two is equipped with installation
6 top of mounting base of seat 6, left side is equipped with motor 7, is connected by electric wire between motor 7 and accumulator 5, the mounting base 6 on right side is pushed up
Portion is equipped with bearing block 8, and the first bull stick 9 is respectively connected on the output shaft of motor 7 and in bearing block 8, and 9 front side of the first bull stick is equipped with
Belt pulley 10, belt pulley 10 are located at the rear side of mounting base 6, are wound with flat belt 11 between the belt pulley 10 of the left and right sides, first turn
9 rear portion of bar is equipped with cam 12, and 1 middle part of mounting plate is provided with through-hole 13, and the 1 middle part left and right sides of mounting plate is equipped with sliding rail 14, sliding
Rail 14 is located in through-hole 13, and equal slidingtype is connected with sliding block 15 on sliding rail 14, and lifting is connected between the sliding block 15 of the left and right sides
Bar 16, elevating lever 16 are located at 11 rear side of flat belt, and elevating lever 16 passes through through-hole 13,16 top of elevating lever to be equipped with mounting rod 17, peace
The lower end of 17 left and right sides of dress bar is equipped with contact wheel 18, and the contact wheel 18 of the left and right sides is remote with the cam of the left and right sides 12 respectively
End in contact, 17 downside left and right two of mounting rod are respectively connected with the first spring 19, and the end of the first spring 19 is both connected to mounting plate 1
Upside, the first spring 19 are in tensional state, and 16 end of elevating lever is connected with the first hammer ram 20, and 1 upside right part of mounting plate is equipped with
The first in command 201.
Further include having the second hammer ram 21, the first connecting plate 22, bolt 24, the second connecting plate 25, threaded rod 26,27 and of nut
Flap 28, the left and right sides of the first hammer ram 20 rotary type are connected with the second hammer ram 21, in 21 upside of the second hammer ram of the left and right sides
Portion is respectively connected with the first connecting plate 22, and 22 middle and upper part of the first connecting plate and middle part are provided with the first threaded hole 23, and elevating lever 16 is left
Right two side lower parts are respectively connected with the second connecting plate 25, and the second connecting plate 25 is located at 1 lower section of mounting plate, second connecting plate 25 in left side
Left end and 25 right end of the second connecting plate on right side are respectively connected with threaded rod 26, and the mode being connected through a screw thread on threaded rod 26 connects
It is connected to nut 27,27 downside of nut is equipped with flap 28, and 28 lower part of flap and 22 top of the first connecting plate are provided with the second screw thread
Hole 29, the mode being connected through a screw thread in the second threaded hole 29 are connected with bolt 24.
Embodiment 3
A kind of adjustable pavement tamper of bridge construction includes as shown in Figs. 1-5 mounting plate 1, the rolling of supporting rod 2, first
Wheel 3, installs case 4, accumulator 5, mounting base 6, motor 7, bearing block 8, the first bull stick 9, belt pulley 10, flat belt 11, cam 12,
Sliding rail 14, sliding block 15, elevating lever 16, mounting rod 17, contact wheel 18, the first spring 19, the first hammer ram 20 and the first in command 201,
All around four sides are respectively connected with supporting rod 2 to 1 lower part of mounting plate, and 2 end of supporting rod is respectively connected with the first idler wheel 3, mounting plate 1
Upper side left part is equipped with installs case 4, and installs case 4 is internally provided with accumulator 5, and 1 upper side of mounting plate or so two is equipped with installation
6 top of mounting base of seat 6, left side is equipped with motor 7, is connected by electric wire between motor 7 and accumulator 5, the mounting base 6 on right side is pushed up
Portion is equipped with bearing block 8, and the first bull stick 9 is respectively connected on the output shaft of motor 7 and in bearing block 8, and 9 front side of the first bull stick is equipped with
Belt pulley 10, belt pulley 10 are located at the rear side of mounting base 6, are wound with flat belt 11 between the belt pulley 10 of the left and right sides, first turn
9 rear portion of bar is equipped with cam 12, and 1 middle part of mounting plate is provided with through-hole 13, and the 1 middle part left and right sides of mounting plate is equipped with sliding rail 14, sliding
Rail 14 is located in through-hole 13, and equal slidingtype is connected with sliding block 15 on sliding rail 14, and lifting is connected between the sliding block 15 of the left and right sides
Bar 16, elevating lever 16 are located at 11 rear side of flat belt, and elevating lever 16 passes through through-hole 13,16 top of elevating lever to be equipped with mounting rod 17, peace
The lower end of 17 left and right sides of dress bar is equipped with contact wheel 18, and the contact wheel 18 of the left and right sides is remote with the cam of the left and right sides 12 respectively
End in contact, 17 downside left and right two of mounting rod are respectively connected with the first spring 19, and the end of the first spring 19 is both connected to mounting plate 1
Upside, the first spring 19 are in tensional state, and 16 end of elevating lever is connected with the first hammer ram 20, and 1 upside right part of mounting plate is equipped with
The first in command 201.
Further include having the second hammer ram 21, the first connecting plate 22, bolt 24, the second connecting plate 25, threaded rod 26,27 and of nut
Flap 28, the left and right sides of the first hammer ram 20 rotary type are connected with the second hammer ram 21, in 21 upside of the second hammer ram of the left and right sides
Portion is respectively connected with the first connecting plate 22, and 22 middle and upper part of the first connecting plate and middle part are provided with the first threaded hole 23, and elevating lever 16 is left
Right two side lower parts are respectively connected with the second connecting plate 25, and the second connecting plate 25 is located at 1 lower section of mounting plate, second connecting plate 25 in left side
Left end and 25 right end of the second connecting plate on right side are respectively connected with threaded rod 26, and the mode being connected through a screw thread on threaded rod 26 connects
It is connected to nut 27,27 downside of nut is equipped with flap 28, and 28 lower part of flap and 22 top of the first connecting plate are provided with the second screw thread
Hole 29, the mode being connected through a screw thread in the second threaded hole 29 are connected with bolt 24.
Further include having placing box 30, drawing liquid pump 31, hose 32, oscillating rod 33, second spring 34 and nozzle 35, mounting plate 1
Downside right part is equipped with placing box 30, and 1 upside right part of mounting plate is equipped with drawing liquid pump 31, passes through electricity between drawing liquid pump 31 and accumulator 5
Line connects, and drawing liquid pump 31 is located at 30 left side of placing box, and 31 left and right sides of drawing liquid pump is respectively connected with hose 32, and the hose 32 on right side is stretched
Enter in placing box 30,30 front side outer wall right part rotary type of placing box is connected with oscillating rod 33, and 33 lower right side of oscillating rod is connected with
The end of second spring 34, second spring 34 is connected to 2 left part of supporting rod of forward right side, and 33 lower end of oscillating rod is equipped with nozzle 35,
The hose 32 in left side is connect with nozzle 35.
Embodiment 4
A kind of adjustable pavement tamper of bridge construction includes as shown in Figs. 1-5 mounting plate 1, the rolling of supporting rod 2, first
Wheel 3, installs case 4, accumulator 5, mounting base 6, motor 7, bearing block 8, the first bull stick 9, belt pulley 10, flat belt 11, cam 12,
Sliding rail 14, sliding block 15, elevating lever 16, mounting rod 17, contact wheel 18, the first spring 19, the first hammer ram 20 and the first in command 201,
All around four sides are respectively connected with supporting rod 2 to 1 lower part of mounting plate, and 2 end of supporting rod is respectively connected with the first idler wheel 3, mounting plate 1
Upper side left part is equipped with installs case 4, and installs case 4 is internally provided with accumulator 5, and 1 upper side of mounting plate or so two is equipped with installation
6 top of mounting base of seat 6, left side is equipped with motor 7, is connected by electric wire between motor 7 and accumulator 5, the mounting base 6 on right side is pushed up
Portion is equipped with bearing block 8, and the first bull stick 9 is respectively connected on the output shaft of motor 7 and in bearing block 8, and 9 front side of the first bull stick is equipped with
Belt pulley 10, belt pulley 10 are located at the rear side of mounting base 6, are wound with flat belt 11 between the belt pulley 10 of the left and right sides, first turn
9 rear portion of bar is equipped with cam 12, and 1 middle part of mounting plate is provided with through-hole 13, and the 1 middle part left and right sides of mounting plate is equipped with sliding rail 14, sliding
Rail 14 is located in through-hole 13, and equal slidingtype is connected with sliding block 15 on sliding rail 14, and lifting is connected between the sliding block 15 of the left and right sides
Bar 16, elevating lever 16 are located at 11 rear side of flat belt, and elevating lever 16 passes through through-hole 13,16 top of elevating lever to be equipped with mounting rod 17, peace
The lower end of 17 left and right sides of dress bar is equipped with contact wheel 18, and the contact wheel 18 of the left and right sides is remote with the cam of the left and right sides 12 respectively
End in contact, 17 downside left and right two of mounting rod are respectively connected with the first spring 19, and the end of the first spring 19 is both connected to mounting plate 1
Upside, the first spring 19 are in tensional state, and 16 end of elevating lever is connected with the first hammer ram 20, and 1 upside right part of mounting plate is equipped with
The first in command 201.
Further include having the second hammer ram 21, the first connecting plate 22, bolt 24, the second connecting plate 25, threaded rod 26,27 and of nut
Flap 28, the left and right sides of the first hammer ram 20 rotary type are connected with the second hammer ram 21, in 21 upside of the second hammer ram of the left and right sides
Portion is respectively connected with the first connecting plate 22, and 22 middle and upper part of the first connecting plate and middle part are provided with the first threaded hole 23, and elevating lever 16 is left
Right two side lower parts are respectively connected with the second connecting plate 25, and the second connecting plate 25 is located at 1 lower section of mounting plate, second connecting plate 25 in left side
Left end and 25 right end of the second connecting plate on right side are respectively connected with threaded rod 26, and the mode being connected through a screw thread on threaded rod 26 connects
It is connected to nut 27,27 downside of nut is equipped with flap 28, and 28 lower part of flap and 22 top of the first connecting plate are provided with the second screw thread
Hole 29, the mode being connected through a screw thread in the second threaded hole 29 are connected with bolt 24.
Further include having placing box 30, drawing liquid pump 31, hose 32, oscillating rod 33, second spring 34 and nozzle 35, mounting plate 1
Downside right part is equipped with placing box 30, and 1 upside right part of mounting plate is equipped with drawing liquid pump 31, passes through electricity between drawing liquid pump 31 and accumulator 5
Line connects, and drawing liquid pump 31 is located at 30 left side of placing box, and 31 left and right sides of drawing liquid pump is respectively connected with hose 32, and the hose 32 on right side is stretched
Enter in placing box 30,30 front side outer wall right part rotary type of placing box is connected with oscillating rod 33, and 33 lower right side of oscillating rod is connected with
The end of second spring 34, second spring 34 is connected to 2 left part of supporting rod of forward right side, and 33 lower end of oscillating rod is equipped with nozzle 35,
The hose 32 in left side is connect with nozzle 35.
Further include having the second bull stick 36, the second idler wheel 37 and oscillating deck 38,9 front end of the first bull stick on right side is connected with second
Bull stick 36,36 end of the second bull stick are connected with the second idler wheel 37, and 33 left upper portion of oscillating rod is connected with oscillating deck 38, oscillating deck 38
Positioned at 36 right side of the second bull stick.
Further include having gooseneck 39, LED light 40 and second handle 41,4 top left side of installs case is connected with gooseneck 39, goose
39 upper end of neck tube is equipped with LED light 40, is connected by electric wire between LED light 40 and accumulator 5,39 left upper portion of gooseneck is connected with
Second handle 41.
Operation principle:Staff can grasp the first in command 201 and this is set when tamping road surface using the equipment
It is standby to be pushed at bridge construction, it is then turned on motor 7, motor 7 can drive first bull stick 9 in left side to rotate counterclockwise, left side
Belt pulley 10 and the cam in left side 12 rotate counterclockwise therewith, and the belt pulley 10 in left side drives the skin on right side by flat belt 11 again
Belt wheel 10 rotates counterclockwise, and the belt pulley 10 on right side drives the cam 12 on right side to turn counterclockwise by first bull stick 9 on right side again
Dynamic, when the distalmost end of cam 12 is detached with contact wheel 18, the first spring 19 is shunk, under the action of the first 19 elastic force of spring,
Mounting rod 17 and elevating lever 16 move downward, and elevating lever 16 drives the first hammer ram 20 to move downward, and the first hammer ram 20 downwards can be with
Road surface is tamped, cam 12 is rotated further, and mounting rod 17 and elevating lever 16 move upwards, and the first spring 19 is stretched, elevating lever 16
The first hammer ram 20 is driven to move upwards.Motor 7 constantly drives belt pulley 10 to rotate, and can make 20 continuous fortune up and down of the first hammer ram
It is dynamic, thus can road pavement tamped.Motor 7 is closed after the completion of compacting and the equipment is moved back to original position.
Because further including having the second hammer ram 21, the first connecting plate 22, bolt 24, the second connecting plate 25, threaded rod 26, nut
27 and flap 28,20 left and right sides of the first hammer ram rotary type is connected with the second hammer ram 21, on the second hammer ram 21 of the left and right sides
Middle side part is respectively connected with the first connecting plate 22, and 22 middle and upper part of the first connecting plate and middle part are provided with the first threaded hole 23, elevating lever
16 left and right sides lower part are respectively connected with the second connecting plate 25, and the second connecting plate 25 is located at 1 lower section of mounting plate, second connection in left side
25 left end of plate and 25 right end of the second connecting plate on right side are respectively connected with threaded rod 26, the side being connected through a screw thread on threaded rod 26
Formula is connected with nut 27, and 27 downside of nut is equipped with flap 28, and 28 lower part of flap and 22 top of the first connecting plate are provided with second
Threaded hole 29, the mode being connected through a screw thread in the second threaded hole 29 are connected with bolt 24.So elevating lever 16 can drive
One hammer ram 20 and the second hammer ram 21 move downward simultaneously, can thus increase the area on compacting road surface, the time is saved to reach,
Put forward efficient effect.Bolt 24 is removed out of second threaded hole 29 after the completion of compacting, is rotated up flap 28, then be rotated up
22 bottom of the first connecting plate of the second hammer ram 21 for closing the left and right sides, 22 top of the first connecting plate and right side that make left side connects
It touches, is then screwed into the first threaded hole 23 with bolt 24, can thus save space, be also easy to place the equipment, such energy
Enough more convenient operations when needing to increase tamping area.
Because further including having placing box 30, drawing liquid pump 31, hose 32, oscillating rod 33, second spring 34 and nozzle 35, installation
1 downside right part of plate is equipped with placing box 30, and 1 upside right part of mounting plate is equipped with drawing liquid pump 31, passes through between drawing liquid pump 31 and accumulator 5
Electric wire connects, and drawing liquid pump 31 is located at 30 left side of placing box, and 31 left and right sides of drawing liquid pump is respectively connected with hose 32, the hose 32 on right side
It stretches into placing box 30,30 front side outer wall right part rotary type of placing box is connected with oscillating rod 33, the connection of 33 lower right side of oscillating rod
There are second spring 34, the end of second spring 34 to be connected to 2 left part of supporting rod of forward right side, 33 lower end of oscillating rod is equipped with nozzle
35, the hose 32 in left side is connect with nozzle 35.Larger dust is will produce during tamping road surface, so needing tamping
When road surface simultaneously depositing dust.Staff can be packed into suitable dustfall agent in placing box 30, be then turned on drawing liquid pump 31, drawing liquid pump
31 can be pumped into dustfall agent in nozzle 35 by hose 32, and dustfall agent is sprayed by nozzle 35 again, to realize depositing dust, simultaneously
Staff can move left and right oscillating rod 33, and oscillating rod 33 drives nozzle 35 to swing, can thus expand depositing dust range.
Drawing liquid pump 31 is closed after the completion of depositing dust and stops mobile oscillating rod 33.
Because further including having the second bull stick 36, the second idler wheel 37 and oscillating deck 38,9 front end of the first bull stick on right side is connected with
Second bull stick 36,36 end of the second bull stick are connected with the second idler wheel 37, and 33 left upper portion of oscillating rod is connected with oscillating deck 38, swing
Plate 38 is located at 36 right side of the second bull stick.So the second bull stick 36 can be driven to rotate counterclockwise when the first bull stick 9 rotation on right side,
When the second idler wheel 37 of 36 end of the second bull stick is contacted with oscillating deck 38, persistently rotation can pass through oscillating deck to the second bull stick 36
38 promotion oscillating rods 33 rotate clockwise, and second spring 34 is stretched, when the second idler wheel 37 is not contacted with oscillating deck 38, second
Spring 34 resets, and under the action of 34 elastic force of second spring, oscillating rod 33 rotates counterclockwise.The constantly rotation of oscillating rod 33 can make
35 side-to-side movement of nozzle thus moves oscillating rod 33 to make nozzle 35 move without human hand, can reach labor-saving effect
Fruit.
Because further including having gooseneck 39, LED light 40 and second handle 41,4 top left side of installs case is connected with gooseneck
39,39 upper end of gooseneck is equipped with LED light 40, is connected by electric wire between LED light 40 and accumulator 5,39 left upper portion of gooseneck
It is connected with second handle 41.So when using the equipment at night or inadequate light, LED light 40 can be opened, then lead to
It crosses second handle 41 and twists gooseneck 39 to adjust the position of LED light 40, the equipment can thus can adapt to different
Use environment, to enhance the practicability of the equipment.Light can close LED light 40 when more sufficient.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (5)
1. a kind of adjustable pavement tamper of bridge construction, which is characterized in that include mounting plate(1), supporting rod(2)、
First idler wheel(3), installs case(4), accumulator(5), mounting base(6), motor(7), bearing block(8), the first bull stick(9), belt
Wheel(10), flat belt(11), cam(12), sliding rail(14), sliding block(15), elevating lever(16), mounting rod(17), contact wheel
(18), the first spring(19), the first hammer ram(20)And the first in command(201), mounting plate(1)All around four sides connect for lower part
It is connected to supporting rod(2), supporting rod(2)End is respectively connected with the first idler wheel(3), mounting plate(1)Upper side left part is equipped with installs case
(4), installs case(4)It is internally provided with accumulator(5), mounting plate(1)Upper side or so two is equipped with mounting base(6), left side
Mounting base(6)Top is equipped with motor(7), motor(7)With accumulator(5)Between connected by electric wire, the mounting base on right side(6)Top
Portion is equipped with bearing block(8), motor(7)Output shaft on and bearing block(8)Inside it is respectively connected with the first bull stick(9), the first bull stick(9)
Front side is equipped with belt pulley(10), belt pulley(10)Positioned at mounting base(6)Rear side, the belt pulley of the left and right sides(10)Spaced winding
There is flat belt(11), the first bull stick(9)Rear portion is equipped with cam(12), mounting plate(1)Middle part is provided with through-hole(13), mounting plate
(1)It is equipped with sliding rail at left and right sides of middle part(14), sliding rail(14)Positioned at through-hole(13)It is interior, sliding rail(14)Upper equal slidingtype is connected with
Sliding block(15), the sliding block of the left and right sides(15)Between be connected with elevating lever(16), elevating lever(16)Positioned at flat belt(11)Rear side,
Elevating lever(16)Across through-hole(13), elevating lever(16)Top is equipped with mounting rod(17), mounting rod(17)The lower end of the left and right sides
It is equipped with contact wheel(18), the contact wheel of the left and right sides(18)Respectively with the cam of the left and right sides(12)Distal end contacts, mounting rod
(17)Downside or so two is respectively connected with the first spring(19), the first spring(19)End be both connected to mounting plate(1)Upside,
First spring(19)In tensional state, elevating lever(16)End is connected with the first hammer ram(20), mounting plate(1)Upside right part is set
There is the first in command(201).
2. a kind of adjustable pavement tamper of bridge construction according to claim 1, which is characterized in that further include having
Second hammer ram(21), the first connecting plate(22), bolt(24), the second connecting plate(25), threaded rod(26), nut(27)And flap
(28), the first hammer ram(20)The equal rotary type in the left and right sides is connected with the second hammer ram(21), the second hammer ram of the left and right sides(21)On
Middle side part is respectively connected with the first connecting plate(22), the first connecting plate(22)Middle and upper part and middle part are provided with the first threaded hole(23),
Elevating lever(16)Left and right sides lower part is respectively connected with the second connecting plate(25), the second connecting plate(25)Positioned at mounting plate(1)Lower section,
Second connecting plate in left side(25)Second connecting plate of left end and right side(25)Right end is respectively connected with threaded rod(26), threaded rod
(26)On the mode that is connected through a screw thread be connected with nut(27), nut(27)Downside is equipped with flap(28), flap(28)
Lower part and the first connecting plate(22)Top is provided with the second threaded hole(29), the second threaded hole(29)The side being inside connected through a screw thread
Formula is connected with bolt(24).
3. a kind of adjustable pavement tamper of bridge construction according to claim 2, which is characterized in that further include having
Placing box(30), drawing liquid pump(31), hose(32), oscillating rod(33), second spring(34)And nozzle(35), mounting plate(1)Under
Side right part is equipped with placing box(30), mounting plate(1)Upside right part is equipped with drawing liquid pump(31), drawing liquid pump(31)With accumulator(5)It
Between connected by electric wire, drawing liquid pump(31)Positioned at placing box(30)Left side, drawing liquid pump(31)The left and right sides is respectively connected with hose
(32), the hose on right side(32)Stretch into placing box(30)It is interior, placing box(30)Front side outer wall right part rotary type is connected with oscillating rod
(33), oscillating rod(33)Lower right side is connected with second spring(34), second spring(34)End be connected to the branch of forward right side
Strut(2)Left part, oscillating rod(33)Lower end is equipped with nozzle(35), the hose in left side(32)With nozzle(35)Connection.
4. a kind of adjustable pavement tamper of bridge construction according to claim 3, which is characterized in that further include having
Second bull stick(36), the second idler wheel(37)And oscillating deck(38), first bull stick on right side(9)Front end is connected with the second bull stick
(36), the second bull stick(36)End is connected with the second idler wheel(37), oscillating rod(33)Left upper portion is connected with oscillating deck(38), pendulum
Movable plate(38)Positioned at the second bull stick(36)Right side.
5. a kind of adjustable pavement tamper of bridge construction according to claim 4, which is characterized in that further include having
Gooseneck(39), LED light(40)And second handle(41), installs case(4)Top left side is connected with gooseneck(39), gooseneck
(39)Upper end is equipped with LED light(40), LED light(40)With accumulator(5)Between connected by electric wire, gooseneck(39)Left upper portion
It is connected with second handle(41).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810292603.1A CN108589534A (en) | 2018-04-04 | 2018-04-04 | A kind of adjustable pavement tamper of bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810292603.1A CN108589534A (en) | 2018-04-04 | 2018-04-04 | A kind of adjustable pavement tamper of bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108589534A true CN108589534A (en) | 2018-09-28 |
Family
ID=63624351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810292603.1A Pending CN108589534A (en) | 2018-04-04 | 2018-04-04 | A kind of adjustable pavement tamper of bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108589534A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004810A (en) * | 2019-04-11 | 2019-07-12 | 杨志兵 | Road construction tamping apparatus |
CN112609540A (en) * | 2020-12-12 | 2021-04-06 | 湖北盛荣建设有限公司 | Road surface tamping device for municipal road construction |
CN112663448A (en) * | 2020-12-21 | 2021-04-16 | 刘峰 | Road construction tamping device |
CN112681073A (en) * | 2020-12-28 | 2021-04-20 | 刘江桥 | Quick tamping device for highway pavement |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10106742C2 (en) * | 2000-03-10 | 2003-05-08 | Kurt Stiebenz | Tool for compacting and smoothing |
CN205171491U (en) * | 2015-11-05 | 2016-04-20 | 张辉煌 | Long service life's rammer compactor |
CN107322805A (en) * | 2017-08-11 | 2017-11-07 | 苏昭缄 | A kind of municipal construction concrete quick agitator |
CN206616436U (en) * | 2017-03-17 | 2017-11-07 | 刘华 | A kind of efficient compacting machine of road construction |
CN107476281A (en) * | 2017-10-12 | 2017-12-15 | 杨燕萍 | A kind of construction compacting of subsoil device |
-
2018
- 2018-04-04 CN CN201810292603.1A patent/CN108589534A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10106742C2 (en) * | 2000-03-10 | 2003-05-08 | Kurt Stiebenz | Tool for compacting and smoothing |
CN205171491U (en) * | 2015-11-05 | 2016-04-20 | 张辉煌 | Long service life's rammer compactor |
CN206616436U (en) * | 2017-03-17 | 2017-11-07 | 刘华 | A kind of efficient compacting machine of road construction |
CN107322805A (en) * | 2017-08-11 | 2017-11-07 | 苏昭缄 | A kind of municipal construction concrete quick agitator |
CN107476281A (en) * | 2017-10-12 | 2017-12-15 | 杨燕萍 | A kind of construction compacting of subsoil device |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004810A (en) * | 2019-04-11 | 2019-07-12 | 杨志兵 | Road construction tamping apparatus |
CN112609540A (en) * | 2020-12-12 | 2021-04-06 | 湖北盛荣建设有限公司 | Road surface tamping device for municipal road construction |
CN112663448A (en) * | 2020-12-21 | 2021-04-16 | 刘峰 | Road construction tamping device |
CN112681073A (en) * | 2020-12-28 | 2021-04-20 | 刘江桥 | Quick tamping device for highway pavement |
CN112681073B (en) * | 2020-12-28 | 2022-08-09 | 山西路桥第四工程有限公司 | Quick tamping device for highway pavement |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108589534A (en) | A kind of adjustable pavement tamper of bridge construction | |
CN107127171A (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN107127005A (en) | A kind of traffic bridge cement block breaker | |
CN207227922U (en) | A kind of Multifunctional asphalt pouring machine | |
CN107142865A (en) | A kind of road and bridge construction, which is used, is easy to mobile alarm set | |
CN205636607U (en) | Bridge is with water spray heat sink | |
CN108468291A (en) | A kind of bridge pavement cleaning equipment | |
CN207003195U (en) | A kind of construction of the highway tamping apparatus | |
CN201521111U (en) | Cast-in-situ bridge concrete spreader | |
CN205735418U (en) | A kind of highway isolated mound producing device | |
CN100381646C (en) | Apparatus of anchoring capable of repeating use and its construction method | |
CN105888361B (en) | Electric pole centering guide machine | |
CN207071557U (en) | A kind of traffic bridge roadblock device for high-efficiency cleaning | |
CN214883062U (en) | Device for seepage prevention and reinforcement of bridge concrete | |
CN205968397U (en) | Iron plate drilling equipment for building | |
CN109926137A (en) | A kind of environmental type bridge construction waste bricks efficiency crushing device | |
CN207003199U (en) | A kind of bridge construction applies mud device with pave function | |
CN208415015U (en) | A kind of hydraulic rail head rail jack | |
CN107119608A (en) | A kind of traffic bridge roadblock Quick cleaning device | |
CN211816258U (en) | Vibrator for precast cement foundation pile in foundation pit | |
CN206911717U (en) | A kind of road bridge construction material screening plant | |
CN207240430U (en) | The vibrating forming machine of base of high-speed railway plate construction | |
CN210216181U (en) | Maintenance device of bridge for highway | |
CN207062816U (en) | A kind of bridge construction suggestion device | |
CN2769349Y (en) | Repeatedly using anchor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180928 |