CN206034216U CN201621027106.1U CN201621027106U CN206034216U CN 206034216 U CN206034216 U CN 206034216U CN 201621027106 U CN201621027106 U CN 201621027106U CN 206034216 U CN206034216 U CN 206034216U
Authority
CN
China
Prior art keywords
road
specified future
break
future date
barricade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621027106.1U
Other languages
Chinese (zh)
Inventor
张亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CMCU Engineering Co Ltd
Original Assignee
CMCU Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMCU Engineering Co Ltd filed Critical CMCU Engineering Co Ltd
Priority to CN201621027106.1U priority Critical patent/CN206034216U/en
Application granted granted Critical
Publication of CN206034216U publication Critical patent/CN206034216U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an intersection road structure belongs to road bridge technical field, including major trunk roads, the break -over way down at a specified future date that useful back filling fills is predetermine to the below of major trunk roads, the both sides that break -over down at a specified future date was said are provided with the barricade that extends to trunk road surface. The utility model discloses a preset at a specified future date break -over way and barricade down, treat at a specified future dately when implementing that the break -over is said down, need prop up and keep off the design, directly excavate the compaction back filling, according to the designing requirement implement break -over down say road road bed and road surface structure can, the traffic that can not influence both sides is passed through, can not cause also that the additional of both sides road subsides and be out of shape.

Description

A kind of intersection road structure
Technical field
This utility model belongs to road and bridge structure technical field, and in particular to a kind of intersection road structure.
Background technology
Urban road, the volume of traffic at a specified future date are big, and usual friendship mouth is difficult to meet transport need, in major trunk roads and the crossing of major trunk roads It is many in design to adopt a usual friendship, the simple overpass scheme worn under.Due to recent small traffic volume, it is usually taken by stages Implement:Implement by usual friendship in the recent period, when crossing is unsatisfactory for transport need, then the underpass for implementing long term.
Conventional design thinking first carries out road construction by the usual friendship mouth without underpass, during the underpass in enforcement long term again Take supporting measure uprightly to be excavated, conventional method for protecting support (peg board barricade etc.), its cost are high, and affect crossing and under The traffic of break-through road both sides is passed through, and construction period traffic organization is inconvenient, and there is substantial amounts of external coordination work.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of simple construction, low cost and do not affect traffic to pass through Intersection road structure.
For reaching above-mentioned purpose, the purpose of this utility model is achieved through the following technical solutions:
A kind of intersection road structure, including major trunk roads, is preset with below the major trunk roads with backfill filling Underpass at a specified future date, the both sides of the underpass at a specified future date arrange the barricade that oriented turnpike road face extends.
Further, the barricade wall back of the body is provided with ratio of slope, i.e., the taper with progressive additive from top to bottom.
Further, the metope of the barricade is vertical surface, arranges the wall for stretching into underpass road surface at a specified future date in bottom Toe.
The beneficial effects of the utility model are:
This utility model, is not required to carry out propping up by default long term underpass and barricade when enforcement underpass at a specified future date Gear design, directly excavates compacting backfill, implements underpass road foundation and pavement structure, Bu Huiying by design requirement The traffic for ringing both sides is passed through, and will not also cause additional settlement and the deformation of both sides road.
Description of the drawings
Fig. 1 is a kind of structural representation of intersection road structure of this utility model;
Fig. 2 is the structural representation after this utility model enforcement at a specified future date.
Specific embodiment
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail.
As shown in figure 1, a kind of intersection road structure of the present embodiment, including major trunk roads 1 and positioned at 1 both sides of major trunk roads Driveway 2 successively toward external expansion, greenbelt 3 and footpath 4, the lower section of the major trunk roads 1 are preset with and are filled with backfill Underpass at a specified future date 5, the both sides of the underpass at a specified future date 5 arrange the barricade 6 that oriented turnpike road face extends, specifically, gear Wall 6 is Gravity Retaining Wall, and is provided with ratio of slope, the i.e. taper 7 with progressive additive from top to bottom in the wall back of the body, can strengthen its structure strong Degree, improves its gear ability, and the present embodiment taper 7 is arranged on the wall back of barricade 6, can reduce the area of section of barricade, together When, the metope of barricade 6 is set to into vertical surface for convenience of construction, the service efficiency on road surface can be also improved, further, be set in bottom Install the toe of wall 8 for stretching into underpass road surface at a specified future date, can improve the stability in the large of barricade, and accelerate construction speed at a specified future date and Improve construction quality.
The present embodiment, is first implemented by the design altitude of planning underpass at a specified future date when usual friendship mouth is implemented in the recent period using a kind of A gear measure (gravity retaining wall) of both sides, then after being compacted backfill, implement road foundation and the road surface of the both direction of usual friendship mouth Structure (should adopt permanent cover plate) in the range of another direction road width of crossing.When enforcement underpass at a specified future date, no A gear design need to be carried out again, the closing of underpass construction area is carried out into compacting backfill directly and is excavated, implemented by design requirement Underpass road foundation and pavement structure, as shown in Fig. 2 the traffic for not interfering with both sides is passed through, will not also cause two The additional settlement on side line road and deformation.
The present embodiment not only low cost, investment reduction are easy to implement, it is not necessary to carry out the traffic organization of construction period, and And the substantial amounts of external coordination work of proprietor can also be reduced.Preferable economic benefit and society can be brought for such construction project Meeting benefit, with preferable practicality, especially in high roadbed location, economic benefit becomes apparent from.
Finally illustrate, preferred embodiment above is only unrestricted to illustrate the technical solution of the utility model, to the greatest extent Gutron is crossed above preferred embodiment and this utility model is described in detail, but those skilled in the art should manage Solution, can make various changes, in the form and details without departing from this utility model claims institute to which The scope of restriction.

Claims (3)

1. a kind of intersection road structure, including major trunk roads, it is characterised in that:It is preset with below the major trunk roads with backfill The underpass at a specified future date of soil filling, the both sides of the underpass at a specified future date arrange the barricade that oriented turnpike road face extends.
2. a kind of intersection road structure according to claim 1, it is characterised in that:The wall back of the body of the barricade is provided with slope Rate, the ratio of slope are the taper of progressive additive from top to bottom.
3. a kind of intersection road structure according to claim 1, it is characterised in that:The metope of the barricade is upright Face, arranges the toe of wall for stretching into underpass road surface at a specified future date in bottom.
CN201621027106.1U 2016-08-31 2016-08-31 Intersection road structure Active CN206034216U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621027106.1U CN206034216U (en) 2016-08-31 2016-08-31 Intersection road structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621027106.1U CN206034216U (en) 2016-08-31 2016-08-31 Intersection road structure

Publications (1)

Publication Number Publication Date
CN206034216U true CN206034216U (en) 2017-03-22

Family

ID=58297758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621027106.1U Active CN206034216U (en) 2016-08-31 2016-08-31 Intersection road structure

Country Status (1)

Country Link
CN (1) CN206034216U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106887A (en) * 2019-05-07 2019-08-09 青海盐湖工业股份有限公司 It is a kind of to pump the processing method cheated and pump hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110106887A (en) * 2019-05-07 2019-08-09 青海盐湖工业股份有限公司 It is a kind of to pump the processing method cheated and pump hole
CN110106887B (en) * 2019-05-07 2021-04-30 青海盐湖工业股份有限公司 Pump pit processing method and pump pit

Similar Documents

Publication Publication Date Title
CN107558480B (en) The construction method of the reinforced ecological slope protection structure of roadbed three-dimensional water discharge
CN205934629U (en) Wide structure of increasing is pieced together to existing barricade section road bed
CN206308569U (en) It is a kind of to reinforce the road structure for punishing the solution cavity that underlies
CN101598028A (en) Lining structure for super large section water-rich loess tunnel of high-speed railroad
CN105297571A (en) Mudstone filled roadbed structure and construction method thereof
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
CN104358196A (en) Construction method for embankment settlement treatment structure of road open to traffic
CN102817298B (en) Construction method on permafrost
CN206034216U (en) Intersection road structure
CN204753261U (en) Light -duty road bed of a doublestage shelves structure
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN207215815U (en) A kind of analog simulation experiment shelf of unconsolidated formation traveling angle
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN105951667A (en) Riverway structure reserved in reclamation district through mud filling pipe bags and construction method of riverway structure
CN203335089U (en) Protruding type environment-friendly tunnel portal with supports
CN202925538U (en) Rammer used in construction on frozen earth
CN208363109U (en) A kind of slope protection equipment of roadbed
CN100487202C (en) Vibration pressurizing quick solidification soft foundation processing method
CN208039220U (en) A kind of old roadbed develops the base formation of stake reinforcing in column hammer
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN206486886U (en) A kind of equipment for reinforcing Line for Passenger Transportation Extra-fine sand ground
CN205529732U (en) Sand seal layer is in bags woven to desert road bed
CN102912702A (en) Soft soil subgrade treatment method adopting spodosol and hill-skill soil
CN203034335U (en) Silty soil section highway drainage system
CN207552830U (en) A kind of Anti-settling device of highway subgrade

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant