CN206023811U - Drive test supervisory systems - Google Patents

Drive test supervisory systems Download PDF

Info

Publication number
CN206023811U
CN206023811U CN201620955696.8U CN201620955696U CN206023811U CN 206023811 U CN206023811 U CN 206023811U CN 201620955696 U CN201620955696 U CN 201620955696U CN 206023811 U CN206023811 U CN 206023811U
Authority
CN
China
Prior art keywords
information
test
drive test
module
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620955696.8U
Other languages
Chinese (zh)
Inventor
肖孝余
黄兴艺
高洪军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Loncin General Dynamics Co Ltd
Original Assignee
Loncin General Dynamics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Loncin General Dynamics Co Ltd filed Critical Loncin General Dynamics Co Ltd
Priority to CN201620955696.8U priority Critical patent/CN206023811U/en
Application granted granted Critical
Publication of CN206023811U publication Critical patent/CN206023811U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The drive test supervisory systems that the utility model is provided, including information collecting device, server, transmitting device and send the terminal device of work information for receiving, described information harvester includes personnel information acquisition module for collecting test personal information, the drive test acquisition module gathered for outside drive test information and the equipment information collection module for gathering exemplar information and facility information;Drive test supervisory systems in the utility model, by information collecting device collecting test personal information, exemplar information, facility information and drive test information, and carry out sending work by server, experimental duties are assigned carries out standardized management, establish digital experiment digitization management platform, ensure that security, authenticity, integrality, uniformity and the trackability of experimental data, achieve the unified management of experimental data, the task of improve sends work efficiency rate, the total quality of experiment is improve, is reduced and is repeated to test.

Description

Drive test supervisory systems
Technical field
The utility model is related to the communications field, more particularly to a kind of drive test supervisory systems.
Background technology
Any product is required for doing substantial amounts of experiment during research and development, and can produce in experimentation a large amount of Data, but carry out the process and data of management misconduct for a long time without special technological means, and by the management of science Carrying out assigned tasks, this brings huge challenge to management to method.Lack effective experimental data management in prior art The support of system, the work related to experiment also rest on manual work state, and data statistics is difficult, manager is difficult in real time Know, the state that experiment is carried out how, and which experimental project who take part in, and experimental duties are such as What concrete assignment, it is impossible to realize the multistage project management of test center, project process module solidification management, it is impossible to by test equipment Tester is organically associated with the auxiliary material information used in test process, and is unable to the maintenance criterion testing time, is referred to Lead and when working out plan, understand daily workload whether saturation, it is impossible to which it is real that exact p-value center pays special attention to the test per sub-project Existing standard time, personnel account for the standard time, it is impossible to tester can be carried out multinomial test experiments simultaneously, tester marks daily The quasi- working time is connected with daily order ticket and is managed.
Road vehicle test experiments mostly have very strong professional, according to the difference of product, the difference of specialty, test number According to regulatory requirement and application have very big difference, need the management reality for carrying out differentiation for the professional and diversity of experiment Data existing structure data are tested, also has unstructured data, and the difference with collecting device, the lattice of unstructured data Formula is also to vary, and it is a difficult problem to manage these data, and the data that experimentation is produced include the original number of equipment collection According to, preprocessed data, analysis report etc. be all very important data because the support without experimental data management system, this A little data are often dissipated on experimenter's personal computer, it is easy to lost, its main cause be data do not leave concentratedly and Management, make administrative staff, designer and experimenter inquire about experimental data, laboratory report, also so that reuse before Experiment Result becomes highly difficult, is more unfavorable for the assignment of experiment test task, causes experimentation inefficiency, and effect is not Good, the progress and result of integral experiment is have impact on, therefore, a kind of new technological means is needed badly, to solve the above problems.
Utility model content
In view of this, the utility model provides a kind of drive test supervisory systems, to solve the above problems.
The drive test supervisory systems that the utility model is provided, including information collecting device, server, transmitting device and is used for connecing The terminal device for sending work information is received, described information harvester includes the personnel information acquisition mould for collecting test personal information Block, the drive test acquisition module for outside drive test information collection and adopt for gathering the facility information of exemplar information and facility information Collection module;
The output end of described information harvester is connected with the input of server by transmitting device, the server with Terminal device connects.
Further, the drive test acquisition module includes controller, locating module, wireless transceiver and environment information acquisition mould Block;
The locating module is connected with controller, the output end of the environment information acquisition module and the input of controller Connection, the controller are connected with server by wireless transceiver.
Further, the environment information acquisition module includes air velocity transducer, Temperature Humidity Sensor, baroceptor and rain Quantity sensor, the output end of the air velocity transducer, Temperature Humidity Sensor, baroceptor and rain sensor respectively with control The input connection of device.
Further, the personnel information acquisition module includes fingerprint collecting unit, fingerprint identification unit and fingerprint attendance list Unit, the output end of the fingerprint collecting unit are connected with the input of fingerprint identification unit, the output of the fingerprint identification unit End is connected with the input of fingerprint attendance unit.
Further, the equipment information collection module include being arranged on exemplar and/or equipment for represent exemplar and/ Or electronic tag and the reading unit for recognizing the electronic tag of the identity information of equipment, the output of the reading unit End is connected with server by transmitting device.
Further, the terminal device is provided with test result logging modle, and the server is provided with test result and sentences Other module and automatic job distribution module, the test result discrimination module are connected with automatic job distribution module, for according to test result Carry out sending work.
Further, the transmitting device is wireless transport module, and the wireless transport module includes GPRS module, 3G module Or 4G modules.
Further, the terminal device is mobile terminal, and the mobile terminal includes micro-control unit, input block and aobvious Show unit, the input block and display unit are connected with micro-control unit respectively, the micro-control unit is connected with server.
Further, the terminal device also includes entering when finally completing the time for the test assignment time more than the project plan Row report to the police alarm unit, the alarm unit with for control unit connection.
The beneficial effects of the utility model:Drive test supervisory systems in the utility model, is gathered by information collecting device Tester's information, exemplar information, facility information and drive test information, and carry out sending work by server, experimental duties are assigned Carry out standardized management, establish digital experiment digitization management platform, it is ensured that the security of experimental data, authenticity, Integrality, uniformity and trackability, it is achieved that work efficiency rate is sent in the unified management of experimental data, the task of improve, and improves reality The total quality that tests, reduces and repeats to test, and greatly reduces the experiment development cost of enterprise, it is achieved that restrictive scheduling.
Description of the drawings
With reference to the accompanying drawings and examples the utility model is further described:
Fig. 1 is principle schematic of the present utility model.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is further described:Fig. 1 is that principle of the present utility model is shown It is intended to.
As shown in figure 1, the drive test supervisory systems in the present embodiment, including information collecting device, server, transmitting device and For receiving the terminal device for sending work information, described information harvester includes the personal information for collecting test personal information Acquisition module, drive test acquisition module and the equipment for gathering exemplar information and facility information for outside drive test information collection Information acquisition module;The output end of information collecting device is connected with the input of server by transmitting device, the server It is connected with terminal device.
In the present embodiment, drive test acquisition module includes controller, locating module, wireless transceiver and environment information acquisition Module;Locating module is connected with controller, and the output end of environment information acquisition module is connected with the input of controller, institute State controller to be connected with server by wireless transceiver.Environment information acquisition module includes air velocity transducer, temperature and humidity sensing Device, baroceptor and rain sensor, the air velocity transducer, Temperature Humidity Sensor, baroceptor and rain sensor Output end be connected with the input of controller respectively, can be gathered during drive test to environment temperature by drive test acquisition module The isoparametric online acquisition of degree, rainfall, humidity, wind speed, wind direction, air pressure and solar radiation.Tester can pass through mobile phone, The information terminals such as PDA, computer, grasp the environmental information of drive test harvester monitoring range in real time, obtain abnormal alarm in time Information and weather warning information, in good time scientific analysis and management during physical circuit survey, finally realize energy-saving, green ring Protect, improve the target of conventional efficient.
In the present embodiment, experimental project planning management and manufacturing process management have been carried out effectively to closing, has worked out item During mesh plan can clear wash rice equipment service condition, personal information, by information collecting device, system server according to the project plan, The punctual list that assigns a task of facility information, personal information, exemplar information, auxiliary material information, by each tester of terminal device Ruly experiment test task can be carried out according to job order, be finally completed overall experimentation.In by the application Method can assign rational task in the rational time, sensible substantial amounts of test experiments are summarized modification and determine standard time, complete Kind experiment flow, formation test database, knowledge base, system write laboratory report automatically.
In the present embodiment, personnel information acquisition module includes fingerprint collecting unit, fingerprint identification unit and fingerprint attendance Unit, the output end of the fingerprint collecting unit are connected with the input of fingerprint identification unit, the fingerprint identification unit defeated Go out end to be connected with the input of fingerprint attendance unit, personnel information acquisition module can adopt fingerprint attendance machine, by fingerprint attendance Machine is connected with each other with server, obtains the information of tester, and tester's information includes identity information, finger print information and arranges an order according to class and grade Information, by the fingerprint attendance situation of tester and the workload of experiment, dynamic assignment experiment test task;The equipment letter Breath includes whether device identifying information, equipment account for inspection information and plant maintenance information.The identity information of tester can be to institute Have employee to carry out unified organizational system employee's coding, by system typing employee coding, employee's title, department, educational background, enter factory's date, The information such as identity card, home address, gather employee's fingerprint by attendance record terminal equipment, store attendance record terminal, and administrative staff can be with Arrange one section of date of employee on duty to situation (day shift or night shift) according to the unification of test job amount;Pass through fingerprint before employee's working daily The daily reality of work situation of attendance recorder automatic data collection employee, attendance recorder are direct-connected with test center's Management System Data storehouse, and employee is every When making a call to a fingerprint, automatically write in test center's Management System Data storehouse.By above method, daily employee is actual examines for statistics Diligent situation, is that personnel's dimension beam provides foundation when project task assigns offer.
In the present embodiment, equipment information collection module include being arranged on exemplar and/or equipment for representing exemplar And/or electronic tag and the reading unit for recognizing the electronic tag of the identity information of equipment, the reading unit Output end is connected with server by transmitting device, and by being encoded to equipment accordingly, facility information includes that equipment enters factory Inspection, stickup bar code, bar code content include the information such as equipment serial number, model, purchase date, producer, and whether equipment accounts for inspection, Plant maintenance information is included whether more than defects liability period, verifies the information such as whether pass through, will be above-mentioned by electronic tag and read write line All information unifications register warehouse-in in test and management system.
In the present embodiment, terminal device is provided with test result logging modle, and the server is provided with test result Discrimination module and automatic job distribution module, test result discrimination module and automatic job distribution module can adopt CPU, FPGA or other can To realize that the chip of above-mentioned functions, test result logging modle can be input into by input block, or by other means Recorded, the unification of all of test result is preserved into test record module, be easy to enter the whole process that tests in the future Row control, test result discrimination module are connected with automatic job distribution module, for carrying out sending the work, transmitting device are according to test result Wireless transport module, the wireless transport module include GPRS module, 3G module or 4G modules, and terminal device is mobile terminal, The mobile terminal includes that micro-control unit, input block and display unit, input block can adopt single input equipment, Such as keyboard etc., it would however also be possible to employ the touch-screen that display module is combined with logging modle, the input block and display unit It is connected with micro-control unit respectively, the micro-control unit is connected with server, when terminal device is also included for test assignment Between the alarm unit reported to the police when finally completing the time more than the project plan, the alarm unit be connected for control unit Connect, in the present embodiment, server is simulated resolving by test assignment and identified project the test deadline, it is preferable that test is appointed Business simulation resolving can include that order is resolved and inverted order is resolved, and the order is resolved to be included for test assignment being divided into some height Project, statistics can concurrent testing sub-project, determine the initial time of test assignment, according to during the standard testing of every sub-project Between and the daily full test duration for allowing, obtain the deadline of test assignment;The inverted order is resolved to be included appointing test Business is divided into some sub-projects, statistics can concurrent testing sub-project, determine the deadline of test assignment, according to every height The testing time of project and the daily full test duration for allowing, the anti-initial time for pushing away acquisition test assignment.For example, it is assumed that Totally 7 test sub-project, sub-project 2, sub-project 3 can concurrent testing, other sub-projects can only serial test, daily test job Time is 7 hours, total test 14 hours, needs to have surveyed for 2 days.Order solution process includes:Such as Start Date is 2016 The morning 8 on June 1,:00 starts, and the test of sub-project 1 is completed as 11 points (tests 3 hours), and sub-project 2, sub-project 3 are parallel, can Simultaneously from the beginning of 11 points, the beginning testDate of maximum testing time for sub-project 4, Ruo Dangkai arrange sub-project 4 then surpass 7 hours are spent, needs to start for second day;The morning 8 on June 2nd, second day:00 beginning sub-project 4 is tested, 11 points of end time; 11 points of 5 time started of sub-project, 12 points of end time;6 time started 13 of sub-project:00 (nooning 1 hour), 16:00 knot Beam;7 time started 16 of sub-project:00, the end time 17:00;Resolving of seizing back confiscated property includes:In June, 2016 No. 2 last day is before leaving offices Complete sub-project 7 to test, sub-project of retrodicting 6, sub-project 5, sub-project 4, sub-project 3, sub-project 1 start over the time.At this In embodiment, according to the testing equipment that facility information prioritizing selection history accumulative free time is short, while by tester Sort by priority, according to test assignment, according to priority order selects test man, if exemplar is put in storage, carries out sending work, if sample Part is not put in storage, then stop to carry out sending work, and send warning, and such as task delegation 1, trust 3 hour testing time of 2 each need, by item Mesh task priority resolves principle, and tester is no more than testing standard time on the same day, test of the equipment no more than the same day Time, exemplar must be put in storage as most basic principle, and otherwise system alarm prompting needs manual intervention to process (or overtime work or delay), One-state is inserted according to the urgency level of the project plan or promptly, test assignment priority is changed, if the test assignment time exceedes item Mesh plan finally completes the time, then automatic alarm.
In the present embodiment, spot-checking plan prompting is carried out to check staff also by mobile terminal, to the point that can quantify Whether inspection item time is qualified according to the threshold value automatic decision equipment for pre-setting;Artificial judgment is adopted to not energetic point inspection item Whether qualified, if equipment arbitrfary point inspection item time is unqualified, equipment is simultaneously freezed by triggering maintenance flow, until which meets standard, According to sending work to generate test order ticket, tester sends test assignment and opens by testing order ticket described in mobile scanning terminal Beginning information, by mobile terminal records test result after end to be tested, if test result is unqualified, triggering automatically is sent again Work, and multiple experiment test repeatedly is carried out, record and upload test initial data and all previous test data of experiment.According to test The performance of sub-project, automatically generates test report, by the test report analyze every equipment service efficiency, each The operating efficiency of tester and project overall progress complete efficiency.
In the present embodiment, system is calculated according to an overhaul period automatically and verifies planning chart, and mobile terminal can be adopted and is equipped with The smart mobile phone of corresponding APP programs, by smart mobile phone in APP prompting inspector's same day verify plan;Count according to verifying Draw, temporary freezing equipment, inspector's typing or equipment collection point inspection item are secondary, and whether energetic item subsystem automatic decision closes Lattice, it is impossible to which whether the item time artificial judgment of quantization is qualified;If verification equipment any one time is unqualified, system trigger maintenance stream Journey, this equipment are frozen, could use until meeting standard;If all qualified, the automatic thawing equipment of system is that task sends work most Basic condition.Defective item system triggers quality writ automatically, and user fills in correlated quality information, uploads maintenance daily record.Per Test group director checks test plan, and the test equipment situation of current group, personal information situation, assigning a task completes feelings Condition;One-state is inserted according to the emergency of the project plan or promptly, test assignment priority is changed, is arranged the test assignment time, Date, otherwise system automatic alarm are finally completed no more than the project plan in principle, points out to cause other project delay information. Group group leader receive the accepted test assignment of the task on the same day, history whether complete, the information such as performance;According to sub-project The standard testing time, test qualification personnel (same day whether work attendance working), whether facility information, exemplar put in storage, auxiliary material stock Enough information, system automatic job distribution, in the present embodiment, according to test order ticket, can adopt smart mobile phone to pass through phase The APP program scannings that answers start to test, and test terminates rear scanning barcode typing test result, if unqualified, need gap filling macadam to accuse Ticket information;For test failure sub-project, work job order is sent in triggering to system again automatically, needs tester repeatedly to test repeatedly; Tester is uploaded test initial data or is networked automatic read test initial data with test equipment, according to test subitem range estimation Examination performance, returns the performance of falling the project plan, object of experiment performance;According to object of experiment reporting requirement, system is certainly The dynamic partial data that reads writes test report;Can thus realize analyzing every equipment service efficiency, each tester Operating efficiency, and project process completes efficiency.
In the present embodiment, server also includes, for carrying out the authentication server of rights management, carrying out tester Rights management, the tester for controlling different functions by rights management check that relative test assignment, leader's group can be looked into See that all items node data, project process instrument board show, project report.Shown by abnormal alarm and successively can be launched, chased after Trace back original test data.For example:All personnel project plan group, task be can be divided into according to function and group, test assigned The different groups such as group, quality group, equipment group, exemplar management group, disbursement and sattlement group and information management group, project plan group can root Plan is worked out according to project superclass, examination & approval are submitted to.Task is assigned group and can only check this group of project plan, arranges the test number of this group According to.Test group can only check my test assignment, upload this test record.Quality group is accused according to test result typing quality Ticket.Equipment group can only manage the equipment for having authorized and register, put inspection, maintenance, verify.Exemplar management group can only manage exemplar receive, Warehouse-in, neck material, cancelling stocks, all data of return.According to test process management, system calculates clearing form to disbursement and sattlement group automatically. Information management group processes the authority of each group, and the intersection authority of one or two people can be made according to the different authorities of the different settings of employee post Each the personnel in post can only check, operate this post number evidence, achieve unified Role Management by rights management.
Finally illustrate, above example is only unrestricted in order to the technical solution of the utility model to be described, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent, the objective and model without deviating from technical solutions of the utility model Enclose, which all should be covered in the middle of right of the present utility model.

Claims (9)

1. a kind of drive test supervisory systems, it is characterised in that:Including information collecting device, server, transmitting device and for receiving The terminal device of work information, described information harvester is sent to include the personnel information acquisition mould for collecting test personal information Block, the drive test acquisition module for outside drive test information collection and adopt for gathering the facility information of exemplar information and facility information Collection module;
The output end of described information harvester is connected with the input of server by transmitting device, the server and terminal Equipment connects.
2. drive test supervisory systems according to claim 1, it is characterised in that:The drive test acquisition module include controller, Locating module, wireless transceiver and environment information acquisition module;
The locating module is connected with controller, and the output end of the environment information acquisition module is connected with the input of controller Connect, the controller is connected with server by wireless transceiver.
3. drive test supervisory systems according to claim 2, it is characterised in that:The environment information acquisition module includes wind speed Sensor, Temperature Humidity Sensor, baroceptor and rain sensor, the air velocity transducer, Temperature Humidity Sensor, air pressure transmission The output end of sensor and rain sensor is connected with the input of controller respectively.
4. drive test supervisory systems according to claim 1, it is characterised in that:The personnel information acquisition module includes fingerprint Collecting unit, fingerprint identification unit and fingerprint attendance unit, the output end of the fingerprint collecting unit and fingerprint identification unit Input connects, and the output end of the fingerprint identification unit is connected with the input of fingerprint attendance unit.
5. drive test supervisory systems according to claim 1, it is characterised in that:The equipment information collection module includes arranging The electronic tag for representing the identity information of exemplar and/or equipment on the exemplar and/or equipment and for recognizing the electricity The reading unit of subtab, the output end of the reading unit are connected with server by transmitting device.
6. drive test supervisory systems according to claim 1, it is characterised in that:The terminal device is provided with test result note Record module, the server are provided with test result discrimination module and automatic job distribution module, the test result discrimination module with Automatic job distribution module connects, for carrying out sending work according to test result.
7. drive test supervisory systems according to claim 1, it is characterised in that:The transmitting device is wireless transport module, The wireless transport module includes GPRS module, 3G module or 4G modules.
8. drive test supervisory systems according to claim 1, it is characterised in that:The terminal device is mobile terminal, described Mobile terminal include micro-control unit, input block and display unit, the input block and display unit respectively with microcontroller Unit connects, and the micro-control unit is connected with server.
9. drive test supervisory systems according to claim 8, it is characterised in that:The terminal device also includes appointing for test The alarm unit reported to the police when finally completing the time more than the project plan by the business time, the alarm unit with for control unit company Connect in succession.
CN201620955696.8U 2016-08-26 2016-08-26 Drive test supervisory systems Expired - Fee Related CN206023811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620955696.8U CN206023811U (en) 2016-08-26 2016-08-26 Drive test supervisory systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620955696.8U CN206023811U (en) 2016-08-26 2016-08-26 Drive test supervisory systems

Publications (1)

Publication Number Publication Date
CN206023811U true CN206023811U (en) 2017-03-15

Family

ID=58251815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620955696.8U Expired - Fee Related CN206023811U (en) 2016-08-26 2016-08-26 Drive test supervisory systems

Country Status (1)

Country Link
CN (1) CN206023811U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113566812A (en) * 2021-07-19 2021-10-29 中数通信息有限公司 Mobile terminal outfield test management system platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113566812A (en) * 2021-07-19 2021-10-29 中数通信息有限公司 Mobile terminal outfield test management system platform

Similar Documents

Publication Publication Date Title
CN106327087A (en) Test task assignment method
CN206921161U (en) It is a kind of to include inspection management and defect processing and the intelligent inspection system of examination
EP3115858A1 (en) Centralized monitoring system and monitoring method for unmanned aerial vehicle to patrol power transmission line
CN103345673B (en) A kind of electric power asset whole life-cycle monitoring system
CN111242574A (en) Intelligent site inspection management system and method based on GPS technology
CN106447156A (en) Attendance management method and system
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN107146065A (en) Railway engineering management platform system
CN106846530A (en) A kind of property movement cruising inspection system and method based on NFC technique
CN103824340A (en) Intelligent inspection system and inspection method for electric transmission line by unmanned aerial vehicle
CN111127689A (en) System and method for managing and controlling inspection service of unmanned aerial vehicle
CN110751340A (en) Method and system for forecasting and analyzing pedestrian flow in airport security check area
CN104881006A (en) Fire coal sampling, preparation and testing management method and apparatus
CN106570567A (en) Main network maintenance multi-constraint multi-target evaluation expert system and optimization method
CN111488999A (en) Be applied to wind-powered electricity generation field safety production information-based management system
CN116975990B (en) Management method and system for three-dimensional model of oil-gas chemical engineering wharf
CN111553633A (en) Engineering cost management system and method
CN106296038A (en) Test assignment triggering method
CN109636312A (en) Land control engineering online monitoring and management system
CN112633779B (en) Method for evaluating reliability of environmental monitoring data
Cui et al. Design of highway intelligent transportation system based on the internet of things and artificial intelligence
CN103942251A (en) Method and system for inputting high altitude meteorological data into database based on multiple quality control methods
CN206023811U (en) Drive test supervisory systems
CN113822781B (en) Ecological environment supervision method and system based on block chain
CN104317907A (en) Method for processing data used for assessing railway transport capacity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170315

CF01 Termination of patent right due to non-payment of annual fee