CN206011007U - Lifting type workbench for the assembling of crane pedestal - Google Patents
Lifting type workbench for the assembling of crane pedestal Download PDFInfo
- Publication number
- CN206011007U CN206011007U CN201621016312.2U CN201621016312U CN206011007U CN 206011007 U CN206011007 U CN 206011007U CN 201621016312 U CN201621016312 U CN 201621016312U CN 206011007 U CN206011007 U CN 206011007U
- Authority
- CN
- China
- Prior art keywords
- steel
- support tube
- lifting type
- support
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forklifts And Lifting Vehicles (AREA)
Abstract
This utility model is related to a kind of lifting type workbench for the assembling of crane pedestal, and including guardrail assembly, platform assembly and support assembly, wherein support assembly support platform assembly, guardrail assembly is arranged in platform assembly.Device of the present utility model after being installed with test platform for folding-jib crane is reduced the time of operator's mounting platform, improves work efficiency, can be by adjusting the link position between support tube come the height of adjustment work platform;The guardrail of formation can be dismantled, and facilitate the use of diverse location;Workbench side is designed as arc, can mutually agree with crane base internal wall, reduces gap between workbench and installation pedestal so as to ensureing the safety of operator.The lifting type workbench overall structure that this utility model is provided simultaneously is simple, detachably, easy for installation, with low cost.
Description
Technical field
This utility model is related to a kind of lifting type workbench, and relates more specifically to a kind of for crane pedestal dress
The lifting type workbench that matches somebody with somebody.
Background technology
At present, when folding-jib crane being carried out with test platform installation, need to carry out operation in base interior, mainly relate to
And bolt disassembly, viewing lifting progress etc. other complementary operations.Hydraulic shear of the platform for working at this stage using manual hand
Fork lifter or the steel structure platform that manually builds.Due to the base interior work space of crane narrow and small, interior lights
Line is not enough, multiple reasons such as on barrel wall oils and fatss are more, using manual hand hydraulic fork type elevator when, volume is big, moves
Dynamic underaction, hardly enters working internal, likewise, during using the workbench that manually builds, can increase the work of operator
Measure, and stability is very poor, there is potential safety hazard.
Utility model content
For the technical problem of above-mentioned solution, the purpose of this utility model is to provide a kind of low cost, small volume, conveniently tears open
The lifting type workbench for the assembling of crane pedestal of dress.
In order to realize that above-mentioned utility model, this utility model are adopted the following technical scheme that:
A kind of lifting type workbench for the assembling of crane pedestal, including guardrail assembly, platform assembly and supports total
Into support assembly support platform assembly, guardrail assembly are arranged in platform assembly, wherein:
Guardrail assembly includes multiple the first upright band steels, rustless steel steel wire rope and carbine, plurality of upright the
One band steel is around forming ring and multiple the first upright band steel levels of rustless steel steel wire penetrating fix to form guardrail, guardrail two
Rustless steel steel wire rope between first band steel of side passes through carbine fixation to form the gateway of guardrail;
Platform assembly includes that multiple horizontal angle steel, multiple second band steels and flase floor, plurality of second band steel are arranged
On multiple horizontal angle steel, for being connected with multiple the first upright band steels, multiple horizontal angle steel be interconnected to form with
The framework of the form fit of ring, flase floor are placed in framework;
Support assembly includes support chip, the first support tube and the second support tube, and wherein the diameter of the first support tube is less than the
The diameter of two support tubes, the bottom of the first support tube are connected with support chip, and the top of the first support tube is provided with multiple through holes, the
The through hole corresponding with the through hole on the first support tube is provided with two support tubes, for fastening with the first support tube, second
Stay tube is fixed to angle steel.
Further, platform assembly further includes the reinforcement angle steel for supportive grid plate bottom.
Further, multiple the first upright band steels are that side is arcuate shape around the ring for being formed, and remaining side is level
The ring of shape.
Further, the base plate of the first band steel is provided with screwed hole, the first band steel and the second band steel by bolt, nut and
Pad is fixed.
Further, flase floor is steel grating plate.
Further, the first support tube is fixed by bolt, nut and pad with the second support tube.
Further, by changing the position of assembling through hole between the first support tube and the second support tube come adjustment work platform
Height.
Further, the second support tube passes through to be welded and fixed with angle steel.
Further, it is connected with each other by welding between multiple horizontal angle steel.
Further, multiple horizontal angle steel are set above flase floor upper surface.
Due to adopting above technical scheme, the beneficial effects of the utility model to be:
Device of the present utility model reduces operator's installation after installing with test platform for folding-jib crane
The time of platform, work efficiency is improve, can be by adjusting the link position between support tube come the height of adjustment work platform.
The guardrail of formation can be dismantled, and facilitate the use of diverse location.Workbench side is designed as arc, can be with crane pedestal
Inwall mutually agrees with, and reduces gap between workbench and installation pedestal so as to ensureing the safety of operator.While workbench
Overall structure is simple, detachably, easy for installation, with low cost.
Description of the drawings
Fig. 1 is the structural representation of the lifting type workbench for the assembling of crane pedestal that this utility model is provided;
Fig. 2 is the enlarged diagram of part A structure in Fig. 1;
Fig. 3 is the enlarged diagram of part B structure in Fig. 1.
Description of reference numerals
1 first support tube, 2 second support tubes, 3 rustless steel steel cables, 4 first band steels, 5 second band steels, 6 angle steel, 7 grids
Plate, 8 carbines, 9 bolts, 10 nuts, 11 pads, 12 support chips.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with the accompanying drawings and implement
Example is described in further detail to this utility model.It should be appreciated that specific embodiment described herein is only in order to explaining this reality
With new, it is not used to limit this utility model.
As Figure 1-3, a kind of lifting type workbench for the assembling of crane pedestal that this utility model is provided, bag
Guardrail assembly, platform assembly and support assembly is included, support assembly support platform assembly, guardrail assembly are arranged in platform assembly.
Guardrail assembly includes ten the first upright band steels 4, rustless steel steel wire rope 3 and carbines 8, wherein ten the first upright band steels
4 fix to form guardrail through the hole horizontal on ten the first upright band steels 4 around ring and rustless steel steel wire rope 3 is formed, and protect
Rustless steel steel wire rope 3 between first band steel 4 of hurdle both sides is fixed to form the gateway of guardrail by carbine 8.Platform is total
Into four horizontal angle steel 6 are provided with, on each angle steel 6, be provided with the second prominent band steel 5, the second band steel 5 be used for upright
The first band steel 4 connect, four horizontal angle steel 6 are interconnected to form the framework with the form fit of ring, and flase floor 7 is placed in
In framework.Support assembly includes support chip 12, the first support tube 1 and the second support tube 2, and the diameter of wherein the first support tube 1 is little
In the diameter of the second support tube 2, the bottom of the first support tube 1 is connected with support chip 12, and the top of the first support tube 1 is provided with four
The through hole of an individual determining deviation, is provided with four through holes corresponding with four through holes on the first support tube on the second support tube 2,
For fastening with the first support tube 1, the second support tube 2 is fixed together with angle steel 6.
In above-mentioned technical proposal, platform assembly further includes (not showing for the reinforcement angle steel of 7 bottom of supportive grid plate
Go out), can so prevent 7 bottom of flase floor without support fracture damage.
In above-mentioned technical proposal, the first upright band steel 4 is that side is arcuate shape around the ring for being formed, and remaining side is
The ring of flat shape, such setting can ensure that workbench is mutually agreed with crane base internal wall, reduce workbench and installation
Gap between pedestal, so that ensure the safety of operator.
In above-mentioned technical proposal, the base plate of the first band steel 4 is provided with screwed hole, and the first band steel 4 is passed through with the second band steel 5
Bolt 9, nut 10 and pad 11 are fixed.
In above-mentioned technical proposal, 7 preferred steel grating plate of flase floor.
In above-mentioned technical proposal, this utility model is supported using three pairs of the first and second parallel support tubes 1,2,
Wherein the first support tube 1 is fixed by bolt 9, nut 10 and pad 11 with the second support tube 2.
In above-mentioned technical proposal, the second support tube 2 is with angle steel 6 by being welded and fixed.
In above-mentioned technical proposal, it is connected with each other by welding between four angle steel 6.
In above-mentioned technical proposal, four angle steel 6 of platform assembly are set above the upper surface of flase floor 7, so as to anti-
Only on workbench, instrument, debris fall and injure staff by a crashing object.
During device busy of the present utility model, assemble between the first support tube 1 and the second support tube 2 through hole by changing
Position realizing the height of adjustment work platform.
In addition, the flase floor 7 in this utility model device can be laid on the framework that four angle steel 6 are formed, without the need for fixing,
Conveniently replaced after damage.
Utility model works platform overall structure is simple, detachably, easy for installation, with low cost.
Preferred embodiment of the present utility model is the foregoing is only, is not used for limiting practical range of the present utility model;
If without departing from spirit and scope of the present utility model, modified to this utility model or equivalent, all should cover
In the middle of this utility model scope of the claims.
Claims (10)
1. a kind of for crane pedestal assembling lifting type workbench, it is characterised in that including guardrail assembly, platform assembly
And support assembly, the support assembly supports the platform assembly, the guardrail assembly to be arranged in the platform assembly, its
In:
The guardrail assembly includes multiple the first upright band steels, rustless steel steel wire rope and carbine, wherein the plurality of upright
The first band steel around forming ring and the plurality of the first upright band steel level of the rustless steel steel wire penetrating fixes shape
Into guardrail, the rustless steel steel wire rope between the first band steel of the guardrail both sides is by the carbine fixation forming the shield
The gateway on hurdle;
The platform assembly includes multiple horizontal angle steel, multiple second band steels and flase floor, wherein the plurality of second band steel
It is arranged on the plurality of horizontal angle steel, for being connected with the plurality of the first upright band steel, the plurality of horizontal angle
Steel is interconnected to form the framework with the form fit of the ring, and the flase floor is placed in the framework;
The support assembly includes support chip, the first support tube and the second support tube, and the diameter of wherein described first support tube is little
In the diameter of second support tube, the bottom of first support tube is connected with the support chip, first support tube
Top is provided with multiple through holes, is provided with corresponding with the through hole on first support tube leading on second support tube
Hole, for fastening with first support tube, second support tube is fixed to the angle steel.
2. the lifting type workbench for the assembling of crane pedestal according to claim 1, it is characterised in that described flat
Platform assembly is further included for supporting the reinforcement angle steel of the flase floor bottom.
3. according to claim 1 for crane pedestal assembling lifting type workbench, it is characterised in that described many
Individual the first upright band steel is that side is arcuate shape, ring of remaining side for flat shape around the ring for being formed.
4. the lifting type workbench for the assembling of crane pedestal according to claim 1, it is characterised in that described the
The base plate of one band steel is provided with screwed hole, and first band steel is carried out solid with second band steel by bolt, nut and pad
Fixed.
5. according to claim 1 for crane pedestal assembling lifting type workbench, it is characterised in that the lattice
Screen is steel grating plate.
6. the lifting type workbench for the assembling of crane pedestal according to claim 1, it is characterised in that described the
One support tube is fixed by bolt, nut and pad with second support tube.
7. according to claim 1 for crane pedestal assembling lifting type workbench, it is characterised in that by changing
Carry out the height of adjustment work platform in the position for becoming assembling through hole between the first support tube and the second support tube.
8. the lifting type workbench for the assembling of crane pedestal according to claim 1, it is characterised in that described the
Two support tubes are with the angle steel by being welded and fixed.
9. according to claim 1 for crane pedestal assembling lifting type workbench, it is characterised in that described many
It is connected with each other by welding between individual horizontal angle steel.
10. according to claim 1 for crane pedestal assembling lifting type workbench, it is characterised in that described
Multiple horizontal angle steel are set above the flase floor upper surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621016312.2U CN206011007U (en) | 2016-08-31 | 2016-08-31 | Lifting type workbench for the assembling of crane pedestal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621016312.2U CN206011007U (en) | 2016-08-31 | 2016-08-31 | Lifting type workbench for the assembling of crane pedestal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206011007U true CN206011007U (en) | 2017-03-15 |
Family
ID=58255849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621016312.2U Active CN206011007U (en) | 2016-08-31 | 2016-08-31 | Lifting type workbench for the assembling of crane pedestal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206011007U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106181926A (en) * | 2016-08-31 | 2016-12-07 | 润邦卡哥特科工业有限公司 | Lifting type workbench for the assembling of crane pedestal |
-
2016
- 2016-08-31 CN CN201621016312.2U patent/CN206011007U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106181926A (en) * | 2016-08-31 | 2016-12-07 | 润邦卡哥特科工业有限公司 | Lifting type workbench for the assembling of crane pedestal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102146729B (en) | Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof | |
CN106181926A (en) | Lifting type workbench for the assembling of crane pedestal | |
CN203639095U (en) | Inner-side-column lifting device for reverse installation method | |
CN206011007U (en) | Lifting type workbench for the assembling of crane pedestal | |
WO2020119068A1 (en) | Support device and method for mounting cantilevered material unloading platform | |
CN103628692B (en) | A kind of floor beam mounting bracket and use it to install the method for floor beam | |
CN109752239A (en) | A kind of reaction frame for blower embedded foundation load carrying capacity test | |
CN2923644Y (en) | Superhigh super-large high-tonnage walking derricktype lifting machine | |
CN112573341B (en) | Column top hoisting mechanism and construction method thereof | |
CN206428986U (en) | A kind of detachable turnover type support jig | |
CN205975635U (en) | Foundation pit support structure | |
CN206986745U (en) | A kind of cast-in-place simply supported beam decentering of scaffold device | |
CN204252022U (en) | A kind of packaged type steel box-girder frange plate welding operation platform | |
CN210152220U (en) | Movable operating platform that encorbelments | |
CN201052950Y (en) | Crane | |
CN204552051U (en) | The cradle structure of high-altitude crossbeam soffit monitoring point layout | |
CN113027711A (en) | Outer platform at bottom of fan pylon tower | |
CN103743581A (en) | Internal-climbing tower crane test platform apparatus and test method | |
CN203373661U (en) | Movable operation platform device below cantilever arm of steel-structure bridge | |
CN203392657U (en) | Machine maintenance platform | |
JP5948828B2 (en) | Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof | |
CN202201650U (en) | Four-supporting-column combined hoisting device for ultra-high voltage serial compensation platform | |
CN219175814U (en) | Adjustable overhanging operation platform | |
CN110654991A (en) | Portable hoisting support | |
CN205740027U (en) | A kind of hanging apparatus of packaged boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 215427, Jiangsu port economic and Technological Development Zone, Suzhou City, Taicang Province Patentee after: Jiangsu Runbang Industrial Equipment Co., Ltd Address before: 215427, Jiangsu port economic and Technological Development Zone, Suzhou City, Taicang Province Patentee before: RAINBOW-CARGOTEC INDUSTRIES Co.,Ltd. |