CN205990630U - A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument - Google Patents

A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument Download PDF

Info

Publication number
CN205990630U
CN205990630U CN201621044708.8U CN201621044708U CN205990630U CN 205990630 U CN205990630 U CN 205990630U CN 201621044708 U CN201621044708 U CN 201621044708U CN 205990630 U CN205990630 U CN 205990630U
Authority
CN
China
Prior art keywords
spade
shovel
connecting shaft
handle
shovel head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621044708.8U
Other languages
Chinese (zh)
Inventor
李光明
田鹏程
杨志海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201621044708.8U priority Critical patent/CN205990630U/en
Application granted granted Critical
Publication of CN205990630U publication Critical patent/CN205990630U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

This utility model is related to a kind of pole and tower foundation that excavates and cheats exclusive clamps spade instrument, belongs to power system digging tool technical field.Technical scheme is:Steel shovel one and the mutually symmetrical with setting of steel shovel two;Described steel shovel one comprises spade handle one(1), shovel head one(3)With spade trousers one(8), spade trousers one(8)Upper end be provided with spade handle one(1), lower end is provided with shovel head one, and the left and right sides of shovel head one is arranged with connecting shaft one(6);Described steel shovel two comprises spade handle two(2), shovel head two(7)With spade trousers two(9), the upper end of spade trousers two is provided with spade handle two, and lower end is provided with shovel head two, and the left and right sides of shovel head two is arranged with connecting shaft two(4);Described connecting shaft one(6)With connecting shaft two(4)Hinged.The beneficial effects of the utility model are:Durable, easy and simple to handle, cost-effective, it is not required to excavate inside workman's entrance foundation ditch, the foundation ditch through 2 meters of depth needed for one 12 meters of concrete bar of overtesting can excavate in 20 minutes and complete.

Description

A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument
Technical field
This utility model is related to a kind of pole and tower foundation that excavates and cheats exclusive clamps spade instrument, belongs to power system digging tool technology Field.
Background technology
Electric power, the Poling Construction such as telecommunications need newly found substantial amounts of cement shaft tower, be that shaft tower often excavates during foundation pit Landform and the environment that excavation machinery has no usage can be run into, e.g., the marshland of coastal area, the narrow street in old town or rural area Road and other extreme terrains, and the indefinite mechanical equivalent of light excavation of underground utilities easily causes destruction, at this moment needs hand excavation, general Logical spade is often taken a lot of work arduously, increases excavation workman with foundation depth and need to enter foundation ditch inner excavation,《Circuit safety》In In the foundation ditch more than 1.5m during operation, outside throwing soil stone should prevent native stone from falling after rise in hole to regulation, and carry out and prevent soil layer from collapsing Collapse faces side safeguard procedures, such as:Slope, plus baffle plate, gallows timber etc., thus with common spade excavation foundation, inefficient, increased Cost of labor.
Utility model content
This utility model purpose is to provide a kind of pole and tower foundation that excavates to cheat exclusive clamps spade instrument, can grip sandy soil, rubble, Durable, easy and simple to handle, cost-effective, it is not required to excavate inside workman's entrance foundation ditch, solve problem present in background technology.
The technical solution of the utility model is:
A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument, comprises steel shovel one, steel shovel two, connecting shaft two and connecting shaft one, Described steel shovel one and the mutually symmetrical with setting of steel shovel two;Described steel shovel one comprises spade handle one, shovel head one and spade trousers one, spade trousers one upper End is provided with spade handle one, and lower end is provided with shovel head one, and the left and right sides of shovel head one is arranged with connecting shaft one;Described steel shovel two comprises spade Handle two, shovel head two and spade trousers two, the upper end of spade trousers two is provided with spade handle two, and lower end is provided with shovel head two, the left and right sides pair of shovel head two Claim to be provided with connecting shaft two;Described connecting shaft one and connecting shaft two are hinged.
Described connecting shaft one and connecting shaft two pass through bolted splice.
The instruction of described spade deep calibration has several, spade handle one and spade handle two, and at least one is provided with deep calibration and refers to Show.
It is equipped with reflective varnish-treated tape on described spade handle one and spade handle two.
Operating process:Workmen. choose the position needing embedded cement shaft tower first, then carry out excavating foundation pit, When foundation pit excavates certain depth, carry out gripping sandy soil, rubble etc. with folder spade instrument, until foundation pit depth reach predetermined Depth can stop excavating.
The beneficial effects of the utility model are:Durable, easy and simple to handle, cost-effective, it is not required to excavate workman's entrance base Hole is internal, and the foundation ditch through 2 meters of depth needed for one 12 meters of concrete bar of overtesting can excavate in 20 minutes and complete.
Brief description
Fig. 1 is this utility model structural representation;
In figure:Spade handle 1, spade handle 22, shovel head 1, connecting shaft 24, bolt 5, connecting shaft 1, shovel head 27, spade trousers one 8th, spade trousers 29, reflectorised paint 10, deep calibration instruction 11.
Specific embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument, comprises steel shovel one, steel shovel two, connecting shaft 24 and connecting shaft one 6, described steel shovel one and the mutually symmetrical with setting of steel shovel two;Described steel shovel one comprises spade handle 1, shovel head 1 and spade trousers 1, spade trousers One 8 upper end is provided with spade handle 1, and lower end is provided with shovel head 1, and the left and right sides of shovel head 1 is arranged with connecting shaft 1;Described Steel shovel two comprises spade handle 22, shovel head 27 and spade trousers 29, and the upper end of spade trousers 29 is provided with spade handle 22, and lower end is provided with shovel head 27, The left and right sides of shovel head 27 is arranged with connecting shaft 24;Described connecting shaft 1 and the hinged setting of connecting shaft 24.
The reflective varnish-treated tape of application color red and white on spade handle one and spade handle two, color is eye-catching to play safe warning function;Apply Upper deep calibration instruction, digs designated depth and compares(Total height 2.5m).

Claims (4)

1. a kind of excavate pole and tower foundation hole exclusive clamps spade instrument it is characterised in that:Comprise steel shovel one, steel shovel two, connecting shaft two(4) With connecting shaft one(6), described steel shovel one and the mutually symmetrical with setting of steel shovel two;Described steel shovel one comprises spade handle one(1), shovel head one (3)With spade trousers one(8), spade trousers one(8)Upper end be provided with spade handle one(1), lower end is provided with shovel head one(3), shovel head(3)Left and right It is symmetrically arranged on two with connecting shaft one(6);Described steel shovel two comprises spade handle two(2), shovel head two(7)With spade trousers two(9), spade trousers two (9)Upper end be provided with spade handle two(2), lower end is provided with shovel head two(7), shovel head two(7)The left and right sides be arranged with connecting shaft two (4);Described connecting shaft one(6)With connecting shaft two(4)Hinged.
2. according to claim 1 a kind of excavate pole and tower foundation hole exclusive clamps spade instrument it is characterised in that:Described connecting shaft One(6)With connecting shaft two(4)By bolt(5)Hinged.
3. according to claim 1 and 2 a kind of excavate pole and tower foundation hole exclusive clamps spade instrument it is characterised in that:Described spade Deep calibration indicates(11)There are several, spade handle one(1)With spade handle two(2), at least one is provided with deep calibration instruction (11).
4. according to claim 1 and 2 a kind of excavate pole and tower foundation hole exclusive clamps spade instrument it is characterised in that:Described spade Handle one(1)With spade handle two(2)On be equipped with reflective varnish-treated tape(10).
CN201621044708.8U 2016-09-09 2016-09-09 A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument Active CN205990630U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621044708.8U CN205990630U (en) 2016-09-09 2016-09-09 A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621044708.8U CN205990630U (en) 2016-09-09 2016-09-09 A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument

Publications (1)

Publication Number Publication Date
CN205990630U true CN205990630U (en) 2017-03-01

Family

ID=58105717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621044708.8U Active CN205990630U (en) 2016-09-09 2016-09-09 A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument

Country Status (1)

Country Link
CN (1) CN205990630U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193143A (en) * 2016-09-09 2016-12-07 国网冀北电力有限公司唐山供电公司 A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193143A (en) * 2016-09-09 2016-12-07 国网冀北电力有限公司唐山供电公司 A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument and using method thereof

Similar Documents

Publication Publication Date Title
CN103938512B (en) The inverted construction method of existing highway is worn under a kind of newly-built road
CN104929133B (en) The construction method of sloping timbering at the bottom of a kind of deep basal pit Larsen steel sheet pile stake
CN110387879A (en) A kind of concrete filling pile construction method of hydraulic vibration hammer hidden pipe
CN105804048B (en) A kind of soft foundation drain bar reinforcement means
CN207362838U (en) A kind of tool-type soft soil foundation irrigates pile wall
CN205990630U (en) A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument
CN206706774U (en) Larsen steel plate matches somebody with somebody i shaped steel foundation ditch sealing support system
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN206768833U (en) A kind of concrete support and steel lattice column attachment structure
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN206337594U (en) A kind of miniature gravity hole digging machine and its handgrip
CN205289147U (en) Bulky concrete inside cable pre buried pipeline blocks up dredge
CN110984168B (en) Combined foundation pit supporting pile structure
CN201671104U (en) Combined tower type crane base
CN205062795U (en) Slope tamping unit
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN105544544A (en) Method for quickly extracting pile under low clearance condition
CN106193143A (en) A kind of pole and tower foundation that excavates cheats exclusive clamps spade instrument and using method thereof
CN203924072U (en) The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large
CN105625435B (en) Sea product island multi-section, multi-level special-shaped equipment deep basal pit quick molding method
CN203878559U (en) Hydraulic battering ram of excavator
CN102767159A (en) Strengthening method for existing revetments of urban river
CN100591861C (en) Mixing pile foundation pit supporting structure
CN210315495U (en) Shallow layer manual board inserting tool
CN204715502U (en) To ride well system

Legal Events

Date Code Title Description
GR01 Patent grant