CN205990622U - A kind of raft foundation - Google Patents
A kind of raft foundation Download PDFInfo
- Publication number
- CN205990622U CN205990622U CN201620395892.4U CN201620395892U CN205990622U CN 205990622 U CN205990622 U CN 205990622U CN 201620395892 U CN201620395892 U CN 201620395892U CN 205990622 U CN205990622 U CN 205990622U
- Authority
- CN
- China
- Prior art keywords
- raft
- edge
- concrete
- length
- spacing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of raft foundation, it is characterized in that, when the ratio of raft plate hight degree and raft span of slab is more than or equal to 0.1, middle part 1/3 region arranges that long stake is controlled settling, and edge 1/3 region is arranged stub to adapt to requirement for bearing capacity.The hardened structure of raft 1/3 position hollow out along in the middle of in-plane, engraved structure is arranged on middle 1/3 position along short transverse;In arrangement prestress muscle in the range of raft edges of boards edge 1/4, non-prestressing tendon is arranged in middle part;Pouring expansive concrete in the range of raft edges of boards edge 1/4, middle part pours normal concrete.
Description
Technical field
This utility model is related to building field, particularly to a kind of raft foundation.
Background technology
China's Development of High-rise Buildings is rapid in recent years, and construction scope and building height are continuously increased, and basic scale is also continuous
Expand, as a kind of large-scale base form, raft foundation has the advantages that other base forms many do not possess, how high-rise
It is widely used in building.But the hardened structure of raft is bigger due to the concrete scale of construction, and concrete can be released in hydration process
Release amount of heat, temperature stress easily makes raft plate cracking, and in addition the hardened structure of raft often goes out in load bearing process
The phenomenon of existing corner crack.
Utility model content
The purpose of this utility model is to provide a kind of raft foundation cracking to solve the problems, such as raft plate.
Test shows:When the ratio of raft plate hight degree and raft span of slab is less than 0.1, the hardened structure of raft presents on stress performance
Go out the feature of narrowing toward each end broad in the middle, and settle the same i.e. narrowing toward each end broad in the middle of distribution situation, when raft plate hight degree and raft plate across
When the ratio of degree is more than or equal to 0.1, the hardened structure of raft presents the big feature in middle little both sides on stress performance, and settles
Present contrary trend, i.e. narrowing toward each end broad in the middle, this utility model is arranged to structure according to this stress and Deposition Characteristic.
When the ratio of raft plate hight degree and raft span of slab is less than 0.1, in the middle part of raft plate, 1/3 region arranges that long stake is controlled sinking
Fall, the harder soil layer of geology is stretched in long stake, and stub is arranged in edge 1/3 region, and stub length is long pile length 0.6~0.85, short
Pile spacing is the 0.85~1.1 of long pile spacing, and concrete length and spacing determine according to place geology.The hardened structure of raft and tradition side
Method is identical.
When the ratio of raft plate hight degree and raft span of slab is more than or equal to 0.1, middle part 1/3 region arranges that long stake is controlled
Sedimentation, edge 1/3 region is arranged stub to adapt to requirement for bearing capacity, and stub length is long pile length 0.6~0.85, stub spacing
For the 0.6~0.8 of long pile spacing, concrete length and spacing determine according to place geology.The hardened structure pair of raft in this utility model
Traditional method improves, the hardened structure of raft along 1/3 position hollow out in the middle of in-plane, engraved structure along short transverse be also in
Between 1/3 position.In order to alleviate the temperature stress of raft plate further and reduce cost, in conjunction with the force-bearing characteristics of raft foundation, hollow out
Structure is 2~2.5m along in-plane isolated edge distance, and engraved structure length and width is 0.8~1.2m, and engraved structure is thick
Degree is at middle 1/3 position along short transverse.
According to raft foundation bottom stress distribution feature, raft plate corner occurs that stress concentration easily ftractures, from raft plate
Arrangement prestress muscle in the range of edge 1/4, non-prestressing tendon is arranged in middle part.Sequence of PR tension is using as follows:First
The deformed bar in the short direction of tensioning, equidirectional deformed bar tensioning using jumping every tensioning, that is, after first reinforcing bar of tensioning again
The 3rd reinforcing bar of tensioning and the like, the whole tensioning of deformed bar in short direction finish after tensioning length direction again prestressing force
Reinforcing bar, deformed bar control stress for prestressing is 0.72 characteristic value of strength of steel bar.
In order to prevent raft plate corner crack further, in the range of raft edges of boards edge 1/4, pouring expansive concrete, pars intermedia
Position pours normal concrete.Concrete vibrating is pulled out slowly using inserting soon, prevents that vibrating time is too short to lead to concrete uneven
Or overlong time leads to the phenomenons such as serious laitance;Take secondary vibration method, improve concrete density, timely exclusion table after pouring
Area water, divides after secondary receipts light and smears pressure, produces to sink and moulds crack after preventing plastic concrete sedimentation.
Three layers of casting concrete are divided along short transverse, every layer pours thickness for the 1/3 of raft plate gross thickness, the second layer during construction
Concrete lays precast slab at hollow out position, and precast concrete is shelved on above casting concrete, and shelving length is
200~300mm.
Cover double-plastic after the completion of concreting immediately and straw bag carries out heat and moisture preserving maintenance, in maintenance processes
Strengthen concrete measuring temperature monitoring work, to adjust the covering number of plies of straw bag in time.
This utility model has the advantages that mechanical property is good, safe and reliable, has preferable application prospect.
Brief description
Fig. 1 is raft foundation floor map, and Fig. 2 is raft foundation generalized section.
Accompanying drawing mark:1st, raft plate, 2, precast slab, 3, long stake, 4, stub.
Specific embodiment
Below in conjunction with accompanying drawing, the present embodiment is described in detail.
In the middle part of the present embodiment, 1/3 region arranges that long stake 3 is controlled settling, and edge 1/3 region is arranged stub 4 to adapt to hold
Load power requires, and stub 4 length is long stake 3 length 0.7, and stub 4 spacing is the 0.7 of long stake 3 spacing, concrete length and spacing according to
Place geology is determining.The hardened structure of raft 1/3 position hollow out along in the middle of in-plane, engraved structure is arranged on centre along short transverse
1/3 position.Engraved structure is 2.5m along in-plane isolated edge distance, and engraved structure length and width is 1m, engraved structure
Thickness is at middle 1/3 position along short transverse.
According to raft foundation bottom stress distribution feature, raft plate 1 corner occurs that stress concentration easily ftractures, from raft plate
Arrangement prestress muscle in the range of 1 edge 1/4, non-prestressing tendon is arranged in middle part.Sequence of PR tension is using as follows:First
The deformed bar in the short direction of tensioning, equidirectional deformed bar tensioning using jumping every tensioning, that is, after first reinforcing bar of tensioning again
The 3rd reinforcing bar of tensioning and the like, the whole tensioning of deformed bar in short direction finish after tensioning length direction again prestressing force
Reinforcing bar, deformed bar control stress for prestressing is 0.72 characteristic value of strength of steel bar.
Pouring expansive concrete in the range of raft plate 1 edge 1/4, middle part pours normal concrete.Concrete shakes
Smash and pulled out slowly using slotting soon;Take secondary vibration method, improve concrete density, after pouring, exclude surface area water, secondary receipts in time
Divide after light and smear pressure, produce to sink after preventing plastic concrete sedimentation and moulds crack.
Three layers of casting concrete are divided along short transverse, every layer pours thickness for the 1/3 of raft plate 1 gross thickness, second during construction
Layer concrete lays precast slab 2 at hollow out position, and precast concrete is shelved on above casting concrete, shelving length
For 250mm.
Cover double-plastic after the completion of concreting immediately and straw bag carries out heat and moisture preserving maintenance, in maintenance processes
Strengthen concrete measuring temperature monitoring work, to adjust the covering number of plies of straw bag in time.
Claims (3)
1. a kind of raft foundation, is characterized in that middle part 1/3 region arranges that long stake is controlled settling, edge 1/3 region arrangement is short
Adapting to requirement for bearing capacity, stub length is long pile length 0.6~0.85, and stub spacing is the 0.6~0.8 of long pile spacing for stake,
Concrete length and spacing determine according to place geology;The hardened structure of raft 1/3 position hollow out, engraved structure edge along in the middle of in-plane
Short transverse is arranged on middle 1/3 position;Engraved structure is 2~2.5m along in-plane isolated edge distance, and engraved structure is long
Degree and width are 0.8~1.2m.
2. raft foundation according to claim 1, is characterized in that in arrangement prestress muscle in the range of raft edges of boards edge 1/4,
Non-prestressing tendon is arranged in middle part.
3. raft foundation according to claim 1, is characterized in that pouring expansion coagulation in the range of raft edges of boards edge 1/4
Soil, middle part pours normal concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620395892.4U CN205990622U (en) | 2016-04-20 | 2016-04-20 | A kind of raft foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620395892.4U CN205990622U (en) | 2016-04-20 | 2016-04-20 | A kind of raft foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205990622U true CN205990622U (en) | 2017-03-01 |
Family
ID=58101788
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620395892.4U Expired - Fee Related CN205990622U (en) | 2016-04-20 | 2016-04-20 | A kind of raft foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205990622U (en) |
-
2016
- 2016-04-20 CN CN201620395892.4U patent/CN205990622U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205653944U (en) | Prestressed concrete truss superimposed sheet | |
CN112012386B (en) | Prefabricated bottom plate of laminated slab, laminated slab and preparation method of laminated slab | |
CN104929290B (en) | Large-span steel-reinforced concrete orthogonal-diagonal lattice hollow floor system and preparation method thereof | |
CN106049732B (en) | A kind of two-way laminated floor slab of honeycomb hole profiled sheet | |
CN109537617B (en) | Construction method for pouring suspended bearing platform by using suspended bottom die bracket | |
CN108661225B (en) | But height-adjusting's precast concrete coincide floor | |
CN105133487B (en) | Construction method for using combined type bridge temporary support to rapidly build continuous beams | |
CN206352357U (en) | A kind of prestressed concrete overlapped slab with steel truss | |
CN206859480U (en) | A kind of assembled large span combines steel truss concrete superimposed sheet | |
CN105113352B (en) | A kind of scour and abrasion resistant concrete pre-installs road | |
CN205990622U (en) | A kind of raft foundation | |
CN206070876U (en) | A kind of ultra-high performance concrete post permanent template | |
CN106968380A (en) | A kind of assembled large span combination steel truss concrete superimposed sheet and its construction method | |
CN205035732U (en) | Interim support of combined type bridge | |
CN106142339A (en) | A kind of automatic production line of mechanical presses molding prestressed concrete base plate | |
CN105839657B (en) | Raft foundation | |
CN206205236U (en) | A kind of deformed bar truss hollow superimposed sheet | |
CN109440991A (en) | A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section | |
CN105382919B (en) | A kind of prefabricated section prefabricated mould and its method for prefabricating | |
CN107035045A (en) | A kind of precast concrete bidirectional hollow plate and preparation method thereof | |
CN201050128Y (en) | Cast in-situ light aggregate reinforcing steel concrete composite floor slab | |
CN109291208B (en) | Large-span prestressed concrete double-T-plate construction method | |
Punnoose et al. | Experimental study of strengthening of RC deep beam with web opening | |
CN206752789U (en) | A kind of precast concrete bidirectional hollow plate and its prepare mould therefor | |
CN215330823U (en) | Truss rib composite floor slab with limiting support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170301 Termination date: 20180420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |