CN109440991A - A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section - Google Patents

A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section Download PDF

Info

Publication number
CN109440991A
CN109440991A CN201811558706.4A CN201811558706A CN109440991A CN 109440991 A CN109440991 A CN 109440991A CN 201811558706 A CN201811558706 A CN 201811558706A CN 109440991 A CN109440991 A CN 109440991A
Authority
CN
China
Prior art keywords
region
span centre
span
several
centre region
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811558706.4A
Other languages
Chinese (zh)
Inventor
王凤来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Original Assignee
HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd filed Critical HARBIN DACHENG GREEN BUILDING TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201811558706.4A priority Critical patent/CN109440991A/en
Publication of CN109440991A publication Critical patent/CN109440991A/en
Priority to PCT/CN2019/121991 priority patent/WO2020125378A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/06Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section, belongs to assembled architecture technical field.The present invention solves the problems, such as that the dosage of cast-in-place concrete overlapping layers required for existing precast slab for superimposed sheet is big, construction period needs setting to support, stress is not reasonable.It includes span centre region and the standoff region positioned at span centre region both ends, the bottom surface in span centre region and the bottom surface of standoff region are located at same level, and the thickness of standoff region is less than the thickness in span centre region, the span centre region of cored slab is machined with several through-holes along its span direction, the top surface of each standoff region offers several first through slots along the span direction in span centre region, the both upper ends thereof in span centre region is machined with several U-lags respectively, the open end of U-lag is located at the both ends in span centre region span direction, several U-lags are uniformly arranged, and the lower part of U-lag and through-hole perforation are arranged.

Description

A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
Technical field
The present invention relates to a kind of glomerations to build the unidirectional prefabricated board of superimposed sheet, and in particular to a kind of glomeration building superimposed sheet use The unidirectional precast hollow slab in gradual change section, belongs to assembled architecture technical field.
Background technique
Superstructure can be divided into monoblock type, assembled and three kinds of assembled integral according to form of construction work.Assembled integral superstructure The length of both monoblock type superstructure and precast assemble floor is taken, with overall stiffness is big, anti-seismic performance is good, easy construction, shortens the construction period The advantages that.Concrete folding plate is on prefabricated board plus to pour one layer of cast-in-place concrete and the assembled integral superstructure that is formed, by by Power situation can be divided into once force-bearing superimposed sheet and secondary loading superimposed sheet.In the construction stage, using prefabricated board as in-situ layer coagulation The template of soil, prefabricated board lower section exempt to set support, and prefabricated board bears its self weight, last layer weight concrete and construction period lotus at this time It carries, after after upper layer, cast-in-place concrete reaches design strength, then the overlapping section formed by pre-erection and cast-in-place part bears to make With load, secondary loading superimposed sheet is constituted, this superimposed sheet, which is more advantageous to, to be improved construction efficiency, economizes on resources.
Although the superimposed sheet prefabricated panel for occurring various technology maturations in architectural engineering and widely applying, exist existing The problems such as pouring concrete overlapping layers dosage is big, construction period needs to be arranged bearing, stress is not reasonable, for this reason, it is necessary to invent Superimposed sheet prefabricated panel being adapted to assembled built with ribbed bricks building, haveing excellent performance.Secondary loading superimposed sheet it is pre- Bottom plate processed, on the one hand the template as rear pouring concrete layer, on the other hand has the bearing function for exempting from bearing, therefore to superimposed sheet The overall process used of constructing plays an important role.
Summary of the invention
The present invention is that the dosage of cast-in-place concrete overlapping layers required in order to solve existing precast slab for superimposed sheet is big, applies It needs to be arranged the not reasonable problem of bearing, stress between duration, and then provides a kind of glomeration building superimposed sheet gradual change section Unidirectional precast hollow slab.
Used technical solution is the present invention to solve above-mentioned technical problem:
A kind of glomeration builds the superimposed sheet unidirectional precast hollow slab in gradual change section, it includes span centre region and is located at span centre The standoff region at region both ends, the bottom surface in span centre region and the bottom surface of standoff region are located at same level, and standoff region Thickness is less than the thickness in span centre region, and the span centre region of cored slab is machined with several through-holes along its span direction, several described logical Hole is arranged in parallel in the horizontal direction, and the top surface of each standoff region offers several along the span direction in span centre region One through slot, several first through slots are identical as the quantity of several through-holes and correspond connection setting, span centre region Both upper ends thereof is machined with several U-lags respectively, and the open end of U-lag is located at the both ends in span centre region span direction, if It does the U-lag to be uniformly arranged, and the lower part of U-lag and through-hole perforation are arranged.
Further, the first through slot in standoff region is arc-shaped slot, what the center line of the arc-shaped slot communicated therewith The center line of through-hole is located along the same line.
Further, be respectively spaced a through-hole between each adjacent two U-lag, each U-lag with through-hole below Face setting.
Further, the width of cored slab is the multiple of 200mm.
Further, the plate thickness of standoff region is not less than 50mm, and the plate thickness in span centre region and the thickness of superposed floor are identical.
Further, the length range of each standoff region is 300mm~500mm.
Further, the lower part of cored slab is embedded with several sagging moment muscle, and several sagging moments along its span direction Muscle is arranged in parallel in the horizontal direction.
Further, the two sides wall construction on cored slab on its span direction is identical and arranged symmetrically, wherein span centre area Equal level is machined with the first fin and the second fin disposed in parallel up and down on each side wall in domain, wherein the first fin and second The second through slot is formed between fin, and the thickness of the first fin is less than the thickness of the second fin.
The present invention has the effect that compared with prior art
One, compared with the thicker prefabricated board for exempting from bearing with the construction stage in the prior art, the gradual change section of the application is pre- The self weight of cored slab processed reduces;It is set compared with the relatively thin prefabricated board of bearing with the construction stage in the prior art, has reached and applied Work exempts from the purpose of bearing.Therefore, the gradual change section form of prefabricated board has taken into account two that construction exempts to support and mitigate member dead weight Target, while also ensuring the smooth control precision of flooring.
Two, cored slab does not set bearing, self weight, overlapping layers load and construction live load is undertaken by it, to improve construction effect Rate reduces engineering cost.
Three, overlapping layers is only present in standoff region in the application, can reinforce the company between prefabricated board and wall or backbar It connects, realizes connection of the vertical member at floor.
Four, span centre region does not need to overlap, and the flatness of superimposed sheet can be made to control more accurate.
Five, the section of cored slab is variation in the application, and the plate thickness in span centre region is greater than the plate thickness of standoff region, this The plate thickness of variation is consistent with the force-bearing situation of construction period plate.
Six, several through-holes can be used for arranging reserved spool, there is saving concrete amount, mitigation precast hollow slab to be self-possessed, The sagging moment for reducing construction period, the deformability for improving cored slab, the application advantage for increasing cored slab sound insulation function.
Detailed description of the invention
Fig. 1 is schematic perspective view of the invention;
Fig. 2 is schematic top plan view of the invention;
Fig. 3 is schematic front view of the invention;
Fig. 4 is enlarged diagram at the P of Fig. 3.
Specific embodiment
Specific embodiment 1: illustrating present embodiment, a kind of glomeration building superimposed sheet gradual change section in conjunction with Fig. 1~4 Unidirectional precast hollow slab, it includes span centre region 1 and the standoff region 2 positioned at 1 both ends of span centre region, the bottom in span centre region 1 Face and the bottom surface of standoff region 2 are located at same level, and the thickness of standoff region 2 is less than the thickness in span centre region 1, cored slab Span centre region 1 be machined with several through-holes 11 along its span direction, several through-holes 11 are arranged in parallel in the horizontal direction, The top surface of each standoff region 2 offers several first through slots 21 along the span direction in span centre region 1, and several described first is logical Slot 21 is identical as the quantity of several through-holes 11 and corresponds connection setting, and the both upper ends thereof in span centre region 1 is processed respectively There are several U-lags 12, the open end of U-lag 12 is located at the both ends in 1 span direction of span centre region, several U-lags 12 are uniformly arranged, and the lower part of U-lag 12 and the perforation of through-hole 11 are arranged.
Cored slab is in the shape of a " convex " along the longitudinal section in its span direction, i.e., along its span direction, the depth of section of cored slab It is variation.Convex portion is span centre region 1, and raised both ends are standoff region 2.It is used in U-lag 12 on span centre region 1 In arrangement negative bending moment rib, to realize that superimposed sheet undertakes hogging moment in the continuous stress of middle support position, and in side support position. The length of U-lag 12 should meet the force request of negative bending moment rib.Pouring concrete overlapping layers is only placed at the branch of precast hollow slab afterwards Seat region 2, only forms in standoff region 2 and overlaps, and span centre region 1 does not need to overlap, and ultimately forms the overlapping locally overlapped Superstructure.
Concrete and overlapping layer concrete (concrete i.e. in standoff region 2) in U-lag 12 and below through-hole 11 It pours jointly, remaining through-hole 11 should keep hollow state.
The unidirectional precast hollow slab in gradual change section produces completely in Prefabrication with the unidirectional pre- of several through-holes 11 first Cored slab processed, then be cut into the variable cross-section form and U-lag 12 of both ends standoff region 2, the cross sectional shape of through-hole 11 and Spacing between adjacent two through hole 11 depends primarily on the depth of section and Reinforcement (including sagging moment muscle 3 of cored slab And negative bending moment rib) arrangement, it is ensured that rib width meets force request between thickness of protection tier and two through hole 11.The section of through-hole Shape can be round or oblong or be made of multi-section circular arc.
Not preferably less than HRB400 grades or HRBF400 grades of the Reinforcement that precast hollow slab is configured, carrying should be met Power calculates, the requirement of crack-control check calculation and deflection design, can longitudinal stress steel to precast hollow slab when being unsatisfactory for requiring The prestressing force of muscle application certain level.When the longitudinal tensile reinforcing bar of the unidirectional precast hollow slab in gradual change section is regular reinforcement, coagulation Native strength grade not preferably less than C30, when applying prestressing force to longitudinal tensile reinforcing bar, strength grade of concrete not preferably less than C40, And not lower than C30.
The general plate class flexural member of stirrup and bent-up bar, Shear bearing capacity are not configured for single thickness Safety stock (i.e. the conservative coefficient of shear resistance capacity) be significantly greater than the safety stock of flexure bearing capacity.Superimposed sheet is used Prefabricated board is in the stress of both ends freely-supported when the construction stage exempting to set bearing, and maximum shear appears in standoff region 2, Maximal bending moment appears in span centre region 1, if the plate thickness of standoff region 2 is thinned and forms board of variable section, Shear The safety stock of bearing capacity will reduce, but its safety stock is still not less than the safety stock of flexure bearing capacity.Due to only It is in standoff region 2 that plate thickness is thinning, so crack-control check calculation and deflection design of such way to serviceability limit state Influence it is smaller.The plate thickness in span centre region 1 is greater than the plate thickness of standoff region 2, the plate thickness of this variation and construction period plate by Power situation is consistent.
Compared with the thicker prefabricated board that the construction stage in the prior art exempts from bearing, the prefabricated sky in gradual change section of the application The self weight of core reduces;It is set compared with the relatively thin prefabricated board of bearing with the construction stage in the prior art, has reached construction and exempted from The purpose of bearing.Therefore, the gradual change section form of prefabricated board has taken into account construction and has exempted to support and mitigate two targets of member dead weight, The smooth control precision of flooring is also ensured simultaneously.
Cored slab does not set bearing, undertakes self weight, overlapping layers load and construction live load by it, to improve construction efficiency, Reduce engineering cost.
Overlapping layers is only present in standoff region 2 in the application, can reinforce the connection between prefabricated board and wall or backbar, Realize connection of the vertical member at floor.
Several through-holes 11 can be used for arranging reserved spool, has and saves concrete amount, mitigate precast hollow slab self weight, subtract The sagging moment of small construction period, the deformability for improving cored slab, the application advantage for increasing cored slab sound insulation function.Meet green Color, energy-saving and environmental protection theory.
The variable cross-section form and U-lag 12 of standoff region 2 can cut on the basis of complete cored slab and obtain, greatly Prefabrication difficulty is reduced greatly.
Span centre region 1 does not need to overlap, and the flatness of superimposed sheet can be made to control more accurate.
The first through slot 21 in standoff region 2 is arc-shaped slot, the through-hole 11 that the center line of the arc-shaped slot communicates therewith Center line be located along the same line.In cored slab process, plate directly can be processed into several edges along its span direction Horizontal plane through-hole 11 arranged in parallel, then goes out two standoff regions 2, standoff region for the both upper ends thereof horizontal resection of plate The first through slot 21 on 2 is the lower part of the through-hole 11 processed in original plate, no longer needs to individually process the first through slot 21, Prefabrication difficulty is reduced greatly, effectively improves processing efficiency.
Respectively be spaced a through-hole 11 between each adjacent two U-lag 12, each U-lag 12 with through-hole 11 below Face setting.For arranging negative bending moment rib in U-lag 12, length should meet the force request of negative bending moment rib.U-lag 12 and The concrete in through-hole 11 below pours jointly with overlapping layer concrete, remaining through-hole 11 keeps hollow state.
The width L of cored slab is the multiple of 200mm.The wide carry out Prefabrication of series of plates can be selected according to requirement of engineering.Root The unidirectional precast hollow slab in gradual change section is formed according to the span and template that need to be cut into needs, changes in the prior art " one The inefficient production method of one plate of mould ".
The plate thickness of standoff region 2 is not less than 50mm, and the plate thickness in span centre region 1 and the thickness of superposed floor are identical.Span centre area The top surface in domain 1 is the top surface of cored slab itself, so that the flatness control of superimposed sheet is more accurate.The thickness size of superposed floor It is determined by calculation.
The length range of each standoff region 2 is 300mm~500mm.The length of both ends standoff region 2 is identical, main to use Connection between reinforcement floor and wall or backbar, and realize concrete folding layer to the bonding and anchor of negative bending moment rib Gu.
The lower part of cored slab is embedded with several sagging moment muscle 3 along its span direction, and several sagging moment muscle 3 are in level It is arranged in parallel on direction.Sagging moment muscle 3 is directly arranged when hollow board prefabrication produces, it is unidirectionally pre- that gradual change section can be reduced The Prefabrication difficulty of cored slab processed, and negative bending moment rib is arranged after hollow board prefabrication production.
Two sides wall construction on cored slab on its span direction is identical and arranged symmetrically, wherein each of span centre region 1 Equal level is machined with the first fin 13 disposed in parallel and the second fin 14 up and down on side wall, wherein the first fin 13 and second convex The second through slot 15 is formed between rib 14, and the thickness A of the first fin 13 is less than the thickness B of the second fin 14.The plate in span centre region 1 Side uses the form of non-vertical plane, is machined with fin and groove, in superposed floor assembling, the plate side of two neighboring cored slab Docking, two the second fins 14 are in close contact, the gap there are gap between two the first fins 13, between two cored slabs It is poured concrete, to guarantee being reliably connected for adjacent two plates plate side seams.

Claims (8)

1. a kind of glomeration builds the superimposed sheet unidirectional precast hollow slab in gradual change section, it is characterised in that: it includes span centre region (1) And it is located at the standoff region (2) at span centre region (1) both ends, the bottom surface of span centre region (1) and the bottom surface of standoff region (2) are located at Same level, and the thickness of standoff region (2) is less than the thickness of span centre region (1), the span centre region (1) of cored slab along its across Degree direction is machined with several through-holes (11), and several through-holes (11) are arranged in parallel in the horizontal direction, each standoff region (2) top surface offers several first through slots (21), several first through slots (21) along the span direction of span centre region (1) And one-to-one correspondence connection setting, the both upper ends thereof of span centre region (1) identical as the quantity of several through-holes (11) are processed respectively Have several U-lags (12), the open end of U-lag (12) is located at the both ends in span centre region (1) span direction, several described U-lag (12) is uniformly arranged, and the lower part of U-lag (12) and through-hole (11) perforation are arranged.
2. a kind of glomeration according to claim 1 builds the superimposed sheet unidirectional precast hollow slab in gradual change section, feature exists In: the first through slot (21) in standoff region (2) is arc-shaped slot, the through-hole (11) that the center line of the arc-shaped slot communicates therewith Center line be located along the same line.
3. a kind of glomeration according to claim 1 or 2 builds the superimposed sheet unidirectional precast hollow slab in gradual change section, feature Be: being respectively spaced a through-hole (11) between each adjacent two U-lag (12), each U-lag (12) with through-hole below (11) face is arranged.
4. a kind of glomeration according to claim 3 builds the superimposed sheet unidirectional precast hollow slab in gradual change section, feature exists In: the width (L) of cored slab is the multiple of 200mm.
5. a kind of glomeration according to claim 1 or 2 builds the superimposed sheet unidirectional precast hollow slab in gradual change section, feature Be: the plate thickness of standoff region (2) is not less than 50mm, and the plate thickness of span centre region (1) is identical as the thickness of superposed floor.
6. a kind of glomeration according to claim 5 builds the superimposed sheet unidirectional precast hollow slab in gradual change section, feature exists In: the length range of each standoff region (2) is 300mm~500mm.
7. a kind of according to claim 1, glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section described in 2,4 or 6, Be characterized in that: the lower part of cored slab is embedded with several sagging moment muscle (3), and several sagging moment muscle (3) along its span direction It is arranged in parallel in the horizontal direction.
8. a kind of glomeration according to claim 7 builds the superimposed sheet unidirectional precast hollow slab in gradual change section, feature exists In: the two sides wall construction on cored slab on its span direction is identical and arranged symmetrically, wherein each side wall of span centre region (1) Upper equal level is machined with the first fin (13) disposed in parallel and the second fin (14) up and down, wherein the first fin (13) and second It is formed between fin (14) the second through slot (15), and the thickness (A) of the first fin (13) is less than the thickness of the second fin (14) (B)。
CN201811558706.4A 2018-12-19 2018-12-19 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section Pending CN109440991A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811558706.4A CN109440991A (en) 2018-12-19 2018-12-19 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
PCT/CN2019/121991 WO2020125378A1 (en) 2018-12-19 2019-11-29 One-way precast hollow slab having gradually varying cross section for laminated slab of agglomeration building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811558706.4A CN109440991A (en) 2018-12-19 2018-12-19 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section

Publications (1)

Publication Number Publication Date
CN109440991A true CN109440991A (en) 2019-03-08

Family

ID=65560334

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811558706.4A Pending CN109440991A (en) 2018-12-19 2018-12-19 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section

Country Status (2)

Country Link
CN (1) CN109440991A (en)
WO (1) WO2020125378A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020125378A1 (en) * 2018-12-19 2020-06-25 哈尔滨达城绿色建筑技术开发股份有限公司 One-way precast hollow slab having gradually varying cross section for laminated slab of agglomeration building

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681592B (en) * 2020-12-15 2022-06-14 河北工业大学 Prefabricated slab and beam connecting structure based on reinforcement connection and construction method thereof

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094118A (en) * 1995-06-15 1997-01-07 Supankuriito Corp:Kk Precast concrete plate
US20030005661A1 (en) * 2001-07-03 2003-01-09 Loris Collavino Prestressed hollowcore concrete plank leveler device
CN1644833A (en) * 2005-01-25 2005-07-27 吴方伯 Hollow prefabricated steel bar reinforced concrete boards
KR20100100711A (en) * 2009-03-05 2010-09-15 지석원 T-typed precast concrete slab and contstruction method thereof
CN203905241U (en) * 2014-05-30 2014-10-29 王睿敏 Hollow laminated floor slab
CN105155855A (en) * 2015-09-11 2015-12-16 孟凡林 Arrangement method of short-span negative-moment reinforcing steel bars of assembled core post-grouted concrete plates
KR101701416B1 (en) * 2016-07-14 2017-02-01 (주)에스앤씨산업 Precast Concrete Deck for Long-Span Slab and the Slab using it
CN106401036A (en) * 2016-11-16 2017-02-15 浙江工业大学工程设计集团有限公司 Assembled type steel framework prefabricated concrete floor slab structure
CN106401052A (en) * 2016-10-21 2017-02-15 季兆桐 Prefabricated prestressed hollow slab and preparing method thereof
CN106555453A (en) * 2017-02-04 2017-04-05 赤峰市建筑科学研究院有限公司 A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
CN106639094A (en) * 2017-02-21 2017-05-10 哈尔滨达城绿色建筑技术开发股份有限公司 Assembling type post-tensioned pre-stressing steel reinforced concrete bidirectional laminated board for aggregate building
CN107023103A (en) * 2017-06-06 2017-08-08 广西大学 A kind of part overlaps superimposed sheet with holes
US20180023296A1 (en) * 2016-07-21 2018-01-25 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
CN209339419U (en) * 2018-12-19 2019-09-03 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204401844U (en) * 2014-12-30 2015-06-17 王睿敏 Easy-to-install laminated floor slab
DE102015200661A1 (en) * 2015-01-16 2016-07-21 MMK Holz-Beton-Fertigteile GmbH Composite precast
CN205557951U (en) * 2016-03-15 2016-09-07 王硕干 Novel local cast -in -place assembled coincide building roof boarding
CN206457973U (en) * 2016-11-11 2017-09-01 浙江绿筑集成科技有限公司 Prefabricated local laminated floor slab
CN109629729A (en) * 2018-12-19 2019-04-16 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building unidirectional precast hollow slab superposed floor in gradual change section
CN109440991A (en) * 2018-12-19 2019-03-08 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
CN209353552U (en) * 2018-12-19 2019-09-06 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building unidirectional precast hollow slab superposed floor in gradual change section

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH094118A (en) * 1995-06-15 1997-01-07 Supankuriito Corp:Kk Precast concrete plate
US20030005661A1 (en) * 2001-07-03 2003-01-09 Loris Collavino Prestressed hollowcore concrete plank leveler device
CN1644833A (en) * 2005-01-25 2005-07-27 吴方伯 Hollow prefabricated steel bar reinforced concrete boards
KR20100100711A (en) * 2009-03-05 2010-09-15 지석원 T-typed precast concrete slab and contstruction method thereof
CN203905241U (en) * 2014-05-30 2014-10-29 王睿敏 Hollow laminated floor slab
CN105155855A (en) * 2015-09-11 2015-12-16 孟凡林 Arrangement method of short-span negative-moment reinforcing steel bars of assembled core post-grouted concrete plates
KR101701416B1 (en) * 2016-07-14 2017-02-01 (주)에스앤씨산업 Precast Concrete Deck for Long-Span Slab and the Slab using it
US20180023296A1 (en) * 2016-07-21 2018-01-25 Meadow Burke, Llc Lifting and leveling insert for a precast concrete slab
CN106401052A (en) * 2016-10-21 2017-02-15 季兆桐 Prefabricated prestressed hollow slab and preparing method thereof
CN106401036A (en) * 2016-11-16 2017-02-15 浙江工业大学工程设计集团有限公司 Assembled type steel framework prefabricated concrete floor slab structure
CN106555453A (en) * 2017-02-04 2017-04-05 赤峰市建筑科学研究院有限公司 A kind of prefabricated overlapped hollow plate of prestressing force and its construction method
CN106639094A (en) * 2017-02-21 2017-05-10 哈尔滨达城绿色建筑技术开发股份有限公司 Assembling type post-tensioned pre-stressing steel reinforced concrete bidirectional laminated board for aggregate building
CN107023103A (en) * 2017-06-06 2017-08-08 广西大学 A kind of part overlaps superimposed sheet with holes
CN209339419U (en) * 2018-12-19 2019-09-03 哈尔滨达城绿色建筑技术开发股份有限公司 A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020125378A1 (en) * 2018-12-19 2020-06-25 哈尔滨达城绿色建筑技术开发股份有限公司 One-way precast hollow slab having gradually varying cross section for laminated slab of agglomeration building

Also Published As

Publication number Publication date
WO2020125378A1 (en) 2020-06-25

Similar Documents

Publication Publication Date Title
CN105002816B (en) The fish belly I shape prestressing force steel reinforced concrete composite continuous bridge of precast assembly and construction method
CN106703269A (en) Prestressed concrete superimposed sheet with steel trusses and manufacturing method
CN105040878B (en) Overlapped floor
CN107476482B (en) A kind of prefabricated panel with light gauge cold-formed steel shape rib, superimposed sheet and preparation method thereof
CN106049732B (en) A kind of two-way laminated floor slab of honeycomb hole profiled sheet
CN211396208U (en) Green type coincide floor's mosaic structure
WO2020253811A1 (en) Local composite slab connection node, and construction method therefor
CN108643428A (en) A kind of height-adjustable prefabricated reinforced concrete slab
CN106996161A (en) A kind of steel bar girder sandwich precast floor slab
CN108661225A (en) A kind of height-adjustable precast concrete laminated floor slab
CN109440991A (en) A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
CN209353552U (en) A kind of glomeration building unidirectional precast hollow slab superposed floor in gradual change section
CN109629729A (en) A kind of glomeration building unidirectional precast hollow slab superposed floor in gradual change section
CN109853873A (en) Overlap concrete bidirectional stress insulation roof slab
CN206752828U (en) A kind of steel bar girder sandwich precast floor slab
CN209339419U (en) A kind of glomeration building superimposed sheet unidirectional precast hollow slab in gradual change section
CN112663486A (en) Steel-concrete combined beam structure with increased steel beam in hogging moment area and construction method
CN108643429A (en) A kind of height-adjustable assembled laminated floor slab
CN105696453B (en) A kind of steel-concrete combination beam
CN111335530A (en) Variable cross-section one-way hollow prefabricated slab for block building laminated slab
CN206205236U (en) A kind of deformed bar truss hollow superimposed sheet
CN105484147B (en) Steel case purlin composite continuous bridge and its construction method
CN105484148B (en) Part steel case purlin composite continuous bridge and its construction method
CN102051963A (en) Concrete composite beam floor system and pouring method thereof
CN105952044B (en) A kind of full precast prestressed concrete floor construction and prestressing force assembly method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination