CN205988658U - A kind of waste gas treatment device - Google Patents

A kind of waste gas treatment device Download PDF

Info

Publication number
CN205988658U
CN205988658U CN201620927879.9U CN201620927879U CN205988658U CN 205988658 U CN205988658 U CN 205988658U CN 201620927879 U CN201620927879 U CN 201620927879U CN 205988658 U CN205988658 U CN 205988658U
Authority
CN
China
Prior art keywords
tank
bristle
waste gas
motion block
observation port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620927879.9U
Other languages
Chinese (zh)
Inventor
丰秀英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jinbei Construction Engineering Co. Ltd.
Original Assignee
Quzhou Shengrong Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quzhou Shengrong Electronic Technology Co Ltd filed Critical Quzhou Shengrong Electronic Technology Co Ltd
Priority to CN201620927879.9U priority Critical patent/CN205988658U/en
Application granted granted Critical
Publication of CN205988658U publication Critical patent/CN205988658U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

This utility model relates to the technical field of the equipment of exhaust-gas treatment, more particularly to a kind of waste gas treatment device, and it preferably can be observed to process tank and gas tank, and can be by processing chamber bottom water recycling;Including gas tank, process tank and water tank, the waste gas that is internally provided with of gas tank stores chamber, process tank be internally provided with processing chamber, water tank be internally provided with water storage cavity, processing chamber be internally provided with communicating pipe and electrical heating coil pipe, communicating pipe is provided with multigroup shower nozzle;Process and be provided with the first observation port on pot sidewall, and be provided with the first transparent baffle at the first observation port, also include the first in command, first rotating shaft, first band motion block and the first bristle;Second observation port is provided with waste gas pot sidewall, and is provided with the second transparent baffle at the second observation port, also include the second in command, the second rotating shaft, the second band motion block and the second bristle;Also include collecting-tank, the input of collecting-tank is communicated with processing chamber.

Description

A kind of waste gas treatment device
Technical field
This utility model relates to the technical field of the equipment of exhaust-gas treatment, more particularly to a kind of waste gas pollution control and treatment dress Put.
Background technology
It is known that waste gas treatment device be a kind of be exclusively used in the device that various industrial waste gases are processed, it is in industry It is widely used in the links such as the manufacturing, because it can reach the purpose of more environmental protection to waste gas pollution control and treatment, also obtain each Unit and department are widely popularized;Existing waste gas treatment device includes gas tank, process tank and water tank, the inside of gas tank Be provided with waste gas and store chamber, process tank be internally provided with processing chamber, water tank be internally provided with water storage cavity, gas tank defeated Go out end communicated with process tank by escape pipe, processing chamber be internally provided with communicating pipe and electrical heating coil pipe, the output of water tank End is passed through outlet pipe and is connected the communicating pipe of process tank, and is provided with multigroup shower nozzle on communicating pipe;This waste gas treatment device Find in use, its process tank and gas tank internal state cannot be carried out observing, thus leading to its maintenance and observation efficiency to reduce; And the water that its shower nozzle sprays is directly entered processing chamber bottom and then drains, waste very much waterpower resourses.
Utility model content
For solving above-mentioned technical problem, this utility model provides one kind that process tank and gas tank preferably can be seen Examine, and can be by the waste gas treatment device of processing chamber bottom water recycling.
Waste gas treatment device of the present utility model, including gas tank, process tank and water tank, being internally provided with of gas tank Waste gas stores chamber, process tank be internally provided with processing chamber, water tank be internally provided with water storage cavity, the outfan of gas tank leads to Cross escape pipe to communicate with process tank, processing chamber be internally provided with communicating pipe and electrical heating coil pipe, the outfan of water tank passes through Outlet pipe with connect the communicating pipe of process tank, and multigroup shower nozzle is provided with communicating pipe;It is provided with described process pot sidewall First observation port, and it is provided with the first transparent baffle at the first observation port, described first observation port is communicated with processing chamber, also wraps Include the first in command, first rotating shaft, first band motion block and the first bristle, the described first in command is located at the outside of process tank, described the One band motion block and the first bristle be respectively positioned on process intracavity, described first rotating shaft one end is connected with the first in command, first rotating shaft another One end pass through the first transparent baffle and stretch to process intracavity be connected with first band motion block, described first bristle is arranged on first band On motion block, and the first bristle is adjacent to described first transparent baffle;It is provided with the second observation port on described waste gas pot sidewall, and Be provided with the second transparent baffle at second observation port, described second observation port stores chamber with waste gas and communicates, also include the second in command, Second rotating shaft, the second band motion block and the second bristle, the described second in command is located at the outside of gas tank, described second band motion block and the Two bristles are respectively positioned on process intracavity, and described second rotating shaft one end is connected with the second in command, and the other end of the second rotating shaft passes through second Transparent baffle and stretch to waste gas store intracavity with second band motion block be connected, described second bristle is arranged on the second band motion block, And the second bristle is adjacent to described second transparent baffle;Also include collecting-tank, the input of described collecting-tank is communicated with processing chamber, The outfan of collecting-tank is communicated with water tank.
Waste gas treatment device of the present utility model, also includes base plate, and the bottom of described base plate is provided with multigroup support column, and It is provided with roller in the bottom of every group of support column, described gas tank, process tank, collecting-tank and water tank are installed in described bottom The top of plate.
Waste gas treatment device of the present utility model, also includes first support group, second support group and the 3rd support group, described First support group, second support group and the 3rd support group bottom are all connected with base plate top, first support group top and gas tank Connect, second support group top is connected with process tank, and the 3rd support group top is connected with water tank.
Compared with prior art the beneficial effects of the utility model are:By above-mentioned setting, two groups of transparent gears can be passed through Plate stores chamber to processing chamber and waste gas respectively to be observed, convenient maintenance, and drives bristle pair when it is dirty by handle Transparent baffle carries out clearing up;And utilization can be circulated to water resource by the design of collecting-tank, more practical.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is A portion partial enlarged drawing in Fig. 1.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is used for this utility model is described, but is not limited to scope of the present utility model.
As depicted in figs. 1 and 2, waste gas treatment device of the present utility model, including gas tank 1, process tank 2 and water tank 3, The waste gas that is internally provided with of gas tank stores chamber, process tank be internally provided with processing chamber, water tank be internally provided with water storage Chamber, the outfan of gas tank is communicated with process tank by escape pipe, processing chamber be internally provided with communicating pipe 4 and electrical heating coil pipe 5, the outfan of water tank passes through outlet pipe and connects the communicating pipe of process tank, and is provided with multigroup shower nozzle 6 on communicating pipe;Place It is provided with the first observation port on reason pot sidewall, and be provided with the first transparent baffle 7, the first observation port and place at the first observation port Reason chamber communicates, and also includes the first in command 8, first rotating shaft 9, first band motion block 10 and the first bristle 11, and the first in command is located at and processes The outside of tank, first band motion block and the first bristle are respectively positioned on process intracavity, and first rotating shaft one end is connected with the first in command, first turn The other end of axle pass through the first transparent baffle and stretch to process intracavity be connected with first band motion block, the first bristle is arranged on first On band motion block, and the first bristle is adjacent to the first transparent baffle;Second observation port is provided with waste gas pot sidewall, and in the second sight Cha Kongchu is provided with the second transparent baffle, and the second observation port stores chamber with waste gas and communicates, and also includes 12, second turn of the second in command Axle, the second band motion block and the second bristle, the second in command is located at the outside of gas tank, and the second band motion block and the second bristle are respectively positioned on place Reason intracavity, second rotating shaft one end is connected with the second in command, and the other end of the second rotating shaft passes through the second transparent baffle and stretches to useless Gas is stored intracavity and is connected with the second band motion block, and the second bristle is arranged on the second band motion block, and the second bristle to be adjacent to second saturating Bright baffle plate;Also include collecting-tank 13, the input of collecting-tank is communicated with processing chamber, and the outfan of collecting-tank is communicated with water tank; By above-mentioned setting, respectively chamber can be stored to processing chamber and waste gas by two groups of transparent baffles and observe, convenient maintenance, and And drive bristle that transparent baffle is carried out clearing up when it is dirty by handle;And can be to water by the design of collecting-tank Resource is circulated utilization, more practical.
Waste gas treatment device of the present utility model, also includes base plate 14, and the bottom of base plate is provided with multigroup support column 15, and It is provided with roller 16 in the bottom of every group of support column, gas tank, process tank, collecting-tank and water tank are installed in the top of base plate End.
Waste gas treatment device of the present utility model, also includes first support group, second support group and the 3rd support group 17, the One support group, second support group and the 3rd support group bottom are all connected with base plate top, and first support group top is with gas tank even Connect, second support group top is connected with process tank, the 3rd support group top is connected with water tank.
The above is only preferred implementation of the present utility model it is noted that common skill for the art For art personnel, on the premise of without departing from this utility model know-why, some improvement and modification can also be made, these change Enter and also should be regarded as protection domain of the present utility model with modification.

Claims (3)

1. a kind of waste gas treatment device, including gas tank, process tank and water tank, the waste gas that is internally provided with of gas tank stores Chamber, process tank be internally provided with processing chamber, water tank be internally provided with water storage cavity, the outfan of gas tank passes through escape pipe Communicate with process tank, processing chamber be internally provided with communicating pipe and electrical heating coil pipe, the outfan of water tank pass through outlet pipe with The communicating pipe connection of process tank, and multigroup shower nozzle is provided with communicating pipe;It is characterized in that, described process pot sidewall is arranged There is the first observation port, and be provided with the first transparent baffle at the first observation port, described first observation port is communicated with processing chamber, also Including the first in command, first rotating shaft, first band motion block and the first bristle, the described first in command is located at the outside of process tank, described First band motion block and the first bristle are respectively positioned on process intracavity, and described first rotating shaft one end is connected with the first in command, first rotating shaft The other end pass through the first transparent baffle and stretch to process intracavity be connected with first band motion block, described first bristle is arranged on first On band motion block, and the first bristle is adjacent to described first transparent baffle;It is provided with the second observation port on described waste gas pot sidewall, and It is provided with the second transparent baffle at the second observation port, described second observation port stores chamber with waste gas and communicates, and also includes second Handss, the second rotating shaft, the second band motion block and the second bristle, the described second in command is located at the outside of gas tank, described second band motion block It is respectively positioned on process intracavity with the second bristle, described second rotating shaft one end is connected with the second in command, and the other end of the second rotating shaft passes through Second transparent baffle and stretch to waste gas store intracavity with second band motion block be connected, described second bristle is arranged on the second band motion block On, and the second bristle is adjacent to described second transparent baffle;Also include collecting-tank, the input of described collecting-tank and processing chamber phase Logical, the outfan of collecting-tank is communicated with water tank.
2. it is characterised in that also including base plate, the bottom of described base plate is arranged waste gas treatment device as claimed in claim 1 There is multigroup support column, and be provided with roller in the bottom of every group of support column, described gas tank, process tank, collecting-tank and water storage Tank is installed in the top of described base plate.
3. waste gas treatment device as claimed in claim 2 it is characterised in that also include first support group, second support group and 3rd support group, described first support group, second support group and the 3rd support group bottom are all connected with base plate top, first support Group top is connected with gas tank, and second support group top is connected with process tank, and the 3rd support group top is connected with water tank.
CN201620927879.9U 2016-08-24 2016-08-24 A kind of waste gas treatment device Expired - Fee Related CN205988658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620927879.9U CN205988658U (en) 2016-08-24 2016-08-24 A kind of waste gas treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620927879.9U CN205988658U (en) 2016-08-24 2016-08-24 A kind of waste gas treatment device

Publications (1)

Publication Number Publication Date
CN205988658U true CN205988658U (en) 2017-03-01

Family

ID=58106251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620927879.9U Expired - Fee Related CN205988658U (en) 2016-08-24 2016-08-24 A kind of waste gas treatment device

Country Status (1)

Country Link
CN (1) CN205988658U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107297120A (en) * 2017-07-18 2017-10-27 盐城市兰丰环境工程科技有限公司 Waste gas treatment equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107297120A (en) * 2017-07-18 2017-10-27 盐城市兰丰环境工程科技有限公司 Waste gas treatment equipment
CN107297120B (en) * 2017-07-18 2023-10-13 王芳 Exhaust gas treatment device

Similar Documents

Publication Publication Date Title
CN206997220U (en) A kind of cleaning equipment for parts
CN202823021U (en) Quick-opening and quick-changing bag filter
CN205988658U (en) A kind of waste gas treatment device
CN204637911U (en) A kind of exhaust treatment system
CN206526648U (en) A kind of processing equipment of waste gas
CN209865414U (en) A waste water filter equipment for papermaking production
CN205762627U (en) Converter cover cleans device
CN205085051U (en) Water conservation agricultural product cleaning machine
CN107213719A (en) A kind of industrial oil mist purifier
CN202246938U (en) Automatic zipper coloring equipment
CN210165820U (en) Oil cooler core belt cleaning device
CN204411951U (en) A kind of forming machine waste gas recovering device
CN202933830U (en) Oil mist spraying device on inner and outer walls of short steel tube
CN203382831U (en) Drying production line of electrophoresis workpiece
CN203265137U (en) Cleaning machine for engine parts
CN207891400U (en) A kind of system for Steel Wire Heat Treatment
CN206745336U (en) A kind of school canteen irony meal disk clearing and drying device
CN103028526B (en) Device for spraying oil mist onto inner wall and outer wall of short steel pipe
CN211384501U (en) Efficient chemical machinery tail gas processing apparatus
CN205575083U (en) Processing apparatus behind gear
CN211328706U (en) Unhairing device for industrial oil smoke
CN206810020U (en) Tower for purifying waste gas
CN203923676U (en) A kind of energy-saving printing and dyeing emission-control equipment
CN203803332U (en) Dye synthesis exhaust gas treatment system
CN202212376U (en) Cleaning device for gas valve of gas pressurizing machine

Legal Events

Date Code Title Description
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Gao Chongming

Inventor before: Feng Xiuying

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170609

Address after: Wuhou District Jinyang road Chengdu City, Sichuan province 610015 No. 184 Jinyan Building 9 floor No. 5

Patentee after: Sichuan Jinbei Construction Engineering Co. Ltd.

Address before: 324000 room 130-9, West Street, Quzhou, Zhejiang

Patentee before: QUZHOU SHENGRONG ELECTRONIC TECHNOLOGY CO., LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170301

Termination date: 20170824

CF01 Termination of patent right due to non-payment of annual fee