CN205977109U - Tunnel crab -bolt operation panel that punches - Google Patents

Tunnel crab -bolt operation panel that punches Download PDF

Info

Publication number
CN205977109U
CN205977109U CN201620879225.3U CN201620879225U CN205977109U CN 205977109 U CN205977109 U CN 205977109U CN 201620879225 U CN201620879225 U CN 201620879225U CN 205977109 U CN205977109 U CN 205977109U
Authority
CN
China
Prior art keywords
longitudinal
positioning sleeve
bar
longitudinal positioning
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620879225.3U
Other languages
Chinese (zh)
Inventor
任文海
谢海棠
宋新南
李会芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN201620879225.3U priority Critical patent/CN205977109U/en
Application granted granted Critical
Publication of CN205977109U publication Critical patent/CN205977109U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型公开了一种隧道锚栓打孔操作台。本实用新型的目的在于提供一种隧道锚栓打孔操作台。本实用新型包括上平台和支脚,上平台置于支脚的上端,其特征在于:所述上平台包括横向杆、纵向杆、纵向定位杆、纵向定位套管,该横向杆的两端与纵向杆的两端相互连接形成方形框架,横向杆的外面套接有横向定位套管,该横向定位套管能沿横向杆滑动,纵向定位杆的两端与横向定位套管相连,其外套接有纵向定位套管,该纵向定位套管也能沿纵向定位杆滑动,纵向定位套管上通过固定螺栓与水钻机支架固定板相连,该固定板与水钻机支架的下端相连,该支架上套有滑块,该滑块能沿水钻机支架上下移动。本实用新型主要用于隧道锚栓打孔。

The utility model discloses a drilling operation platform for tunnel anchor bolts. The purpose of the utility model is to provide a drilling operation platform for tunnel anchor bolts. The utility model comprises an upper platform and a supporting foot, and the upper platform is placed on the upper end of the supporting foot, and is characterized in that: the upper platform includes a transverse bar, a longitudinal bar, a longitudinal positioning bar, and a longitudinal positioning sleeve, and the two ends of the transverse bar and the longitudinal bar The two ends of the horizontal rod are connected to each other to form a square frame. The lateral positioning sleeve is sleeved on the outside of the horizontal rod, and the lateral positioning sleeve can slide along the horizontal rod. The positioning sleeve, the longitudinal positioning sleeve can also slide along the longitudinal positioning rod, the longitudinal positioning sleeve is connected with the fixing plate of the water drilling rig bracket through the fixing bolt, the fixing plate is connected with the lower end of the water drilling rig bracket, the bracket is covered with a sliding block, the slide block can move up and down along the water drilling rig support. The utility model is mainly used for punching holes for tunnel anchor bolts.

Description

一种隧道锚栓打孔操作台A tunnel anchor drilling operation table

技术领域technical field

本实用新型涉及一种操作台,尤其涉及一种隧道锚栓打孔操作台。The utility model relates to an operation platform, in particular to a drilling operation platform for tunnel anchor bolts.

背景技术Background technique

目前,在电气化铁路隧道施工中,多采用后置锚栓方式进行各种设备的安装固定,而后置锚栓施工一般采用人工手举电锤的打孔方式。隧道锚栓施工对锚栓打孔间距、垂直度等精度要求高,并且一般锚栓数量较大,采用人工手举电锤进行操作,使得工人劳动强度大,工作效率低下,同时施工过程中随意性大,误差大,施工质量难以控制,影响后续设备安装固定。At present, in the construction of electrified railway tunnels, the installation and fixation of various equipment is mostly carried out in the way of post anchor bolts, and the construction of post anchor bolts generally adopts the method of drilling holes manually with electric hammers. Tunnel anchor bolt construction has high requirements on the accuracy of anchor bolt punching spacing and verticality, and generally the number of anchor bolts is large, and the manual hand-held electric hammer is used for operation, which makes the labor intensity of workers high and the work efficiency low. The reliability is large, the error is large, and the construction quality is difficult to control, which affects the subsequent installation and fixation of equipment.

随着电气化铁路设计速度的不断提高和建设步伐的不断加快,对设备安装质量和施工效率提出了更高的要求,传统的施工方式已无法满足现场施工需求。With the continuous improvement of the design speed and construction pace of electrified railway, higher requirements are put forward for the quality of equipment installation and construction efficiency, and the traditional construction methods can no longer meet the needs of on-site construction.

发明内容Contents of the invention

本实用新型的目的在于提供一种隧道锚栓打孔操作台,以解决手工操作时工人劳动强度大,施工效率低、施工误差大的问题。The purpose of the utility model is to provide a drilling operation platform for tunnel anchors to solve the problems of high labor intensity, low construction efficiency and large construction errors during manual operation.

为实现上述目的,本实用新型的技术解决方案是:一种隧道锚栓打孔操作台,包括上平台和支脚,上平台置于支脚的上端,其特征在于:所述上平台包括横向杆9、纵向杆8、纵向定位杆6、纵向定位套管2,该横向杆的两端与纵向杆的两端相互连接形成方形框架,横向杆9的外面套接有横向定位套管5,该横向定位套管能沿横向杆滑动,纵向定位杆6的两端与横向定位套管5相连,其外套接有纵向定位套管2,该纵向定位套管也能沿纵向定位杆滑动,纵向定位套管2上通过固定螺栓4与水钻机支架固定板3相连,该固定板与水钻机支架1的下端相连,该支架上套有滑块12,该滑块能沿水钻机支架1上下移动。In order to achieve the above purpose, the technical solution of the present invention is: a tunnel anchor drilling operation platform, including an upper platform and a foot, the upper platform is placed on the upper end of the foot, and the feature is that: the upper platform includes a horizontal bar 9 , longitudinal bar 8, longitudinal positioning bar 6, longitudinal positioning sleeve 2, the two ends of this transverse bar and the two ends of longitudinal bar are mutually connected to form a square frame, and the outside of transverse bar 9 is sleeved with transverse positioning sleeve 5, and this transverse The positioning sleeve can slide along the transverse rod, and the two ends of the longitudinal positioning rod 6 are connected with the horizontal positioning sleeve 5, and the outer sleeve is connected with the longitudinal positioning sleeve 2, and the longitudinal positioning sleeve can also slide along the longitudinal positioning rod. Pipe 2 links to each other with water drilling rig support fixed plate 3 by fixing bolt 4, and this fixed plate links to each other with the lower end of water drilling rig support 1, and this support is covered with slide block 12, and this slide block can move up and down along water drilling rig support 1.

所述纵向杆8、横向杆9、纵向定位套管2纵向定位杆6,横向定位套管5均为钢管。The longitudinal bar 8, the transverse bar 9, the longitudinal positioning sleeve 2, the longitudinal positioning bar 6, and the lateral positioning sleeve 5 are all steel pipes.

本实用新型的有益效果是:The beneficial effects of the utility model are:

通过制作隧道锚栓打孔平台可以很好地解决现场工人劳动强度大、工作效率低的问题,同时提高了打孔精度和施工质量。The problem of high labor intensity and low work efficiency of on-site workers can be well solved by making the tunnel anchor bolt drilling platform, and the drilling accuracy and construction quality are improved at the same time.

1、改手举电锤式操作为操纵水钻机操作杆操作,极大地降低了工人劳动强度。1. Change the hand-held electric hammer operation to operate the operating rod of the water drilling rig, which greatly reduces the labor intensity of workers.

2、施工效率比传统模式得到极大提高。2. The construction efficiency is greatly improved compared with the traditional mode.

3、通过横向和纵向定位,使锚栓孔距、垂直度相关精度达到要求,满足了设备安装条件。3. Through horizontal and vertical positioning, the accuracy of anchor bolt hole distance and verticality can meet the requirements and meet the equipment installation conditions.

4、操作台成本低廉,操作简便,便于推广。4. The cost of the console is low, the operation is simple and convenient, and it is easy to popularize.

附图说明Description of drawings

图1是本实用新型的结构示意图。Fig. 1 is a structural representation of the utility model.

图中:1-水钻机支架,2-纵向定位套管,3-水钻机支架固定板,4-固定螺栓,5-横向定位套管,6-纵向定位杆,7-工具悬挂钢管,8-纵向杆,9-横向杆,10-支脚,11-操作台底座角钢,12-滑块,13-螺钉。In the figure: 1-water drilling rig bracket, 2-longitudinal positioning sleeve, 3-water drilling rig bracket fixing plate, 4-fixing bolt, 5-horizontal positioning sleeve, 6-longitudinal positioning rod, 7-tool suspension steel pipe, 8- Longitudinal bar, 9-horizontal bar, 10-foot, 11-angle steel of operating table base, 12-slider, 13-screw.

具体实施方式detailed description

下面结合附图对本实用新型及其具体实施方式作进一步详细说明。The utility model and its specific implementation will be described in further detail below in conjunction with the accompanying drawings.

参见图1,本实用新型包括上平台和支脚,上平台置于支脚的上端,其特征在于:所述上平台包括横向杆9、纵向杆8、纵向定位杆6、纵向定位套管2,该横向杆的两端与纵向杆的两端相互连接形成方形框架,横向杆9的外面套接有横向定位套管5,该横向定位套管能沿横向杆滑动,纵向定位杆6的两端与横向定位套管5相连,其外套接有纵向定位套管2,该纵向定位套管也能沿纵向定位杆滑动,纵向定位套管2上通过固定螺栓4与水钻机支架固定板3相连,该固定板与水钻机支架1的下端相连,该支架上套有滑块12,该滑块能沿水钻机支架1上下移动。Referring to Fig. 1, the utility model comprises an upper platform and a leg, the upper platform is placed on the upper end of the leg, and it is characterized in that: the upper platform includes a transverse bar 9, a longitudinal bar 8, a longitudinal positioning bar 6, and a longitudinal positioning sleeve 2, the The two ends of the transverse bar and the two ends of the longitudinal bar are mutually connected to form a square frame, and the outside of the transverse bar 9 is sleeved with a transverse positioning sleeve 5, which can slide along the transverse bar. The horizontal positioning sleeve 5 is connected, and its outer sleeve is connected with a longitudinal positioning sleeve 2. This longitudinal positioning sleeve can also slide along the longitudinal positioning rod. The fixed plate links to each other with the lower end of the water drilling rig support 1, and the support is covered with a slide block 12, which can move up and down along the water drilling rig support 1.

所述纵向杆8、横向杆9、纵向定位套管2纵向定位杆6,横向定位套管5均为钢管。The longitudinal bar 8, the transverse bar 9, the longitudinal positioning sleeve 2, the longitudinal positioning bar 6, and the lateral positioning sleeve 5 are all steel pipes.

一、操作步骤:1. Operation steps:

1、将手持式电锤安装于水钻机支架1的滑块12上,紧固到位;1. Install the hand-held electric hammer on the slider 12 of the water drilling rig bracket 1, and fasten it in place;

2、通过横向定位装置(由横向杆9、横向定位套管5组成)和纵向定位装置(由纵向定位杆6、纵向定位套管2组成)调整电锤位置,对准标记孔位;2. Adjust the position of the electric hammer through the horizontal positioning device (consisting of the horizontal rod 9 and the horizontal positioning sleeve 5) and the longitudinal positioning device (consisting of the longitudinal positioning rod 6 and the longitudinal positioning sleeve 2), and align the marked hole position;

3、开启电锤,操纵水钻机支架操作杆,使电锤钻头进入隧道壁;3. Turn on the electric hammer, manipulate the operating rod of the water drilling rig bracket, and make the drill bit of the electric hammer enter the tunnel wall;

4、打孔完毕后,通过水钻机支架操作杆退出电锤钻头,重复第二步,进行下一个打孔作业。4. After the drilling is completed, withdraw the electric hammer drill bit through the operating rod of the water drilling rig bracket, and repeat the second step to carry out the next drilling operation.

二、原理说明:2. Principle description:

1、隧道锚栓打孔操作台的制作:1. Manufacture of the drilling console for tunnel anchor bolts:

该操作台电锤固定装置直接采用成品水钻机支架,方便安装;横向定位装置和纵向定位装置采用¢32mm和¢40mm的钢管焊接而成,¢40mm的钢管套在¢32mm钢管外部,确保平滑移动。横向定位装置与操作台底座相连,通过滑动调整可实现精确定位。The electric hammer fixing device of the operating table directly adopts the finished water drilling rig bracket, which is convenient for installation; the horizontal positioning device and the vertical positioning device are welded by ¢32mm and ¢40mm steel pipes, and the ¢40mm steel pipe is sleeved outside the ¢32mm steel pipe to ensure smooth movement. The lateral positioning device is connected with the base of the operating table, and precise positioning can be realized through sliding adjustment.

2、工具应用:2. Tool application:

现场使用时,一般将隧道锚栓打孔操作台固定在梯车或作业车平台上。然后将电锤安装于电锤固定装置上,通过横向定位装置和纵向定位装置调整电锤位置,对准标记孔位。再开启电锤,操纵水钻机支架操作杆,使电锤钻头进入隧道壁进行打孔作业,打孔完毕后,通过水钻机支架操作杆退出电锤钻头,重新定位下一个锚栓孔位,进行下一个打孔作业。When used on site, the tunnel anchor drilling operation table is generally fixed on the platform of the ladder truck or the work vehicle. Then install the electric hammer on the electric hammer fixing device, adjust the position of the electric hammer through the horizontal positioning device and the longitudinal positioning device, and align with the marked hole. Turn on the electric hammer again, manipulate the operating rod of the water drilling rig support, so that the electric hammer bit enters the tunnel wall for drilling. Next punch job.

三、结构说明:3. Structure description:

隧道锚栓打孔操作台主要由四部分结构构成,各部分结构如下:The tunnel anchor bolt drilling operation table is mainly composed of four parts, each part structure is as follows:

1、电锤固定装置:水钻机支架1套,安装在纵向定位装置上。1. Electric hammer fixing device: 1 set of water drilling rig bracket, installed on the longitudinal positioning device.

2、纵向定位装置:将2根182mm长的¢40钢管(纵向定位套管2)与2块170mm长的50*10铁板焊接,将¢40的钢管套在¢32的钢管(纵向定位杆6)上;将4根M12*50的螺栓焊接在纵向定位装置的铁板上,保证间距150mm*150mm,与水钻机支架预留连接孔相匹配。2. Longitudinal positioning device: Weld two 182mm long ¢40 steel pipes (longitudinal positioning sleeve 2) with two 170mm long 50*10 iron plates, and put the ¢40 steel pipes on the ¢32 steel pipes (longitudinal positioning rods) 6) On: Weld 4 M12*50 bolts to the iron plate of the longitudinal positioning device to ensure a spacing of 150mm*150mm, which matches the reserved connection holes of the water drilling rig bracket.

3、横向定位装置:将2根928mm长的¢32钢管(纵向定位杆6)与2根182mm长的¢40钢管(横向定位套管5)焊接,将¢40的钢管套在上平台¢32的钢管(横向杆9)上。3. Lateral positioning device: Weld two 928mm long ¢32 steel pipes (longitudinal positioning rod 6) with two 182mm long ¢40 steel pipes (horizontal positioning sleeve 5), and put the ¢40 steel pipes on the upper platform ¢32 on the steel pipe (transverse bar 9).

4、操作台底座:由2根968mm长的¢32钢管(纵向杆8)、2根1064mm长的¢32钢管(横向杆9)、4根800mm长的¢50钢管、4根968mm长的∟50*50角钢焊接成立方体框架,四个角焊接4个30mm长的¢32钢管。4. Console base: consists of 2 968mm long ¢32 steel pipes (longitudinal rod 8), 2 1064mm long ¢32 steel pipes (horizontal rod 9), 4 800mm long ¢50 steel pipes, 4 968mm long ∟ The 50*50 angle steel is welded into a cube frame, and four 30mm long ¢32 steel pipes are welded at the four corners.

Claims (2)

1.一种隧道锚栓打孔操作台,包括上平台和支脚,上平台置于支脚的上端,其特征在于:所述上平台包括横向杆(9)、纵向杆(8)、纵向定位杆(6)、纵向定位套管(2),该横向杆的两端与纵向杆的两端相互连接形成方形框架,横向杆(9)的外面套接有横向定位套管(5),该横向定位套管能沿横向杆滑动,纵向定位杆(6)的两端与横向定位套管(5)相连,其外套接有纵向定位套管(2),该纵向定位套管也能沿纵向定位杆滑动,纵向定位套管(2)上通过固定螺栓(4)与水钻机支架固定板(3)相连,该固定板与水钻机支架(1)的下端相连,该支架上套有滑块(12),该滑块能沿水钻机支架(1)上下移动。1. A tunnel anchor drilling operation platform, comprising an upper platform and a foot, the upper platform is placed on the upper end of the foot, it is characterized in that: the upper platform includes a transverse bar (9), a longitudinal bar (8), a longitudinal positioning bar (6), longitudinal positioning sleeve (2), the two ends of the transverse bar and the two ends of the longitudinal bar are connected to each other to form a square frame, the outside of the transverse bar (9) is sleeved with a transverse positioning sleeve (5), the transverse The positioning sleeve can slide along the transverse rod, and the two ends of the longitudinal positioning rod (6) are connected with the horizontal positioning sleeve (5), and the outer sleeve is connected with the longitudinal positioning sleeve (2), and the longitudinal positioning sleeve can also be positioned along the longitudinal direction The rod slides, and the longitudinal positioning sleeve (2) is connected with the water drilling rig bracket fixing plate (3) through the fixing bolt (4), and the fixing plate is connected with the lower end of the water drilling rig bracket (1), and the slider ( 12), the slide block can move up and down along the water drilling rig support (1). 2.按权利要求1所述操作台,其特征在于所述纵向杆(8)、横向杆(9)、纵向定位套管(2)纵向定位杆(6),横向定位套管(5)均为钢管。2. According to the said console of claim 1, it is characterized in that said longitudinal bar (8), transverse bar (9), longitudinal positioning sleeve (2) longitudinal positioning bar (6), and lateral positioning sleeve (5) are all for steel pipes.
CN201620879225.3U 2016-08-12 2016-08-12 Tunnel crab -bolt operation panel that punches Expired - Fee Related CN205977109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620879225.3U CN205977109U (en) 2016-08-12 2016-08-12 Tunnel crab -bolt operation panel that punches

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620879225.3U CN205977109U (en) 2016-08-12 2016-08-12 Tunnel crab -bolt operation panel that punches

Publications (1)

Publication Number Publication Date
CN205977109U true CN205977109U (en) 2017-02-22

Family

ID=59977537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620879225.3U Expired - Fee Related CN205977109U (en) 2016-08-12 2016-08-12 Tunnel crab -bolt operation panel that punches

Country Status (1)

Country Link
CN (1) CN205977109U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108214408A (en) * 2018-01-02 2018-06-29 四川同风源建设工程有限公司 Impact electric hammer universal working platform
CN110984258A (en) * 2019-12-11 2020-04-10 中国建筑西南勘察设计研究院有限公司 Drilling, pile cutting and inclination correcting construction device and method for existing super high-rise building
CN112177522A (en) * 2020-09-02 2021-01-05 天津理工大学 Robot end effector for punching and placing bolts and method of using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108214408A (en) * 2018-01-02 2018-06-29 四川同风源建设工程有限公司 Impact electric hammer universal working platform
CN110984258A (en) * 2019-12-11 2020-04-10 中国建筑西南勘察设计研究院有限公司 Drilling, pile cutting and inclination correcting construction device and method for existing super high-rise building
CN112177522A (en) * 2020-09-02 2021-01-05 天津理工大学 Robot end effector for punching and placing bolts and method of using the same

Similar Documents

Publication Publication Date Title
CN102003071B (en) Prestressing channel drilling and positioning construction process of prestressed beam by post-tensioning method
CN204662952U (en) A kind of self-propelled tool single side formwork formwork system
CN103123016A (en) Construction method for laying gas pipelines along bridge
CN105618812B (en) A kind of device for rectifying a deviation to building in small space
CN207484512U (en) A kind of integrated reinforcement trolley for the construction of pipe gallery tunneling boring
CN102654021B (en) Tunnel drilling machine
CN205096590U (en) Simple and easy auxiliary device of ceiling punching operation
CN103670286B (en) A kind of electric power pylon composite foundation anchoring drilling machine all-around mobile base
WO2020042192A1 (en) Pile driving method and special apparatus, for when using bridge erecting machine
CN203702002U (en) Simple bi-directional rapid sliding frame
CN110778279A (en) A lift-type synchronous drilling equipment
CN205330623U (en) Percussion drill shift unit
CN102305035B (en) Device for adjusting centration of complete vehicle-mounted service machine to wellhead
CN202832238U (en) All-dimensional moving base seat for steel pylon composite foundation anchoring drill rig
CN211397473U (en) Lifting type synchronous drilling equipment
CN204666391U (en) Old concrete can continous sampling device
CN205954730U (en) Major diameter down --hole hammer construction drill way positioner
CN104833542A (en) Existing concrete continuous core taking apparatus
CN110405253A (en) Vertical embedded bar accurate positioning and drilling device and construction method thereof
CN210264517U (en) Intelligent tunnel drilling equipment
CN206352297U (en) A kind of underlying concrete tamping equipment
CN203175407U (en) Upper-air hole punching electric hammer moving support
CN203245833U (en) Multifunctional Quick Drilling Tool Holder
CN205036293U (en) Automatic drill jumbo in tunnel
CN217680339U (en) Simple and easy reinforced concrete roof beam board end auxiliary device that punches a hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222