CN201679218U - Top plate drilling device for ceiling construction inside building - Google Patents

Top plate drilling device for ceiling construction inside building Download PDF

Info

Publication number
CN201679218U
CN201679218U CN2010201894704U CN201020189470U CN201679218U CN 201679218 U CN201679218 U CN 201679218U CN 2010201894704 U CN2010201894704 U CN 2010201894704U CN 201020189470 U CN201020189470 U CN 201020189470U CN 201679218 U CN201679218 U CN 201679218U
Authority
CN
China
Prior art keywords
bar
vertical rod
plate
plate drilling
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201894704U
Other languages
Chinese (zh)
Inventor
李松
张坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of CTCE Group
Original Assignee
Construction Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of CTCE Group filed Critical Construction Engineering Co Ltd of CTCE Group
Priority to CN2010201894704U priority Critical patent/CN201679218U/en
Application granted granted Critical
Publication of CN201679218U publication Critical patent/CN201679218U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model relates to a top plate drilling device for ceiling construction inside a building. The device comprises a vertical bar A1, a vertical bar B2, a cross bar A3 and a cross bar B4 which are connected by bolts into a movable latticed frame. An adjusting bar is connected to the upper portion of the vertical bar A1; a depth control bar is arranged on one side at the upper end of the adjusting bar; and both the ends of the cross bar A3 and the cross bar B4 which are positioned on one side of the vertical bar B2 extend outwards. The top plate drilling device is simple in processing and manufacturing and convenient for obtaining materials, and the materials can be obtained from local sources in general construction sites. When the top plate drilling device is used, an electric hammer is directly mounted at the upper end of the adjusting bar, and an operator directly operates the top plate drilling device on ground and applies force onto the electric hammer by a lever without carrying a trestle ladder and climbing up and down the ladder, thereby the top plate drilling device greatly reduces labor intensity and improves labor efficiency. The top plate drilling device is used for changing high-altitude operation into ground operation, decreases potential safety hazard in construction process, is suitable for current light steel keel gypsum plate ceiling construction and meets the requirement of a large amount of drilling on a top plate.

Description

Interior of building furred ceiling construction top board drilling equipment
Technical field
The utility model belongs to the interior of building construction and uses device, is specifically related to interior of building furred ceiling construction top board drilling equipment.
Background technology
In the construction of light steel keel gypsum board furred ceiling, fixedly hang muscle with expansion bolt, need on concrete roof, bore a large amount of holes.Boring method commonly used on concrete roof is exactly nothing but manually directly to hole with electric hammer at present.When manually directly holing, the operator will remove the double ladder shift position and reach ladder up and down, and arm makes progress when holing simultaneously, and labour intensity is bigger, inefficiency.Workman's operation belongs to work high above the ground highly generally greater than 2 meters in addition, has potential safety hazard.
Summary of the invention
Present top board boring labour intensity is big, efficient is low in order to solve, have the problem of potential safety hazard.The utility model provides a kind of easy to operate interior of building furred ceiling construction top board drilling equipment.
Concrete technical solution is as follows:
The construction of interior of building furred ceiling comprises vertical rod A1, vertical rod B2, cross bar A3 and cross bar B 4 with the top board drilling equipment, and described four bars connect into movable groined type framework by bolt; Vertical rod A1 top is connecting adjusting rod, and adjusting rod upper end one side is provided with the depthkeeping bar; The cross bar A3 and cross bar B 4 ends that are positioned at vertical rod B2 one side are all overhanging.
Described vertical rod A1 top is provided with three connecting holes, the adjusting rod bottom is provided with the adjustment hole more than five, described three connecting holes are corresponding with described adjustment hole, by threaded connector vertical rod A1 and adjusting rod are connected at described three connecting holes and described adjustment hole place.
The length of described vertical rod A1 is 2.5 meters, and the length of vertical rod B2 and cross bar A3 is 1 meter, and the length of cross bar B 4 is 0.8 meter, and the length of adjusting rod is 2 meters; Spacing between described vertical rod A1 and the vertical rod B2 is 400 millimeters, and the spacing between described cross bar A3 and the cross bar B 4 is 500 millimeters; The length of described depthkeeping bar is the 300-330 millimeter; Spacing between the described adjacent adjustment hole is 150 millimeters.
The utility model has the advantage of following interior aspect compared with prior art:
1, the utility model processing and fabricating is simple, draws materials conveniently, can gather materials on the spot in general building site.During use, electric hammer is directly installed on the adjusting rod upper end gets final product, the operator is operation on the ground directly,, need not to move double ladder and reaches ladder up and down in electric hammer by leverage power, greatly reduces labour intensity, has improved efficiency.
2, use the utility model to uprise idle job and be Ground Operation, reduced the potential safety hazard in the work progress.But top board drillhole height regulated at will, only this covering device can satisfy the different floor height top board of common buildings boring requirement.Be fit to present light steel keel gypsum board furred ceiling construction, satisfy the requirement of a large amount of borings of top board.
In four innings of meeting affairs center engineerings of middle iron, building area 15677m 2The meeting affairs center adopts the utility model to carry out furred ceiling top board drilling construction, has obtained good effect, and drilling quality meets design and code requirement fully.
Description of drawings
Fig. 1 is the utility model structural representation.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described by embodiment.
Embodiment:
Referring to Fig. 1, the construction of interior of building furred ceiling comprises that with the top board drilling equipment vertical rod A1, vertical rod B2, cross bar A3 and 4, four bars of cross bar B connect into movable groined type framework by bolt.The cross bar A3 and cross bar B 4 ends that are positioned at vertical rod B2 one side are all overhanging.Also comprise adjusting rod 5, adjusting rod 5 upper ends one side fixedly connected depthkeeping bar 6.Vertical rod A1 top is provided with three connecting holes, and adjusting rod 5 bottoms offer ten adjustment holes 7, by threaded connector vertical rod A1 and adjusting rod 5 is connected at three connecting holes and adjustment hole corresponding position.Vertical rod A1, vertical rod B2, cross bar A3 and cross bar B 4 are the aluminum alloy square tube of cross section 36 * 36 * 3 (mm), and the length of vertical rod A1 is 2.5 meters, and the length of vertical rod B2 and cross bar A3 is 1 meter, and the length of cross bar B 4 is 0.8 meter, and the length of adjusting rod 5 is 2 meters; Spacing between vertical rod A1 and the vertical rod B2 is 400 millimeters, and the spacing between cross bar A3 and the cross bar B 4 is 500 millimeters; Depthkeeping bar 6 is the round steel of 10 millimeters of diameters, and length is the 300-330 millimeter; Spacing between the adjacent adjustment hole 7 is 150 millimeters.
This device top board drillhole height can change the drillhole height of top board by the permanent position that changes adjusting rod 5 and vertical rod A1 at 3-4.5m.If the height of top board boring surpasses above scope, but the length of appropriate change vertical rod A1, adjusting rod 5 changes the specification of square tube, simultaneously to satisfy the requirement of intensity and stability.Determine the degree of depth of boring by the permanent position that changes depthkeeping bar 6 and adjusting rod 5.
The operating process of using is as follows:
(1), electric hammer 8 usefulness iron wires or band are fixed on top one side of adjusting rod 5, and confirm fixing reliably, electric hammer 8 increases a power switch and is fixed on the cross bar A3.
(2), determine the position of depthkeeping bar, and fixing reliable according to drilling depth.
(3), vertical rod B2 fixes on the ground, makes electric hammer drill aim at bore position, the operator acts on cross bar A3,4 one power F1 of cross bar B and F2 respectively with trick, electric hammer 8 has just obtained a power that makes progress, and starts electric hammer and just can hole.
(4), when depthkeeping bar 6 pushes up floor, has promptly bored in the hole.

Claims (3)

1. the top board drilling equipment is used in the construction of interior of building furred ceiling, it is characterized in that: comprise vertical rod (A1), vertical rod (B2), cross bar (A3) and cross bar (B4), described four bars connect into movable groined type framework by bolt; Vertical rod (A1) top is connecting adjusting rod (5), and adjusting rod (5) upper end one side is provided with depthkeeping bar (6); The cross bar (A3) and cross bar (B4) end that are positioned at vertical rod (B2) side are all overhanging.
2. interior of building furred ceiling construction top board drilling equipment according to claim 1, it is characterized in that: described vertical rod (A1) top is provided with three connecting holes, adjusting rod (5) bottom is provided with the adjustment hole (7) more than five, described three connecting holes are corresponding with described adjustment hole (7), locate by threaded connector vertical rod (A1) and adjusting rod (5) to be connected at described three connecting holes and described adjustment hole (7).
3. interior of building furred ceiling construction top board drilling equipment according to claim 1 and 2, it is characterized in that: the length of described vertical rod (A1) is 2.5 meters, the length of vertical rod (B2) and cross bar (A3) is 1 meter, and the length of cross bar (B4) is 0.8 meter, and the length of adjusting rod (5) is 2 meters; Spacing between described vertical rod (A1) and the vertical rod (B2) is 400 millimeters, and the spacing between described cross bar (A3) and the cross bar (B4) is 500 millimeters; The length of described depthkeeping bar is the 300-330 millimeter; Spacing between the described adjacent adjustment hole is 150 millimeters.
CN2010201894704U 2010-05-06 2010-05-06 Top plate drilling device for ceiling construction inside building Expired - Fee Related CN201679218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201894704U CN201679218U (en) 2010-05-06 2010-05-06 Top plate drilling device for ceiling construction inside building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201894704U CN201679218U (en) 2010-05-06 2010-05-06 Top plate drilling device for ceiling construction inside building

Publications (1)

Publication Number Publication Date
CN201679218U true CN201679218U (en) 2010-12-22

Family

ID=43344268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201894704U Expired - Fee Related CN201679218U (en) 2010-05-06 2010-05-06 Top plate drilling device for ceiling construction inside building

Country Status (1)

Country Link
CN (1) CN201679218U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720340A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Electric hammer punching bracket for building and using method of bracket
CN102995888A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 High punch moving device
CN102996077A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 High punch positioning device
CN106695356A (en) * 2017-01-25 2017-05-24 湖南省第五工程有限公司 Top plate drilling device and application method thereof
CN111001855A (en) * 2019-07-01 2020-04-14 中国二十冶集团有限公司 Portable roof drilling tool and method of use

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720340A (en) * 2012-06-28 2012-10-10 中建八局第二建设有限公司 Electric hammer punching bracket for building and using method of bracket
CN102995888A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 High punch moving device
CN102996077A (en) * 2012-12-10 2013-03-27 常熟建工建设集团有限公司苏州分公司 High punch positioning device
CN106695356A (en) * 2017-01-25 2017-05-24 湖南省第五工程有限公司 Top plate drilling device and application method thereof
CN111001855A (en) * 2019-07-01 2020-04-14 中国二十冶集团有限公司 Portable roof drilling tool and method of use

Similar Documents

Publication Publication Date Title
CN201679218U (en) Top plate drilling device for ceiling construction inside building
CN201427197Y (en) Upward drilling punching device
CN205134926U (en) Fastener to wall for implemental scaffold
CN204108966U (en) Boring device of top plate
CN204402039U (en) A kind of aluminum alloy mould plate system exterior wall straightening board member
CN102071791B (en) Quick perforation method and device for suspended ceiling
CN205165973U (en) Top bar planting dowelling jig hole strutting arrangement
CN108817473A (en) A kind of high precise positioning drilling equipment of dismountable type
CN203565916U (en) Drilling tool with rear-mounted member
CN203863076U (en) Roof drilling device for suspended ceiling for lifting roofs
CN204934670U (en) A kind of electric drill auxiliary stand
CN202921967U (en) Ceiling faceup impacting and drilling device
CN201487392U (en) Aluminum alloy cable bridge
CN202125060U (en) Simple punching frame
CN202528152U (en) Vertical operation rack
CN204711271U (en) A kind of portable high-rise working crosshead
CN208380507U (en) A kind of smallpox plate drilling device
CN207971457U (en) Top plate drilling combines yoke at a kind of superelevation
CN202448113U (en) Support frame of hole forming device
CN207952708U (en) A kind of reserved aperture apparatus of building floor
CN202559678U (en) Lifting operation platform device of electric hammer
CN202055763U (en) Building roof precise boring device
CN202073297U (en) Assistant lifting device for boring of electric hammer
CN203245833U (en) Multi-functional quick drilling tool rack
CN203401104U (en) Beam slab bottom drilling tool

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101222

Termination date: 20170506

CF01 Termination of patent right due to non-payment of annual fee