CN205954730U - Major diameter down --hole hammer construction drill way positioner - Google Patents

Major diameter down --hole hammer construction drill way positioner Download PDF

Info

Publication number
CN205954730U
CN205954730U CN201620826529.3U CN201620826529U CN205954730U CN 205954730 U CN205954730 U CN 205954730U CN 201620826529 U CN201620826529 U CN 201620826529U CN 205954730 U CN205954730 U CN 205954730U
Authority
CN
China
Prior art keywords
panel
top panel
major diameter
hole hammer
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620826529.3U
Other languages
Chinese (zh)
Inventor
罗会东
焦家训
高明巧
曹莉
樊喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cggc Foundation Engineering Co Ltd
Original Assignee
Cggc Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cggc Foundation Engineering Co Ltd filed Critical Cggc Foundation Engineering Co Ltd
Priority to CN201620826529.3U priority Critical patent/CN205954730U/en
Application granted granted Critical
Publication of CN205954730U publication Critical patent/CN205954730U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a major diameter down - -hole hammer construction drill way positioner, including top panel and lower panel, evenly set up pore size a plurality of and the down -the -hole hammer on the top panel, position matched with goes up circular pore, circular pore under a plurality of and last circular pore matched with has evenly been offered down on the panel, it connects to protect a section of thick bamboo through many direction between top panel and the lower panel, respectively vertical welding on it on corresponding the last circular pore of board and panel down and the lower circular pore of a section of thick bamboo is protected to each direction, install the reinforcement frame on the top panel, consolidate the both sides edge of frame and respectively install hydraulic ram activity landing leg and counter -force landing leg. The utility model provides a major diameter down - -hole hammer construction drill way positioner can solve that drill way location bad news consuming time power, precision are low, the during the construction big problem of drilling rod swing, the location rapidly, accurate, high -efficient, obvious to direction and the constraining effect of drilling rod, can show the construction quality who improves ground and linking the wall.

Description

Major diameter downhole hammer construction aperture positioner
Technical field
The utility model is related to Major diameter downhole hammer pore-forming auxiliary equipment, especially a kind of Major diameter downhole hammer construction aperture Positioner.
Background technology
With the continuous development of China's underground continuous wall construction technique, Major diameter downhole hammer is in the fortune of ground-connecting-wall construction field With more and more extensive, using down-hole hammer, firm ground carried out after multiple spot crushes, then grooving is carried out using equipment such as hydraulic pressure millings, apply Work efficiency rate is remarkably improved.But time and effort consuming when current Major diameter downhole hammer positions in aperture, precision is low, hole position mark is easily moved The factor such as in dynamic, work progress in the hole drill pipe wobbling amplitude is excessive, also badly influences the construction quality of ground-connecting-wall.
Content of the invention
Technical problem to be solved in the utility model is to provide a kind of Major diameter downhole hammer construction aperture positioner, can To solve the problems, such as that aperture positioning takes time and effort, precision is low, construction when drill pipe wobbling big, positioning is rapid, accurately, efficiently, to brill The guiding of bar and effect of contraction substantially, are remarkably improved the construction quality of ground-connecting-wall.
For solving above-mentioned technical problem, the utility model be employed technical scheme comprise that:A kind of Major diameter downhole hammer construction Aperture positioner, including top panel and lower panel, top panel uniformly offers multiple pore sizes with down-hole hammer, position The upper circular opening matching, lower panel uniformly offers the lower circular opening that multiple and upper circular opening matches, above Pass through many guide protective tubes between plate and lower panel to connect, each guide protective tube is respectively perpendicular that to be welded on top panel relative with lower panel On the upper circular opening and lower circular opening answered, top panel is provided with stiffening frame, two sides of stiffening frame are respectively installed There are hydraulic top movable supporting legs and counter-force supporting leg.
It is respectively arranged with linkage levelling screw and hanger on four angles of stiffening frame.
The axis of guide protective tube is respectively perpendicular to top panel and lower panel.
The Major diameter downhole hammer construction aperture positioner that the utility model provides, by top panel and lower panel, can one Secondary property completes the positioning work of multiple hole positions;By stiffening frame, top panel is reinforced, stiffening frame is provided with leveling spiral shell Bar, adjustable apparatus horizontal level;Stiffening frame is provided with hydraulic top movable supporting legs and counter-force supporting leg, the axis of adjustable apparatus Device is simultaneously securely fastened to ground-connecting-wall and leads on wall by position;Guide protective tube is vertically welded in upper and lower panel corresponding hole site, latent Drift drilling when, drilling rod is played guiding and effect of contraction, can solve aperture positioning take time and effort, precision is low, construction when bore Bar swings big problem, and positioning is rapid, accurate, efficient, and the guiding to drilling rod and effect of contraction substantially, are remarkably improved ground-connecting-wall Construction quality;The design of hanger facilitates mobile and lifts.
Brief description
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is side view of the present utility model;
Fig. 4 is the schematic diagram of the utility model top panel;
Fig. 5 is the schematic diagram of the utility model lower panel.
Specific embodiment
As Figure 1-5, a kind of Major diameter downhole hammer construction aperture positioner, including top panel 3 and lower panel 8, on Multiple pore sizes with down-hole hammer are uniformly offered on panel 3, the upper circular opening 9 that matches in position, on lower panel 8 uniformly Offer the lower circular opening 10 that multiple and upper circular opening 9 matches, pass through many between top panel 3 and lower panel 8 and guide Casing 7 connects, and each guide protective tube 7 is respectively perpendicular and is welded on top panel 3 and the corresponding upper circular opening 9 of lower panel 8 and lower circle On shape hole 10, top panel 3 is provided with stiffening frame 1, two sides of stiffening frame 1 are respectively provided with hydraulic top movable supporting legs 2 and counter-force supporting leg 4.
It is respectively arranged with linkage levelling screw 5 and hanger 6 on four angles of stiffening frame 1.
The axis of guide protective tube 7 is respectively perpendicular to top panel 3 and lower panel 8.
The steel plate that top panel 3 is 20 millimeters for thickness, the steel plate that lower panel 8 is 20 millimeters for thickness;Guide protective tube 7 is steel Casing.
The course of work of the present utility model is as follows:
By top panel 3 and lower panel 8, can disposably complete the positioning work of multiple hole positions;Will be upper by stiffening frame 1 Panel is reinforced, and stiffening frame 1 is provided with linkage levelling screw 5, adjustable apparatus horizontal level;Stiffening frame 1 is provided with hydraulic pressure Top movable supporting legs 2 and counter-force supporting leg 4, device is simultaneously securely fastened to ground-connecting-wall and leads on wall 11 by the axial location of adjustable apparatus; Guide protective tube is vertically welded in upper and lower panel corresponding hole site, in DTH drilling, drilling rod is played with guiding and constraint is made With, can solve the problems, such as that aperture positioning takes time and effort, precision is low, construction when drill pipe wobbling big, positioning is rapid, accurately, efficiently, Guiding to drilling rod and effect of contraction substantially, are remarkably improved the construction quality of ground-connecting-wall;The design of hanger 6 facilitate mobile and Lifting.

Claims (3)

1. a kind of Major diameter downhole hammer construction aperture positioner it is characterised in that:Including top panel(3)And lower panel(8), on Panel(3)On uniformly offer multiple pore sizes with down-hole hammer, the upper circular opening that matches in position(9), lower panel(8) On uniformly offer multiple with upper circular opening(9)The lower circular opening matching(10), top panel(3)And lower panel(8)It Between pass through many guide protective tubes(7)Connect, each guide protective tube(7)It is respectively perpendicular and be welded on top panel(3)And lower panel(8)Relatively The upper circular opening answered(9)With lower circular opening(10)On, top panel(3)On stiffening frame is installed(1), stiffening frame(1) Two sides on hydraulic top movable supporting legs are respectively installed(2)With counter-force supporting leg(4).
2. Major diameter downhole hammer according to claim 1 construction aperture positioner it is characterised in that:Stiffening frame(1) Four angles on be respectively arranged with linkage levelling screw(5)And hanger(6).
3. Major diameter downhole hammer according to claim 1 construction aperture positioner it is characterised in that:Guide protective tube(7) Axis be respectively perpendicular to top panel(3)And lower panel(8).
CN201620826529.3U 2016-08-02 2016-08-02 Major diameter down --hole hammer construction drill way positioner Active CN205954730U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620826529.3U CN205954730U (en) 2016-08-02 2016-08-02 Major diameter down --hole hammer construction drill way positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620826529.3U CN205954730U (en) 2016-08-02 2016-08-02 Major diameter down --hole hammer construction drill way positioner

Publications (1)

Publication Number Publication Date
CN205954730U true CN205954730U (en) 2017-02-15

Family

ID=57974042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620826529.3U Active CN205954730U (en) 2016-08-02 2016-08-02 Major diameter down --hole hammer construction drill way positioner

Country Status (1)

Country Link
CN (1) CN205954730U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593337A (en) * 2019-10-14 2019-12-20 中铁第四勘察设计院集团有限公司 Underwater milling groove guiding and positioning device suitable for deepwater embedded foundation
CN111364446A (en) * 2020-03-17 2020-07-03 深圳市工勘岩土集团有限公司 Grooving construction method and grooving construction structure for deep hard rock underground diaphragm wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593337A (en) * 2019-10-14 2019-12-20 中铁第四勘察设计院集团有限公司 Underwater milling groove guiding and positioning device suitable for deepwater embedded foundation
CN111364446A (en) * 2020-03-17 2020-07-03 深圳市工勘岩土集团有限公司 Grooving construction method and grooving construction structure for deep hard rock underground diaphragm wall

Similar Documents

Publication Publication Date Title
CN205296874U (en) Information -based construction monitor positioning device of stake integration
CN102493554B (en) Abutting joint device of steel lattice column, and construction method of same
CN208457334U (en) A kind of concrete prefabricated pipe push pipe coaster
CN203729330U (en) Positioning frame of subway station section steel column formed through cover and cut-top down method
CN104947681B (en) Super large super deep basement ground pit construction method
CN205954730U (en) Major diameter down --hole hammer construction drill way positioner
CN103670286B (en) A kind of electric power pylon composite foundation anchoring drilling machine all-around mobile base
CN107326944A (en) A kind of lattice column construction plumbing device and application method
CN207092093U (en) A kind of fabricated structure for ensureing steel column perpendicularity
CN108240228B (en) A kind of assembly equipment and construction technology of confined concrete arch
CN112580135A (en) Steel column sectional hoisting method based on BIM application
CN203702002U (en) Simple bi-directional rapid sliding frame
CN207327167U (en) What a kind of overlying hard stratum ground set plastic draining board draws aperture apparatus
CN206581318U (en) A kind of pre-embedded device of foundation pile drilling core checking
CN206556910U (en) A kind of accurate guiding concrete coring machine for being used to detect engineering surface
CN109631867A (en) A kind of portable forced centering pier and its installation method
CN206189607U (en) Rag bolt location structure
CN215441975U (en) Precipitation well casing installation positioner
CN104625552A (en) Horizontal assembling and welding device for cylindrical structure
CN205840897U (en) A kind of bored tunnel vault caves in emergency set
CN202559747U (en) Foot portion supporting and size control device of aluminum alloy shear wall template
CN206346201U (en) A kind of sand control alignment system for being used to lay lattice column
CN205577837U (en) Electric power construction uses multi -functional drilling machine
CN110847175A (en) Foundation pile cuts off guide bracket
CN206000173U (en) A kind of multiple steel sleeve pipe arrangement apparatus in a row in template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant