CN205975670U - Double-sided prefabricated hollow core filling wall structure - Google Patents

Double-sided prefabricated hollow core filling wall structure Download PDF

Info

Publication number
CN205975670U
CN205975670U CN201620826064.1U CN201620826064U CN205975670U CN 205975670 U CN205975670 U CN 205975670U CN 201620826064 U CN201620826064 U CN 201620826064U CN 205975670 U CN205975670 U CN 205975670U
Authority
CN
China
Prior art keywords
concrete layer
prefabricated
lacing wire
banketing
bankets
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620826064.1U
Other languages
Chinese (zh)
Inventor
陈昊
何昌杰
刘世辉
温利军
吴晓亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
China State Construction Technology Hunan Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
China State Construction Technology Hunan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd, China State Construction Technology Hunan Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201620826064.1U priority Critical patent/CN205975670U/en
Application granted granted Critical
Publication of CN205975670U publication Critical patent/CN205975670U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a double-sided prefabricated hollow core-filled wall structure, wherein reinforcing steel bars (11) are arranged in a precast concrete layer (1) at the filling side and a precast concrete layer (2) at the non-filling side, and the reinforcing steel bars (11) are connected through tie bars (4); the tie bars (4) are arranged at intervals along the height direction and the length direction of the wall, and concrete is poured at the tie bars (4) to form a tie bar concrete layer (12); a wall hollow part (5) is formed between the lacing wire concrete layers (12); the reinforcing steel bars (11) extend out of the top bottom surfaces of the precast concrete layers (1) on the filling side and the precast concrete layers (2) on the non-filling side to form reserved reinforcing steel bars (3), and the side edges extend to form horizontal reinforcing steel bars (10). The utility model discloses synthesize prefabricated and cast-in-place technology's advantage, can reduce prefabricated component's dead weight through reasonable split, can make each component be linked into wholly through cast-in-place irritate the core again, the technology is advanced, safe and reliable, economic environmental protection.

Description

Two-sided Prefabricated hollow fills out core wall construction
Technical field
This utility model is related to one kind and fills out core wall construction, more particularly to a kind of assembled architecture construction field two-sided pre- System fills out core wall construction on an empty stomach, is particularly suited in prefabricated assembled underground pipe gallery structure.
Background technology
Urban Underground pipe gallery is that the underground of multiple pipeline such as concentrated setting electric power, communication, combustion gas, feedwater, draining is empty Between structure.At present, pipe gallery construction is more adopts entirely cast-in-place form.This kind of mode needs at the construction field (site) to piping lane entirety Structure carries out the operations such as steel bar meter colligation, formwork, concreting, maintenance and form removal, and not only working procedure is complicated, construction week Phase is long, and template loss is big, the problems such as needing also exist for larger raw material and deposit and process place, to narrow and small construction in city Environment brings the deuce to pay.
In order to solve the defect of cast-in-place piping lane form of construction work entirely, occur in that integrated precast Pipe rack and prefabricated Pipe rack.Integrated precast piping lane has good integrity, the advantages of installation procedure is simple, but has that single-unit size is big, weight Greatly, it is difficult the problems such as transporting and hoisting, joint waterproof non insurance.And straight wall is frequently with entirely pre- in existing assembled Pipe rack Form processed, because assembling members are many, globality poor, junction structural failure easily occurs, encapsulant damages or aging leads to The defect such as infiltration in piping lane.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of integrated precast piping lane transporting and hoisting easily and existing Have that assembled piping lane piece is little, good integrity two-sided Prefabricated hollow fills out core wall construction.
In order to solve above-mentioned technical problem, the two-sided Prefabricated hollow that this utility model provides fills out core wall construction, side of banketing It is provided with reinforcing bar and the described side concrete layer and non-fill out of banketing in concrete layer and the non-side concrete layer that bankets Pass through lacing wire between the described reinforcing bar being provided with the concrete layer of native side to be connected;The described side concrete layer that bankets Prefabricated height is from base plate bottom to Roof;The prefabricated height of the described non-side concrete layer that bankets for base plate axil angle push up to Top board axil angle bottom;Described lacing wire is along wall height and wall length direction arranged for interval and prefabricated with described side of banketing along the high direction of wall Concrete layer pours together with the described non-side concrete layer that bankets, and at described lacing wire, casting concrete forms lacing wire and mixes Solidifying soil layer;It is formed with body of wall hollow between lacing wire concrete layer described in along body of wall length direction and described lacing wire concrete layer Part;The reinforcing bar being provided with described banket side concrete layer and the non-side concrete layer that bankets is prefabricated mixed in side of banketing The top bottom surface of solidifying soil layer and the non-side concrete layer that bankets all is extended as reserved steel bar, and side extends to horizontal bar.
Described two-sided Prefabricated hollow fills out core wall construction, and its concrete layer inner surface all carries out frosting treatment.
Described two-sided Prefabricated hollow is filled out and is attached by cast-in-place sleeper between each prefabricated subsection of core wall construction, described The reinforcing bar of cast-in-place sleeper is made up of the first vertical reinforcement, the second vertical reinforcement and closed stirrups, described closed stirrups with described Horizontal bar connect, screw and the side precast concrete that bankets are passed through in the two ends of the first described vertical reinforcement and the second vertical reinforcement Layer and the non-side concrete layer that bankets connect.
Two-sided Prefabricated hollow using technique scheme fills out core wall construction, and it comprises two-layer concrete layer, prefabricated Pass through lacing wire between concrete layer to be connected.The prefabricated height of side concrete layer of banketing is from base plate bottom to Roof, with profit Waterproof.The prefabricated height of the non-side concrete layer that bankets pushes up to top board axil angle bottom for base plate axil angle.Lacing wire is long along wall height and wall Direction arranged for interval, and pour together with concrete layer along the high direction of wall.Along wall length direction lacing wire concrete layer and lacing wire Form body of wall hollow core portion, cast in situs non-shrinkage concrete carries out filling core between concrete layer.Two-sided Prefabricated hollow fills out core wall knot Structure, the equal reserved steel bar of its top bottom surface, with roof and floor bar connecting when assembled at the scene.Two-sided Prefabricated hollow fills out core wall construction, its Concrete layer inner surface all carries out frosting treatment (making rough inner surface), to strengthen and the cast-in-place bonding filling core segment.Double Face Prefabricated hollow fills out core wall construction, is attached by cast-in-place sleeper between its each prefabricated subsection.Reinforcing bar in described cast-in-place sleeper It is made up of the horizontal bar stretching out in vertical reinforcement, closed stirrups and concrete layer.
In sum, this utility model combines prefabricated and cast in place process advantage, is a kind of integrated precast piping lane fortune Defeated lifting is easy and existing assembled piping lane piece is little, good integrity, technique are advanced, safe and reliable, can improve fabricated construction The two-sided Prefabricated hollow of globality and water resistance fills out core wall construction.
Brief description
Fig. 1 is that the two-sided Prefabricated hollow of this utility model fills out core wall elevation.
Fig. 2 is that the two-sided Prefabricated hollow of this utility model fills out core wall plane graph.
Fig. 3 is that the two-sided Prefabricated hollow of this utility model fills out core wall sections connection figure.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Referring to Fig. 1, Fig. 2 and Fig. 3, a kind of two-sided Prefabricated hollow fills out core wall construction, and banket side concrete layer 1 and non-fill out It is provided with native side concrete layer 2 in reinforcing bar 11 and banket side concrete layer 1 and the non-side concrete layer 2 that bankets and set Pass through lacing wire 4 between some reinforcing bars 11 to be connected.The prefabricated height of side concrete layer 1 of banketing is from base plate bottom to Roof, With sharp waterproof.The prefabricated height of the non-side concrete layer 2 that bankets pushes up to top board axil angle bottom for base plate axil angle.Lacing wire 4 is high along wall And wall length direction arranged for interval, and along the high direction of wall and side concrete layer 1 and the non-side concrete layer 2 one that bankets of banketing Road pours, and at lacing wire 4, casting concrete forms lacing wire concrete layer 12.Along body of wall length direction lacing wire concrete layer 12 and lacing wire It is formed with body of wall hollow core portion 5, in body of wall hollow core portion 5, cast-in-place non-shrinkage concrete carries out filling core between concrete layer 12.Fill out The reinforcing bar 11 being provided with native side concrete layer 1 and the non-side concrete layer 2 that bankets is in side concrete layer 1 He of banketing The top bottom surface of the non-side concrete layer 2 that bankets all is extended as reserved steel bar 3, the reinforcing bar company with roof and floor during assembly at the scene Connect.Banket the reinforcing bar 11 being provided with side concrete layer 1 and the non-side concrete layer 2 that bankets in the side precast concrete that bankets Layer 1 and the non-side banketing side concrete layer 2 extend to horizontal bar 10.Described two-sided Prefabricated hollow fills out core wall construction, Its concrete layer inner surface all carries out frosting treatment (making rough inner surface), to strengthen and the cast-in-place bonding filling core segment. Described two-sided Prefabricated hollow fills out core wall construction, is attached by cast-in-place sleeper between its each prefabricated subsection.The steel of cast-in-place sleeper Muscle is made up of the first vertical reinforcement 6, the second vertical reinforcement 8 and closed stirrups 9, and closed stirrups 9 are connected with horizontal bar 10, and first erects Pass through screw 7 and side concrete layer 1 and the non-side concrete that bankets of banketing to the two ends of reinforcing bar 6 and the second vertical reinforcement 8 Soil layer 2 connects.

Claims (3)

1. a kind of two-sided Prefabricated hollow fills out core wall construction, it is characterized in that:Banket side concrete layer (1) and non-side of banketing prefabricated It is provided with reinforcing bar (11) and described banket side concrete layer (1) and the non-side concrete layer that bankets in concrete layer (2) (2) pass through lacing wire (4) between the described reinforcing bar (11) being provided be connected;Described the pre- of side concrete layer (1) of banketing System height is from base plate bottom to Roof;The prefabricated height of the described non-side concrete layer (2) that bankets is that base plate axil angle is pushed up To top board axil angle bottom;Described lacing wire (4) along wall is high and wall length direction arranged for interval, and along the high direction of wall and described side of banketing Concrete layer (1) and the described non-side concrete layer (2) that bankets pour together, and described lacing wire (4) place pours mixed Solidifying soil forms lacing wire concrete layer (12);Lacing wire concrete layer (12) described in along body of wall length direction and described lacing wire coagulation It is formed with body of wall hollow core portion (5) between soil layer (12);Described banket side concrete layer (1) and non-side of banketing prefabricated mixed The reinforcing bar (11) being provided with solidifying soil layer (2) is on the top banketing side concrete layer (1) and non-side concrete layer (2) of banketing Bottom surface is all extended as reserved steel bar (3), and side extends to horizontal bar (10).
2. two-sided Prefabricated hollow according to claim 1 fills out core wall construction, it is characterized in that:Described two-sided Prefabricated hollow is filled out Core wall construction, its concrete layer inner surface all carries out frosting treatment.
3. two-sided Prefabricated hollow according to claim 1 and 2 fills out core wall construction, it is characterized in that:Described two-sided prefabricated sky Abdomen is filled out and is attached by cast-in-place sleeper between each prefabricated subsection of core wall construction, and the reinforcing bar of described cast-in-place sleeper is vertical by first Reinforcing bar (6), the second vertical reinforcement (8) and closed stirrups (9) composition, described closed stirrups (9) and described horizontal bar (10) Connect, screw (7) and the side concrete that bankets are passed through in the two ends of described the first vertical reinforcement (6) and the second vertical reinforcement (8) Soil layer (1) and the non-side concrete layer (2) that bankets connect.
CN201620826064.1U 2016-08-01 2016-08-01 Double-sided prefabricated hollow core filling wall structure Expired - Fee Related CN205975670U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620826064.1U CN205975670U (en) 2016-08-01 2016-08-01 Double-sided prefabricated hollow core filling wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620826064.1U CN205975670U (en) 2016-08-01 2016-08-01 Double-sided prefabricated hollow core filling wall structure

Publications (1)

Publication Number Publication Date
CN205975670U true CN205975670U (en) 2017-02-22

Family

ID=58029770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620826064.1U Expired - Fee Related CN205975670U (en) 2016-08-01 2016-08-01 Double-sided prefabricated hollow core filling wall structure

Country Status (1)

Country Link
CN (1) CN205975670U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112193A (en) * 2020-09-25 2020-12-22 福州市城乡建总集团有限公司 Double-sided superposed pipe gallery side wall with concealed columns and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112112193A (en) * 2020-09-25 2020-12-22 福州市城乡建总集团有限公司 Double-sided superposed pipe gallery side wall with concealed columns and manufacturing method thereof
CN112112193B (en) * 2020-09-25 2022-06-03 福州市城乡建总集团有限公司 Double-sided superposed pipe gallery side wall with concealed columns and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN105019475B (en) Fabricated assembly overall concrete pipe gallery and construction
CN106245674A (en) Hollow wallboard mixed prefabricated assembly type comprehensive pipe gallery and construction method thereof
CN206376276U (en) A kind of prefabricated pipe gallery
CN106088147A (en) Hollow wallboard mixed prefabricated assembly type comprehensive pipe gallery and construction method thereof
CN105862916A (en) Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN207245719U (en) A kind of prefabricated assembled tunnel structure in tunnel bottom
CN207660136U (en) A kind of assembly concrete frame-shear wall keyway connection structure
CN106245544B (en) A kind of assembled steel reinforced concrete guard wall type general channels hole of L-type
CN108086353A (en) Hollow wall plate mixed prefabricated assembly type comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof
CN206174120U (en) Prefabricated constructional column and structure thereof
CN207998860U (en) A kind of assembled pipe gallery
CN105297893B (en) Mortise and tenon type concrete composite beam cross connecting structure and its construction method
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN108708452A (en) The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method
CN206233560U (en) Wall formwork erecting structure
CN206090275U (en) Assembled rectangular concrete -filled steel tube makes up truss bridge
CN107476340A (en) A kind of subway tunnel and the new Joining Structure and its construction method at enlarging station
CN207812488U (en) Globality underground pipe gallery
CN110318427A (en) A kind of prefabricated pipe gallery construction method of segmentation
CN205975670U (en) Double-sided prefabricated hollow core filling wall structure
CN101761187B (en) Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN103758207B (en) Semi-prefabricated semi-cast-in-place type frame structure of integrated building and construction method thereof
CN106320184B (en) A kind of unit construction bridge beam construction method
CN205804237U (en) A kind of recycling roadbed concrete guardrail

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20200801