CN205975517U - Multilayer reaming auto -lock prestressed anchorage pole - Google Patents

Multilayer reaming auto -lock prestressed anchorage pole Download PDF

Info

Publication number
CN205975517U
CN205975517U CN201621005426.7U CN201621005426U CN205975517U CN 205975517 U CN205975517 U CN 205975517U CN 201621005426 U CN201621005426 U CN 201621005426U CN 205975517 U CN205975517 U CN 205975517U
Authority
CN
China
Prior art keywords
anchor
zisuo
zhang
reaming
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621005426.7U
Other languages
Chinese (zh)
Inventor
周剑波
高作平
陈明祥
周志勇
谭星舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUDA JUCHENG STRUCTURE Co Ltd
Original Assignee
WUDA JUCHENG STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUDA JUCHENG STRUCTURE Co Ltd filed Critical WUDA JUCHENG STRUCTURE Co Ltd
Priority to CN201621005426.7U priority Critical patent/CN205975517U/en
Application granted granted Critical
Publication of CN205975517U publication Critical patent/CN205975517U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a multilayer reaming auto -lock prestressed anchorage pole, including the stock body, grout pipe (7), to zhonghuan (8), the stock body comprises according to equilateral hexagon six roots of sensation stock monomer (1), stock monomer (1) is constituteed by the stock body of rod (2) with long anchor rod (3), two stock monomer (1) at diagonal angle for a set of respectively through nut (5) with one from zhang zisuo anchor head (6) thus be connected the formation three -layer from zhangzisuo anchor head (6), the three -layer is from equidistant the arranging of zhang zisuo anchor head (6), grout pipe (7) extend to the stock body of rod (2) front end from adding long anchor rod (3) rear end. Share anchor power from zhang zisuo anchor head (6), the anchored reliability is high, has higher use value.

Description

A kind of multilamellar reaming self-locking prestressed anchor
Technical field
This utility model is related to a kind of anchor pole, more specifically to a kind of multilamellar reaming self-locking prestressed anchor, belongs to Rearmounted large-tonnage anchorage technology art field.
Background technology
There is horizontal interlayer seam in some dam gate piers, horizontal interlayer seam one side weakens rigidity and the globality of gate pier, Working condition is more unfavorable;On the other hand, in overfall dam part lock hole flood discharge, easily make the interlayer seam local tool originally deposited Open trend, by the durability of impact gate pier under the earial drainage exciting dynamic loading of lock hole.For this reason, initial stage gate pier need to be applied vertical Compressive pre-stress, by prestressed reinforcement, improves globality and the durability of gate pier.
Because dam is as important hydraulic engineering, it is desirable to have rational safety stock, it requires that dam consolidation is applied Prestressing tonnage is higher, limit anchoring force is larger;Therefore it is required that prestressed anchor drilling depth is big, required precision is high, and pass The prestressed anchor drilling depth of system less, precision not high it is difficult to meet engineering demand.
Content of the invention
The purpose of this utility model be for existing prestressed anchor drilling depth less, precision high the problems such as, A kind of multilamellar reaming self-locking prestressed anchor is provided.
For achieving the above object, institute using technical solution is this utility model:A kind of multilamellar reaming self-locking prestressing force Anchor pole, including anchor bar body, grout pipe, to medium ring, described anchor bar body is made up of by equilateral hexagon six roots of sensation anchor pole monomer, described Anchor pole monomer by anchor rod body and lengthen anchor pole and form, described anchor rod body rear end and lengthening between anchor pole front end by even Connect device to be connected, described anchor rod body front end is closing taper, two diagonal anchor pole monomers are one group and pass through nut respectively It is connected from Zhang Zisuo anchor head with one thus forming three layers from Zhang Zisuo anchor head, described three layers equidistant from Zhang Zisuo anchor head Arrangement, described grout pipe extends to anchor rod body front end from lengthening anchor pole rear end.
Described three layers are distributed spacing between Zhang Zisuo anchor head up and down and are spaced apart 3m.
Described anchor pole monomer is made by fining twisted steel.
Compared with prior art, the beneficial effects of the utility model are:
In this utility model, multilamellar reaming auto-lock anchorage technology is to provide anchoring using mechanical snap and cohesive force, and can be by How to share anchor force from Zhang Zisuo anchor head, the reliability of anchoring is high, has higher use value;And with monolayer chambering self-locking anchor phase , floor space bigger than low cost, anchor force is little.
Brief description
Fig. 1 is this utility model structural representation.
Fig. 2 is the plan view in concrete backfill hole in this utility model.
Fig. 3 is the A-A profile of Fig. 1.
Fig. 4 is the B-B profile of Fig. 1.
Fig. 5 is the C-C profile of Fig. 1.
Fig. 6 is the D-D profile of Fig. 1.
Fig. 7 is the 1-1 profile of Fig. 3.
Fig. 8 is the 2-2 profile of Fig. 7.
Fig. 9 is charger schematic diagram.
In figure, anchor pole monomer 1, anchor rod body 2, lengthen anchor pole 3, adapter 4, nut 5, from Zhang Zisuo anchor head 6, grout pipe 7, to medium ring 8, counter-force anchor plate 9, anchor plate 10, billet 11, jack 12, steel thimble 13, exhaustor 14, steel plate seat 15, Boring 16, anchor head seat 17.
Specific embodiment
Below in conjunction with brief description and specific embodiment, this utility model is described in further detail.
Referring to Fig. 1 to Fig. 9, a kind of multilamellar reaming self-locking prestressed anchor, can it is adaptable to apply prestressing force to concrete dam To apply in concrete dam engineering;It include anchor bar body, grout pipe 7, to medium ring 8.Described anchor bar body is by six roots of sensation anchor pole Monomer 1 is pressed equilateral hexagon and is constituted, and described anchor pole monomer 1 is made up of anchor rod body 2 and lengthening anchor pole 3;Described anchor pole bar It is connected by adapter 4 between body 2 rear end and lengthening anchor pole 3 front end, described anchor rod body 2 front end is closing taper.Right Two anchor pole monomers 1 at angle are connected from Zhang Zisuo anchor head 6 with one by nut 5 respectively for one group and certainly open thus forming three layers Self-locking anchor head 6;Hence in so that this anchor pole is divided into three layers according to three different depths from Zhang Zisuo anchor head 6, every layer of anchor pole includes this Two anchor pole monomer of layer 1 and this layer corresponding one are from Zhang Zisuo anchor head 6.For enabling three layers to share anchoring equally from Zhang Zisuo anchor head 6 Power, described three layers are equally spaced from Zhang Zisuo anchor head 6.Described grout pipe 7 extends to anchor pole bar from lengthening anchor pole 3 rear end Body 2 front end, through to medium ring 8 with from Zhang Zisuo anchor head 6.
Referring to Fig. 1, described three layers are distributed spacing between Zhang Zisuo anchor head 6 up and down and are spaced apart 3m.
Referring to Fig. 1, described anchor pole monomer 1 is made by fining twisted steel.
Referring to Fig. 1 to Fig. 9, the installation method of this kind of multilamellar reaming self-locking prestressed anchor, comprise the following steps:
Step one, is needing to apply prestressed structure drill straight hole using engineering investigation rig, this needs to apply prestressing force knot Structure elongated for dam;With laser ranging inclinometer to 16 depth and perpendicularity is checked it is desirable to pore-forming of holing after pore-forming Boring 16 perpendicularity deviation be less than 5 ‰.And confirm that the concrete core sample of bottom hole 8m depth scope is closely knit by coring during pore-forming, if Leakiness then needs to deepen boring 16 depth it is ensured that the quality of anchoring section concrete meets design requirement;It is basis herein《Concrete Structural Engineering job specfication》With regard to closely knit regulation, (GB 50666-2011) judges that whether no concrete core sample is closely knit, if sentencing Break and then need to deepen for leakiness.
Step 2, after boring 16 construction finishes, is expanded to the bottom hole of boring 16 in step one with professional reaming bit Hole, reaming hole shape is inverted cone surface, makes reaming bit once expand one layer of reaming, according to bottom reaming, intermediate layer reaming, the superiors Reaming order carries out reaming in three times.
Step 3, after reaming finishes, carries out borehole cleaning using special small-bore deep hole pressure hole cleaner.
Step 4, assembles this anchor pole Anchoring part, by the six roots of sensation anchor pole monomer 1 of hexagonal arrangement with diagonal two for a component Become three groups, be connected by nut 5 from Zhang Zisuo anchor head 6 with three layers respectively;Anchor pole Anchoring part herein refers to this anchor pole and carries For anchor force part, i.e. anchor pole and grouting material contact portion.To be filled with note seam glue between nut 5 and adapter 4 and anchor pole monomer 1 Closely knit, to prevent from loosening during this rockbolt installation.And make this anchor pole exposed junction length be easily installed tensioning equipment more than 2m, herein Anchor pole exposed junction refers to this anchor pole away from bottom hole one end, the part that is, this anchor pole bassets.Because certainly opening from break adrift when installing 6 oblique extensions snap in reaming, then select voussoir fixation from Zhang Zisuo anchor head 6;Restrict when therefore installing from Zhang Zisuo anchor head 6 Voussoir is bundled by rope or iron wire, in case disturbance causes the damage from Zhang Zisuo anchor head 6.Each layer installs from Zhang Zisuo anchor head 6 Afterwards, grout pipe 7 is installed;For ensureing bottom from Zhang Zisuo anchor head 6 grouting density, grout pipe 7 should pass through bottom certainly to open from break adrift 6 length 15~20mm;Bottom herein from Zhang Zisuo anchor head 6 refer to three layers from Zhang Zisuo anchor head 6 bottom next from Zhang Zisuo anchor head 6, as from nearest one of bottom hole from Zhang Zisuo anchor head 6.And penetrate the anchor plate 10 of tensioning in advance, to make It is used in position after anchor pole monomer 1 perforation.
Step 5, installs billet 11 in orifice position, should make center of circular hole and boring 16 centers one in billet 11 Cause.Lifted by crane using crane and this anchor pole is installed, lifted this anchor pole in the hole being drilled in step one with crane;Lifting lifting When effectively should be protected to from Zhang Zisuo anchor head 6 position.When this anchor pole is above aperture, by arrangement for crane machinery relay And be aided with and manually this anchor pole slowly put in the hole, when transferring this anchor pole, treat each layer from the voussoir local of Zhang Zisuo anchor head 6 top Rope or the iron wire of binding can be untied after entering hole.After this anchor pole falls to bottom hole position, lift this anchor pole to gripping orientation, To confirm from Zhang Zisuo anchor head 6, to reaming position, to tighten anchor plate 10 lock nut 5, in position.This anchor pole enters Kong Gu After fixed, should by the pretensioned method of jack 12 adjust each layer from the spacing at Zhang Zisuo anchor head 6 and dam body reaming position so that Voussoir is fitted completely with reaming position top edge.
Step 6, for giving full play to reaming from the anchoring effect of Zhang Zisuo anchor head 6, takes monolayer from 6 innings of Zhang Zisuo anchor head Scope be first in the milk mode of post-stretching in portion's carries out prestress application.
Specifically, described step 3 includes below step:Step one, first, water pipe is stretched into bottom hole, by big Flow current are rinsed from the hole is to hole, until backwater peace and quiet continuity 5~10min.Step 2 is after hole flushing finishes then right Boring carries out complete opening and draws water and dry up using high-pressure blast blowing off, and carries out aperture protection, in order to avoid rainwater and debris enter.
Specifically, when pre- tensioning being layered using jack 12 in described step 5, exert oneself when tensioning and reach 8t and continue 1 During minute, can confirm that and fit completely with reaming wall from Zhang Zisuo anchor head 6, now unload oil pressure, lock corresponding nut 5, respectively Complete each layer from the local modulation of Zhang Zisuo anchor head 6 and reaming wall.
Specifically, described step 6 specifically includes below step:Step one, first to bottom from Zhang Zisuo anchor head 6 local Grouting, is in the milk to bottom from Zhang Zisuo anchor head 6 top 1m altitude range from bottom, treats grouting material intensity close to dam body consolidation coagulation After native intensity, carry out this layer from the tensioning of Zhang Zisuo anchor head 6, make the effective prestress after tensioning should be not less than 700kN;Step 2nd, is in the milk to intermediate layer from Zhang Zisuo anchor head 6 top 1m altitude range from Zhang Zisuo anchor head 6 local in intermediate layer, treats grouting material Intensity, after dam body consolidation concrete strength, carries out this layer from the tensioning of Zhang Zisuo anchor head 6, makes the effective prestress after tensioning 700kN should be not less than;Step 3, top layer is in the milk to top layer from Zhang Zisuo anchor head 6 top 1m height from Zhang Zisuo anchor head 6 local Scope, after grouting material intensity is close to dam body consolidation concrete strength, carries out this layer from the tensioning of Zhang Zisuo anchor head 6, makes tensioning Effective prestress afterwards should be not less than 700kN.Meanwhile, for accelerating construction progress, grouting material typically will not be waited to be fully cured again Tensioning, reaches after grouting material intensity and can proceed by each layer after tensioning requirement from the tensioning of Zhang Zisuo anchor head 6.Generally scene A number of die trial can be made during grouting, for ensureing the curing temperature concordance of die trial intensity and in the hole grouting body intensity, fill Before slurry, temperature in borehole is tested, test finds, temperature in borehole is basically identical with outdoor temperature;Therefore, die trial is carried out Normal maintenance under outdoor temperature, presses different number of days simultaneously(2~4 days)Carry out the test of intensity of test block.And monolayer is opened certainly certainly Before break adrift head 6 tensioning, every layer of theoretic elongation from Zhang Zisuo anchor head 6 and two anchor pole monomer 1 of this layer should be calculated;Remember during tensioning Record deflection when every one-level load stretch value and voltage stabilizing, and be compared with theoretic elongation, if actual measurement stretch value is more than Value of calculation 10% or be less than 5%, should ascertain the reason and be correspondingly processed.In stretching process, rise that lotus speed is per minute should not surpass Cross the 1/10 of design stress, voltage stabilizing 5min can carry out next stage tensioning after reaching every one-level controling power, reach afterbody and open After drawing, voltage stabilizing 10min is lockable.
Referring to Fig. 1 to Fig. 9, of the present utility model can certainly opening when installing from Zhang Zisuo anchor head 6 produces machinery with reaming and stings Close, form mechanical snap using three layers from Zhang Zisuo anchor head 6 reaming and the bonding of grouting material to provide anchor force, this anchor pole is pacified After dress applying prestressing force, whole grouting can form bonding to free tensioning section, meet current dam prestressing force tonnage height, limit anchor Gu the big engine request of power.
Above content be with reference to specific preferred implementation further detailed description of the utility model it is impossible to Identification is of the present utility model to be embodied as being confined to these explanations.Ordinary skill for this utility model art For personnel, without departing from the concept of the premise utility, some simple deduction or replace, said structure can also be made Protection domain of the present utility model all should be considered as belonging to.

Claims (3)

1. a kind of multilamellar reaming self-locking prestressed anchor, including anchor bar body, grout pipe(7), to medium ring(8)It is characterised in that:Institute The anchor bar body stated is by six roots of sensation anchor pole monomer(1)Constitute by equilateral hexagon, described anchor pole monomer(1)By anchor rod body(2)With Lengthen anchor pole(3)Composition, described anchor rod body(2)Rear end and lengthening anchor pole(3)Pass through adapter between front end(4)It is connected Connect, described anchor rod body(2)Front end is closing taper, diagonal two anchor pole monomers(1)Pass through nut for one group respectively(5) With one from Zhang Zisuo anchor head(6)It is connected thus forming three layers from Zhang Zisuo anchor head(6), described three layers from Zhang Zisuo anchor head (6)It is equally spaced, described grout pipe(7)From lengthening anchor pole(3)Rear end extends to anchor rod body(2)Front end.
2. a kind of multilamellar reaming self-locking prestressed anchor according to claim 1 it is characterised in that:Described three layers are opened certainly Self-locking anchor head(6)Between be distributed spacing up and down and be spaced apart 3m.
3. a kind of multilamellar reaming self-locking prestressed anchor according to claim 1 it is characterised in that:Described anchor pole monomer (1)It is made by fining twisted steel.
CN201621005426.7U 2016-08-30 2016-08-30 Multilayer reaming auto -lock prestressed anchorage pole Active CN205975517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621005426.7U CN205975517U (en) 2016-08-30 2016-08-30 Multilayer reaming auto -lock prestressed anchorage pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621005426.7U CN205975517U (en) 2016-08-30 2016-08-30 Multilayer reaming auto -lock prestressed anchorage pole

Publications (1)

Publication Number Publication Date
CN205975517U true CN205975517U (en) 2017-02-22

Family

ID=58039170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621005426.7U Active CN205975517U (en) 2016-08-30 2016-08-30 Multilayer reaming auto -lock prestressed anchorage pole

Country Status (1)

Country Link
CN (1) CN205975517U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223267A (en) * 2016-08-30 2016-12-14 武大巨成结构股份有限公司 A kind of multilamellar reaming self-locking prestressed anchor and installation method thereof
CN111780995A (en) * 2020-07-17 2020-10-16 吉林大学 Automatic centering and self-locking device for tire ride comfort test bench

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106223267A (en) * 2016-08-30 2016-12-14 武大巨成结构股份有限公司 A kind of multilamellar reaming self-locking prestressed anchor and installation method thereof
CN106223267B (en) * 2016-08-30 2018-05-25 武大巨成结构股份有限公司 A kind of installation method of multilayer reaming self-locking prestressed anchor
CN111780995A (en) * 2020-07-17 2020-10-16 吉林大学 Automatic centering and self-locking device for tire ride comfort test bench

Similar Documents

Publication Publication Date Title
CN106223267B (en) A kind of installation method of multilayer reaming self-locking prestressed anchor
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN104213509A (en) Cable rope hoisting anchor rope type anchorage construction method
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN102787595A (en) Double-acting self-stressing combined uplift pile and pile forming method
CN105064358A (en) Compensation adjustment method for prestress loss of anchor cable
CN205975517U (en) Multilayer reaming auto -lock prestressed anchorage pole
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN105926468B (en) Concrete T-shaped beam external prestressing strengthening structure and method
CN106930296A (en) A kind of construction method of internal support of foundation pit
CN102561212A (en) Method for strengthening vertical crack of single-pillar concrete pier
CN110106889A (en) A kind of deep basal pit perfusion slope protection pile adds cable bolting construction
CN113585360A (en) Anti-floating anchor rod device and construction method
CN112695809A (en) Structure and method for preventing downward-lying tunnel from floating upwards due to river channel excavation
CN207111103U (en) A kind of benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN114561881A (en) Longitudinal deviation-rectifying and resetting method suitable for soft soil foundation bridge
CN206784327U (en) A kind of stone masonry dam poor quality dam grouting reinforcing structure
CN105201525B (en) A kind of recoverable preventing and treating pucking method
CN209523212U (en) Assembled isolated footing
CN109024973B (en) Connecting structure for prefabricated shear wall and construction method thereof
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN106917358A (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN112252169B (en) Hollow box-rock anchor combined light ground anchor bridge abutment and construction process thereof
CN205530250U (en) Novel outer anchor head multiple protection of prestressed anchorage cable device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant