CN205975366U - Bridge construction support bracket - Google Patents
Bridge construction support bracket Download PDFInfo
- Publication number
- CN205975366U CN205975366U CN201620837257.7U CN201620837257U CN205975366U CN 205975366 U CN205975366 U CN 205975366U CN 201620837257 U CN201620837257 U CN 201620837257U CN 205975366 U CN205975366 U CN 205975366U
- Authority
- CN
- China
- Prior art keywords
- mounting platform
- bridge construction
- gripper shoe
- supporting bracket
- regulating block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 230000001105 regulatory effect Effects 0.000 claims description 29
- 238000009434 installation Methods 0.000 claims 1
- 230000008859 change Effects 0.000 description 3
- 230000033001 locomotion Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model belongs to the technical field of the bridge construction, a bridge construction support bracket is disclosed, including mounting platform, the mounting platform below is connected with the lift unit, and mounting platform top symmetry is equipped with two backup pads, and two backup pads one end relative are articulated with mounting platform through adjusting the pivot respectively, and two backup pads one end that back of the body mutually are equipped with the accommodate unit who is used for adjusting the angle of elevation of backup pad. The utility model realizes the purpose of quickly adjusting the supporting height of the mounting platform by adopting the lifting unit, and simultaneously, the adjusting unit is arranged, so that different included angles can be obtained between the two supporting plates, the elevation angles of the two supporting plates can be independently adjusted, and the mounting platform can adapt to various supporting requirements; the whole bridge construction supporting bracket structure is ingenious, convenient to adjust and high in adjusting speed, the working efficiency is improved, and the construction time is saved.
Description
Technical field
This utility model is related to technical field of bridge construction, particularly to a kind of supporting bracket of bridge construction.
Background technology
Bridge refers generally to frame on rivers, mountain valley etc. so that current building, typically by five big parts and five little portions
Part forms, and five big parts refer to that bridge bears spanning superstructure and substructure of automobile or other vehicle transport loads, are
The guarantee of bridge structure safe.Bridge is typically made up of superstructure, substructure and attached structure, and superstructure refers mainly to
Bridge span structure and support system;Substructure includes abutment, bridge pier and basis;Attached structure then refers to transition slab at bridge head, taper shield
Slope, shore protection, training works etc..
Need in bridge construction to be supported improving safety using supporting bracket of bridge construction, but existing bridge
Beam Construction Support bracket is not easy to when supporting adjust, and supporting time is long, is not convenient to use.
Utility model content
(1) technical problem to be solved
The technical problems to be solved in the utility model is:For solving the inconvenience when supporting of existing supporting bracket of bridge construction
In regulation, and supporting time is long, the problem being not convenient to use.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides a kind of supporting bracket of bridge construction, flat including installing
Platform, is connected with lifting unit below mounting platform, be arranged with two pieces of gripper shoes above mounting platform, and two pieces of gripper shoes are relative
One end is hinged with mounting platform by adjusting rotating shaft respectively, and two pieces of opposite one end of gripper shoe are provided with for adjusting facing upward of gripper shoe
The adjustment unit at angle.
Wherein, described adjustment unit includes the regulating block that top surface is inclined-plane, and the end of gripper shoe falls within the top surface of regulating block
On, described regulating block is connected with driver, and driver is fixed on mounting platform, and described driver is used for driving regulating block propping up
Move to adjust the elevation angle of gripper shoe on the length direction of fagging.
Wherein, described driver has extended or recoverable drive rod, and described driver passes through drive rod and regulation
Block connects.
Wherein, described mounting platform is provided with locker, and what described locker was used for locking drive rod stretches out state.
Wherein, described mounting platform is provided with limit sliding chutes, and described regulating block can be along gripper shoe in described limit sliding chutes
Length direction slide.
Wherein, described lifting unit includes telescopic adjustment frame, and the top of telescopic adjustment frame is connected with mounting platform.
Wherein, the top of described telescopic adjustment frame is connected with mounting platform by support column, and described support column is put down with installing
It is connected with some bracing pieces, one end of described bracing piece is connected with the side wall of support column, the other end of described bracing piece between platform
It is connected with mounting platform.
Wherein, the bottom of described telescopic adjustment frame is connected with base.
(3) beneficial effect
Technique scheme has the advantage that:A kind of supporting bracket of bridge construction of this utility model, by using lifting
Unit achieves the quick purpose adjusting mounting platform bearing height, be provided with adjustment unit simultaneously so that two pieces of gripper shoes it
Between can obtain different angles, the elevation angle of two gripper shoes all can individually be adjusted, and is adapted to various support demands;Whole bridge
Beam Construction Support carrier structure is ingenious, and easy to adjust, governing speed is fast, improves work efficiency, saves the engineering time.
Brief description
Fig. 1 is the structural representation of supporting bracket of bridge construction described in the utility model;
Fig. 2 is the top view of mounting platform described in the utility model.
Wherein, 1, base;2nd, telescopic adjustment frame;3rd, support column;4th, bracing piece;5th, mounting platform;51st, limit sliding chutes;6、
Gripper shoe;7th, adjust rotating shaft;8th, regulating block;9th, driver;10th, locker.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below
Embodiment is used for this utility model is described, but is not limited to scope of the present utility model.
In description of the present utility model, it should be noted that unless otherwise stated, " multiple " are meant that two or two
More than individual;Term " on ", D score, "left", "right", " interior ", " outward ", " front end ", " rear end ", " head ", the instruction such as " afterbody "
Orientation or position relationship are based on orientation shown in the drawings or position relationship, are for only for ease of description this utility model and simplification
Description, rather than indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and behaviour
Make, therefore it is not intended that to restriction of the present utility model.Additionally, term " first ", " second ", " the 3rd " etc. are only used for describing
Purpose, and it is not intended that indicating or hint relative importance.
In addition it is also necessary to explanation in description of the present utility model, unless otherwise clearly defined and limited, term " is pacified
Dress ", " being connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly
Connect;Can be to be mechanically connected or electrically connect;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary.
For the ordinary skill in the art, the visual concrete condition above-mentioned term of understanding specifically containing in this utility model
Justice.
As shown in figure 1, this utility model discloses a kind of supporting bracket of bridge construction, including mounting platform 5, mounting platform
It is connected with lifting unit below 5, above mounting platform 5, is arranged with two pieces of gripper shoes 6, two pieces of relative one end of gripper shoe 6 are divided
Rotating shaft 7 Tong Guo not adjusted hinged with mounting platform 5, two pieces of opposite one end of gripper shoe 6 are provided with the elevation angle for adjusting gripper shoe 6
Adjustment unit.Lifting unit can be adjusted to the height of whole mounting platform 5, and adjustment unit can be to gripper shoe 6
The elevation angle is adjusted, and makes to form the angle of 180 degree between two pieces of gripper shoes 6 it is also possible to form the folder more than or less than 180 degree
Angle, that is, gripper shoe 6 can be higher than the other end, flush less than the other end or with the other end towards one end of adjustment unit;Specifically apply
Can be adjusted as needed during work.Mounting platform 5 height adjustable, gripper shoe 6 angle is adjustable, and whole bridge construction supports
Bracket is more flexible, is suitable for various construction demands;Governing speed is fast, easy to adjust, supports process to take shorter, efficiency of construction
High.
Further, described adjustment unit includes the regulating block 8 that top surface is inclined-plane, and the end of gripper shoe 6 falls within regulating block 8
Top surface on, described regulating block 8 is connected with driver 9, and driver 9 is fixed on mounting platform 5, and described driver 9 is used for carrying
The elevation angle regulating block 8 that dynamic regulating block 8 moves to adjust gripper shoe 6 on the length direction of gripper shoe 6 is to the side near gripper shoe 6
To during motion, gripper shoe 6 end moves up, and the angle of two gripper shoe 6 formation is gradually reduced;In turn, then angle is more next
Bigger, support angle is flexibly adjustable, easy to control, and adaptability is strong.
Further, described driver 9 has extended or recoverable drive rod, and described driver 9 passes through drive rod
It is connected with regulating block 8.Regulating block 8 length direction along gripper shoe 6 can move back and forth under the pulling function of drive rod, makes
Gripper shoe 6 obtains the different elevations angle.
Further, described mounting platform 5 is provided with locker 10, and described locker 10 is used for locking stretching out of drive rod
State.For avoiding regulating block 8 to be subjected to displacement under the pressure effect of gripper shoe 6, it is additionally arranged locker 10, locker 10 is fixed on
On mounting platform 5, after locker 10 will drive rod locking, drive rod cannot continue to stretch out or withdraw, accordingly, regulating block 8
Position also will not change it is ensured that the elevation angle of gripper shoe 6 does not change.
Further, as shown in Fig. 2 described mounting platform 5 is provided with limit sliding chutes 51, described regulating block 8 can be described
In limit sliding chutes 51, the length direction along gripper shoe 6 slides.Regulating block 8 can only slide in limit sliding chutes 51, limit sliding chutes 51
Define the glide direction of regulating block 8;Meanwhile, will be unable to continue to move to after regulating block 8 moves to the two ends of limit sliding chutes 51,
I.e. limit sliding chutes 51 also define the extreme position of regulating block 8 movement, regulating block 8 can be avoided to skid off it is ensured that regulating block 8 to
The supporting role of fagging 6 is it is ensured that support safety.
Further, as shown in figure 1, described lifting unit includes telescopic adjustment frame 2, the top of telescopic adjustment frame 2 and peace
Assembling platform 5 connects.The height of mounting platform 5 can be changed by adjusting the collapsing length of telescopic adjustment frame 2, bearing height is adjusted
Flexibly, conveniently.
Specifically, the top of described telescopic adjustment frame 2 is connected with mounting platform 5 by support column 3, described support column 3 with
It is connected with some bracing pieces 4, one end of described bracing piece 4 is connected with the side wall of support column 3, described reinforcement between mounting platform 5
The other end of bar 4 is connected with mounting platform 5.Support column 3 and the setting of bracing piece 4, further enhancing mounting platform 5 in lifting
During stationarity, the phenomenon that will not swing.
Further, the bottom of described telescopic adjustment frame 2 is connected with base 1.The setting of base 1 enhances telescopic adjustment frame
2 with the contact area on ground, enhance the stability of telescopic adjustment frame 2.
As can be seen from the above embodiments, this utility model is by achieving quick adjustment mounting platform using lifting unit
The purpose of 5 bearing heights, is provided with adjustment unit so that can obtain different angles between two pieces of gripper shoes 6 simultaneously, two
The elevation angle of gripper shoe 6 all can individually be adjusted, and is adapted to various support demands;Whole supporting bracket of bridge construction clever structure,
Easy to adjust, governing speed is fast, improves work efficiency, saves the engineering time;Support bar enhances stablizing of mounting platform 5
Property, base 1 ensure that the stability that telescopic adjustment frame 2 is installed, and limit sliding chutes 51 then define the range of movement of regulating block 8, protect
Demonstrate,prove the safety of whole supporting bracket of bridge construction.
The above is only preferred implementation of the present utility model it is noted that common skill for the art
For art personnel, on the premise of without departing from this utility model know-why, some improvement can also be made and replace, these change
Enter and replace also to should be regarded as protection domain of the present utility model.
Claims (8)
1. a kind of supporting bracket of bridge construction, it is characterised in that including mounting platform, is connected with lifting single below mounting platform
Unit, is arranged with two pieces of gripper shoes above mounting platform, two pieces of relative one end of gripper shoe are passed through to adjust rotating shaft and installation respectively
Platform is hinged, and two pieces of opposite one end of gripper shoe are provided with the adjustment unit at the elevation angle for adjusting gripper shoe.
2. supporting bracket of bridge construction as claimed in claim 1 is it is characterised in that it is inclined-plane that described adjustment unit includes top surface
Regulating block, the end of gripper shoe falls within the top surface of regulating block, and described regulating block is connected with driver, and driver is fixed on peace
On assembling platform, described driver is used for driving regulating block to move on the length direction of gripper shoe to adjust the elevation angle of gripper shoe.
3. supporting bracket of bridge construction as claimed in claim 2 is it is characterised in that described driver has extended or can receive
The drive rod returning, described driver is connected with regulating block by drive rod.
4. supporting bracket of bridge construction as claimed in claim 3 is it is characterised in that described mounting platform is provided with locker,
What described locker was used for locking drive rod stretches out state.
5. supporting bracket of bridge construction as claimed in claim 4 is it is characterised in that described mounting platform is provided with spacing cunning
Groove, described regulating block the length direction along gripper shoe can slide in described limit sliding chutes.
6. the supporting bracket of bridge construction as described in any one of claim 1-5 is it is characterised in that described lifting unit includes stretching
Contracting adjusting bracket, the top of telescopic adjustment frame is connected with mounting platform.
7. supporting bracket of bridge construction as claimed in claim 6 is it is characterised in that the top of described telescopic adjustment frame is passed through to prop up
Dagger is connected with mounting platform, is connected with some bracing pieces, one end of described bracing piece between described support column and mounting platform
It is connected with the side wall of support column, the other end of described bracing piece is connected with mounting platform.
8. supporting bracket of bridge construction as claimed in claim 7 is it is characterised in that the bottom of described telescopic adjustment frame is connected with
Base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620837257.7U CN205975366U (en) | 2016-08-04 | 2016-08-04 | Bridge construction support bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620837257.7U CN205975366U (en) | 2016-08-04 | 2016-08-04 | Bridge construction support bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205975366U true CN205975366U (en) | 2017-02-22 |
Family
ID=58028974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620837257.7U Expired - Fee Related CN205975366U (en) | 2016-08-04 | 2016-08-04 | Bridge construction support bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205975366U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593099A (en) * | 2019-08-12 | 2019-12-20 | 中铁十局集团第五工程有限公司 | Bridge construction support bracket |
-
2016
- 2016-08-04 CN CN201620837257.7U patent/CN205975366U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593099A (en) * | 2019-08-12 | 2019-12-20 | 中铁十局集团第五工程有限公司 | Bridge construction support bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106348189B (en) | The special lifting formula stand arrangement in power distribution station | |
CN207406359U (en) | Tunnel three arms, three basket steel arch-shelf fitting machine | |
CN101219755A (en) | Crane with heavy frame beam | |
CN111364371B (en) | A overpass roof beam lifting device for road bridge construction | |
CN207362709U (en) | A kind of erection crane of the two-way positioning of energy | |
CN209243581U (en) | A kind of stringer set up for And of Varying Depth steel girder segment | |
CN205345268U (en) | hull support device | |
CN201915980U (en) | Mine temporary support device for roadway excavation | |
CN103225287A (en) | Supporting system of hydraulic moving dam | |
CN205975366U (en) | Bridge construction support bracket | |
CN204473074U (en) | A kind of swinging ladder vehicle of ship | |
CN209339006U (en) | A kind of bridge construction Support bracket | |
CN202787093U (en) | Hydraulic climbing formwork device universally used by skew pier and straight pier | |
CN206985545U (en) | Device for hoisting is erected in a kind of shifting of with brake mechanism | |
CN103552572A (en) | Mobile vehicle-ride bridge | |
CN211314231U (en) | Adjustable tunnel trolley template | |
CN207078935U (en) | A kind of portable full circle swinging mast loop wheel machine anchor | |
CN204591270U (en) | The airborne collapsible advanced stand device of development machine hydraulic pressure | |
CN208604488U (en) | A kind of bridge maintenance elevating mechanism | |
CN202508771U (en) | Anti-torque device used for changeable slope frame beam crane | |
CN206914666U (en) | A kind of adjustable plateform system that picks for boarding vehicle | |
CN206956644U (en) | Governor motion and snow removing shovel | |
CN203961769U (en) | Track bridge reinforcing working stand | |
CN212176584U (en) | Clamping device of building templates | |
CN208250920U (en) | Adjustable main girder construction bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |