CN205968957U - Double -layered bracket is deposited to aluminum alloy coiled material - Google Patents

Double -layered bracket is deposited to aluminum alloy coiled material Download PDF

Info

Publication number
CN205968957U
CN205968957U CN201620929448.6U CN201620929448U CN205968957U CN 205968957 U CN205968957 U CN 205968957U CN 201620929448 U CN201620929448 U CN 201620929448U CN 205968957 U CN205968957 U CN 205968957U
Authority
CN
China
Prior art keywords
steel pipe
aluminum alloy
gusset
alloy coiled
bottom case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620929448.6U
Other languages
Chinese (zh)
Inventor
王万宏
张国帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN MINGTAI ALUMINUM INDUSTRY Co Ltd
Original Assignee
HENAN MINGTAI ALUMINUM INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN MINGTAI ALUMINUM INDUSTRY Co Ltd filed Critical HENAN MINGTAI ALUMINUM INDUSTRY Co Ltd
Priority to CN201620929448.6U priority Critical patent/CN205968957U/en
Application granted granted Critical
Publication of CN205968957U publication Critical patent/CN205968957U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stackable Containers (AREA)

Abstract

The utility model belongs to the technical field of the production of aluminium alloy plate material, specific saying so relates to a double -layered bracket is deposited to aluminum alloy coiled material, mainly be to deposit the support for the aluminum alloy coiled material bilayer that provides a simple and practical, effectual solved that the aluminum alloy coiled material deposits utilize the space problem, provide a double -layered bracket is deposited to aluminum alloy coiled material, including the equipment base, be provided with on the equipment base a plurality of be parallel to each other and with equipment base axis mutually perpendicular's steel pipe, the gusset of crescent moon camber all is provided with in equipment base and the steel pipe department of intersecting vertically, still be provided with two vertical and be parallel to each other stands on the equipment base between every group steel pipe, go back between every assemblage post the overlap joint have on the base, also be provided with the gusset of crescent moon camber on last base, also be provided with the steel pipe on the gusset, improvement that the device is very big the effective use area deposited at aluminum alloy coiled material finished product of workshop, the efficiency of workman's production is improved, the yield that has improved the enterprise worth.

Description

A kind of aluminum alloy coiled materials deposit double-layer scaffold
Technical field
This utility model belongs to aluminum alloy plate materials production technical field;Particularly relate to a kind of aluminum alloy coiled materials to deposit Double-layer scaffold.
Background technology
In industrial processes, Aluminum sheets enterprise all requisite by the substantial amounts of coiled material finished product produced or half Temporary transient the depositing of finished product, is necessary for when therefore planning in workshop considering the design that material is deposited;Deposit volume in workshop in a large number During material, volume frame is widely used because structure is simple, easy to use, with low cost;In workshop planning construction, generally save Coiled material can be concentrated and be put, volume frame is laid out on ground by space, then put coiled material to volume frame, when unreeling number of positions not Enough, when still having a large amount of coiled materials to need to put, these coiled materials can be directly placed in by most of enterprise have been put in volume frame coiled material Top, that is, carry out " putting for two layers ", solve the problems, such as that workshop material area area is not enough by this way, but this mode Put coiled material, several serious problems can be caused:1st, lower floor's material volume is pressed by upper strata, after upper layer coiled material must being removed during discharging, Just can hang out, cause logistics cost high, efficiency is low;2nd, lower floor's material volume will bear upper strata material volume weight, causes coiled material viscous to hinder With press wound, subsequently reduced using yield rate, so that enterprise is stood a loss;3rd, it is not easy to observe stress point when upper strata material volume is put, Easily cave-in accident occurs, cause business property and worker's personal safety etc. to lose.
Content of the invention
Goal of the invention of the present utility model:
Primarily to providing a kind of simple and practical aluminum alloy coiled materials bilayer storage bracket, not only cost is relatively low, and Effectively solve the utilization space that aluminum alloy coiled materials are deposited, sufficiently employ the reasonable area putting workshop, and in pendulum Do not result in the mutual extruding between finished-product material during putting, reduce scuffing probability during putting for the finished product, reduce The labor intensity of workman, improves the production efficiency of workman, and the yield rate improving enterprise is worth.
The technical solution of the utility model is:
Provide a kind of aluminum alloy coiled materials and deposit double-layer scaffold, including plant bottom case, plant bottom case is provided with multiple It is parallel to each other and the orthogonal steel pipe with plant bottom case axis, this steel pipe combines setting in the way of each two is one group, Plant bottom case and the steel pipe place of intersecting vertically are provided with the gusset of crescent moon camber, the crescent moon cambered surface of this gusset and mutual of steel pipe Join, the crescent moon cambered surface of gusset is connected using two-sided welding with fastener for connection coupling, welding and equipment are passed through in the bottom of this gusset Base interfixes, and is additionally provided with two columns that are vertical and being parallel to each other, every on the plant bottom case between every group of steel pipe Also it is overlapped with upper bed-plate between group column, the gusset of crescent moon camber is also provided with upper bed-plate, in the crescent moon cambered surface of gusset Welding is provided with steel pipe.
In the side of column, reinforcement gusset is additionally provided with by welding.
This aluminum alloy coiled materials is deposited and is additionally provided with sliding shoe on the plant bottom case of double-layer scaffold, the gusset setting of crescent moon camber On sliding shoe, chute one is provided with plant bottom case, the chute two being mutually matched with it is provided with sliding shoe, is sliding It is provided with bolt between groove one and chute two.
Described steel pipe is seamless steel pipe.
The both sides end of steel pipe is provided with cover plate.
The beneficial effects of the utility model are:
Greatly improve effective usable floor area in aluminum alloy coiled materials products storage for the workshop, sufficiently employ pendulum Put the reasonable area in workshop, and do not result in the mutual extruding between finished-product material during putting and occur inferior Product, effectively reduce scuffing probability during putting for the finished product, effectively reduce the labor intensity of workman, improve the life of workman Produce efficiency, the yield rate greatly improving enterprise is worth.
Brief description
Fig. 1 is main structure diagram of the present utility model;
Fig. 2 arranges the plant bottom case main structure diagram of sliding shoe for this utility model;
Fig. 3 arranges the plant bottom case overlooking the structure diagram of sliding shoe for this utility model.
In figure, 1 is plant bottom case;2 is steel pipe;3 is gusset;4 is column;5 is upper bed-plate;6 is to strengthen gusset;7 is to slide Motion block;8 is chute one;9 is chute two;10 is bolt;11 is cover plate.
Specific embodiment
Below in conjunction with accompanying drawing, specific embodiment of the present utility model is described in detail.
As shown in Figures 1 to 3, there is provided a kind of aluminum alloy coiled materials deposit double-layer scaffold, including plant bottom case 1, at equipment bottom Seat 1 on be provided with multiple be parallel to each other and the orthogonal steel pipe 2 with plant bottom case axis, this steel pipe 2 is with each two for one group Mode combine setting, be provided with the gusset 3 of crescent moon camber, the moon of this gusset 3 in plant bottom case and the steel pipe place of intersecting vertically Tooth cambered surface and steel pipe are mutually matched, and the crescent moon cambered surface of gusset 3 is connected using two-sided welding with steel pipe 2 matching connection, this gusset 3 Bottom interfixed with plant bottom case by welding, the plant bottom case between every group of steel pipe is additionally provided with two vertical and The column 4 being parallel to each other, is also overlapped with upper bed-plate 5 between every group of column 4, is also provided with crescent moon camber on upper bed-plate 5 Gusset 3, is provided with steel pipe 2 also through welding in the crescent moon cambered surface of gusset 3.
In the side of column 4, reinforcement gusset 6 is additionally provided with by welding.
This aluminum alloy coiled materials is deposited and is additionally provided with sliding shoe 7 on the plant bottom case of double-layer scaffold, and the gusset of crescent moon camber sets Put on sliding shoe 7, chute 1 is provided with plant bottom case, the chute two being mutually matched with it is provided with sliding shoe 9, it is provided with bolt 10 between chute 1 and chute 29.
Described steel pipe is seamless steel pipe.
The both sides end of steel pipe is provided with cover plate 11.
Described in present embodiment, twin-laminate roll frame is welded by shaped steel and steel plate, and plant bottom case is welded by channel-section steel, holds Carrier body and the weight of all aluminum volume, the upper and lower two-layer of coil rest is arranged, and aluminum volume is placed in coil rest, and coil rest is made up of seamless steel pipe, Effectively reduce the contact area of aluminum volume and coil rest, the wiping also just decreasing aluminum volume scratches, in the two ends welding steel of steel pipe It is ensured that do not fall in seamless steel pipe dust and debris, wherein one layer coil rest steel plate is welded on above plant bottom case cover plate, two layers of volume Seat and one layer of coil rest interleaved adjacent arrangement, two layers of coil rest are welded on upper bed-plate, and upper bed-plate is welded on equipment bottom by many root posts On seat, it is provided with reinforcement gusset to strengthen the support force of column on column side also by welding, in order to ensure aluminium alloy roll bending In placement process, the effective placement to the aluminum alloy plate materials of different crimp radiuses, is additionally provided with sliding shoe on plant bottom case, Sliding shoe and plant bottom case effectively coordinate movement, to ensure the aluminum alloy coiled materials of different crimp radiuses by chute two and chute one Effective placement, finally deposit regulation what aluminum alloy plate materials for different crimp radiuses were completed by bolt fastening, It is being embodied as the work process of the present invention, after the completion of present invention welding, be placed on workshop correct position, can multibilayer volume frame Form a line or a few row, line space will consider that aluminum is rolled and hang space determination, during to aluminum volume being placed in the coil rest of upper strata, workshop Aluminum volume is directly hung thereon by driving, and the aluminum to place in lifting upper strata coil rest is rolled up, shop traveller can also directly by Aluminum volume hangs away;To be placed on aluminum volume in lower floor's coil rest, then can not directly fall, to prevent from colliding upper strata coil rest and thereon Aluminum is rolled up;Specific operation process drops to ratio for the aluminum volume that shop traveller lifts by crane and exceeds above bottom coil rest after 100-200mm, adjustment Aluminum volume, in the rear ends direction insertion useful space, is then slowly fallen to and is placed in bottom coil rest, so by aluminum volume position Extract the suspender that aluminum is rolled up in sleeve afterwards out, during the aluminum volume that lifting bottom coil rest is placed, also need to roll aluminum to be hung to than in bottom coil rest Face is lifted by crane after traversing two layers of volume frame to disengaging after exceeding 100-200mm.

Claims (5)

1. a kind of aluminum alloy coiled materials deposit double-layer scaffold, including plant bottom case it is characterised in that:Plant bottom case is provided with many Individual be parallel to each other and the orthogonal steel pipe with plant bottom case axis, this steel pipe combines setting in the way of each two is one group, It is provided with the gusset of crescent moon camber, the crescent moon cambered surface of this gusset and mutual of steel pipe in plant bottom case and the steel pipe place of intersecting vertically Join, the crescent moon cambered surface of gusset is connected using two-sided welding with fastener for connection coupling, welding and equipment are passed through in the bottom of this gusset Base interfixes, and is additionally provided with two columns that are vertical and being parallel to each other, every on the plant bottom case between every group of steel pipe Also it is overlapped with upper bed-plate between group column, the gusset of crescent moon camber is also provided with upper bed-plate, in the crescent moon cambered surface of gusset Welding is provided with steel pipe.
2. a kind of aluminum alloy coiled materials according to claim 1 deposit double-layer scaffold it is characterised in that:Lead in the side of column Cross welding and be additionally provided with reinforcement gusset.
3. a kind of aluminum alloy coiled materials according to claim 1 deposit double-layer scaffold it is characterised in that:This aluminum alloy coiled materials is deposited Put and sliding shoe is additionally provided with the plant bottom case of double-layer scaffold, the gusset of crescent moon camber is arranged on sliding shoe, in plant bottom case On be provided with chute one, the chute two being mutually matched with it is provided with sliding shoe, between chute one and chute two arrange There is bolt.
4. a kind of aluminum alloy coiled materials according to claim 1 deposit double-layer scaffold it is characterised in that:Described steel pipe is no Seam steel pipe.
5. a kind of aluminum alloy coiled materials according to claim 1 deposit double-layer scaffold it is characterised in that:Two side ends in steel pipe It is provided with cover plate at face.
CN201620929448.6U 2016-08-24 2016-08-24 Double -layered bracket is deposited to aluminum alloy coiled material Active CN205968957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620929448.6U CN205968957U (en) 2016-08-24 2016-08-24 Double -layered bracket is deposited to aluminum alloy coiled material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620929448.6U CN205968957U (en) 2016-08-24 2016-08-24 Double -layered bracket is deposited to aluminum alloy coiled material

Publications (1)

Publication Number Publication Date
CN205968957U true CN205968957U (en) 2017-02-22

Family

ID=58033463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620929448.6U Active CN205968957U (en) 2016-08-24 2016-08-24 Double -layered bracket is deposited to aluminum alloy coiled material

Country Status (1)

Country Link
CN (1) CN205968957U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107627284A (en) * 2017-09-01 2018-01-26 泰州市裕鑫吊装设备有限公司 A kind of cushion device placed for cold coiling material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107627284A (en) * 2017-09-01 2018-01-26 泰州市裕鑫吊装设备有限公司 A kind of cushion device placed for cold coiling material

Similar Documents

Publication Publication Date Title
CN103213113A (en) Material rack provided with automatic overturning structure
CN203781096U (en) Packing container for automobile side parts
CN201720841U (en) Placing rack for half-finished short wires in wire harness production
CN205968957U (en) Double -layered bracket is deposited to aluminum alloy coiled material
CN104355027A (en) Special-specification vertical goods storing warehouse
CN204979713U (en) Double -deck storage rack of precast floor plank
CN205801957U (en) Prefabricated panel vertical storage frame
CN107140314A (en) Cantilevered bar storage shelf
CN207104886U (en) A kind of double-deck piling bin
CN206287121U (en) Reinforcing bar storing unit
CN203141478U (en) Material rack with automatic turnover mechanism
CN205600693U (en) Frame is put to portable stirrup
CN205574632U (en) Goods shelves are placed, are transported to passenger tyre
CN209380716U (en) A kind of head rolling machine material frame
CN205972387U (en) Support is deposited to aluminum alloy coiled material
CN201940988U (en) Train top cap storage equipment
CN207272549U (en) One kind welding auxiliary mould
CN207593092U (en) A kind of steel-pipe welding device
CN202542092U (en) Roller code placing frame
CN211767582U (en) Storage device for semitrailer I-shaped longitudinal beam
CN211618542U (en) Storage and transportation device for large-diameter rubber roller
CN205770971U (en) One deposits shape steel bracket
CN219274357U (en) Reinforcing steel bar operation platform device of reinforcing steel bar rib stripping thread rolling machine
CN210757617U (en) Novel roller stacking device
CN208576585U (en) A kind of roll wheels transfer trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant