CN205968946U - Prefabricated component discharging equipment - Google Patents

Prefabricated component discharging equipment Download PDF

Info

Publication number
CN205968946U
CN205968946U CN201620738620.XU CN201620738620U CN205968946U CN 205968946 U CN205968946 U CN 205968946U CN 201620738620 U CN201620738620 U CN 201620738620U CN 205968946 U CN205968946 U CN 205968946U
Authority
CN
China
Prior art keywords
prefabricated components
crossbeam
discharge
tapping equipment
equipment according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620738620.XU
Other languages
Chinese (zh)
Inventor
宋泽镡
王家岳
续文昊
张�林
王建卓
金国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620738620.XU priority Critical patent/CN205968946U/en
Application granted granted Critical
Publication of CN205968946U publication Critical patent/CN205968946U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a prefabricated component discharging equipment, a plurality of prefabricated component including concatenation combination each other discharge the frame. Prefabricated component discharges the frame and includes: the support bracket, erect crossbeam on the support bracket, and the activity supports, install in will on the crossbeam it is interval that the support bracket marks off a plurality of emissions that supply the vertical emission of prefabricated component. The utility model provides a current discharging modes of prefabricated component have that to discharge occupation space big, extravagant space resources, the inefficiency scheduling problem is transported in hoist and mount construction when being unfavorable for follow -up installation after the emission.

Description

Prefabricated components tapping equipment
Technical field
This utility model is related to a kind of construction aid and in particular to a kind of prefabricated components tapping equipment.
Background technology
Prefabrication and assembly construction be in construction project through frequently with a kind of form of construction work.Component is from factory or component production site system It is transported to job site after one-tenth to be assembled.There is sequencing and time difference due to the link such as producing, transporting, installing, in structure After part is made, need to be by prefabricated components discharge fixation area alignment at the construction field (site).And prefabricated components major part is irregular Shape, so on the premise of guaranteeing not cause component damage, compact discharge becomes disturbing problem.Prefabricated components are existing With the presence of discharging modes discharge take up room greatly, wasting space resource;It is unfavorable for lifting construction during subsequent installation after discharge, The low problem of transport efficacy.
Utility model content
For overcoming the defect existing for prior art, now provide a kind of prefabricated components tapping equipment, to solve prefabricated components There is discharge and take up room greatly in existing discharging modes, wasting space resource;It is unfavorable for after discharge that lifting during subsequent installation is applied Work, the low problem of transport efficacy.
For achieving the above object, provide a kind of prefabricated components tapping equipment, including the multiple prefabricated structure mutually splicing and combining Part discharges frame.Prefabricated components discharge frame includes:Support bracket;It is erected at the crossbeam on described support bracket;And movable supporting, install Mark off the multiple discharges intervals for the vertical discharge of prefabricated components on described crossbeam and by described support bracket.
The beneficial effects of the utility model are, can be according to the structure of prefabricated components, size, quantity, and adjustment is prefabricated in time Component discharges the quantity of frame, determines the size of prefabricated components tapping equipment, the discharge of overall arrangement prefabricated components.And prefabricated structure Emission quotas are saved in the vertically upright discharge of part, during postorder lifting, remove movable supporting, are conducive to conveniently from prefabricated structure Lift by crane this prefabricated component above part, improve transport efficacy.
Preferably, support bracket includes underframe and is erected at column on underframe, sets up crossbeam between column.There is underframe Support bracket, the overall steadiness that whole prefabricated components discharge frame can be improved.Prefabricated components can be shelved on underframe simultaneously On, it is to avoid prefabricated components are directly contacted with ground and tarnish and destroy.
Preferably, what the end that column is provided with for crossbeam plugged multiple first plugs hole, and multiple first plug hole along vertical The length direction setting of post.Prefabricated components tapping equipment can be by the highly different single prefabricated components discharge frame group of beam erection Become, the beam height that each prefabricated components discharge frame highly can be adjusted according to the prefabricated components of need discharge.
Preferably, support bracket also includes the hound being fixedly connected between column and underframe.Hound is lifted further and holds The steadiness of bracket.
Preferably, movable supporting is to support inserted link, supports inserted link to be inserted in crossbeam, and forms support in the first side of crossbeam Hold, form block end in the second side of crossbeam, block end is resisted against crossbeam.When prefabricated part hanging discharges, in order to avoid work The dynamic relative slip being supported between crossbeam, and the prefabricated components resulting in relying in movable supporting slip.
Preferably, crossbeam is provided with the second jack for supporting inserted link to plug, and multiple second jacks are along the length side of crossbeam To setting.The discharge to prefabricated components for the job site for convenience, can adjust adjacent two activities according to prefabricated components thickness and prop up Support the second plugged jack, each prefabricated components are adjusted flexibly and discharge the quantity that frame can discharge prefabricated components.
Preferably, movable supporting includes being inserted in supporting inserted link and being inserted in the block part supporting inserted link, block of crossbeam Part is resisted against crossbeam, can further movable supporting be fixed on crossbeam, improves the steadiness of the support end of movable supporting.
Preferably, block part is wedge-shaped steel plate.
Preferably, discharge interval width corresponding with the prefabricated components thickness of discharge so that prefabricated components discharge framves Emission quotas can be fully utilized.
Brief description
Fig. 1 is the structural representation of this utility model prefabricated components tapping equipment.
Fig. 2 discharges the structural representation of frame for prefabricated components.
Fig. 3 is the structural representation of movable supporting.
Specific embodiment
Below by way of specific instantiation, embodiment of the present utility model is described, those skilled in the art can be by this theory Content disclosed by bright book understands other advantages of the present utility model and effect easily.This utility model can also be by addition Different specific embodiments is carried out or applies, and the every details in this specification based on different viewpoints and can also be answered With carrying out various modifications and changes under without departing from spirit of the present utility model.
Fig. 1 is the structural representation of this utility model prefabricated components tapping equipment.Fig. 2 discharges the structure of frame for prefabricated components Schematic diagram.Fig. 3 is the structural representation of movable supporting.
In conjunction with shown in Fig. 1 and Fig. 2, it is by multiple prefabricated components that this utility model provides a kind of prefabricated components tapping equipment Discharge frame splices and combines successively and forms.Can be bolted between single prefabricated components discharge frame and combine.Each is pre- The bottom lengths that component processed discharges frame are 4m, bottom width 1.3m, height 2m.Prefabricated components discharge frame includes:Support bracket, crossbeam with And movable supporting.
Support bracket, is the main force structure for carrying discharge precast construction.Support bracket includes underframe 11 and column 12. Underframe 11 includes two girders and two auxiliary girders join end to end and connect the frame-shaped construction being formed.Two root posts 12 are erected respectively and are located at bottom On two adjacent angles of frame 11, column 12 is perpendicular to the upper surface of underframe 11.Girder, auxiliary girder and the column of setting up underframe 11 can From hollow square steel.The hollow square steel of the 80mm*80mm*4mm that length is 4m selected by girder;Auxiliary girder selects the 80mm* of 1.2m The hollow square steel of 80mm*4mm;Column can be selected for the hollow square steel of the 100mm*100mm*5mm that length is 2m-3m.Support bracket can Set up using welding connecting mode and formed.
In order to be able to prefabricated components that are convenient, being suitable for discharge differing heights, can be along the length direction of column 12, on column 12 Multiple first jacks 121 plugging for beam-end are set.It is right that the shape size of the first jack 121 and the cross section of crossbeam are thought Should.
In order to improve stability and the fastness of support bracket further, four can be increased between column 12 and underframe 11 tiltedly Strut 13.Hound 13 can be selected for the hollow square steel of the 80mm*80mm*4mm that length is 1.96m.The two ends welding of hound 13 It is connected to column 12 and underframe 11.
Crossbeam level frame is between two root posts 12.The two ends of crossbeam are plugged in the first jack 121 of column 12 respectively In, and be fixedly connected with column 12 by bolt.Crossbeam can be selected for the 100mm*100mm*6mm angle steel that length is 4m.
Movable supporting includes the support inserted link 31 being plugged on crossbeam.As shown in Fig. 2 supporting inserted link 31 to have be inserted in horizontal stroke Beam, and form support end 311 and the block end 312 with respect to crossbeam opposite side in the first side of crossbeam.Support end 311 is available for pre- The upper support of component processed relies on.Prefabricated components discharge frame is divided into multiple confession prefabricated components by two adjacent support inserted links 31 The discharge of vertical discharge is interval.The interval width of discharge is consistent with the thickness of prefabricated components.
Meanwhile, along the length direction of crossbeam, multiple second jacks 21 for supporting inserted link to plug can be provided with crossbeam.The Two jacks 21 can be opened up in advance by electric welding.The shape of the second jack 21 is corresponding with movable supporting.
Support inserted link 31 can prepare from the material such as square steel, square steel tube, round steel, round steel pipe.
In the present embodiment, as shown in figure 3, supporting inserted link 31 to be length 600mm, the hollow square tube of 40mm*400m, Hollow square tube has support end 311 and block end 312.
Inserted link 31 is supported to depart from or landing from crossbeam in order to not allow, in conjunction with Fig. 2, movable supporting also includes being inserted in block The block part 32 at end 312.One the 3rd jack being matched with block part 32 is had on block end 312.Block part 32 is one The wedge-shaped steel plate of thickness 20mm.
In one embodiment, movable supporting includes supporting inserted link and block part.Inserted link is supported to include support end and block End.Support end is length is 500mm, a diameter of 20mm round steel, and block end is length 100mm, wide 40mm, the steel plate of thick 200m. Inserted link is supported to be that support end passes through to be welded and fixed to be formed with block end.Accordingly, the second jack is circular socket holes, and aperture is slightly larger than The aperture of support end.Support end is inserted in the second jack of crossbeam so that support end is located at the first side of crossbeam, and until The block part of crossbeam second side is resisted against on crossbeam.
In another kind of embodiment, movable supporting includes supporting inserted link and block part.Support inserted link is a 600mm, directly Footpath is the round steel of 20mm.Inserted link is supported to include support end and block end.The end outer wall at block end is provided with external screw thread.Block Part is to set female nut.The female thread of block part is matched with the external screw thread on the outer wall of block end.Movable supporting is card Block piece is spirally connected with block end and is formed.Accordingly, the second jack is circular socket holes, and aperture is slightly larger than the aperture of support end.To support End is inserted in the second jack of crossbeam so that support end is located at the first side of crossbeam, and until the block part of crossbeam second side It is resisted against on crossbeam.
In practical operation, the quantity set prefabricated components first according to prefabricated components discharge the quantity of frame.Further according to pre- The height of component processed determines that single prefabricated components discharge the beam erection height of frame, and then hoisting prefabricated component, by prefabricated components Setting be placed on underframe 11, select the second jack 21 supporting inserted link 31 to plug according to the thickness of prefabricated components, finally will The top of prefabricated components relies on the support end 311 supporting inserted link 31.Single prefabricated components discharge frame height of release is close A collection of prefabricated components.
Thus and thus, can the single prefabricated components discharge horizontal depth of beam of frame in flexible prefabricated components tapping equipment, The prefabricated components that prefabricated components tapping equipment can be constituted with the adjustment for the treatment of in accordance with local conditions discharge the quantity of frame.
It should be noted that structure depicted in this specification institute accompanying drawings, ratio, size etc., all only in order to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, being not limited to this utility model can implement Qualificationss, therefore do not have technical essential meaning, the adjustment of the modification of any structure, the change of proportionate relationship or size, Under not affecting this utility model effect that can be generated by and the purpose that can reach, all should still fall to disclosed in this utility model Technology contents obtain and can cover in the range of.Meanwhile, in this specification cited as " on ", D score, "left", "right", " in Between " and " one " etc. term, be merely convenient to describe understands, and is not used to limit the enforceable scope of this utility model, its Being altered or modified of relativeness, under no essence change technology contents, when being also considered as the enforceable category of this utility model.
Above in association with accompanying drawing embodiment, this utility model is described in detail, those skilled in the art can root According to described above, this utility model is made with many variations example.Thus, some details in embodiment should not be constituted to this practicality New restriction, this utility model is by the scope being defined using appended claims as protection domain.

Claims (9)

1. a kind of prefabricated components tapping equipment is it is characterised in that include the multiple prefabricated components discharge framves mutually splicing and combining, institute State prefabricated components discharge frame to include:
Support bracket;
It is erected at the crossbeam on described support bracket;And
Movable supporting, is installed on described crossbeam and described support bracket is marked off the multiple discharges for the vertical discharge of prefabricated components Interval.
2. prefabricated components tapping equipment according to claim 1 is it is characterised in that described support bracket includes underframe and frame It is located at the column on described underframe;Described column is added to be provided with described crossbeam.
3. prefabricated components tapping equipment according to claim 2 is it is characterised in that described column is provided with for described crossbeam End plug multiple first plug hole, multiple described first plug hole along the length direction setting of described column.
4. prefabricated components tapping equipment according to claim 2 is it is characterised in that described support bracket also includes being fixedly connected Hound between described column and described underframe.
5. prefabricated components tapping equipment according to claim 1 it is characterised in that described movable supporting be support inserted link, Described support inserted link is inserted on described crossbeam, and forms support end in the first side of described crossbeam, in the second of described crossbeam Side forms block end, and described block end is resisted against described crossbeam.
6. prefabricated components tapping equipment according to claim 5 it is characterised in that described crossbeam be provided with described for plugging Support multiple second jacks of inserted link, multiple described second jacks are along the length direction setting of described crossbeam.
7. prefabricated components tapping equipment according to claim 1 is it is characterised in that described movable supporting includes being inserted in institute State supporting inserted link and being inserted in the described block part supporting inserted link of crossbeam, described block part is resisted against described crossbeam.
8. prefabricated components tapping equipment according to claim 7 is it is characterised in that described block part is wedge-shaped steel plate.
9. prefabricated components tapping equipment according to claim 1 is it is characterised in that the interval width of described discharge and discharge Prefabricated components thickness corresponding.
CN201620738620.XU 2016-07-14 2016-07-14 Prefabricated component discharging equipment Active CN205968946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620738620.XU CN205968946U (en) 2016-07-14 2016-07-14 Prefabricated component discharging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620738620.XU CN205968946U (en) 2016-07-14 2016-07-14 Prefabricated component discharging equipment

Publications (1)

Publication Number Publication Date
CN205968946U true CN205968946U (en) 2017-02-22

Family

ID=58024450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620738620.XU Active CN205968946U (en) 2016-07-14 2016-07-14 Prefabricated component discharging equipment

Country Status (1)

Country Link
CN (1) CN205968946U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109877792A (en) * 2019-01-30 2019-06-14 湖南建工五建建筑工业化有限公司 Prefabricated panel storage rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109877792A (en) * 2019-01-30 2019-06-14 湖南建工五建建筑工业化有限公司 Prefabricated panel storage rack

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN201043354Y (en) Integral architect guide template and its support bracket
CN206646835U (en) It is a kind of from hoisting type steel structure slipping measure support
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN205968946U (en) Prefabricated component discharging equipment
CN208168317U (en) A kind of lower extension platform of high-altitude construction
CN207827674U (en) A kind of special cage of building block pile
CN207228128U (en) Large span supporting structure using triangular pieces as connector
CN203213019U (en) Cast-in-situ construction bracket system of long cantilever bent cap
CN212866793U (en) Assembled construction elevator stops layer platform
CN203021207U (en) Large-load multifunctional gantry crane capable of being flexibly spliced
CN204040437U (en) Cantilever tripod and single protective frame system of encorbelmenting
CN207618901U (en) A kind of vertical hanging apparatus of steel column
CN201605799U (en) Large-scale net rack suspension cable mounting platform
CN101787795B (en) Large-size net rack suspension cable mounting platform and suspension cable construction method
CN206220492U (en) A kind of new adjustable beam fixture
CN201124290Y (en) Combination welding device for girder of stair
CN204980945U (en) Supplementary tower crane dismounting device
CN209179519U (en) Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top
CN203257080U (en) Adjustable overhang supporting device for building construction
CN203782575U (en) Stay cable hanging and tension construction device
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN202674539U (en) Vertical diameter-changing height-adjusting device universally used for ocean platform bridge frames
CN207435918U (en) A kind of box beam hoisting platform and the lifting beam machine using the hoisting platform
CN112431465A (en) Rapid construction method for large-diameter steel bin placed in limited space