CN205954712U - 一种用于钻孔灌注桩成孔施工的质量检测装置 - Google Patents
一种用于钻孔灌注桩成孔施工的质量检测装置 Download PDFInfo
- Publication number
- CN205954712U CN205954712U CN201620309958.3U CN201620309958U CN205954712U CN 205954712 U CN205954712 U CN 205954712U CN 201620309958 U CN201620309958 U CN 201620309958U CN 205954712 U CN205954712 U CN 205954712U
- Authority
- CN
- China
- Prior art keywords
- concrete pile
- forming
- bored concrete
- steel reinforcement
- detection device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种用于钻孔灌注桩成孔施工的质量检测装置,它包括圆形钢筋骨架,在所述的圆形钢筋骨架顶面和底面上分别焊接有锥形端钢筋骨架,在所述的圆形钢筋骨架内间隔焊接有多个十字加劲撑,在所述的圆形钢筋骨架的顶部均匀间隔焊接有四个吊环,缆风绳系在圆形钢筋骨架上。采用本钻孔灌注桩成孔施工质量检测装置确保了水文地质钻孔灌注桩的成孔施工质量,避免了由于钻孔灌注桩孔径偏小使桩基钢筋笼保护层厚度不足,成孔倾斜导致钢筋笼下放不到孔底的现象。
Description
技术领域
本实用新型涉及桩基工程的成孔施工质量检测装置,尤其涉及用于高速公路、铁路工程中桥梁钻孔灌注桩的成孔过程质量检测装置。
背景技术
随着我国高速公路、铁路的迅速发展,对地基承载力的要求越来越高,基础形式一般都采取钻孔灌注桩基础。钻孔灌注桩由于它无噪声,无振动,对环境影响小,直径最大达3-4m,承载力大等特点,目前在建设工程中被较广泛采用,尤其在沿海发达地区,地下水丰富,泥浆护壁钻孔桩便成为建设工程基础形式的首选。施工过程中钻孔灌注桩的成孔直径、倾斜度对工程质量、安全有着至关重要的作用,继而影响整体工程质量,甚至会引发安全事故。
发明内容
本实用新型的目的在于克服已有技术的缺陷,提供一种实现钻孔施工过程中确保成孔施工质量的用于钻孔灌注桩成孔施工的质量检测装置。
本实用新型的一种用于钻孔灌注桩成孔施工的质量检测装置,它包括圆形钢筋骨架,在所述的圆形钢筋骨架顶面和底面上分别焊接有锥形端钢筋骨架,在所述的圆形钢筋骨架内间隔焊接有多个十字加劲撑,在所述的圆形钢筋骨架的顶部均匀间隔焊接有四个吊环,缆风绳系在圆形钢筋骨架上。
采用本钻孔灌注桩成孔施工质量检测装置避免了在施工过程中发生钻孔灌注桩基础成孔偏斜,孔径达不到设计尺寸要求的技术缺陷,制作简单,使用方便,重复使用,绿色节能。钻孔灌注桩成孔施工检测装置的应用,确保了水文地质钻孔灌注桩的成孔施工质量,避免了由于钻孔灌注桩孔径偏小使桩基钢筋笼保护层厚度不足,成孔倾斜导致钢筋笼下放不到孔底的现象。不仅确保了下道工序的正常施工,提高了劳动生产率,而且对提高钻孔灌注桩的桩身完整性效果显著。
附图说明
图1是本实用新型的一种用于钻孔灌注桩成孔施工的质量检测装置的立面示意图;
图2是本实用新型的一种用于钻孔灌注桩成孔施工的质量检测装置的横截面示意图。
具体实施方式
下面结合附图和具体实施例对本实用新型作以详细描述。
如附图所示的本实用新型的一种用于钻孔灌注桩成孔施工的质量检测装置,它包括圆形钢筋骨架1,在所述的圆形钢筋骨架1顶面和底面上分别焊接有锥形端钢筋骨架4,在所述的圆形钢筋骨架1内间隔焊接有多个十字加劲撑2,在所述的圆形钢筋骨架1的顶部均匀间隔焊接有四个吊环3,缆风绳5系在圆形钢筋骨架1上。
十字加劲撑2用于防止圆形钢筋骨架1变形、有足够刚度。
本实用新型的一种用于钻孔灌注桩成孔施工的质量检测装置的使用方法如下:(1)吊车吊住成孔施工质量检测装置上端的吊环3,缓慢提起到桩孔正上方,人工牵制缆风绳5,使成孔施工质量检测装置锥形端钢筋骨架4中心对准桩孔位中心缓慢、匀速下放,严禁摆动碰撞孔壁以免孔壁坍塌,直至成孔施工质量检测装置下放至孔底,量测桩孔孔径、倾斜度。确保满足施工技术规范要求后,进行孔底沉渣清理和浇筑水下混凝土的准备工作。反之,提出成孔施工质量检测装置,修整钻孔,直至成孔施工质量检测装置上、下顺利通过桩孔孔身时为止。
Claims (1)
1.一种用于钻孔灌注桩成孔施工的质量检测装置,其特征在于:它包括圆形钢筋骨架,在所述的圆形钢筋骨架顶面和底面上分别焊接有锥形端钢筋骨架,在所述的圆形钢筋骨架内间隔焊接有多个十字加劲撑,在所述的圆形钢筋骨架的顶部均匀间隔焊接有四个吊环,缆风绳系在圆形钢筋骨架上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620309958.3U CN205954712U (zh) | 2016-04-13 | 2016-04-13 | 一种用于钻孔灌注桩成孔施工的质量检测装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620309958.3U CN205954712U (zh) | 2016-04-13 | 2016-04-13 | 一种用于钻孔灌注桩成孔施工的质量检测装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205954712U true CN205954712U (zh) | 2017-02-15 |
Family
ID=57966576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620309958.3U Expired - Fee Related CN205954712U (zh) | 2016-04-13 | 2016-04-13 | 一种用于钻孔灌注桩成孔施工的质量检测装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205954712U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680736A (zh) * | 2019-02-15 | 2019-04-26 | 中建五局土木工程有限公司 | 成孔灌注桩倾斜度检测的辅助装置及倾斜度检测方法 |
CN110017130A (zh) * | 2019-04-19 | 2019-07-16 | 刘生平 | 一种水下钻孔灌注桩验孔器 |
CN111827981A (zh) * | 2020-06-23 | 2020-10-27 | 中国五冶集团有限公司 | 一种人工挖孔桩成孔尺寸检验装置 |
-
2016
- 2016-04-13 CN CN201620309958.3U patent/CN205954712U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680736A (zh) * | 2019-02-15 | 2019-04-26 | 中建五局土木工程有限公司 | 成孔灌注桩倾斜度检测的辅助装置及倾斜度检测方法 |
CN109680736B (zh) * | 2019-02-15 | 2024-05-10 | 中建五局土木工程有限公司 | 成孔灌注桩倾斜度检测的辅助装置及倾斜度检测方法 |
CN110017130A (zh) * | 2019-04-19 | 2019-07-16 | 刘生平 | 一种水下钻孔灌注桩验孔器 |
CN111827981A (zh) * | 2020-06-23 | 2020-10-27 | 中国五冶集团有限公司 | 一种人工挖孔桩成孔尺寸检验装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110397076B (zh) | 一种深水大直径灌注桩施工方法 | |
CN201649072U (zh) | 桩基钢筋笼吊装装置 | |
CN102191777B (zh) | 钢板桩围堰结构及其逆做法施工方法 | |
CN106638640B (zh) | 岩层地质条件下无封底混凝土组合式围堰的施工方法 | |
CN113445498A (zh) | 复杂地质岩溶孔桩基础施工工艺 | |
CN102535529A (zh) | 自平衡法桩基承载力试验装置施工方法 | |
CN205954712U (zh) | 一种用于钻孔灌注桩成孔施工的质量检测装置 | |
CN105544587B (zh) | 利用复合式塔机基础固定塔机的施工方法 | |
CN112900450A (zh) | 逆作法钢管结构桩旋挖钻进与全回转组合后插法定位方法 | |
CN207879321U (zh) | 一种人工挖孔桩便携式桩孔检测装置 | |
CN102644290A (zh) | 一种适用于浅海地区深淤泥层桥梁施工的钢围堰施工工法 | |
CN105863042A (zh) | 一种全钢结构建筑及其施工方法 | |
CN106812144A (zh) | 双壁钢围堰施工方法 | |
CN104264683B (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
CN106192995A (zh) | 一种有关挖孔桩机械成孔的作业装置及其施工方法 | |
CN108625386A (zh) | 一种栈桥基础钢管拼接桩及施工方法 | |
CN109837891A (zh) | 一种管桩灌芯施工工法 | |
CN113981961B (zh) | 深水裸岩的驳船式植桩方法 | |
CN113502828B (zh) | 一种深基坑预警的处理方法 | |
CN102587377B (zh) | 吊锤沉桩装置及沉桩方法 | |
CN210438260U (zh) | 一种大直径钢护筒吊装结构 | |
CN104499706A (zh) | 电梯井模板平台及其施工方法 | |
CN108951654A (zh) | 不同开挖深度地下室支护施工方法 | |
CN206941596U (zh) | 一种吊装钢筋笼的扁担梁装置 | |
CN203247580U (zh) | 深厚软土地基桥梁混凝土灌注桩施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170215 Termination date: 20170413 |
|
CF01 | Termination of patent right due to non-payment of annual fee |