CN205953918U - Coke oven protects stove device - Google Patents
Coke oven protects stove device Download PDFInfo
- Publication number
- CN205953918U CN205953918U CN201620951781.7U CN201620951781U CN205953918U CN 205953918 U CN205953918 U CN 205953918U CN 201620951781 U CN201620951781 U CN 201620951781U CN 205953918 U CN205953918 U CN 205953918U
- Authority
- CN
- China
- Prior art keywords
- furnace
- coke oven
- posts
- stay
- grate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Coke Industry (AREA)
Abstract
The utility model relates to a coke oven protects stove device belongs to coke oven construction technical field, the technical problem that will solve provides a coke oven protects stove device, shortens coke oven construction cycle, practices thrift construction machinery cost and labour's cost, the technical scheme who adopts is: a coke oven protects stove device, the fixed two grate furnace posts that are equipped with on the civil engineering basis, two grate furnace posts be two double -phase to and the symmetry setting, every grate furnace post is all through at least one transversal branch fagging fixed connection, does the furnace body set up between two grate furnace posts, and the interval is 80 between furnace stay and the furnace body 120mm, the furnace body is inside to be equipped with a plurality of carbomorphism rooms, and all is equipped with a carbomorphism room between per two adjacent furnace stays, all installs big protection shield just on every furnace stay big protection shield is located between furnace stay and the furnace body, and every carbomorphism room export all is equipped with a furnace door frame, and every furnace door frame both sides limit is all sealed fixed with corresponding big protection shield, the utility model discloses mainly be applicable to down and spout top mounted coal, side and spouting the side and fill coal, spout down the side formula coke oven of fillling coal.
Description
Technical field
A kind of the utility model protecting coke oven device, belongs to coke oven construction technical field and in particular to a kind of new Jiao
Stove device for protecting oven.
Background technology
In coke-oven plant's coke oven installing engineering, the installation of furnace retaining ironware does not only exist quantities greatly, the feature of short time limit, and
The installation quality of furnace retaining ironware has great impact to coke oven using furnace life.Structure according to traditional coke oven furnace retaining and technique,
Require to carry out furnace retaining ironware installation after the completion of coke furnace building again(Found furnace stay afterwards), so not only long construction period, and to coke oven
Build by laying bricks or stones and there is also impact.
Utility model content
The utility model overcomes the shortcomings of that prior art exists, and technical problem to be solved is to provide a kind of protecting coke oven
Device, shortens the coke oven construction cycle, saves construction machinery cost and labour costs.
In order to solve above-mentioned technical problem, the utility model be employed technical scheme comprise that:A kind of protecting coke oven device, bag
Include foundation of civil work, furnace stay, horizontal support plate, big protection board and body of heater, foundation of civil work is fixed with two grate furnace posts, described two grate furnaces
Post is relative two-by-two and is symmetrical arranged, every grate furnace post is all fixedly connected by least one horizontal support plate, and described body of heater is arranged on
Between two grate furnace posts, and between furnace stay and body of heater, spacing is 80-120mm, and described furnace interior is provided with multiple carbonization chambers, and every two
It is equipped with a carbonization chamber between individual adjacent furnace stay, each furnace stay is mounted on big protection board and described big protection board is located at stove
Between post and body of heater, each carbonization chamber outlet be equipped with a firedoor frame, and each firedoor frame two side all with accordingly protect greatly
Plate sealing is fixed.
Two corresponding furnace stays of described two grate furnace posts are all connected by chain block.
It is equipped with little backplate, the little backplate on corresponding two furnace stays of described two grate furnace posts passes through in the middle part of each furnace stay described
Chain block is connected.
Described chain block two ends are all fixed on little backplate by U-shaped card.
Described horizontal support plate is [10 channel-section steels.
The horizontal support plate of described every grate furnace post foot is all fixedly connected with foundation of civil work and structure by multiple bearing ribs
Become stable triangular structure.
Described bearing rib is [10 channel-section steels.
The utility model is compared with the existing technology had an advantageous effect in that:New structure of the present utility model is in construction
When can be finished in coke oven base construction using the working procedure first founding furnace stay, after found furnace stay, payment brickwork, furnace stay can make
Build mark post by laying bricks or stones for brickwork, saved brickwork time operation, and coke furnace building finish after can directly carry out big protection board installation, greatly
Can facilitate in place, greatly save the furnace retaining ironware set-up time, decrease construction with furnace stay as support when protection board is installed
Machinery, the input of personnel, have good economic benefit and social benefit.
Brief description
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the mounting structure schematic diagram of furnace stay in the utility model.
Fig. 3 is the installation side view of furnace stay in the utility model.
Fig. 4 is the connection diagram of firedoor frame and big protection board in the utility model.
In figure:1 is foundation of civil work, and 2 is furnace stay, and 3 is horizontal support plate, and 4 is big protection board, and 5 is body of heater, and 6 is carbonization chamber, 7
For chain block, 8 is little backplate, and 9 is U-shaped card, and 10 is bearing rib, and 11 is firedoor frame.
Specific embodiment
As Figure 1-4, a kind of protecting coke oven of the utility model device, including foundation of civil work 1, furnace stay 2, horizontal support plate 3,
Big protection board 4 and body of heater 5, foundation of civil work 1 are fixed with two grate furnace posts 2, described two grate furnace posts 2 are relatively and symmetrically to set two-by-two
Put, every grate furnace post 2 is all fixedly connected by least one horizontal support plate 3, described body of heater 5 is arranged between two grate furnace posts 2, and stove
Between post 2 and body of heater 5 spacing be 80-120mm, be provided with multiple carbonization chambers 6 inside described body of heater 5, and the adjacent furnace stay of each two 2 it
Between be equipped with a carbonization chamber 6, each furnace stay 2 is mounted on big protection board 4 and described big protection board 4 and is located at furnace stay 2 and stove
Between body 5, each carbonization chamber 6 outlet be equipped with a firedoor frame 11, and 11 liang of sides of each firedoor frame all with accordingly protect greatly
Plate 4 sealing is fixed.
Two corresponding furnace stays 2 of described two grate furnace posts 2 are all connected by chain block 7.
It is equipped with little backplate 8, the little backplate 8 on corresponding two furnace stays of described two grate furnace post 2 in the middle part of each furnace stay 2 described
It is connected by chain block 7.
Described chain block 7 two ends are all fixed on little backplate 8 by U-shaped card 9.
Described horizontal support plate 3 is [10 channel-section steels.
The horizontal support plate 3 of described every grate furnace post 2 foot is all fixedly connected with foundation of civil work 1 by multiple bearing ribs 10
And constitute stable triangular structure.
Described bearing rib 10 is [10 channel-section steels.
Four corner angle of described big protection board 4 are coated with cardboard, in order to protect body of heater 5.
The utility model be primarily adapted for use in lower spray top coaling, side spray side coal, lower spray side coal formula coke oven.
Coke oven is thorough to build installation all needs to set up the interim booth of coke oven, and general carbonization chamber sets three for 5.5m with soil coke oven booth domestic demand
Platform driving cooperation is installed, and three drivings can lift simultaneously, substantially reduce the lifting time when installing furnace retaining ironware.Carbonization chamber is
Below 4.3m coke oven booth can not set up driving, is mounted directly with truck crane, and the expense that so can reduce booth puts into.Booth can
To reuse according to the type of furnace, reduce financial cost.
Situation is invested to build according to coke-oven plant, if extension project, using coal gas baker, can be using installation fire door before baker
Frame it is not necessary to using envelope wall, decreases the envelope input of wall and builds a wall and take off the human and material resources of wall and put into.
After foundation of civil work 1 and booth construction finish, installed using the first time that truck crane carries out furnace stay 2, by furnace stay 2 along pre-
Determine to move outside body of heater 5 outer wall 100mm about after fixing, form room, to be inserted perpendicularly into when facilitating and installing big protection board 4.Furnace stay 2 is pacified
With horizontal support plate 3, a grate furnace post 2 full-face is coupled together during dress, and be fixed on foundation of civil work 1 by bearing rib 10, from
And it is overall to form a furnace stay.
Furnace stay 2 fixation pays brickwork after finishing, and in coke furnace building, furnace stay 2 can build mark post by laying bricks or stones as brickwork, saves
The lifting of big protection board 4 is put in place after the completion of coke furnace building by brickwork time operation, big protection board 4 have to be inserted perpendicularly into body of heater 5 with
Between furnace stay 2.
After the adjustment of big protection board 4 finishes, remove horizontal support plate 3 and bearing rib 10, to furnace stay 2 by chain block
7 exert oneself to furnace stay 2 simultaneously, and furnace stay 2 is put in place and pressurizes with the tension of big protection board 4.
Furnace stay 2 adjustment can install firedoor frame 11 and fire door after finishing as requested.
Described little backplate 8 is connected for spot welding with the connected mode of furnace stay 2, after the utility model installs, before baker,
Little backplate 8 directly cuts open it is easy to separate.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all this
Any modification, equivalent and improvement made within the spirit of utility model and principle etc., all should wrap in the utility model model
In enclosing.
Claims (7)
1. a kind of protecting coke oven device it is characterised in that:Including foundation of civil work(1), furnace stay(2), horizontal support plate(3), big protect
Plate(4)And body of heater(5), foundation of civil work(1)On be fixed with two grate furnace posts(2), described two grate furnace posts(2)For relatively and right two-by-two
Claim setting, every grate furnace post(2)All by least one horizontal support plate(3)It is fixedly connected, described body of heater(5)It is arranged on two grate furnace posts
(2)Between, and furnace stay(2)With body of heater(5)Between spacing be 80-120mm, described body of heater(5)Inside is provided with multiple carbonization chambers
(6), and the adjacent furnace stay of each two(2)Between be equipped with a carbonization chamber(6), each furnace stay(2)On be mounted on big protection board
(4)And described big protection board(4)Positioned at furnace stay(2)With body of heater(5)Between, each carbonization chamber(6)Outlet is equipped with a fire door
Frame(11), and each firedoor frame(11)Two sides all with accordingly big protection board(4)Sealing is fixed.
2. a kind of protecting coke oven device according to claim 1 it is characterised in that:Described two grate furnace posts(2)Corresponding
Two furnace stays(2)All by chain block(7)It is connected.
3. a kind of protecting coke oven device according to claim 2 it is characterised in that:Each furnace stay described(2)Middle part is all provided with
There is little backplate(8), described two grate furnace posts(2)Little backplate on corresponding two furnace stays(8)By chain block(7)It is connected.
4. a kind of protecting coke oven device according to claim 3 it is characterised in that:Described chain block(7)Two ends are all logical
Cross U-shaped card(9)It is fixed on little backplate(8)On.
5. a kind of protecting coke oven device according to claim 1 it is characterised in that:Described horizontal support plate(3)For [10 grooves
Steel.
6. a kind of protecting coke oven device according to claim 1-5 any one it is characterised in that:Described every grate furnace post
(2)The horizontal support plate of foot(3)All by multiple bearing ribs(10)With foundation of civil work(1)It is fixedly connected and to constitute triangle steady
Fixed structure.
7. a kind of protecting coke oven device according to claim 6 it is characterised in that:Described bearing rib(10)For [10 grooves
Steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620951781.7U CN205953918U (en) | 2016-08-27 | 2016-08-27 | Coke oven protects stove device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620951781.7U CN205953918U (en) | 2016-08-27 | 2016-08-27 | Coke oven protects stove device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205953918U true CN205953918U (en) | 2017-02-15 |
Family
ID=57980716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620951781.7U Active CN205953918U (en) | 2016-08-27 | 2016-08-27 | Coke oven protects stove device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205953918U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107163955A (en) * | 2017-07-13 | 2017-09-15 | 南京钢铁股份有限公司 | Platform above section furnace stay more changing device and its replacing options in a kind of coke side stove |
CN113732697A (en) * | 2021-09-29 | 2021-12-03 | 中国十九冶集团有限公司 | Combined installation method for iron parts of coke oven protection |
CN114958398A (en) * | 2022-05-29 | 2022-08-30 | 五冶集团上海有限公司 | Construction method for temporarily fixing furnace column |
-
2016
- 2016-08-27 CN CN201620951781.7U patent/CN205953918U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107163955A (en) * | 2017-07-13 | 2017-09-15 | 南京钢铁股份有限公司 | Platform above section furnace stay more changing device and its replacing options in a kind of coke side stove |
CN113732697A (en) * | 2021-09-29 | 2021-12-03 | 中国十九冶集团有限公司 | Combined installation method for iron parts of coke oven protection |
CN114958398A (en) * | 2022-05-29 | 2022-08-30 | 五冶集团上海有限公司 | Construction method for temporarily fixing furnace column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205953918U (en) | Coke oven protects stove device | |
CN106869368A (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN206616184U (en) | Coke oven loss flue dust dust gathering arrester supporting construction | |
CN109778898A (en) | A kind of novel tower crane pile foundation cushion cap | |
CN208039797U (en) | A kind of construction hanging basket suspension device suitable for steel-frame beam | |
CN204662458U (en) | Detachable pretightning force combined support frame system brace summer transition Connection Block | |
CN104060836B (en) | The lifting installation method of high curved surface rack | |
CN206607709U (en) | A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure | |
CN207122313U (en) | Constructing middle partition wall in tunnel template and its constructing device | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
CN210195200U (en) | Hanging flower basket device of encorbelmenting of high parapet | |
CN104878928B (en) | Method for integrally hoisting steel structure galleries across factory buildings in place by aid of multiple machines | |
CN109944430A (en) | A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation | |
CN106917498A (en) | A kind of Portable scaffold | |
CN207220650U (en) | Connect i-beam structure and with the integrated metal pelmet of curtain wall fireproof blocking | |
CN113998587B (en) | Support suspension device for mounting newly-built coke oven protection plate | |
CN208310404U (en) | Modular suspension moso bamboo ecology enclosure wall | |
CN207512790U (en) | A kind of trapezoidal bottom plate rear pouring tape and special-shaped steel plate for sealing water anti-leakage structure | |
CN218150921U (en) | Semi-circular operation crawling ladder for shield tunnel duct piece | |
CN205976570U (en) | Overhanging type steel construction escape way facility | |
CN107542032A (en) | A kind of safety-type bolt steel girder bridge and its construction technology | |
CN206376578U (en) | A kind of monoblock type fire water pump house | |
CN205382557U (en) | Adopt environment -friendly type wall body's building window subassembly structure | |
CN203336186U (en) | Sliding supporting device | |
CN212535157U (en) | High mound turns over mould protection network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 650000 Songming, Yunnan, Yang Linzhen, Patentee after: Yunnan construction machinery manufacturing and Installation Engineering Co., Ltd. Address before: 650000 Songming, Yunnan, Yang Linzhen, Patentee before: Fourteen Metallurgical Construction Group Yunnan Machinery Manufacturing Installation Engineering Co., Ltd. |