CN205953813U - Sludge pyrolysis stove - Google Patents

Sludge pyrolysis stove Download PDF

Info

Publication number
CN205953813U
CN205953813U CN201620916518.4U CN201620916518U CN205953813U CN 205953813 U CN205953813 U CN 205953813U CN 201620916518 U CN201620916518 U CN 201620916518U CN 205953813 U CN205953813 U CN 205953813U
Authority
CN
China
Prior art keywords
pyrolysis
flue gas
gas
air
collection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620916518.4U
Other languages
Chinese (zh)
Inventor
朱玉雯
李浩宇
刘汉桥
张蕊
苗艳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Chengjian University
Original Assignee
Tianjin Chengjian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Chengjian University filed Critical Tianjin Chengjian University
Priority to CN201620916518.4U priority Critical patent/CN205953813U/en
Application granted granted Critical
Publication of CN205953813U publication Critical patent/CN205953813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/40Valorisation of by-products of wastewater, sewage or sludge processing

Landscapes

  • Carbon And Carbon Compounds (AREA)

Abstract

The utility model provides a sludge pyrolysis stove is equipped with the feed valve in the material inlet bottom, and the conveying chain is established in feed valve below, and the drive wheel is established at conveying chain both ends, is equipped with the scraper blade between coke collection device and pyrolysis liquid collection device, establishes in conveying chain below at pyrolysis liquid collecting board, is equipped with the flue gas calandria in pyrolysis liquid collecting board below, and the flue gas calandria is arranged in pyrolysis liquid collecting board below, and the flue gas passageway is established in conveying chain top, is equipped with below the flue gas calandria the combustion chamber is equipped with gas burner and atomized liquid body combustor on burner housing, be equipped with pyrolysis liquid collection device in flue gas passageway and material inlet relative one side, is equipped with the liquid discharge port in pyrolysis liquid collection device bottom, is equipped with coke collection device in pyrolysis liquid collection device one side, is equipped with the discharge opening in coke collection device bottom, is equipped with the export of pyrolysis gas on coke collection device top. A large amount of moisture in the make full use of mud are used for activation preparation active carbon after the evaporation.

Description

Pyrolyzing sludge stove
Technical field
This utility model is related to technical field of sludge treatment, works in coordination with carbon value resource more specifically to pyrolyzing sludge Processing equipment and its method.
Background technology
Municipal sewage sludge contains plurality of heavy metal, pathogenic microorganism and parasitic ovum etc., and property is unstable and perishable Lose.But mud is equally rich in biological source, organic matter, inorganic component etc., also can become a kind of potential energy and resource substance.Adopt Process mud, the recovery energy of achievable mud with pyrolysismethod;Activated carbon is prepared in sludge activation, can be used for purify sewage or Waste gas, realizes its recycling.But mud using during all there is inevitable problem.
(1) contain large quantity of moisture in mud, mass percent up to more than 80%.Sludge handling process first has to moisture Evaporation, the energy-output ratio of this process is huge, and in existing processing method, moisture also cannot be utilized effectively.Moisture Evaporation with using the key issue being Treatment of Sludge.
(2) adopt pyrolysismethod to process mud, the part organic matter decomposition in mud can be converted into CO2、CO、H2、CH4And CnHmDeng pyrolysis gas and pyrolysis liquids, realize the recovery of the energy.But CO2Presence, leverage the product of pyrolysis gas Matter.Another major issue be partly organic presented in fixed carbon in mud it is impossible to be carried out by way of pyrolysis Conversion, is ultimately present in solid product.And the carbon content of solid product is relatively low, burning is difficult, has thus resulted in part The waste of potential energy source.
(3) pyrolyzing sludge solid product has certain pore structure, and activation further can prepare active sludge carbon.Can adopt With vapor, CO2Or flue gas etc. is as activated gas, wherein vapor and CO2Need separately to prepare, increased activated carbon preparation Cost;And vapor and CO in flue gas2Content is limited, and therefore flue gas activated hole is less-developed.Another major issue is pyrolysis, lives The processes such as change are both needed to external heat source and provide energy, and energy charge is high.
(4) because sludge components are complicated, often produce the pollutant such as waste water, waste gas in processing procedure, deal with improperly Easily cause the secondary pollution of environment.
For problem above, need to comprehensively utilize the energy and the resource of mud, and at utmost reduce outside confession Under conditions of energy, so that mud is effectively addressed and utilize;Avoid the environmental pollution of sludge handling process simultaneously, be finally reached dirt Mud energy, resource and safe are processed.
Utility model content
This utility model overcomes deficiency of the prior art, there is provided pyrolyzing sludge and carbon value resource are worked in coordination with process and set Standby and its method.
The purpose of this utility model is achieved by following technical proposals.
Pyrolyzing sludge works in coordination with processing equipment with carbon value resource, including warehouse of sludge, straw warehouse, ZnCl2Warehouse, mixing Storehouse, the first conveying worm, first order air-dry machine, the second conveying worm, comminutor, belt conveyor, second level air-dry machine, Feed pipe, pyrolysis oven, condenser, activation furnace, active sludge carbon warehouse, saturation scrubbing tower, the first distributing valve, gas and hot water pot Stove, activated carbon adsorber, air-introduced machine, the second distributing valve and the 3rd distributing valve, described warehouse of sludge, described straw warehouse and institute State ZnCl2Warehouse is connected with the charging aperture of described mixing bunker by feeding pipe, and the discharging opening of described mixing bunker passes through described the One conveying worm is connected with the charging aperture of described first order air-dry machine, and the discharging opening of described first order air-dry machine passes through described the Two conveying worms are connected with the charging aperture of described comminutor, described belt conveyor by the discharging opening of described comminutor with described The charging aperture of second level air-dry machine is connected, and the discharging opening of described second level air-dry machine passes through described feed pipe and described pyrolysis oven Material inlet be connected, the discharge port of described pyrolysis oven is connected with the charging aperture of described activation furnace, the discharging opening of described activation furnace and Described active sludge carbon warehouse is connected;
The pyrolysis gas outlet of described pyrolysis oven is connected with described saturation scrubbing tower, and the air vent of described saturation scrubbing tower passes through First distributing valve respectively with the gas burner of described pyrolysis oven, the gas burner of described activation furnace and described gas and hot water First air inlet of boiler is connected, and the first liquid outlet of described saturation scrubbing tower passes through pipeline and described activated carbon adsorber phase Even, the second liquid outlet of described saturation scrubbing tower is connected with the inlet of described gas-fired water heating boiler, described gas-fired water heating boiler Air vent be connected with described activated carbon adsorber by described second distributing valve, the air vent of described gas-fired water heating boiler, institute State the exhaust gases passes of pyrolysis oven and the exhaust gases passes of described activation furnace are connected with described second air-dry machine, described second air-dry machine It is connected with described first air-dry machine, described first air-dry machine passes through the described 3rd distributing valve air inlet with described activation furnace respectively It is connected with described activated carbon adsorber, the tail gas air vent of described activation furnace is connected with described activated carbon adsorber, described It is provided with described air-introduced machine on pipeline between one air-dry machine and the 3rd distributing valve;
The liquid outlet of described pyrolysis oven is connected with described condenser, and described condenser passes through reflux pipe and described heat The atomized liquid burner of solution stove is connected.
Described pyrolysis oven include material inlet, feed valve, transmission chain, drive, scraper plate, coke collection device, discharge port, Pyrolytic behavior collecting board, pyrolysis liquor collecting device, liquid outlet, pyrolysis gas outlet, combustor, gas burner, atomized liquid Burner, flue gas comb and exhaust gases passes, are provided with described feed valve in the bottom of described material inlet, and described transmission chain sets Put below described feed valve, described drive is arranged on described transmission chain two ends, in described coke collection device and described It is provided with described scraper plate, described scraper plate is oppositely arranged with one end of described transmission chain, described between pyrolysis liquor collecting device Pyrolytic behavior collecting board is arranged on below described transmission chain, is provided with described flue gas comb below described pyrolytic behavior collecting board, Described flue gas comb is uniformly arranged in below described pyrolytic behavior collecting board, and described exhaust gases passes are arranged on described transmission chain Side, is provided with described combustor below described flue gas comb, is respectively arranged with described gas combustion on described Inner Wall of Combustion Chamber Burner and described atomized liquid burner, are provided with described pyrolytic behavior in described exhaust gases passes and described material inlet opposite side and receive Acquisition means, are provided with described liquid outlet in the bottom of described pyrolysis liquor collecting device, in described pyrolysis liquor collecting device one Side is provided with described coke collection device, the bottom of described coke collection device is provided with described discharge port, in described coke The top side of collection device is provided with described pyrolysis gas outlet.
Described transmission chain includes chain main body, chain, pyrolytic behavior groove and liquid collecting hole, in described chain main body two Side is provided with described pyrolytic behavior groove, and the outside of described pyrolytic behavior groove is provided with described chain, in described chain main body On be evenly arranged with described liquid collecting hole, described liquid collecting hole includes cylindrical hole and trapezoidal hole, and described cylindrical hole is arranged on described trapezoidal Kong Shang, is provided with decussation baffle plate in described cylindrical hole and described chain main body touching position, described cylindrical hole a diameter of 8-12mm, the height of described cylindrical hole is 5-9mm, and the bottom diameter of described trapezoidal hole is 20-35mm, the height of described trapezoidal hole For 5-9mm.
The rear side of described flue gas comb is provided with flue gas main pipe, described flue gas main pipe is connected with flue gas comb each described Logical, described flue gas main pipe is connected with described exhaust gases passes.
Described flue gas comb includes flue gas pipe and connecting plate, and described flue gas pipe be arranged in parallel, described connecting plate setting Between described flue gas pipe, the internal diameter of described flue gas pipe is 30-45mm.
The method that pyrolyzing sludge and carbon value resource work in coordination with process, the mud in warehouse of sludge, the straw in straw warehouse And ZnCl2ZnCl in warehouse2Entered in mixing bunker by feeding pipe and sufficiently mixed, mixed material is through One conveying worm is delivered in first order air-dry machine and carries out preliminary air dry operation, then the mixed material after tentatively air-drying is passed through Second conveying worm is delivered in comminutor, adds binding agent in comminutor, is prepared into as molding materials, then passes through Belt conveyor is sent into the second air-dry machine and is carried out air dry operation again, makes the temperature of molding materials reach 300-350 DEG C simultaneously, Dried molding materials are entered by feed pipe and carry out pyrolysis operations in pyrolysis oven, and the gas obtained by pyrolysis passes through pyrolysis gas Outlet discharge pyrolysis oven hence in saturation scrubbing tower, be then passed through the first distributing valve be respectively pyrolysis oven, activation furnace and Gas-fired water heating boiler combustion heat supplying, the liquid obtained by pyrolysis enters condenser by liquid outlet, and water therein is separated Afterwards the tar obtaining is returned in pyrolysis oven again by atomized liquid burner, be pyrolysis oven combustion heat supplying, be pyrolyzed gained The solid arriving enters activation furnace by discharge port, and a product part for activation gained is sent in active sludge carbon warehouse, another portion Divide and then enter into activated carbon adsorber, for contained SO in adsorption cleaning flue gas2、NOxDeng pollutant;
Pyrolysis gas produced by pyrolysis oven are expelled in saturation scrubbing tower by pyrolysis gas outlet, by pyrolysis gas H2S、SO2It is removed Deng soluble contaminant gas, the liquid in saturation scrubbing tower is then transported in activated carbon adsorber and carries out Absorption, the liquid after adsorption cleaning is disposed to the external world, and 30-50 DEG C obtained warm water is delivered to gas-fired water heating boiler In, it is transported in pyrolysis oven, activation furnace and gas-fired water heating boiler by the first distributing valve through the pyrolysis gas of washing, and Flue gas produced by burning in pyrolysis oven and activation furnace is again introduced in the second air-dry machine, produced cigarette in gas-fired water heating boiler Gas is then respectively enterd in the second air-dry machine and activated carbon adsorber by the second distributing valve, after activated carbon adsorber purifies Flue gas can be emitted in outside air, and the flue gas in the second air-dry machine is again introduced in the first air-dry machine, for increasing flue gas In water vapour content, in the presence of air-introduced machine, then enter activation furnace prepare activated carbon, unnecessary flue gas then passes through the 3rd Distributing valve is emitted in outside air after being delivered to adsorption cleaning in activated carbon adsorber, and the activation tail gas in activation furnace then discharges It is emitted in outside air after adsorption cleaning to activated carbon adsorber.
The addition of straw is the 10-20%, preferably 13-16% of mud addition.
ZnCl2Addition be mud addition 8-12%, preferably 9-11%.
The water content tentatively air-drying resulting material is to be less than or equal to 50% more than 20%, air-dries the aqueous of resulting material again Amount is to be less than or equal to 20% more than zero.
Binding agent adopts the quality of coal tar (Shanghai Wei Pu Chemical Engineering Technology Services Co., Ltd), molding materials and binding agent Than for 1:(0.1-0.5), preferably 1:0.3.
Pyrolytical condition in pyrolysis oven:Pyrolysis temperature is 650-850 DEG C, preferably 750 DEG C, and pyrolysis time is 20-40min, Preferably 30min.
Activation condition in activation furnace:Activation temperature is 750-850 DEG C, preferably 800 DEG C, and soak time is 40-120min, Preferably 60min.
The quality of coke is 1 with the ratio of the volume flow of activated gas:(15-20), preferably 1:17.
Flue gas in second air-dry machine is again introduced in the first air-dry machine, the vapor in flue gas after increase water vapour content Percent by volume is to be less than 65% more than 45%.
The beneficial effects of the utility model are:The energy of mud and resource are worked in coordination with and are utilized by this utility model, realize Without the Treatment of Sludge of external heat source heat supply, utilize process.Make full use of large quantity of moisture in mud, after evaporation, be used for activation preparation Activated carbon;Drying, pyrolysis, activation process are without external heat source heat supply;Activation process adopts the flue gas of high water vapor content, activates gas Body need not separately be prepared, and derives from sludge handling process;The waste gas that sludge handling process produces is purified.
Brief description
Fig. 1 is the schematic diagram of pyrolyzing sludge device in this utility model;
Fig. 2 is the structural representation of pyrolysis oven in this utility model;
Fig. 3 is the structural representation of transmission chain in this utility model pyrolysis oven;
Fig. 4 is the structural representation of flue system in this utility model pyrolysis oven;
Fig. 5 is the side structure schematic view of flue system in this utility model pyrolysis oven;
Fig. 6 is the different schematic diagrams to pyrolysis gas yield effect for the pyrolysis temperature in this utility model;
Fig. 7 is the different schematic diagrams to pyrolysis gas yield effect for the pyrolysis time in this utility model;
Fig. 8 is the schematic diagram that in this utility model, pyrolysis temperature affects on recyclable tar calorific value;
Fig. 9 is the schematic diagram that in this utility model, different pyrolysis times affect on recyclable tar calorific value;
Figure 10 is the schematic diagram that in this utility model, different soak times affect on activated carbon BET specific surface area;
Figure 11 is the schematic diagram that in this utility model, different activation temperatures affect on activated carbon BET specific surface area;
In figure:1 is warehouse of sludge, and 2 is straw warehouse, and 3 is ZnCl2Warehouse, 4 is mixing bunker, and 5 is the first helical feed Machine, 6 is first order air-dry machine, and 7 is the second conveying worm, and 8 is comminutor, and 9 is belt conveyor, and 10 air-dry for the second level Machine, 11 is feed pipe, and 12 is pyrolysis oven, and 13 is condenser, and 14 is activation furnace, and 15 is active sludge carbon warehouse, and 16 wash for saturation Wash tower, 17 is the first distributing valve, 18 is gas-fired water heating boiler, 19 is activated carbon adsorber, 20 is air-introduced machine, 21 is the second distribution Valve, 22 is the 3rd distributing valve, and 23 is material inlet, and 24 is feed valve, and 25 is transmission chain, and 26 is drive, and 27 is scraper plate, and 28 are Coke collection device, 29 is discharge port, and 30 is pyrolytic behavior collecting board, and 31 is pyrolysis liquor collecting device, and 32 is liquid outlet, 33 For pyrolysis gas outlet, 34 is combustor, and 35 is gas burner, and 36 is atomized liquid burner, and 37 is flue gas comb, and 38 is cigarette Gas passage, 39 is chain, and 40 is pyrolytic behavior groove, and 41 is liquid collecting hole, and 42 is flue gas main pipe.
Specific embodiment
Below by specific embodiment, the technical solution of the utility model is further described.
As shown in Figures 1 to 5, wherein, 1 is warehouse of sludge, and 2 is straw warehouse, and 3 is ZnCl2Warehouse, 4 is mixing bunker, 5 For the first conveying worm, 6 is first order air-dry machine, and 7 is the second conveying worm, and 8 is comminutor, and 9 is belt conveyor, 10 For second level air-dry machine, 11 is feed pipe, and 12 is pyrolysis oven, and 13 is condenser, and 14 is activation furnace, and 15 is active sludge carbon storage Storehouse, 16 is saturation scrubbing tower, and 17 is the first distributing valve, and 18 is gas-fired water heating boiler, and 19 is activated carbon adsorber, and 20 is air inducing Machine, 21 is the second distributing valve, and 22 is the 3rd distributing valve, and 23 is material inlet, and 24 is feed valve, and 25 is transmission chain, and 26 is transmission Wheel, 27 is scraper plate, and 28 is coke collection device, and 29 is discharge port, and 30 is pyrolytic behavior collecting board, and 31 is pyrolysis liquor collecting device, 32 is liquid outlet, and 33 is pyrolysis gas outlet, and 34 is combustor, and 35 is gas burner, and 36 is atomized liquid burner, 37 For flue gas comb, 38 is exhaust gases passes, and 39 is chain, and 40 is pyrolytic behavior groove, and 41 is liquid collecting hole, and 42 is flue gas main pipe.
Pyrolyzing sludge works in coordination with processing equipment with carbon value resource, including warehouse of sludge, straw warehouse, ZnCl2Warehouse, mixing Storehouse, the first conveying worm, first order air-dry machine, the second conveying worm, comminutor, belt conveyor, second level air-dry machine, Feed pipe, pyrolysis oven, condenser, activation furnace, active sludge carbon warehouse, saturation scrubbing tower, the first distributing valve, gas and hot water pot Stove, activated carbon adsorber, air-introduced machine, the second distributing valve and the 3rd distributing valve, described warehouse of sludge, described straw warehouse and institute State ZnCl2Warehouse is connected with the charging aperture of described mixing bunker by feeding pipe, and the discharging opening of described mixing bunker passes through described the One conveying worm is connected with the charging aperture of described first order air-dry machine, and the discharging opening of described first order air-dry machine passes through described the Two conveying worms are connected with the charging aperture of described comminutor, described belt conveyor by the discharging opening of described comminutor with described The charging aperture of second level air-dry machine is connected, and the discharging opening of described second level air-dry machine passes through described feed pipe and described pyrolysis oven Material inlet be connected, the discharge port of described pyrolysis oven is connected with the charging aperture of described activation furnace, the discharging opening of described activation furnace and Described active sludge carbon warehouse is connected;
The pyrolysis gas outlet of described pyrolysis oven is connected with described saturation scrubbing tower, and the air vent of described saturation scrubbing tower passes through First distributing valve respectively with the gas burner of described pyrolysis oven, the gas burner of described activation furnace and described gas and hot water First air inlet of boiler is connected, and the first liquid outlet of described saturation scrubbing tower passes through pipeline and described activated carbon adsorber phase Even, the second liquid outlet of described saturation scrubbing tower is connected with the inlet of described gas-fired water heating boiler, described gas-fired water heating boiler Air vent be connected with described activated carbon adsorber by described second distributing valve, the air vent of described gas-fired water heating boiler, institute State the exhaust gases passes of pyrolysis oven and the exhaust gases passes of described activation furnace are connected with described second air-dry machine, described second air-dry machine It is connected with described first air-dry machine, described first air-dry machine passes through the described 3rd distributing valve air inlet with described activation furnace respectively It is connected with described activated carbon adsorber, the tail gas air vent of described activation furnace is connected with described activated carbon adsorber, described It is provided with described air-introduced machine on pipeline between one air-dry machine and the 3rd distributing valve;
The liquid outlet of described pyrolysis oven is connected with described condenser, and described condenser passes through reflux pipe and described heat The atomized liquid burner of solution stove is connected.
Described pyrolysis oven include material inlet, feed valve, transmission chain, drive, scraper plate, coke collection device, discharge port, Pyrolytic behavior collecting board, pyrolysis liquor collecting device, liquid outlet, pyrolysis gas outlet, combustor, gas burner, atomized liquid Burner, flue gas comb and exhaust gases passes, are provided with described feed valve in the bottom of described material inlet, and described transmission chain sets Put below described feed valve, described drive is arranged on described transmission chain two ends, in described coke collection device and described It is provided with described scraper plate, described scraper plate is oppositely arranged with one end of described transmission chain, described between pyrolysis liquor collecting device Pyrolytic behavior collecting board is arranged on below described transmission chain, is provided with described flue gas comb below described pyrolytic behavior collecting board, Described flue gas comb is uniformly arranged in below described pyrolytic behavior collecting board, and described exhaust gases passes are arranged on described transmission chain Side, is provided with described combustor below described flue gas comb, is respectively arranged with described gas combustion on described Inner Wall of Combustion Chamber Burner and described atomized liquid burner, are provided with described pyrolytic behavior in described exhaust gases passes and described material inlet opposite side and receive Acquisition means, are provided with described liquid outlet in the bottom of described pyrolysis liquor collecting device, in described pyrolysis liquor collecting device one Side is provided with described coke collection device, the bottom of described coke collection device is provided with described discharge port, in described coke The top side of collection device is provided with described pyrolysis gas outlet.
Described transmission chain includes chain main body, chain, pyrolytic behavior groove and liquid collecting hole, in described chain main body two Side is provided with described pyrolytic behavior groove, and the outside of described pyrolytic behavior groove is provided with described chain, in described chain main body On be evenly arranged with described liquid collecting hole, described liquid collecting hole includes cylindrical hole and trapezoidal hole, and described cylindrical hole is arranged on described trapezoidal Kong Shang, is provided with decussation baffle plate in described cylindrical hole and described chain main body touching position, described cylindrical hole a diameter of 8-12mm, the height of described cylindrical hole is 5-9mm, and the bottom diameter of described trapezoidal hole is 20-35mm, the height of described trapezoidal hole For 5-9mm.
The rear side of described flue gas comb is provided with flue gas main pipe, described flue gas main pipe is connected with flue gas comb each described Logical, described flue gas main pipe is connected with described exhaust gases passes.
Described flue gas comb includes flue gas pipe and connecting plate, and described flue gas pipe be arranged in parallel, described connecting plate setting Between described flue gas pipe, the internal diameter of described flue gas pipe is 30-45mm.
The method that pyrolyzing sludge and carbon value resource work in coordination with process, the mud in warehouse of sludge, the straw in straw warehouse And ZnCl2ZnCl in warehouse2Entered in mixing bunker by feeding pipe and sufficiently mixed, mixed material is through One conveying worm is delivered in first order air-dry machine and carries out preliminary air dry operation, then the mixed material after tentatively air-drying is passed through Second conveying worm is delivered in comminutor, adds binding agent in comminutor, is prepared into as molding materials, then passes through Belt conveyor is sent into the second air-dry machine and is carried out air dry operation again, makes the temperature of molding materials reach 300-350 DEG C simultaneously, Dried molding materials are entered by feed pipe and carry out pyrolysis operations in pyrolysis oven, and the gas obtained by pyrolysis passes through pyrolysis gas Outlet discharge pyrolysis oven hence in saturation scrubbing tower, be then passed through the first distributing valve be respectively pyrolysis oven, activation furnace and Gas-fired water heating boiler combustion heat supplying, the liquid obtained by pyrolysis enters condenser by liquid outlet, and water therein is separated Afterwards the tar obtaining is returned in pyrolysis oven again by atomized liquid burner, be pyrolysis oven combustion heat supplying, be pyrolyzed gained The solid arriving enters activation furnace by discharge port, and a product part for activation gained is sent in active sludge carbon warehouse, another portion Divide and then enter into activated carbon adsorber, for contained SO in adsorption cleaning flue gas2、NOxDeng pollutant;
Pyrolysis gas produced by pyrolysis oven are expelled in saturation scrubbing tower by pyrolysis gas outlet, by pyrolysis gas H2S、SO2It is removed Deng soluble contaminant gas, the liquid in saturation scrubbing tower is then transported in activated carbon adsorber and carries out Absorption, the liquid after adsorption cleaning is disposed to the external world, and 30-50 DEG C obtained warm water is delivered to gas-fired water heating boiler In, it is transported in pyrolysis oven, activation furnace and gas-fired water heating boiler by the first distributing valve through the pyrolysis gas of washing, and Flue gas produced by burning in pyrolysis oven and activation furnace is again introduced in the second air-dry machine, produced cigarette in gas-fired water heating boiler Gas is then respectively enterd in the second air-dry machine and activated carbon adsorber by the second distributing valve, after activated carbon adsorber purifies Flue gas can be emitted in outside air, and the flue gas in the second air-dry machine is again introduced in the first air-dry machine, for increasing flue gas In water vapour content, in the presence of air-introduced machine, then enter activation furnace prepare activated carbon, unnecessary flue gas then passes through the 3rd Distributing valve is emitted in outside air after being delivered to adsorption cleaning in activated carbon adsorber, and the activation tail gas in activation furnace then discharges It is emitted in outside air after adsorption cleaning to activated carbon adsorber.
The addition of straw is the 10-20%, preferably 13-16% of mud addition.
ZnCl2Addition be mud addition 8-12%, preferably 9-11%.
The water content tentatively air-drying resulting material is to be less than or equal to 50% more than 20%, air-dries the aqueous of resulting material again Amount is to be less than or equal to 20% more than zero.
Binding agent adopts the quality of coal tar (Shanghai Wei Pu Chemical Engineering Technology Services Co., Ltd), molding materials and binding agent Than for 1:(0.1-0.5), preferably 1:0.3.
Pyrolytical condition in pyrolysis oven:Pyrolysis temperature is 650-850 DEG C, preferably 750 DEG C, and pyrolysis time is 20-40min, Preferably 30min.
Activation condition in activation furnace:Activation temperature is 750-850 DEG C, preferably 800 DEG C, and soak time is 40-120min, Preferably 60min.
The quality of coke is 1 with the ratio of the volume flow of activated gas:(15-20), preferably 1:17.
Flue gas in second air-dry machine is again introduced in the first air-dry machine, the vapor in flue gas after increase water vapour content Percent by volume is to be less than 65% more than 45%.
Embodiment 1
Straw and ZnCl is added in mud2, straw quality is 15%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 10% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 50%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.3, system Standby one-tenth diameter 8mm, the cylinder of length 15mm;Second level air-dry machine is sent into by belt conveyor, makes material water ratio drop to 20%, So that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation.It is dried Molding materials afterwards send into pyrolysis oven by feed pipe, and pyrolysis temperature is 650 DEG C, and the time of staying is 30min.Pyrolysis gas are by warm Solution furnace roof portion is discharged into saturation scrubbing tower, and then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condenser and divide After water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation temperature For 800 DEG C, soak time is 60min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:17, the work obtaining Property charcoal send into active sludge carbon warehouse, a portion send into activated carbon adsorber, as SO in adsorbent purifying smoke2、NOx Deng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 45%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
Embodiment 2
Straw and ZnCl is added in mud2, straw quality is 10%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 8% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 20%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.1, system Standby one-tenth diameter 8mm, the cylinder of length 15mm;Second level air-dry machine is sent into by belt conveyor, makes material water ratio drop to 5%, So that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation.It is dried Molding materials afterwards send into pyrolysis oven by feed pipe, and pyrolysis temperature is 750 DEG C, and the time of staying is 30min.Pyrolysis gas are by warm Solution furnace roof portion is discharged into saturation scrubbing tower, and then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condenser and divide After water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation temperature For 750 DEG C, soak time is 120min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:15, obtain Activated carbon sends into active sludge carbon warehouse, and a portion sends into activated carbon adsorber, as SO in adsorbent purifying smoke2、 NOxDeng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 65%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
Embodiment 3
Straw and ZnCl is added in mud2, straw quality is 20%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 12% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 40%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.5, system Standby one-tenth diameter 8mm, the cylinder of length 15mm;Second level air-dry machine is sent into by belt conveyor, makes material water ratio drop to 15%, So that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation.It is dried Molding materials afterwards send into pyrolysis oven by feed pipe, and pyrolysis temperature is 850 DEG C, and the time of staying is 30min.Pyrolysis gas are by warm Solution furnace roof portion is discharged into saturation scrubbing tower, and then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condenser and divide After water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation temperature For 850 DEG C, soak time is 40min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:20, the work obtaining Property charcoal send into active sludge carbon warehouse, a portion send into activated carbon adsorber, as SO in adsorbent purifying smoke2、NOx Deng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 50%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
Embodiment 4
Straw and ZnCl is added in mud2, straw quality is 13%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 9% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 30%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.2, system Standby one-tenth diameter 8mm, the cylinder of length 15mm;Second level air-dry machine is sent into by belt conveyor, makes material water ratio drop to 15%, So that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation.It is dried Molding materials afterwards send into pyrolysis oven by feed pipe, and pyrolysis temperature is 850 DEG C, and the time of staying is 20min.Pyrolysis gas are by warm Solution furnace roof portion is discharged into saturation scrubbing tower, and then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condenser and divide After water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation temperature For 800 DEG C, soak time is 30min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:16, the work obtaining Property charcoal send into active sludge carbon warehouse, a portion send into activated carbon adsorber, as SO in adsorbent purifying smoke2、NOx Deng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 50%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
Embodiment 5
Straw and ZnCl is added in mud2, straw quality is 16%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 11% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 40%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.4, system Standby one-tenth diameter 8mm, the cylinder of length 15mm;Second level air-dry machine is sent into by belt conveyor, makes material water ratio drop to 12%, So that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation.It is dried Molding materials afterwards send into pyrolysis oven by feed pipe, and pyrolysis temperature is 750 DEG C, and the time of staying is 20min.Pyrolysis gas are by warm Solution furnace roof portion is discharged into saturation scrubbing tower, and then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condenser and divide After water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation temperature For 800 DEG C, soak time is 60min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:19, the work obtaining Property charcoal send into active sludge carbon warehouse, a portion send into activated carbon adsorber, as SO in adsorbent purifying smoke2、NOx Deng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 50%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
Embodiment 6
Straw and ZnCl is added in mud2, straw quality is 17%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 10% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 35%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.5, system Standby one-tenth diameter 8mm, the cylinder of length 15mm;Second level air-dry machine is sent into by belt conveyor, makes material water ratio drop to 8%, So that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation.It is dried Molding materials afterwards send into pyrolysis oven by feed pipe, and pyrolysis temperature is 650 DEG C, and the time of staying is 30min.Pyrolysis gas are by warm Solution furnace roof portion is discharged into saturation scrubbing tower, and then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condenser and divide After water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation temperature For 800 DEG C, soak time is 90min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:18, the work obtaining Property charcoal send into active sludge carbon warehouse, a portion send into activated carbon adsorber, as SO in adsorbent purifying smoke2、NOx Deng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 50%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
Embodiment 7
Straw and ZnCl is added in mud2, straw quality is 15%, ZnCl of dewatered sludge quality2Quality is dewatered sludge matter The 10% of amount, three enters mixing bunker stirring homogenizing.Send into first order air-dry machine through conveying worm, so that material water ratio is dropped to 30%;Comminutor is sent into by conveying worm, adds coal tar and make binding agent, material is 1 with the mass ratio of coal tar:0.35, It is prepared into the cylinder of diameter 8mm, length 15mm;Second level air-dry machine is sent into by belt conveyor, so that material water ratio is dropped to 15%, so that molding materials temperature is improved to 320 DEG C simultaneously, decompose the CO producing2Together taken away by heat smoke with the moisture of evaporation. Dried molding materials send into pyrolysis oven by feed pipe, and pyrolysis temperature is 850 DEG C, and the time of staying is 40min.Pyrolysis gas Saturation scrubbing tower is discharged into by pyrolysis oven top, then the allocated valve is divided into three road combustion heat supplyings;Pyrolysis liquids enter condensation After device separation water, the tar loopback obtaining enters pyrolysis oven combustion heat supplying;Solid product coke after pyrolysis sends into activation furnace, activation Temperature is 800 DEG C, and soak time is 120min, and the quality of feeding density charcoal is 1 with the ratio of the volume flow of activated gas:17, obtain The activated carbon arriving sends into active sludge carbon warehouse, and a portion sends into activated carbon adsorber, as in adsorbent purifying smoke SO2、NOxDeng pollutant.
Pyrolysis gas and flue gas flow:The pyrolysis gas producing in pyrolysis oven are discharged by upper air vent, are introduced into saturation Scrubbing tower removes H2S、SO2Deng soluble contaminant gas, the warm water simultaneously producing 40 DEG C sends into gas-fired water heating boiler.Through washing The pyrolysis gas washed are divided into three tunnels by distributing valve, and a road loopback enters the combustor of pyrolysis oven, and burning provides energy needed for pyrolytic process Amount;The combustor of activation furnace is sent on one tunnel, and burning provides energy needed for activation process;Remaining pyrolysis gas sends into gas and hot water Boiler, combustion heat release produces 80 DEG C of hot water.The whole flue gases producing in pyrolysis oven, activation furnace combustor collect the entrance second level Air-dry machine, the allocated valve of flue gas that gas-fired water heating boiler produces, a part for supplement be dried needed for exhaust gas volumn collect entrance the The dry machine of light breeze, remaining flue gas enters after activated carbon adsorber purifies and discharges.Heat smoke flows out from second level air-dry machine, carries Vapor and CO2Enter first order air-dry machine afterwards, increase water vapour content further, so that vapor percent by volume is reached 50%, in the presence of air-introduced machine, enter activation furnace and prepare activated carbon, the allocated valve of flue gas of excess enthalpy is sent directly into activated carbon and inhales Attached tower purifies discharge.After activation, tail gas is discharged by activation furnace top, sends into after activated carbon adsorber purifies and discharges.
It will be appreciated from fig. 6 that raising with pyrolysis temperature, fuel gas total amount is gradually increased.Except three of the above fuel gas, Also produce the low carbon number hydrocarbon gas based on propylene, acetylene etc..When temperature is increased to 850 DEG C from 650 DEG C, pyrolysis gas are recyclable Heat increases to 5194kJ/kg (mud) from 3676kJ/kg (mud).
As shown in Figure 7, extend with pyrolysis time, pyrolytic process is more abundant, and product liquid also can occur secondary pyrolysis, Fuel gas total amount is increased, but increase tendency gradually slows down.When pyrolysis time reaches 50min, pyrolysis gas can return Receive heat and reach 4553kJ/kg (mud).Consider production efficiency and heat cost, under the conditions of pyrolytic process is more sufficient, Pyrolysis time can be shortened.
As shown in Figure 8, pyrolytic behavior is condensed, be separated from water and obtain tar, measures calorific value using high pressure oxygen bomb type calorimeter instrument. When pyrolysis temperature is increased to 850 DEG C from 650 DEG C, callable tar calorific value is gradually reduced, but it is (dirty to be above 6000kJ/kg Mud).
As shown in Figure 9, pyrolysis time affects very little to callable tar calorific value.
As shown in Figure 10, vapor percent by volume is 50%, CO2Percent by volume is 22%, the quality of feeding density charcoal Ratio with the volume flow of activated gas is 1:When 17,800 DEG C of activation obtain the BET specific surface area of active sludge carbon.Work as activation Time increases to 2h from 0.5h, and BET specific surface area first increases and reduces afterwards, reaches maximum in 1.5h.Thus, this utility model Control soak time in 40-120min.
As shown in Figure 11, vapor percent by volume is 50%, CO2Percent by volume is 22%, the quality of feeding density charcoal Ratio with the volume flow of activated gas is 1:When 17, at 700,800 and 900 DEG C, activation 1.5h obtains the BET of active sludge carbon Specific surface area.Increase with activation temperature, BET specific surface area first increases and reduces afterwards, reaches maximum when 800 DEG C.When temperature relatively When low, gas activation process can not fully be carried out;And temperature when reaching 900 DEG C, easily occurs reaming or hole wall to subside, thus reducing Activated carbon specific surface area.
Above this utility model is done with exemplary description it should illustrate, without departing from core of the present utility model In the case of the heart, any simple deformation, modification or other skilled in the art can not spend creative work etc. Each fall within protection domain of the present utility model with replacing.

Claims (8)

1. pyrolyzing sludge stove it is characterised in that:Collect dress including material inlet, feed valve, transmission chain, drive, scraper plate, coke Put, discharge port, pyrolytic behavior collecting board, pyrolysis liquor collecting device, liquid outlet, pyrolysis gas outlet, combustor, gas combustion Device, atomized liquid burner, flue gas comb and exhaust gases passes, are provided with described feed valve, institute in the bottom of described material inlet State transmission chain and be arranged on below described feed valve, described drive is arranged on described transmission chain two ends, receive in described coke It is provided with described scraper plate, described scraper plate is relative with one end of described transmission chain between acquisition means and described pyrolysis liquor collecting device Setting, is arranged on below described transmission chain in described pyrolytic behavior collecting board, arranges below described pyrolytic behavior collecting board State flue gas comb, described flue gas comb is uniformly arranged in below described pyrolytic behavior collecting board, and described exhaust gases passes are arranged on institute State above transmission chain, be provided with described combustor below described flue gas comb, described Inner Wall of Combustion Chamber is respectively provided with There are described gas burner and described atomized liquid burner, be provided with described material inlet opposite side in described exhaust gases passes Described pyrolysis liquor collecting device, is provided with described liquid outlet in the bottom of described pyrolysis liquor collecting device, in described pyrolysis Liquor collecting device side is provided with described coke collection device, and the bottom of described coke collection device is provided with described discharging Mouthful, the top side of described coke collection device is provided with described pyrolysis gas outlet.
2. pyrolyzing sludge stove according to claim 1 it is characterised in that:Described transmission chain includes chain main body, chain Groove, pyrolytic behavior groove and liquid collecting hole, are provided with described pyrolytic behavior groove in described chain main body both sides, in described pyrolytic behavior ditch The outside of groove is provided with described chain, is evenly arranged with described liquid collecting hole in described chain main body.
3. pyrolyzing sludge stove according to claim 2 it is characterised in that:Described liquid collecting hole includes cylindrical hole and trapezoidal hole, Described cylindrical hole is arranged on described trapezoidal hole, and described cylindrical hole and described chain main body touching position are provided with decussation Baffle plate.
4. pyrolyzing sludge stove according to claim 3 it is characterised in that:A diameter of 8-12mm of described cylindrical hole, described The height of cylindrical hole is 5-9mm.
5. pyrolyzing sludge stove according to claim 3 it is characterised in that:The bottom diameter of described trapezoidal hole is 20-35mm, The height of described trapezoidal hole is 5-9mm.
6. pyrolyzing sludge stove according to claim 1 it is characterised in that:The rear side of described flue gas comb is provided with flue gas Main pipe, described flue gas main pipe is connected with flue gas comb each described, and described flue gas main pipe is connected with described exhaust gases passes.
7. pyrolyzing sludge stove according to claim 1 it is characterised in that:Described flue gas comb includes flue gas pipe and connection Plate, described flue gas pipe be arranged in parallel, and described connecting plate is arranged between described flue gas pipe.
8. pyrolyzing sludge stove according to claim 7 it is characterised in that:The internal diameter of described flue gas pipe is 30-45mm.
CN201620916518.4U 2016-08-19 2016-08-19 Sludge pyrolysis stove Expired - Fee Related CN205953813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620916518.4U CN205953813U (en) 2016-08-19 2016-08-19 Sludge pyrolysis stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620916518.4U CN205953813U (en) 2016-08-19 2016-08-19 Sludge pyrolysis stove

Publications (1)

Publication Number Publication Date
CN205953813U true CN205953813U (en) 2017-02-15

Family

ID=57976636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620916518.4U Expired - Fee Related CN205953813U (en) 2016-08-19 2016-08-19 Sludge pyrolysis stove

Country Status (1)

Country Link
CN (1) CN205953813U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676574A (en) * 2018-07-16 2018-10-19 四川大宇中和农业科技发展有限公司 A kind of aerobic carbonization decomposition method of biomass and its device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108676574A (en) * 2018-07-16 2018-10-19 四川大宇中和农业科技发展有限公司 A kind of aerobic carbonization decomposition method of biomass and its device
CN108676574B (en) * 2018-07-16 2023-11-03 四川大宇中和农业科技发展有限公司 Biomass aerobic carbonization decomposition method and device thereof

Similar Documents

Publication Publication Date Title
CN105502876B (en) A kind of sludge indirect thermal drying tail gas utilizes system and drying method
CN104986934B (en) A kind of continous way sludge thermolysis process and device
CN104804775B (en) The method and system of domestic garbage pyrolysis gasification production combustible gas
CN204702642U (en) A kind of continous way Thermal decomposition device for sludge
CN105737162B (en) The house refuse low temperature pyrogenation system and method for Kernel-based methods decoupling and gas washing burning
CN205235984U (en) Low energy consumption saturation activated carbon regeneration system
CN106938881A (en) A kind of processing system and method for carbonaceous solids discarded object
CN204079738U (en) A kind of environmental protection, energy-saving sludge high temperature cabonization system
CN101508902A (en) Biomass fuel cycle gasifying device and method thereof
CN102786951B (en) Crude gas guiding device for coal pyrolyzing furnace
CN105018121B (en) Gas, tar and activated carton co-production system
CN107098559A (en) A kind of oily sludge is from heat supply Non-oxygen pyrolytic equipment and its method for pyrolysis
CN107723003B (en) Organic matter carbonization system and method thereof
CN205953813U (en) Sludge pyrolysis stove
CN106316034A (en) Sludge pyrolysis and carbon value reutilization co-treatment apparatus and method
CN107298517A (en) A kind of energy-efficient recycling sludge utilizes technique and system
CN104329676B (en) Fluid bed sludge incinerating system and processing method
CN204897829U (en) Cogeneration system of coal gas, tar and active carbon
CN106047382A (en) Automatic-dust-removal refuse pyrolysis and cracking system
CN204369820U (en) Biomass gasifying furnace waste heat comprehensive utilization system
CN110129077A (en) Pyrolytic process
CN203768193U (en) Vitrified sludge disposal system
CN205953812U (en) Sludge pyrolysis and carbon value resource concurrent processing equipment
CN205347174U (en) Utilize plus sludge drying of living beings and processing apparatus that carbomorphism combined together
CN206143142U (en) System for handle domestic waste

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20210819