CN205945020U CN201620914996.1U CN201620914996U CN205945020U CN 205945020 U CN205945020 U CN 205945020U CN 201620914996 U CN201620914996 U CN 201620914996U CN 205945020 U CN205945020 U CN 205945020U
Authority
CN
China
Prior art keywords
processing unit
central processing
module
phase
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620914996.1U
Other languages
Chinese (zh)
Inventor
姚文涛
林柯宇
尹国涛
李永胜
张本智
于子金
郭文涛
付晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Changyi Power Supply Co
State Grid Corp of China SGCC
Original Assignee
State Grid Shandong Electric Power Co Changyi Power Supply Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Changyi Power Supply Co, State Grid Corp of China SGCC filed Critical State Grid Shandong Electric Power Co Changyi Power Supply Co
Priority to CN201620914996.1U priority Critical patent/CN205945020U/en
Application granted granted Critical
Publication of CN205945020U publication Critical patent/CN205945020U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Breakers (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

The utility model discloses an intelligent circuit breaker of control load, including casing, incoming wire terminal and terminal outgoing lines, being connected with power module between two arbitrary phase lines in the casing, power module is connected with central processing unit, and the three phase line in the casing goes up to correspond and has concatenated circuit breaker normally closed contact, and circuit breaker normally closed contact has connected gradually circuit breaker trip coil and earth leakage protection module, and central processing unit is connected with the earth leakage protection module, still is equipped with overload terminal outgoing lines 2 device in the casing, central processing unit still is connected with three looks current sampling coil, and central processing unit still is connected with power consumption monitoring module, display module and PC customer end, no matter whether the power user connect is used the zero line, and central processing unit can both utilize 380v's voltage normally to work for the user can't walk around central processing unit's detection, thereby makes user loads all the time all in the control, avoids the power consumption of breaking a contract, has restrained the uncontrolled growth of platform district load effectively, has reduced the line loss index, has improved a platform district voltage quality.

Description

Control load intelligent breaker
Technical field
This utility model is related to a kind of electrical equipment technical field, more particularly, to a kind of control load intelligent breaker.
Background technology
Current limliting RCCB is used for controlling and protects low-voltage network, and current limliting RCCB of the prior art is main Be using low-pressure side 220v civil power as working power, above-mentioned intelligent breaker is primarily present following shortcoming, and user can be around Cross central processing unit controlling organization and carry out electricity consumption, make testing equipment inoperative, user mainly to realize by the following means 's:
1. zero line is around more type:Zero line from ammeter extraction after, not through current limliting RCCB but directly register one's residence, now Current limliting RCCB only introduces and has allotted three live wires.
2. zero line deletion form:Zero line although there being zero line to allot, but allots zero line not toward current limliting electric leakage after ammeter extraction Wiring on chopper, or ammeter do not allot zero line, now current limliting RCCB only has three live wires to enter, and the zero of exit Line performs practically no function, and the voltage entering customer charge terminal is 380V.
Both the above mode is all not provide zero line to current limliting RCCB, and this cheating makes control and monitor console area bear Lotus becomes uncontrollable, and transformator heavy duty, overloading happen occasionally, and serious overload is easily burnt transformator and cable, with When jeopardize high-tension line safe operation and low-voltage electricity transmission line, lead to line loss remain high, quality of voltage is low, badly influences residence The normal electricity consumption of people lighting consumer, not only cause unpredictable loss to electric company, and very disruptive supplies electricity consumption order Sequence.
Utility model content
Technical problem to be solved in the utility model be provide a kind of can limited load, anticreep, auxiliary expense control control Load intelligent breaker processed.
For solving above-mentioned technical problem, the technical solution of the utility model is:Control load intelligent breaker, including shell Body, described housing tip is provided with four input terminals connecting three-phase four-wire circuit, and described housing bottom corresponds to described inlet wire Terminal is provided with four outlet terminals, the electrical connection corresponding with described outlet terminal of described input terminal, appointing in described housing Be connected with power module between two phase lines of meaning, the electric power output of described power module be connected with central processing unit, described shell On internal three-phase line, correspondence is serially connected with the chopper normally-closed contact of gearing respectively, and described chopper normally-closed contact is connected with disconnected Road device tripping coil, described circuit breaker tripping coil is connected with leakage protection module, and described central processing unit is protected with described electric leakage Shield module connects, and is additionally provided with the overload trip protection device being connected with described leakage protection module in described housing;Described housing Inside it is additionally provided with the arrearage tripping operation modular device being connected with described leakage protection module;Described housing is outer to be correspondingly provided with three-phase line Three phase current sample coil, described phase current sample coil is connected to the process of described central authorities by phase current signal modular converter Device, the outfan of described central processing unit is also associated with power consumption monitoring module and display module, and described display module is flush-mounted in The surface of described housing, described central processing unit is connected to pc client by going back communication module.
As preferred technical scheme, described overload trip protection device includes the zero-sequence current being provided with described housing Sample coil, described zero-sequence current sample coil connects to described leakage protection module.
As preferred technical scheme, described three-phase four-wire circuit includes phase line A, phase line B and phase line C and zero line N, It is connected with zero line leakage testses branch road between described central processing unit and described zero line N.
As preferred technical scheme, described zero line leakage testses branch road includes the safety electricity being connected on described zero line N The outfan of resistance R, described safe Resistance R is connected with leakage testses button K, and the wire of described leakage testses button K outfan is even It is connected in any one phase line, described leakage testses button K both sides are parallel with button actions control circuit, described button actions control Connection processed is flush-mounted on described housing to described central processing unit, described leakage testses button K.
As preferred technical scheme, described power consumption monitoring module includes mis module of marketing, described marketing mis module Outfan be connected with intelligent electric meter, described intelligent electric meter is installed in described housing.
As preferred technical scheme, described pc client includes processor, hard disk, internal memory and system bus.
As preferred technical scheme, described communication module be set to based on wired communication interface or based on GPRS, EDGE, The wireless communication interface of WLAN, Wi-Fi, 3G, 4G technology.
Due to employing technique scheme, control load intelligent breaker, including housing, described housing tip is provided with even Connect four input terminals of three-phase four-wire circuit, the corresponding described input terminal in described housing bottom is provided with four outlet terminals, The electrical connection corresponding with described outlet terminal of described input terminal, is connected with electricity between any two phase lines in described housing Source module, the electric power output of described power module be connected with central processing unit, right respectively on the three-phase line in described housing The chopper normally-closed contact of gearing should be serially connected with, described chopper normally-closed contact is connected with circuit breaker tripping coil, described open circuit Device tripping coil is connected with leakage protection module, and described central processing unit is connected with described leakage protection module, in described housing It is additionally provided with the overload trip protection device being connected with described leakage protection module;Described housing is outer and three-phase line is correspondingly provided with three Individual phase current sample coil, described phase current sample coil is connected to the process of described central authorities by phase current signal modular converter Device, the outfan of described central processing unit is also associated with power consumption monitoring module and display module, and described display module is flush-mounted in The surface of described housing, described central processing unit is connected to pc client by going back communication module;Beneficial effect of the present utility model It is really:After above-mentioned technological means, power user uses zero line regardless of whether connecing, and central processing unit can utilize the electricity of 380V Pressure carries out normal work so that user cannot bypass the detection of central processing unit, so that customer charge is all the time all in monitoring, Avoid promise breaking electricity consumption, the uncontrolled growth of containment Liao Tai area load, reduces line losses indices, improve platform area voltage matter effectively Amount, in addition, also add power consumption control function, that is, takes control function, using tripping mechanism and the marketing system of chopper And gauge table cooperation, achievable arrearage trip remotely function, the risk of big power family owing electricity charges can be effectively prevented from.
Brief description
The following drawings is only intended to, in this utility model is done with schematic illustration and explanation, not limit model of the present utility model Enclose.Wherein:
Fig. 1 is the easy structure schematic diagram of this utility model embodiment;
Fig. 2 is the structured flowchart of this utility model embodiment;
Fig. 3 is the circuit theory diagrams of this utility model embodiment;
In figure:1- housing;2- input terminal;3- outlet terminal;4- central processing unit;5- chopper normally-closed contact.
Specific embodiment
With reference to the accompanying drawings and examples, this utility model is expanded on further.In the following detailed description, only pass through to say Bright mode describes some one exemplary embodiment of the present utility model.Undoubtedly, those of ordinary skill in the art is permissible Recognize, in the case of without departing from spirit and scope of the present utility model, can by with various different in the way of to described Embodiment is modified.Therefore, accompanying drawing and description are inherently illustrative, rather than for limiting the protection of claim Scope.
As shown in Figure 1, Figure 2 and Figure 3, control load intelligent breaker, including housing 1, described housing 1 top is provided with connection Four input terminals 2 of three-phase four-wire circuit, the corresponding described input terminal 2 in described housing 1 bottom is provided with four outlet terminals 3, described input terminal 2 and described outlet terminal 3 pass through guiding and correspond electrically connect, formed phase line in described housing 1 and Zero line.
It is connected with power module between any two phase lines in described housing 1, the electric power of described power module is defeated Go out is connected with central processing unit 4, and the present embodiment does power supply using arbitrarily biphase in three-phase firewire, will described central processing unit Power supply powered by original 220v and be changed to 380v and power, make power user use zero line regardless of whether connecing, described central processing unit Can normal work so that user cannot bypass the detection of described central processing unit so that customer charge is all the time all in prison In control, it is to avoid the phenomenon of promise breaking electricity consumption.
On three-phase line in described housing 1, correspondence is serially connected with the chopper normally-closed contact 5 of gearing, described chopper respectively Normally-closed contact 5 is connected with circuit breaker tripping coil, and described circuit breaker tripping coil is connected with leakage protection module, described centre Reason device is connected with described leakage protection module, is additionally provided with, in described housing 1, the overload trip being connected with described leakage protection module Protection device, described overload trip protection device includes the zero-sequence current sample coil being provided with described housing 1, described zero sequence Current sampling coil connects to described leakage protection module.The outfan of described central processing unit is also associated with display module, institute State the surface that display module is flush-mounted in described housing 1, each sample coil is it can also be provided that current transformer.In described housing also It is provided with the arrearage tripping operation modular device being connected with described leakage protection module.
Described housing 1 is outer and three-phase line is correspondingly provided with three phase current sample coil, and described phase current sample coil is led to Cross phase current signal modular converter to connect to described central processing unit, the electric current sensing is believed by described phase current signal modular converter Number be changed into the digital signal that described central processing unit is capable of identify that, described three-phase four-wire circuit include phase line A, phase line B and Phase line C and zero line N, are connected with zero line leakage testses branch road, described zero line electric leakage between described central processing unit and described zero line N Test branch road includes the safe Resistance R being connected on described zero line N, and the outfan of described safe Resistance R is connected with leakage testses Button K, the wire of described leakage testses button K outfan connects to any one phase line, described leakage testses button K both sides It is parallel with button actions control circuit, described button actions control circuit connects to described central processing unit, described leakage testses Button K is flush-mounted on described housing 1.
The outfan of described central processing unit is also associated with power consumption monitoring module, and described central processing unit passes through also to communicate Module connects to pc client.Described power consumption monitoring module includes mis module of marketing, the outfan of described marketing mis module It is connected with intelligent electric meter, described intelligent electric meter is installed in described housing 1.Described arrearage tripping operation modular device is located at described intelligence In ammeter, it is the technical scheme in described technical field known to those of ordinary skill, here no longer describes in detail.Described PC visitor Family end includes processor, hard disk, internal memory and system bus, and described communication module is set to based on wired communication interface or is based on The wireless communication interface of GPRS, EDGE, WLAN, Wi-Fi, 3G, 4G technology.
Electricity on described central processing unit, power supply is taken from civil power 380v and is powered, described central processing unit initialization, described display Module display limits power initial value, starts the aobvious parameter such as each phase voltage, electric current, active power of wheel afterwards.
Operationally, circulation respectively shows A, B, C three-phase voltage, size of current and current system to described display module Power.Information content passes through LED group of four figures pipe video data in turn.4 LED data pipe from left to right first expression classes Not, A represents A phase;B represents B phase;C represents C phase;P represents power, second and third, four, for current data measured, system is surveyed Current unit be ampere (A), power unit be kilowatt (kW).
In upper electricity, whether the LED numeral method of described display module self-inspection four first is correct, system loads numeral The display time of 0~9 each 500 milliseconds of numeral, after the completion of numeral loads, described display module reads the current power setting Value, show value represents the current-limited power such as 10kW of current setting, after power exceedes this setting value, equipment delay adjustmentses when Between (in delay time still overload power utilization), be then cut off power supply, after this video data shows 1 second, system enters normal work Make state.
During normal work, LED group of four figures pipe takes turns aobvious electric current and power respectively, and data is from A phase, B phase, C phase and power P Show respectively, such as A:10.1 represent that A phase current current system measured value is that (this data is due to systematic error, general and real for 10.1A Actual value has 5% error amount);B15.6 represents that B phase current current system measured value is 15.6A;C12.4 represents that C phase current is current Measured value is 12.4A;P8.20 represents that current power power is 8.20kW.
The operation principle of the present embodiment is:
Carry out the current sampling of phase line by three phase current sample coil, and pass through described phase current signal modular converter It is sent to described central processing unit, by described central processing unit computing output and numerical value is carried out by described display module and show.
Customer parameter utilizes software editing good through pc client, is issued to described central authorities by communicating serial ports or wireless network In processor (customer parameter includes rated power, overload power, allows overload time etc.), when customer charge is normal, from institute State the next signal of phase current sample coil sampling to make comparisons with the customer parameter of described central processing unit memory storage, if detection ginseng Number runs well less than the rated power of customer parameter, then equipment;If it exceeds the rated power of customer parameter, but it is less than Overload power, then described central processing unit start timing, when load exceed rated power but be not above set permission overload Time recovers normal, then next overload time is from zero meter;When based model for load duration exceedes rated power and exceedes the permission of setting After the load time, then described central processing unit sends trip command, by described leakage protection module and described circuit breaker tripping line Circle carries out safety trip.
When customer charge directly exceedes overload power, then described central processing unit directly sends trip command.Described central authorities Processor sends trip command and connects described zero line leakage testses branch road by described leakage protection module, so that zero-sequence current is sampled Coil midstream crosses out-of-balance current, so that described leakage protection module judges that system has electric leakage and sends trip command, control Making described circuit breaker tripping coil to connect, so that tripping mechanism is tripped thus disconnecting user's power supply.
The described central processing unit of the present embodiment passes through three described phase current sample coil detection load, to judge user Power load size, when user power utilization load exceedes assumed load value and during not less than maximum, described central processing unit starts Timing, when based model for load duration is constant, timing time reaches setting value and trips, when customer charge exceedes maximum, by described Central processing unit directly sends trip command, controls customer charge with this.
The present embodiment mainly realizes following functions:
First, short-circuit protection.When overload, are short-circuited in protected circuit or user equipment, phase current sample coil In flow through larger current, drive circuit breaker tripping coil to complete instantaneous trip action, thus cut off the electricity supply playing overload or short circuit Protective effect.
2nd, earth leakage protective.When having in by protection circuit phase line grounding or the person to get an electric shock, as long as residual current reaches adjusting Working value, zero-sequence current sample coil just exports a signal, under the control of described leakage protection module, drives chopper to take off Fastening wire circle completes instantaneous trip action, starts electric leakage and electrical shock protection effect.
After above-mentioned technological improvement, the present embodiment can bring following benefit:
First, improve power supplying efficiency.The effectively uncontrolled growth of containment platform area load, reduces the damage that circuit increases because of overload Consumption, reduces transformator heavy duty, the generation of overload situations, improves the controllability of load and orderly development, alleviate power supply enterprise with Electric power distribution transforming increase-volume pressure during electric peak.
2nd, save power supply cost.All of electric cost, finally can embody by way of finance are settled accounts with cash Out, do not cause other expenses to rise and increase extra work amount.Cause to transformator as increased load because user is unordered The demand of capacity increases, and the investment of increase-volume and labour cost;Increase load because user is unordered and cause transformator heavy duty, overload The line loss loss bringing increases, the loss such as quality of voltage decline;Increasing load because user is unordered causes transformator overload to burn out Replacing and labour cost etc..
3rd, improve power supply quality.There is provided stable electric power, effective control line losses indices for electrical equipment, improve platform area electricity Pressure quality.
4th, arrearage trip avoidance function.The expense control function of newly increasing, with described marketing mis system and gauge table cooperation, can achieve Arrearage trip remotely function, thus being prevented effectively from the risk of big power family owing electricity charges, saves manpower output.
After above-mentioned technological means, power user uses zero line regardless of whether connecing to the present embodiment, and central processing unit can Carry out normal work using the voltage of 380V so that user cannot bypass the detection of central processing unit, so that customer charge begins Eventually all in monitoring, it is to avoid promise breaking electricity consumption, the uncontrolled growth of containment Liao Tai area load, reduces line losses indices, carries effectively Gao Liaotai area quality of voltage, in addition, also add power consumption control function, that is, takes control function, using the tripping operation of chopper Mechanism and marketing system and gauge table cooperation, achievable arrearage trip remotely function, can be effectively prevented from big power family and be in arrears with electricity The risk taken, it is to avoid the uncertain factor urged expense and produce of manually visiting, reduce artificial export, be effectively prevented from urging expense process In the phenomenon such as the complaint that causes with user's confusing communication generation.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have been shown and described above.One's own profession The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model is also Have various changes and modifications, these changes and improvements both fall within the range of claimed this utility model.This utility model Claimed scope is by appending claims and its equivalent thereof.

Claims (7)

1. control load intelligent breaker, including housing it is characterised in that:Described housing tip is provided with connection three-phase four-wire system line Four input terminals on road, the corresponding described input terminal in described housing bottom is provided with four outlet terminals, described input terminal with The corresponding electrical connection of described outlet terminal, is connected with power module, described electricity between any two phase lines in described housing The electric power output of source module be connected with central processing unit, on the three-phase line in described housing respectively correspondence be serially connected with gearing Chopper normally-closed contact, described chopper normally-closed contact is connected with circuit breaker tripping coil, and described circuit breaker tripping coil connects There is leakage protection module, described central processing unit is connected with described leakage protection module, be additionally provided with described housing and described leakage The overload trip protection device that electric protection module connects;It is additionally provided with the arrearage being connected with described leakage protection module in described housing Tripping operation modular device;Described housing is outer and three-phase line is correspondingly provided with three phase current sample coil, described phase current sample line Circle is connected to described central processing unit by phase current signal modular converter, and the outfan of described central processing unit is also associated with using Electricity monitoring module and display module, described display module is flush-mounted in the surface of described housing, and described central processing unit passes through also Communication module connects to pc client.
2. as claimed in claim 1 control load intelligent breaker it is characterised in that:Described overload trip protection device includes The zero-sequence current sample coil being provided with described housing, described zero-sequence current sample coil connects to described earth leakage protective mould Block.
3. as claimed in claim 1 control load intelligent breaker it is characterised in that:Described three-phase four-wire circuit includes phase Line A, phase line B and phase line C and zero line N, are connected with zero line leakage testses branch road between described central processing unit and described zero line N.
4. as claimed in claim 3 control load intelligent breaker it is characterised in that:Described zero line leakage testses branch road includes It is connected to the safe Resistance R on described zero line N, the outfan of described safe Resistance R is connected with leakage testses button K, described leakage The wire of electrical testing button K outfan connects to any one phase line, and described leakage testses button K both sides are parallel with button and move Make control circuit, described button actions control circuit connects to described central processing unit, and described leakage testses button K is flush-mounted in institute State on housing.
5. the control load intelligent breaker as described in claim 1,2,3 or 4 it is characterised in that:Described power consumption monitors mould Block includes mis module of marketing, and the outfan of described marketing mis module is connected with intelligent electric meter, and described intelligent electric meter is installed on institute State in housing.
6. as claimed in claim 5 control load intelligent breaker it is characterised in that:Described pc client include processor, Hard disk, internal memory and system bus.
7. as claimed in claim 6 control load intelligent breaker it is characterised in that:Described communication module is set to be based on to be had Line communication interface or the wireless communication interface based on GPRS, EDGE, WLAN, Wi-Fi, 3G, 4G technology.
CN201620914996.1U 2016-08-19 2016-08-19 Intelligent circuit breaker of control load Expired - Fee Related CN205945020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620914996.1U CN205945020U (en) 2016-08-19 2016-08-19 Intelligent circuit breaker of control load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620914996.1U CN205945020U (en) 2016-08-19 2016-08-19 Intelligent circuit breaker of control load

Publications (1)

Publication Number Publication Date
CN205945020U true CN205945020U (en) 2017-02-08

Family

ID=57948661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620914996.1U Expired - Fee Related CN205945020U (en) 2016-08-19 2016-08-19 Intelligent circuit breaker of control load

Country Status (1)

Country Link
CN (1) CN205945020U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106253218A (en) * 2016-08-19 2016-12-21 国网山东省电力公司昌邑市供电公司 Control load intelligent breaker

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106253218A (en) * 2016-08-19 2016-12-21 国网山东省电力公司昌邑市供电公司 Control load intelligent breaker

Similar Documents

Publication Publication Date Title
CN204649834U (en) A kind of integral and intelligent electric energy meter with leakage current monitoring and protecting function
CN108859830A (en) A kind of power-supply management system of electric automobile charging pile intelligent power distribution and the charging pile for having the system
CN207354054U (en) The electric power system of online power equipment monitoring system
CN201893540U (en) Intelligent radio network dispatching digital-type boundary controller complete equipment
CN105811553B (en) A kind of family expenses quick charge device and its control method
CN205945020U (en) Intelligent circuit breaker of control load
CN100508099C (en) Portable analog circuit breaker
CN105048562A (en) Direct-current charging pile
CN201341023Y (en) High pressure switch intelligent measuring, controlling and protecting device for underground coal mine
CN104467050A (en) Charging and discharging control method and device for storage battery
CN204858159U (en) Smart jack case with network and state monitoring
CN206416866U (en) Portable charging energy-storing system
CN206471821U (en) Low-voltage network neutral line break detects protection device
CN106059094B (en) Distribution substation's transformer energy saving control system and method
CN106253218A (en) Control load intelligent breaker
CN105186457B (en) Motor Protective Device
CN201289990Y (en) Multifunctional low voltage distribution box
CN114204529A (en) Mobile temporary overcurrent protection device and method
CN208707129U (en) Intelligent distribution box
CN209608566U (en) A kind of CT machine brake
CN208257173U (en) 16 control loop intelligent distribution boxes
CN205092825U (en) Monitoring devices for photovoltaic energy storage battery
CN110320414A (en) It is a kind of applied to the precharge Phase sequence detection of single-phase SVG and guard method and device
CN206077066U (en) Distribution substation's transformer energy saving control system
CN202276130U (en) Prepayment device protection unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee