CN205936641U - A hinge shi kamo for construction of tunnel secondary lining - Google Patents

A hinge shi kamo for construction of tunnel secondary lining Download PDF

Info

Publication number
CN205936641U
CN205936641U CN201620459776.4U CN201620459776U CN205936641U CN 205936641 U CN205936641 U CN 205936641U CN 201620459776 U CN201620459776 U CN 201620459776U CN 205936641 U CN205936641 U CN 205936641U
Authority
CN
China
Prior art keywords
die body
hinge
upper die
tunnel
lower mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620459776.4U
Other languages
Chinese (zh)
Inventor
万永昌
张建平
兰文庆
王建兴
李文辉
王海杰
邹红有
庞尔林
宿春亮
钟锐锋
曾志新
李桂兰
余寿伦
掲木雄
温裕芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN201620459776.4U priority Critical patent/CN205936641U/en
Application granted granted Critical
Publication of CN205936641U publication Critical patent/CN205936641U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a hinge shi kamo for construction of tunnel secondary lining connects on the platform truck, include last die body and lower die body, go up the die body and all include baffle and splint with lower die body that baffle and splint alternately are angle connector, be equipped with between the splint of the splint of going up the die body and die body down and be used for realizing going up die body and the first ear of articulated hinge between the die body down, the splint of last die body when the splint of die body are parallel under with formation be used for the clamping structure of the tight waterstop of clamp, down the baffle of die body is connected with platform truck end gusset, and one side of platform truck end gusset is equipped with and is used for last die body and descends the roof pressure structure that the die body compressed tightly to the platform truck orientation. The utility model provides a bury in the current tunnel lining construction seam that formula waterstop construction process is complicated, the inefficiency not high technical problem of construction quality again.

Description

A kind of hinge-type snap gauge for Tunnel Second Lining Construction
Technical field
The utility model is related to technical field of tunnel construction, is used for Tunnel Second Lining Construction more particularly, to a kind of Hinge-type snap gauge.
Background technology
Tunnel lining concrete is all using formwork jumbo, relatively early stage tunnel lining concrete gang form stand construction work Skill improves a lot, and after tunnel completion, the problem of lining cutting percolating water is greatly reduced, and a small amount of seepage part occurring is concentrated mainly on The waterproof measure at construction joint position is carried out at construction joint position, and tunnel-liner seepage problem can be greatly reduced.
There is a problem of in buried rubber water-proof belt construction in lining construction seam most be the pre-buried position of waterstop not It is centered about being forbidden to fix loosely, workmen does not notice that finished product protection is arbitrarily bored a hole, poor attachment repaired by waterstop, and these are disobeyed Rule way weakens the waterproof effect of waterstop, and after rectification, waterproof effect also can decrease.
Tunnel waterstop construction quality is not high, positioning loosely, punch position repeatedly occur the problems such as forbidden, sink to abjection, Can not only be explained with the poor reason of field management.Present on mounting process, problem causes to management The dependence of level, the fluctuation of management intensity causes the fluctuation of quality, and it is inevitable for going wrong, from technological design Big degree ground eliminates the dependence to human factor, is the only way improving waterstop installation quality.
Utility model content
The utility model provides a kind of hinge-type snap gauge for Tunnel Second Lining Construction, solves existing tunnel lining cutting and applies Buried water stop complicated construction technique, inefficiency and the not high technical problem of construction quality in work seam.
The utility model provides a kind of hinge-type snap gauge for Tunnel Second Lining Construction, is connected on chassis, closes Page snap gauge includes upper die body and lower mold body, and upper die body and lower mold body all include baffle plate and clamping plate, and baffle plate and cleat are in angle Degree connects;It is provided between the clamping plate of upper die body and the clamping plate of lower mold body for realizing hinged first between upper die body and lower mold body Ear cuts with scissors, and forms the clamp structure for clamping waterstop when parallel in the clamping plate of upper die body and the clamping plate of lower mold body;Lower mold body Baffle plate and chassis termination link of boards, the side of chassis termination gusset is provided with for pressing upper die body and lower mold body to chassis direction Tight top pressure structure.
Further, top pressure structure includes the stand tube being detachably arranged on the gusset of chassis termination, and stand tube is near platform The side of car termination gusset removably intersects and is provided with reinforcing pipe, and reinforcing pipe is used for applying towards platform on upper die body and lower mold body The pressure in car direction is to compress upper die body, lower mold body and chassis termination gusset.
Further, it is provided with for realizing hinged at least one second between the baffle plate of lower mold body and chassis termination gusset Ear cuts with scissors, and the second ear hinge includes mould under the fixed part being connected on the gusset of chassis termination and being connected to matching with the first articulated section Rotating part on the baffle plate of body.
Further, the baffle plate of the upper die body side relative with chassis is fitted with for adapting to touching of secondary lining thickness Top template.
Further, the tactile top template side relative with the baffle plate of upper die body connects at least one angle steel by securing member, Top pressure structure is passed through angle steel and tactile top template and is applied pressure to upper die body.
Further, the side that tactile top template is used for contacting with tunnel roof arranges rounded, shaped form or linear pattern, with The tactile top template of realization is fitted with tunnel roof.
Further, chassis termination gusset is provided with U-shaped for mounting bracket pipe, V-arrangement, rectangle or circular buckle.
Further, the baffle plate of upper die body welds at least one standing screw, after tactile top template and angle steel perforate successively It is socketed on standing screw.
Further, it is provided with one or more reinforcings between top pressure structure and upper die body, lower mold body and chassis termination gusset Template.
Further, vertically connect between baffle plate and clamping plate, the clamping plate of upper die body is pasted when parallel with the clamping plate of lower mold body Close.
The beneficial effects of the utility model:
The utility model is used for the hinge-type snap gauge of Tunnel Second Lining Construction, by the cooperation shape of upper die body and lower mold body Middle buried water stop is tiled and clamps by the clamp structure becoming, and can prevent middle buried water stop from occurring during Second Lining Construction Positioning loosely, sink to the phenomenons such as abjection, construction quality and waterproof effect are effectively ensured.Meanwhile, the utility model hinge-type snap gauge Upper die body and lower mold body between, unload modulo operation all very convenient, pole die-filling construction before and construction after hinged using ear hinge The earth reduces to the operation level of operating personnel and the requirement of personal experience, buried water stop work progress control in effectively strengthening System, is greatly improved operating efficiency.
Brief description
The accompanying drawing constituting the part of the application is used for providing further understanding to of the present utility model, of the present utility model Schematic description and description is used for explaining the utility model, does not constitute to improper restriction of the present utility model.In accompanying drawing In:
Fig. 1 is that the utility model embodiment is used for buried water stop in the hinge-type snap gauge clamping of Tunnel Second Lining Construction Structural representation;
Fig. 2 is the construction technology process of the hinge-type snap gauge that the utility model embodiment is used for Tunnel Second Lining Construction Figure.
Reference:
10th, upper die body;20th, lower mold body;31st, baffle plate;32nd, clamping plate;40th, the first ear hinge;50th, chassis termination gusset;61st, prop up Frame pipe;62nd, reinforcing pipe;63rd, buckle;70th, the second ear hinge;71st, fixed part;72nd, rotating part;80th, touch top template;90th, angle steel; 91st, standing screw;92nd, reinforcing template;93rd, middle buried water stop.
Specific embodiment
To describe the utility model below with reference to the accompanying drawings and in conjunction with the embodiments in detail.It should be noted that not conflicting In the case of, the embodiment in the application and the feature in embodiment can be mutually combined.
With reference to Fig. 1, the utility model provides a kind of hinge-type snap gauge for Tunnel Second Lining Construction, is connected to platform Che Shang, hinge-type snap gauge includes upper die body 10 and lower mold body 3120, and upper die body 10 and lower mold body 3120 all include baffle plate and clamping plate 32, baffle plate and clamping plate 32 intersect angled connection;It is provided with use between the clamping plate 32 of upper die body 10 and the clamping plate 32 of lower mold body 3120 In realizing hinged the first ear hinge 40 between upper die body 10 and lower mold body 3120, in clamping plate 32 and the lower mold body 3120 of upper die body 10 Clamping plate 32 parallel when form clamp structure for clamping waterstop;The baffle plate of lower mold body 3120 is with chassis termination gusset 50 even Connect, the side of chassis termination gusset 50 is provided with for tying upper die body 10 and lower mold body 3120 to the top pressure that chassis direction compresses Structure.
The utility model is used for the hinge-type snap gauge of Tunnel Second Lining Construction, by upper die body 10 and lower mold body 3120 Middle buried water stop 93 is tiled clamping by the clamp structure cooperatively forming, and can prevent middle buried water stop 93 in Second Lining Construction During occur positioning loosely, sink to the phenomenons such as abjection, construction quality and waterproof effect are effectively ensured.Meanwhile, the utility model Adopt ear hinge hinged between the upper die body 10 of hinge-type snap gauge and lower mold body 3120, the mould unloading behaviour after die-filling and construction before construction Make all very convenient, significantly reduce to the operation level of operating personnel and the requirement of personal experience, greatly reduce people For the impact to buried water stop 93 construction quality at secondary lining arch wall circular construction joint for the factor, in effectively strengthening buried only Water band 93 construction process control, is greatly improved operating efficiency.
More preferably, upper die body 10 is connected using square steel with lower mold body 3120, and hinge-type snap gauge is welded in secondary lining chassis Form an entirety with chassis on gusset, when carrying out Second Lining Construction, can according to the actual requirements hinge-type snap gauge be carried out Upper and lower stir, and chassis forward and backward walking when nor affect on the semi-finished product of construction, the quality of finished product.
Actual size according to tunnel cross-section and shape, the upper die body to the utility model preferred embodiment hinge-type snap gauge 10 carry out that targeted design is linear or arc, can be closely connected with tunnel roof with the baffle plate upper end ensureing upper die body 10.
More preferably, upper die body 10 and lower mold body 3120 are made using the steel plate thick not less than 5mm, and the first ear hinge 40 adopts 5- 15mm steel plate cuts, and ear hinge pin hole adopts drill hole of drilling machine, aperture Φ 22, connect the ear pin of the first ear hinge 40 using M20 × 65mm bolt, upper die body 10 is 10-30cm it is ensured that middle buried water stop 93 can be put down with clamping plate 32 width of lower mold body 3120 Paving is clamped between upper die body 10 and lower mold body 3120, and after hinge-type snap gauge is removed, clamped middle buried water stop 93 parts expose termination concrete surface.
Further, top pressure structure includes the stand tube 61 being detachably arranged on chassis termination gusset 50, stand tube 61 Removably intersect near the side of chassis termination gusset 50 and be provided with reinforcing pipe 62, reinforcing pipe 62 is used in upper die body 10 and lower mould Pressure towards chassis direction is applied on body 3120 to compress upper die body 10, lower mold body 3120 and chassis termination gusset 50.
More specifically, stand tube 61 is mounted on chassis termination gusset 50, apply towards chassis to reinforcing pipe 62 The pressure in direction, the pressure that this reinforcing pipe 62 is born is further transferred to upper die body 10 and lower mold body 3120.
More preferably, stand tube 61 and reinforcing pipe 62 adopt the seamless steel pipe of Φ 30- Φ 100.More preferably, steel pipe is arranged to reality The heart, improves its mechanical strength further.
Further, it is provided with for realizing hinged at least one between the baffle plate of lower mold body 3120 and chassis termination gusset 50 Individual second ear hinge 70, the second ear hinge 70 is included the fixed part 71 being connected on chassis termination gusset 50 and is matched with the first articulated section The rotating part 72 on the baffle plate being connected to lower mold body 3120 closing.
By this kind of mode, lower mold body 3120 can overturn so that the utility model hinge by chassis termination gusset 50 relatively Formula snap gauge can obtain more flexibly using, and the installation and removal operation of hinge-type snap gauge is easier.
More preferably, on chassis termination gusset 50, mark is provided with the predeterminated position for welding the second ear hinge 70, with further Height apart from secondary lining inner edge after middle buried water stop 93 tiling during guarantee Second Lining Construction.
Further, the baffle plate of upper die body 10 side relative with chassis is fitted with for adapting to secondary lining thickness Tactile top template 80.
By this kind of mode, for during different tunnel cross-section or during same section diverse location to tactile backform Plate 80 carries out specific aim processing, closely connected with tunnel roof to ensure tactile top template 80.
More preferably, tactile top template 80 is fabricated to 3-10cm thickness using wood, and the more big then mechanical strength of thickness is bigger, and thickness is got over Little, it is easier to machining.
Meanwhile, touch top template 80 and reach scheme with the closely connected effect of tunnel basal plane, this practicality by this kind of direct replacement Other structures part in addition to tactile top template 80 for the new preferred embodiment hinge-type snap gauge all can reuse it is not necessary to right Upper die body 10 carries out additional designs processing, effectively save cost, especially adopts the hard metals such as steel plate rigidity material in upper die body 10 In the case that material makes, machining is more simple, and operating efficiency is higher.
Further, tactile top template 80 side relative with the baffle plate of upper die body 10 connects at least one angle by securing member Steel 90, top pressure structure is passed through angle steel 90 and tactile top template 80 and is applied pressure to upper die body 10.
By this kind of mode, the lifting surface area of tactile top template 80 and equilibrium degree can be effectively increased it is ensured that touching top template 80 not Deformation can be produced because layout pressure is uneven.
More preferably, angle steel 90 adopts the L-shaped steel plate of 50 × 50mm to connect and makes.
Further, the side that tactile top template 80 is used for contacting with tunnel roof arranges rounded, shaped form or linear pattern, To realize touching fitting of top template 80 and tunnel roof.
By this kind of mode, the utility model preferred embodiment adapts to any tunnel cross-section size and dimension, and to same The change of Tunnel Engineering secondary lining thickness and preliminary bracing irregularity strong adaptability.
Alternatively, the actual conditions that operating personnel can change according to lining thickness in operation field, enter to tactile top template 80 Row cutting processing, to ensure that touching top template 80 is fitted tightly with tunnel roof.
Further, chassis termination gusset 50 is provided with U-shaped for mounting bracket pipe 61, V-arrangement, rectangle or circular buckle 63.
According to the different shape of stand tube 61, then the corresponding buckle of shape 63 therewith is set, to reaching optimal consolidating Determine effect.
More preferably, each unit situation according to Tunnel Second Lining, the ring arc length of the utility model hinge-type snap gauge sets It is set to 50-80cm.
Further, the baffle plate of upper die body 10 welds at least one standing screw 91, tactile top template 80 and angle steel 90 are opened It is socketed on successively on standing screw 91 behind hole.
More preferably, it is welded in the diameter of bolt chi for fixing angle steel 90 and tactile top template 80 on the baffle plate of upper die body 10 Very little for M10-M30.Tactile top template 80 is consistent with Bolt sizes with the bore size on angle steel 90, and tactile top template 80 is socketed on The baffle plate of die body 10 and the centre of angle steel 90.More specifically, being inserted on bolt, angle steel is after 90s to tighten nut so that touching top template 80 are fitted tightly with the baffle plate of upper die body 10 and angle steel 90.
Further, be provided between top pressure structure and upper die body 10, lower mold body 3120 and chassis termination gusset 50 one or Multiple reinforcing templates 92.
More preferably, reinforcing template 92 be arranged at reinforcing pipe 62 in top pressure structure and chassis termination gusset 50 upper die body 10, Ground gap between lower mold body 3120, wedging each several part, so that secondary lining chassis forms an entire combination reinforcement system, enters one Step ensures the compression effect of top pressure structure.
Further, vertically connect between baffle plate and clamping plate 32, the clamping plate of the clamping plate of upper die body 10 32 and lower mold body 3120 32 fit when parallel.
More specifically, L-shaped connection between baffle plate and clamping plate 32.
Wherein, hinge-type snap gauge construction technology can be divided into following key step:
The first step, according to design document Tunnel Second Lining size, type and its thickness, the design of secondary lining arch wall is each Unit arc length, two lining lining cutting arch wall ring total arc length design hinge-type snap gauge drawings;
Second step, hinge-type snap gauge and secondary lining chassis synchronous processing;
3rd step, hinge-type snap gauge is welded in secondary lining chassis termination gusset 50;
4th step, at secondary lining arch wall circular construction joint in buried water stop 93 install, be fixed under hinge-type snap gauge Between portion's punching block and upper part steel moulds;
5th step, the integral reinforcing of hinge-type snap gauge each Component composition system.
More specifically, hinge-type snap gauge construction technology process refers to Fig. 2.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.All of the present utility model spirit and principle Within, any modification, equivalent substitution and improvement made etc., should be included within protection domain of the present utility model.

Claims (10)

1. a kind of hinge-type snap gauge for Tunnel Second Lining Construction, is connected on chassis it is characterised in that described hinge-type Snap gauge includes upper die body (10) and lower mold body (20), described upper die body (10) and described lower mold body (20) all include baffle plate (31) and Clamping plate (32), described baffle plate (31) and described clamping plate (32) intersect angled connection;The clamping plate (32) of described upper die body (10) with It is provided between the clamping plate (32) of lower mold body (20) for realizing hinged at least one between upper die body (10) and lower mold body (20) First ear hinge (40), forms when the clamping plate (32) of described upper die body (10) and the clamping plate (32) of described lower mold body (20) are parallel and uses Clamp structure in clamping waterstop;The baffle plate (31) of described lower mold body (20) is connected with described chassis termination gusset (50), institute The side stating chassis termination gusset (50) is provided with for pressing described upper die body (10) and described lower mold body (20) to chassis direction Tight top pressure structure.
2. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 1 is it is characterised in that described top pressure Structure includes the stand tube (61) being detachably arranged on described chassis termination gusset (50), and described stand tube (61) is near chassis The side of termination gusset (50) removably intersects and is provided with reinforcing pipe (62), and described reinforcing pipe (62) is used in described upper die body And the upper pressure applying towards chassis direction of described lower mold body (20) is to compress upper die body (10), lower mold body (20) and chassis (10) Termination gusset (50).
3. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 1 is it is characterised in that described lower mould It is provided between the baffle plate (31) of body (20) and described chassis termination gusset (50) for realizing hinged at least one second ear hinge (70), described second ear hinge (70) include being connected to fixed part (71) on described chassis termination gusset (50) and with described fixation What portion (71) matched is connected to the rotating part (72) on the baffle plate (31) of described lower mold body (20).
4. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 1 is it is characterised in that described upper mould The side that the baffle plate (31) of body (10) is relative with chassis is fitted with the tactile top template (80) for adapting to secondary lining thickness.
5. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 4 is it is characterised in that described tactile top Template (80) side relative with the baffle plate (31) of upper die body (10) connects at least one angle steel (90), described top by securing member Laminated structure passes through described angle steel (90) and tactile top template (80) and applies pressure to described upper die body (10).
6. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 4 is it is characterised in that described touch The side that top template (80) is used for contacting with tunnel roof arranges rounded, shaped form or linear pattern, to realize touching top template (80) with the fitting of tunnel roof.
7. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 2 is it is characterised in that described chassis Termination gusset (50) is provided with U-shaped, V-arrangement, rectangle or the circular buckle (63) for installing described stand tube (61).
8. the hinge-type snap gauge for Tunnel Second Lining Construction according to claim 5 is it is characterised in that described upper mould The baffle plate (31) of body (10) is upper to weld at least one standing screw (91), described tactile top template (80) and described angle steel (90) perforate It is socketed on successively afterwards on described standing screw (91).
9. according to the arbitrary described hinge-type snap gauge for Tunnel Second Lining Construction of claim 1 to 7 it is characterised in that It is provided with one or more adding between described top pressure structure and described upper die body (10), lower mold body (20) and chassis termination gusset (50) Solid model plate (92).
10. according to the arbitrary described hinge-type snap gauge for Tunnel Second Lining Construction of claim 1 to 7 it is characterised in that Vertically connect between described baffle plate (31) and clamping plate (32), the clamping plate (32) of described upper die body (10) and described lower mold body (20) Clamping plate (32) is fitted when parallel.
CN201620459776.4U 2016-05-18 2016-05-18 A hinge shi kamo for construction of tunnel secondary lining Active CN205936641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620459776.4U CN205936641U (en) 2016-05-18 2016-05-18 A hinge shi kamo for construction of tunnel secondary lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620459776.4U CN205936641U (en) 2016-05-18 2016-05-18 A hinge shi kamo for construction of tunnel secondary lining

Publications (1)

Publication Number Publication Date
CN205936641U true CN205936641U (en) 2017-02-08

Family

ID=57934239

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620459776.4U Active CN205936641U (en) 2016-05-18 2016-05-18 A hinge shi kamo for construction of tunnel secondary lining

Country Status (1)

Country Link
CN (1) CN205936641U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060833A (en) * 2017-06-23 2017-08-18 浙江科技学院 Any intersection vault lining construction template of type variable underground engineering
CN107762536A (en) * 2017-11-02 2018-03-06 中铁四局集团第二工程有限公司 A kind of reinforcement means of new tunnel lining trolley step plug and the plug
CN109461387A (en) * 2018-12-27 2019-03-12 苏州宝洪泰电子有限公司 Interior liquid crystal display screen support front frame
CN110778335A (en) * 2019-11-06 2020-02-11 甘肃路桥第四公路工程有限责任公司 Tunnel secondary lining buried water stop belt installation device and construction method
CN113356891A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining formwork trolley end-sealing construction method
CN113356892A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining template trolley end sealing system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060833A (en) * 2017-06-23 2017-08-18 浙江科技学院 Any intersection vault lining construction template of type variable underground engineering
CN107762536A (en) * 2017-11-02 2018-03-06 中铁四局集团第二工程有限公司 A kind of reinforcement means of new tunnel lining trolley step plug and the plug
CN107762536B (en) * 2017-11-02 2024-03-19 中铁四局集团有限公司 Novel stepped plug of tunnel lining trolley and reinforcing method of plug
CN109461387A (en) * 2018-12-27 2019-03-12 苏州宝洪泰电子有限公司 Interior liquid crystal display screen support front frame
CN110778335A (en) * 2019-11-06 2020-02-11 甘肃路桥第四公路工程有限责任公司 Tunnel secondary lining buried water stop belt installation device and construction method
CN110778335B (en) * 2019-11-06 2021-03-12 甘肃路桥第四公路工程有限责任公司 Tunnel secondary lining buried water stop belt installation device and construction method
CN113356891A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining formwork trolley end-sealing construction method
CN113356892A (en) * 2021-07-19 2021-09-07 中铁一局集团有限公司 Tunnel secondary lining template trolley end sealing system
CN113356891B (en) * 2021-07-19 2022-04-01 中铁一局集团有限公司 Tunnel secondary lining formwork trolley end-sealing construction method

Similar Documents

Publication Publication Date Title
CN205936641U (en) A hinge shi kamo for construction of tunnel secondary lining
CN207194268U (en) The repeatable steel bar truss floor support plate utilized of bed die
CN106014446B (en) A kind of reinforcement means of enhancing high ground stress soft rock stress tunnel inverted arch structural stability
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN110424380A (en) The accurate guide construction method of cast-in-situ bored pile
CN107524461A (en) A kind of device and method for improving Tunnel Second Lining ring waterstop waterproof effect
CN107191006B (en) Dismantling and repairing method for refractory concrete layer of diversion trench
CN105862859A (en) Thick steel bar prestress anchor rod tensioning method
CN205934915U (en) Staple bolt tensioning equipment of crude steel muscle stock
CN204024068U (en) A kind of hoisting steel pipe pillar concrete connection control device
CN104153464A (en) Steel pipe concrete jacking inserting plate type control device and method for connecting steel pipe concrete jacking inserting plate type control device to steel pipe column
CN201620602U (en) Preburied sleeve
CN208792746U (en) A kind of expansion joint regularization same tool steel plate template
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN109098456A (en) A kind of aluminum alloy pattern plate Transfer pipe molding machine and construction method
CN212506641U (en) Drainage ditch regularization mould
CN213114883U (en) Frock for concrete placement based on drainage ditch of falling trapezoidal form
CN201155209Y (en) Three-way corner formwork core belt
CN205778915U (en) A kind of soft bridging arrangement of concrete lining trolley
CN101954544B (en) Preparation method of 1250-ton crawler crane supporting box
CN209682483U (en) The hydraulic gliding model lower part automatic hydraulic pull rod device of T beam
CN107327082A (en) Suspension type adjustable steel bar split heads
CN207847151U (en) The telescopic support device to cornice for installing exterior wall
CN211690361U (en) Staple bolt formula steel shotcrete connection structure
CN201627203U (en) Revolvable ground anchor device for single-side support form

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant