CN105862859A - Thick steel bar prestress anchor rod tensioning method - Google Patents

Thick steel bar prestress anchor rod tensioning method Download PDF

Info

Publication number
CN105862859A
CN105862859A CN201610358822.6A CN201610358822A CN105862859A CN 105862859 A CN105862859 A CN 105862859A CN 201610358822 A CN201610358822 A CN 201610358822A CN 105862859 A CN105862859 A CN 105862859A
Authority
CN
China
Prior art keywords
stretch
anchor
draw
anchor ear
blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610358822.6A
Other languages
Chinese (zh)
Inventor
胡井友
胡锦伟
李孝华
胡锦辉
刘兵
王咸东
马举俊
黄望来
田俊
李海鹏
侯国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd
Original Assignee
KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd filed Critical KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201610358822.6A priority Critical patent/CN105862859A/en
Publication of CN105862859A publication Critical patent/CN105862859A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques

Abstract

The invention discloses a thick steel bar prestress anchor rod tensioning and locking method. According to the method, main components comprise a thick steel bar anchor rod (100), a concrete waist beam or a box iron waist beam (200), an anchor bearing plate (300), a locking welding-assisting steel bar (400), a tensioning split head (500), a hoop normal tensioning system (600), a hoop blade (601, a hoop blade (602), a tensioning assisting threaded rod (603), tensioning assisting nuts (604), high-strength blade connection bolts (605), a first hoop blade engagement groove (606), a second hoop blade engagement groove (6-7), an oil jack (700) and a tensioning assisting anchor bearing plate (800). After the hoop normal tensioning system (600) is connected with the thick steel bar anchor rod (100) through the hoop blade engagement grooves (606 and 607), tensile stress can be transferred, all mechanisms are combined and connected for prestress construction, the method is easy to operate in the construction process, the defect that in a traditional method, every anchor rod needs a threaded rod is overcome, and thus the project investment is reduced.

Description

A kind of bar reinforcement prestressed anchor method for stretching
Technical field
The present invention relates to field of civil engineering, the stretch-draw of a kind of bar reinforcement prestressed anchor, locking means.
Background technology
In Supporting Structure of Deep Foundation Pit in City, consider engineering geology hydrologic condition, local environmental conditions, construction investment During the factors such as cost, not every Deep Foundation Pit Supporting Project all uses " campshed+anchor cable (inner support) " supporting scheme, it is possible to adopt Using Composition Soil Nailing Walls scheme, meet surrounding enviroment protection requirement for controlling foundation pit deformation, outer anchor structure can arrange crude steel Rib prestressed anchor pole, controls foundation pit deformation.During bar reinforcement anchor pole Shi Hanzhang, conventional method uses draws anchor section to weld outside reinforcing bar Connect tensioning screw rod, after punching jack tension, use nut to be fixed.During practice of construction, by tensioning screw rod With the factor such as bar reinforcement anchor pole poor welding quality, the most concentric, stretch-draw segment length difficulty control, the prestressing force of applying does not reaches anticipated effect Really.
Therefore, bar reinforcement prestressed anchor method for stretching needs constantly to discuss, and sums up a kind of operation in practice Simplicity, effect substantially, does not waste the method for resource.
Summary of the invention
In view of the above problems, it is proposed that a kind of tensioning fixation method using hood type, the method is without welding stretch-draw spiral shell Bar, after anchor ear locking, can directly use jack to carry out stretch-draw, after Shi Hanzhang, uses the solid welding of two reinforcing bar sides due to anchor On backing plate.
The present invention is a combined type inventive technique.Main member is 100: bar reinforcement anchor pole;200: concrete breast beam or Channel-section steel waist rail;300: anchor plate;400: locking side welding steel muscle;500: stretch-draw split heads 600: Hold Hoop method tensioning system;601: anchor ear Blade 1;602: anchor ear blade 2;603: stretch-draw auxiliary threaded rod;604: stretch-draw auxiliary nut;605: blade connects high-strength bolt; 606: anchor ear blade occlusal crib 1;607: anchor ear blade occlusal crib 2;700: hydraulic jack;800: stretch-draw piggy-back anchor backing plate.
One aspect of the present invention, it is provided that an anchor ear system 600, can sting completely with the termination of bar reinforcement anchor pole 100 It is combined, can not slip during stretch-draw, the changing of the relative positions.Stretch-draw anchor ear includes: anchor ear blade 601 and 602 with ribbing, and 2 blades are by height Strong spiral 605 connects fixing, anchor ear blade (601 and 602) internal orifice arrange with spiral with ribbing formed male and female groove rib mouth 606, 607 (band tooth mouth is engaged spiral), smear quartz sand in female groove rib mouth, increase between anchor ear blade and spiral Frictional force.A stretch-draw auxiliary threaded rod 603, the screw rod 603 welded and crude steel is welded in one of them flap of anchor ear blade Muscle 100 axle center is corresponding, is connecting side welding steel plate, is eliminating stress mutation, and spiro rod length and screw position are according to stretch-draw jack 700 Highly it is adjusted, screw rod arranges 2 nuts, when stretch-draw, fixes anchor slab.Anchor ear system 600 act as can be by bar reinforcement Bond, during Shi Hanzhang, effectively transmit tension.Any device being similar to use anchor ear mode to transmit tension, belongs to This scope of patent protection.
One aspect of the present invention a, it is provided that split heads 500 coordinating stretch-draw, is a punching split heads, can be by anchor ear Blade is placed in one, and tensioning screw rod passes split heads.Split heads is by three block plate welding productions, and two end plates directly acts on prestressing force On the locking backing plate of anchor pole, top end plate needs perforate, and as tensioning screw rod through the passage of split heads, split heads ensures enough strong Degree, rigidity.
One aspect of the present invention, is the construction method of stretch-draw bar reinforcement anchor pole: purlin is enclosed in bar reinforcement anchorage body, anchoring After 200 reach curing period, it is firm stretch-draw anchor ear system 600 to be connected with bar reinforcement anchor pole 100 termination, and then the stretch-draw body of rod passes Split heads 500, arranges stretch-draw jack 700 outside split heads 500, arrange steel plate and fixing nut, it is provided that stretch-draw outside jack 700 Counter-force.Bar reinforcement anchor pole 100, by after jack 700 Shi Hanzhang, uses two locking side welding steel muscle 400 and bar reinforcement anchor Bar 100 helps solid welding to schedule on stretch-draw anchor slab, and stretching process terminates.
Beneficial effects of the present invention: one for without to arrange silk mouth or weld in termination in spiral stretch-draw termination Tensioning screw rod, work progress is easy, reduces the difficulty of stretch-draw terminal filament mouth finished product protection.It two is equal without every bar reinforcement anchor pole A tensioning screw rod need to be welded, decrease material usage, cost saving.
Accompanying drawing explanation
Accompanying drawing is only used for showing the purpose of preferred embodiments, and limitation of the present invention when being not regarded as, whole attached In figure, use different digital codings to represent different parts, its specification, model are not done qualitative description, to some parts, portion Part change and replacing, all in scope.
Fig. 1 is all parts scheme of installation of the present invention.
Fig. 2 is anchor ear system band tooth mouth anchor ear blade drawing of the present invention.
Fig. 3 is that anchor ear system of the present invention is connected drawing with bar reinforcement anchor pole.
Detailed description of the invention
In conjunction with accompanying drawing content, the implementation process of the present invention is discussed in detail.
Chief technology point of the present invention is the method for stretching of prestressed thick reinforcement anchor pole, the processing of bar reinforcement anchor rod body, Pore-forming, slip casting, maintenance, not in key technology, are not described in detail.
After bar reinforcement anchor bolt construction completes, require smooth domatic according to design, construction concrete breast beam or channel-section steel waist rail 200, after the 75% of waist rail concrete curing to design strength, stretch-draw can be carried out.
Before stretch-draw, anchor ear system 600 should be debugged, the anchor ear blade occlusal crib during wherein key point is anchor ear system (606 and 607), according to bar reinforcement anchor pole rib tooth technical parameter, the anchor ear blade occlusal crib of processing correspondence is (with the single crude steel of Φ 25 As a example by muscle anchor pole).
Nominal diameter d=25.0mm, internal diameter d1=24.2mm, cross rib height h=2.1mm, cross rib width b=1.5mm, longitudinal rib height h1= 2.6mm, longitudinal rib width a=2.5mm, cross rib spacing l=12.5mm, cross rib and axis angle are 60 °.
According to above parameter, using thickness is the processing of 15mm steel plate and spiral cross rib angle, spacing, width, thickness Consistent anchor ear system anchor ear blade.For ensureing that bar reinforcement is substantially corresponding with auxiliary tensioning screw rod 603 axle center, anchor ear occlusal crib is cut Cut open about groove depth 5mm, in groove, process profile of tooth occlusal crib corresponding with spiral.
After the anchor ear blade occlusal crib (606 and 607) of two anchor ear blades (601 and 602) and correspondence machines, will open Auxiliary threaded rod 603 is drawn to be welded as a whole with anchor ear blade, stretch-draw auxiliary threaded rod a length of jack height+200mm.
Stretch-draw split heads 500 is as aid when stretch-draw, and major function is to provide the stretch-draw platform of jack, and examines The space of locking bar reinforcement anchor pole is reserved after considering stretch-draw.
After hydraulic jack 700 edits, coordinate with oil pressure pump, can Shi Hanzhang.
After above-mentioned work completes, bar reinforcement anchor pole 100 is placed in one by two anchor ear blades (601 and 602), uses blade Connecting high-strength bolt to be fastened by anchor ear blade, bar reinforcement anchor pole 100 and two anchor ear blades (601 and 602) form entirety.
Complete above-mentioned work [020], by punching stretch-draw split heads 500 through stretch-draw auxiliary threaded rod 603, act on and poured On the waist rail that maintenance completes, and being installed by hydraulic jack 700 with on the platform of stretch-draw split heads 500, the jack other end is arranged Stretch-draw subbolster 800, after using stretch-draw auxiliary nut 604 fastening outside backing plate, bar reinforcement anchor rod prestress tensioning system shape Become.Refer to accompanying drawing 1 " all parts scheme of installation of the present invention ".
Complete above-mentioned work [021], can be pushed up by oil jack 700 by design requirement and bar reinforcement anchor pole 100 classification is opened Drawing, and carry out by code requirement stable, final employing two helps welding steel muscle 400, side with bar reinforcement anchor pole 100 with the locking of diameter Being welded on bar reinforcement anchor pole, locking side welding steel muscle 400 and anchor plate 300 reliable contacts, locking, prestress application terminates.
The above, only a kind of embodiment in the present invention, single protection scope of the present invention is not limited thereto, and is similar to Use anchor ear mode to transmit the device of tension, belong to this scope of patent protection.

Claims (10)

1. the present invention is a combined type inventive technique, it is characterised in that main member is 100: bar reinforcement anchor pole;200: coagulation Soil waist rail or channel-section steel waist rail;300: anchor plate;400: locking side welding steel muscle;500: stretch-draw split heads 600: Hold Hoop method tensioning system; 601: anchor ear blade 1;602: anchor ear blade 2;603: stretch-draw auxiliary threaded rod;604: stretch-draw auxiliary nut;605: blade connects height Strength bolt;606: anchor ear blade occlusal crib 1;607: anchor ear blade occlusal crib 2;700: hydraulic jack;800: stretch-draw assists Anchor plate.
The most according to claim 1, it is characterised in that stretch-draw combined system provides an anchor ear system 600, can with slightly The termination of reinforced anchor bolt 100 is fully engaged against together, can not slip, the changing of the relative positions during stretch-draw.
3. stretch-draw anchor ear includes: anchor ear blade 601 and 602 with ribbing, and 2 blades connect fixing by high-strength spiral 605, anchor ear leaf Sheet (601 and 602) internal orifice arranges and forms male and female groove rib mouth 606,607 (band tooth mouth is engaged spiral) with spiral with ribbing, In female groove rib mouth, smear quartz sand, increase the frictional force between anchor ear blade and spiral.
4. in one of them flap of anchor ear blade, weld a stretch-draw auxiliary threaded rod 603, the screw rod 603 welded and bar reinforcement 100 axle center are corresponding, connecting side welding steel plate, eliminating stress mutation, spiro rod length and screw position high according to stretch-draw jack 700 Degree is adjusted, and screw rod arranges 2 nuts, fixes anchor slab when stretch-draw.
5. anchor ear system 600 act as being bonded by bar reinforcement, effectively transmits tension during Shi Hanzhang.
The most any device being similar to use anchor ear mode to transmit tension, belongs to this scope of patent protection.
The most according to claim 1, it is characterised in that provide a split heads 500 coordinating stretch-draw, be a punching split heads, Can be placed in one by anchor ear blade, tensioning screw rod passes split heads.
8. split heads is by three block plate welding productions, and two end plates directly acts on the locking backing plate of prestressed anchor, top end Plate needs perforate, and as tensioning screw rod through the passage of split heads, split heads ensures enough intensity, rigidity.
9. it is single component and combination described in claim 1, claim 2, claim 3, it is characterised in that with reference to the accompanying drawings 1 " all parts scheme of installation of the present invention " carries out each component installation.
10., according to claim 4 content, it is characterised in that the construction method of a kind of bar reinforcement anchor pole, step is:
A. according to design bar reinforcement anchor pole 100 technical parameter, anchor ear blade (601 and 602) and the occlusion of anchor ear blade are machined Groove (606 and 607), and be connected with stretch-draw auxiliary threaded rod 603, stretch-draw auxiliary nut 604, blade high-strength bolt 605 connect after, shape Become stretch-draw anchor ear system 600;B. each component installation is carried out according to the inventive method;C. require bar reinforcement anchor pole is executed according to design Prestressing;D. locking side welding steel muscle 400 is used to be locked by bar reinforcement anchor pole 100.
CN201610358822.6A 2016-05-27 2016-05-27 Thick steel bar prestress anchor rod tensioning method Pending CN105862859A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610358822.6A CN105862859A (en) 2016-05-27 2016-05-27 Thick steel bar prestress anchor rod tensioning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610358822.6A CN105862859A (en) 2016-05-27 2016-05-27 Thick steel bar prestress anchor rod tensioning method

Publications (1)

Publication Number Publication Date
CN105862859A true CN105862859A (en) 2016-08-17

Family

ID=56642119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610358822.6A Pending CN105862859A (en) 2016-05-27 2016-05-27 Thick steel bar prestress anchor rod tensioning method

Country Status (1)

Country Link
CN (1) CN105862859A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185269A (en) * 2019-05-09 2019-08-30 上海市政建设有限公司 A kind of bar reinforcement pre-stress stretching device and method
CN110905569A (en) * 2019-11-28 2020-03-24 国家电网有限公司 Prestressed anchor rod tensioning device
CN110984174A (en) * 2019-12-06 2020-04-10 石家庄铁道大学 Bolt anchor node for open cut foundation pit purlin enclosing structure
CN111411625A (en) * 2020-05-11 2020-07-14 江苏景源万河环境科技有限公司 Post-tensioned prestressing force applying device of anchor rod

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3827519B2 (en) * 2000-10-27 2006-09-27 鹿島建設株式会社 Anchor head water stop method
CN202705900U (en) * 2012-07-18 2013-01-30 鄂州恺鑫铸业有限公司 Stayed-cable bridge stayed-cable anchor pull rod cast steel cable clamp body
CN103321220A (en) * 2012-03-19 2013-09-25 深圳市工勘岩土工程有限公司 Stretching method and device of prestressed anchor cable
CN103422676A (en) * 2013-07-30 2013-12-04 中煤科工集团西安研究院 Device for evenly tensioning anchor cable
CN104047287A (en) * 2014-05-26 2014-09-17 江苏金海新能源科技有限公司 Prestressed sleeve self-lock anchor rod
CN203905974U (en) * 2014-06-26 2014-10-29 河北联合大学 High-pretightening anchor rod tensioning device
CN204882242U (en) * 2015-07-31 2015-12-16 河南理工大学 Experimental quick detachable ground tackle device is drawn to laboratory stock
CN204875782U (en) * 2015-06-08 2015-12-16 北京市勘察设计研究院有限公司 Device that carries out stretch -draw and locking to prestressed anchorage pole of muscle of giving first place to with reinforcing bar
CN205934915U (en) * 2016-05-27 2017-02-08 昆明军龙岩土工程有限公司 Staple bolt tensioning equipment of crude steel muscle stock

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3827519B2 (en) * 2000-10-27 2006-09-27 鹿島建設株式会社 Anchor head water stop method
CN103321220A (en) * 2012-03-19 2013-09-25 深圳市工勘岩土工程有限公司 Stretching method and device of prestressed anchor cable
CN202705900U (en) * 2012-07-18 2013-01-30 鄂州恺鑫铸业有限公司 Stayed-cable bridge stayed-cable anchor pull rod cast steel cable clamp body
CN103422676A (en) * 2013-07-30 2013-12-04 中煤科工集团西安研究院 Device for evenly tensioning anchor cable
CN104047287A (en) * 2014-05-26 2014-09-17 江苏金海新能源科技有限公司 Prestressed sleeve self-lock anchor rod
CN203905974U (en) * 2014-06-26 2014-10-29 河北联合大学 High-pretightening anchor rod tensioning device
CN204875782U (en) * 2015-06-08 2015-12-16 北京市勘察设计研究院有限公司 Device that carries out stretch -draw and locking to prestressed anchorage pole of muscle of giving first place to with reinforcing bar
CN204882242U (en) * 2015-07-31 2015-12-16 河南理工大学 Experimental quick detachable ground tackle device is drawn to laboratory stock
CN205934915U (en) * 2016-05-27 2017-02-08 昆明军龙岩土工程有限公司 Staple bolt tensioning equipment of crude steel muscle stock

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185269A (en) * 2019-05-09 2019-08-30 上海市政建设有限公司 A kind of bar reinforcement pre-stress stretching device and method
CN110905569A (en) * 2019-11-28 2020-03-24 国家电网有限公司 Prestressed anchor rod tensioning device
CN110984174A (en) * 2019-12-06 2020-04-10 石家庄铁道大学 Bolt anchor node for open cut foundation pit purlin enclosing structure
CN111411625A (en) * 2020-05-11 2020-07-14 江苏景源万河环境科技有限公司 Post-tensioned prestressing force applying device of anchor rod

Similar Documents

Publication Publication Date Title
CN106677069B (en) A kind of construction method of bridge pier integral formwork support one-shot forming structure
CN103088920B (en) Pre-tensioning prestressed composite beam structural system and construction method thereof
CN105862859A (en) Thick steel bar prestress anchor rod tensioning method
CN106120568B (en) The construction method of cross a river Main Bridge bridge pier secondary locking temporary consolidation structure
CN201007041Y (en) Concrete prefabricated element hanging connecting mechanism
CN107401113B (en) Stiff skeleton straining beam structure and construction method built in a kind of high pier
CN105484142B (en) A kind of pin-connected panel precast segment concrete hollow slab beam structure and preparation method thereof
CN103194972B (en) Construction method for cable-stayed bridge cable guiding pipe with pipe opening extending out of tower wall
CN110206143A (en) A kind of construction method of post-stressed assembly concrete frame structure
CN108678218A (en) Assembly concrete shear wall and its method of construction based on multipurpose thin-wall steel tube
CN112012491A (en) Construction method for slow bonding prestress
CN201539106U (en) Beam-column joint reinforced structure adopting enlarging section method
CN113605771A (en) Prestress assembly type frame structure system
CN110528778B (en) Novel tensile shear steel-concrete composite beam structure and manufacturing process thereof
CN108214837A (en) Precast prestressed floor production mould, production equipment and production technology
CN205934915U (en) Staple bolt tensioning equipment of crude steel muscle stock
CN102251481B (en) Railway pier layered construction method and construction device
CN102733308B (en) Method for connecting steel guide girder with box girder
CN112482569A (en) Construction method and structure of three-direction unbonded prestressed crossed beam-column joint
CN112144859A (en) Prefabricated laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN106149546A (en) Steel rubber concrete combined bridge beam slab
CN207452684U (en) Stiff skeleton straining beam structure built in high pier
CN106835966A (en) A kind of construction method of partial prestressing bridge expanssion joint changeover portion
CN202493386U (en) External prestressing steel and concrete wind power tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160817

RJ01 Rejection of invention patent application after publication