CN205936634U - Big section joint rock mass subway tunnel supporting construction of little clean distance - Google Patents

Big section joint rock mass subway tunnel supporting construction of little clean distance Download PDF

Info

Publication number
CN205936634U
CN205936634U CN201620694180.2U CN201620694180U CN205936634U CN 205936634 U CN205936634 U CN 205936634U CN 201620694180 U CN201620694180 U CN 201620694180U CN 205936634 U CN205936634 U CN 205936634U
Authority
CN
China
Prior art keywords
steelframe
tunnel
faces
anchor pole
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620694180.2U
Other languages
Chinese (zh)
Inventor
阳长江
杨翔
张庆明
翟旭茹
张志飞
江真
李丽琴
王淼
谢永辉
汪兆明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING JIANGONG MUNICIPAL TRANSPORTATION PROJECT Co Ltd
Priority to CN201620694180.2U priority Critical patent/CN205936634U/en
Application granted granted Critical
Publication of CN205936634U publication Critical patent/CN205936634U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a big section joint rock mass subway tunnel supporting construction of little clean distance belongs to tunnel construction technical field for solve the strut problem of joint rock mass subway tunnel in the work progress. It includes preliminary bracing and the temporary support who goes on the tunnel, and tunnel cross section includes left and right pilot tunnel and be located the main cave between the left and right pilot tunnel, the preliminary bracing is including first stock and a first steelframe, just props up the inside and outside top -cross of steelframe for arranging permanent longitudinal tie muscle, props up just that the steelframe is inboard to spray permanent inlayer concrete, just props up the steelframe outside and sprays permanent outer concrete, temporary support is including facing a stock and facing a steelframe, face steelframe and be located main cave both sides vertical layout, face the inside and outside top -cross of a steelframe for arranging interim longitudinal tie muscle, face that a steelframe is inboard to spray an interim inlayer concrete, face the outer interim outer concrete of suface jet of a steelframe. The utility model discloses the tunnel supporting structure can the effective control country rock the deformation, guarantee the construction safety in tunnel.

Description

Small interval big cross section jointed rock mass subway tunnel supporting construction
Technical field
The utility model belongs to Construction of City Tunnel field, is related to the supporting construction of Tunnel in Jointed Rock Mass, specifically, is A kind of for two-wire small interval big cross section jointed rock mass subway tunnel pass through intersect double -side approach construction method adopted Protection structure.
Background technology
With the development of the city, city rail is built just in high speed development, nearly all provincial capital and partly economically developed Area is all building track traffic.Build track traffic in city, be greatly tunnel.First work of tunnel excavation Sequence is rock excavation, and in digging process, whether country rock is stable, and in addition to wall rock geology condition and excavation method, tunnel props up Shield measure has vital effect during tunnel excavation.
For the large cross-section tunnel in the stratum of joint, because it has obvious joints characteristics, for ensureing to prop up Shield effect, its excavation step is more complicated, and therefore its supporting construction relative difficult, for the existing skill of support system of jointed rock mass It is few that art refers to, easily causes STRESS VARIATION frequently using the supporting construction in general tunnel excavation, vault sinking, earth's surface are sunk The problem of fall, the application to formulate suitable supporting construction mainly for intersecting double -side approach method.
Content of the invention
There is a problem of that tunnel support structure cannot be applied to Tunnel in Jointed Rock Mass for prior art, the utility model carries Supply a kind of supporting construction for small interval big cross section jointed rock mass subway tunnel.
For realizing above-mentioned technical purpose, the technical solution adopted in the utility model is as follows:
A kind of small interval big cross section jointed rock mass subway tunnel supporting construction, including the preliminary bracing that tunnel is carried out with face When supporting, tunnel cross sectional include left and right base tunnel and be located at left and right base tunnel between main hole.
Described preliminary bracing includes:It is located at arch wall both sides after left and right excavation with guide pit and be located at vault after leading wide open digging Just an anchor pole and just a steelframe, a described just anchor pole is in that blossom type is arranged, a described just steelframe is circumferentially disposed along arch wall and vault, Just inside and outside a steelframe, side is alternately arranged forever longitudinally connected muscle, just props up the thick permanent internal layer coagulation of injection 40 ~ 60mm inside steelframe Soil, just props up and hangs permanent bar-mat reinforcement outside steelframe, and sprays the thick permanent outer concrete of 260 ~ 300mm;
Described gib includes:It is located at facing an anchor pole and facing a steelframe of main hole both sides after left and right excavation with guide pit, described Facing an anchor pole is in that blossom type is arranged, a described steelframe that faces is vertically arranged positioned at main hole both sides, faces side inside and outside a steelframe and is alternately arranged Longitudinally connected muscle temporarily, faces the thick temporarily interior layer concrete of injection 20 ~ 30mm inside a steelframe, faces to prop up a steelframe outer surface and hang and faces Prop up bar-mat reinforcement, and spray the thick interim outer concrete of 200 ~ 250mm.
Using the tunnel support structure of technique scheme, by reasonable setting anchor rod system, flexible steel frame system, inside and outside The composite lining structure such as layer concrete, can provide certain pre- allowance to surrouding rock deformation, prevent supporting construction from causing simultaneously Stress frequently change, vault sinking, ground settlement the problems such as, thus reducing construction risk.
Limit further, a described just anchor pole adopts C25 hollow grouting anchor, and ring, longitudinal pitch are 1.0m × 0.5m, long Spend for 5 ~ 6m.
Limit further, a described just steelframe adopts work 25b profile steel frame, and longitudinal pitch is 0.5m, forever longitudinally connected Muscle adopts work C25 reinforcing bar, and circumferential distance is 1m.
Limit further, a described anchor pole that faces adopts C22 grouting rock bolt, and ring, longitudinal pitch are 1.0m × 0.5m, and length is 2~3m.
Limit further, a described steelframe that faces adopts work 22a profile steel frame, and longitudinal pitch is 0.5m, temporarily longitudinally connected Muscle adopts work C22 reinforcing bar, and circumferential distance is 1m.
Compared to existing technology, the tunnel surrounding that can allow in big cross section jointed rock mass produces 120mm's to the utility model Deformation, significantly alleviates and intersects the safe pressure that in two side-wall pilot tunnel work progress, supporting construction is subject to, reduce construction wind Danger.
Brief description
Fig. 1 is tunnel support structure schematic diagram;
Fig. 2 is concrete pouring structure schematic diagram.
A steelframe, 21- forever interior layer concrete, 22- forever longitudinally connected muscle, the permanent outer layer of 23- at the beginning of an anchor pole, 2- at the beginning of 1- Concrete, 3- faces an anchor pole, and 4- faces a steelframe, 41- interior layer concrete temporarily, 42- longitudinally connected muscle temporarily, the interim outer layer of 43- Concrete.
Specific embodiment
In order that those skilled in the art may be better understood the present invention, with reference to the accompanying drawings and examples to this reality Further illustrated with new technique scheme.
" longitudinal " described in the utility model refers to the direction that tunnel passage extends, and multiple tunnels passage is along longitudinally head and the tail Connect and form tunnel, certainly, tunnel can be straight, can also be curved;Arbitrary cross section of tunnel passage and tunnel passage Curve obtained from surface is intersecting is ring curve, and multiple ring curves parallel to each other form tunnel passage along longitudinal arrangement Ring inner surface, the ring inner surface left and right sides is arch wall, and upper end arc top is vault.
As shown in Figure 1, 2, a kind of small interval big cross section jointed rock mass subway tunnel supporting construction, including carry out to tunnel Preliminary bracing and gib, tunnel cross sectional includes left and right base tunnel A, B and is located at left and right main hole C between base tunnel A, B.
Described preliminary bracing includes:Positioned at first anchor pole 1 and the first steelframe 2 of ring inner surface, in work progress, its Mainly to complete in two steps, first step is to be located at the first anchor that arch wall both sides are installed after left and right base tunnel A, B excavate Bar 1 and just a steelframe 2, second step formed be master is wide open dig after be located at the first anchor pole 1 that vault installs and a first steelframe 2, a described just anchor pole 1 is in that blossom type is arranged, using C25 hollow grouting anchor, circumferential distance is 1.0m, and longitudinal pitch is 0.5m, just propping up anchor pole 1 length is 5 ~ 6m, preferably 6m;A described just steelframe 2 is circumferentially disposed along arch wall and vault, and it adopts work 25b Profile steel frame, longitudinal pitch is 0.5m, just props up side inside and outside steelframe 2 and is alternately arranged work C25 forever longitudinally connected muscle 22, between its ring Away from for 1m, just propping up the thick forever interior layer concrete 21 of steelframe 2 inner side injection 40 ~ 60mm, just prop up and outside steelframe 2, hang double-deck A8 steel Muscle net(Spacing 150mm × 150mm), and spray the thick permanent outer concrete 23 of 260 ~ 300mm.
Described gib includes:Left and right base tunnel A, B are located at facing an anchor pole 3 and facing a steelframe of main hole C both sides after excavating 4, a described anchor pole 3 that faces is in that blossom type is arranged, using C22 grouting rock bolt, circumferential distance is 1.0m, and longitudinal pitch is 0.5m, faces Propping up anchor pole 3 length is 2 ~ 3m, preferably 2.5m;A described steelframe 4 that faces is vertically arranged positioned at main hole both sides, and it adopts work 22a shaped steel Steelframe, longitudinal pitch is 0.5m, faces side inside and outside a steelframe 4 and is alternately arranged work C22 longitudinally connected muscle 42 temporarily, its circumferential distance is 1m, faces the thick temporarily interior layer concrete 41 of a steelframe 4 inner side injection 20 ~ 30mm, faces steelframe 4 outer surface and hang individual layer A8 reinforcing bar Net(Spacing 200mm × 200mm), and spray the thick interim outer concrete 43 of 200 ~ 250mm.
A kind of small interval big cross section jointed rock mass subway tunnel supporting construction above the utility model being provided is carried out It is discussed in detail.The explanation of specific embodiment is only intended to help understand method of the present utility model and its core concept.Should refer to Go out, for those skilled in the art, on the premise of without departing from the utility model principle, can also be to this Utility model carries out some improvement and modifies, and these improve and modification also falls into the utility model scope of the claims Interior.

Claims (5)

1. small interval big cross section jointed rock mass subway tunnel supporting construction, including the preliminary bracing that tunnel is carried out and interim Shield, tunnel cross sectional include left and right base tunnel and be located at left and right base tunnel between main hole it is characterised in that:
Described preliminary bracing includes:First being located at arch wall both sides after left and right excavation with guide pit and being located at vault after leading wide open digging Anchor pole and just a steelframe, a described just anchor pole is in that blossom type is arranged, a described just steelframe is circumferentially disposed along arch wall and vault, just props up Inside and outside steelframe, side is alternately arranged forever longitudinally connected muscle, just props up the thick forever interior layer concrete of injection 40 ~ 60mm inside steelframe, just Prop up and outside steelframe, hang permanent bar-mat reinforcement, and spray the thick permanent outer concrete of 260 ~ 300mm;
Described gib includes:It is located at facing anchor pole and facing a steelframe of main hole both sides after left and right excavation with guide pit, described face Anchor pole is in that blossom type is arranged, a described steelframe that faces is vertically arranged positioned at main hole both sides, faces side inside and outside a steelframe and is alternately arranged temporarily Longitudinally connected muscle, faces the thick temporarily interior layer concrete of injection 20 ~ 30mm inside a steelframe, faces to prop up a steelframe outer surface and hang and faces Zhi Gang Muscle net, and spray the thick interim outer concrete of 200 ~ 250mm.
2. iron tunnel support structure according to claim 1 is it is characterised in that a described just anchor pole adopts C25 hollow to note Slurry anchor pole, ring, longitudinal pitch are 1.0m × 0.5m, and length is 5 ~ 6m.
3. iron tunnel support structure according to claim 2 is it is characterised in that a described just steelframe adopts work 25b shaped steel Steelframe, longitudinal pitch is 0.5m, and forever longitudinally connected muscle adopts work C25 reinforcing bar, and circumferential distance is 1m.
4. iron tunnel support structure according to claim 1 is it is characterised in that a described anchor pole that faces adopts C22 mortar anchor Bar, ring, longitudinal pitch are 1.0m × 0.5m, and length is 2 ~ 3m.
5. iron tunnel support structure according to claim 4 is it is characterised in that a described steelframe that faces adopts work 22a shaped steel Steelframe, longitudinal pitch is 0.5m, and longitudinally connected muscle adopts work C22 reinforcing bar temporarily, and circumferential distance is 1m.
CN201620694180.2U 2016-07-05 2016-07-05 Big section joint rock mass subway tunnel supporting construction of little clean distance Active CN205936634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620694180.2U CN205936634U (en) 2016-07-05 2016-07-05 Big section joint rock mass subway tunnel supporting construction of little clean distance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620694180.2U CN205936634U (en) 2016-07-05 2016-07-05 Big section joint rock mass subway tunnel supporting construction of little clean distance

Publications (1)

Publication Number Publication Date
CN205936634U true CN205936634U (en) 2017-02-08

Family

ID=57931313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620694180.2U Active CN205936634U (en) 2016-07-05 2016-07-05 Big section joint rock mass subway tunnel supporting construction of little clean distance

Country Status (1)

Country Link
CN (1) CN205936634U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059634A (en) * 2017-04-26 2017-08-18 盛亚红 A kind of special gib equipment of tunnel bridge
CN109113747A (en) * 2018-08-24 2019-01-01 江苏翰烽美筑工程技术有限公司 A kind of tunnel excavation engineering method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059634A (en) * 2017-04-26 2017-08-18 盛亚红 A kind of special gib equipment of tunnel bridge
CN109356632A (en) * 2017-04-26 2019-02-19 盛亚红 A kind of tunnel bridge construction gib equipment
CN107059634B (en) * 2017-04-26 2019-05-17 高军 A kind of dedicated gib equipment of tunnel bridge
CN109113747A (en) * 2018-08-24 2019-01-01 江苏翰烽美筑工程技术有限公司 A kind of tunnel excavation engineering method
CN109113747B (en) * 2018-08-24 2020-08-11 江苏华设远州交通科技有限公司 Tunnel excavation construction method

Similar Documents

Publication Publication Date Title
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
WO2021120991A1 (en) Method for reconstructing shield tunnel for mining construction
CN106014449B (en) The construction method of two-wire small interval big cross section jointed rock mass subway tunnel
CN109555528B (en) Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation and method for protecting support
CN106567718B (en) A kind of construction method of compound stratum list arch super-span subway station kerve support replacement
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN204729099U (en) Rock quality layer tunneling three layers of subway station canopy structure
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN104612698A (en) Method for constructing upper step middle partition wall of shallow-buried excavation tunnel
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN108547643B (en) A kind of construction method encircleed for handling tunnel top large size cavity solution cavity shield
CN103821167A (en) Construction method for subway station body
CN106968691A (en) Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel
CN107762529B (en) Lateral Hole and tunnel main tunnel infall construction method based on gib system
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN108561156A (en) Separate tunnel changes arch supporting construction and its construction method
CN110486036B (en) Construction method for expanding arch foot primary support arch cover method
CN208280965U (en) Coal mine deep well tunnel smooth surface concrete spraying support structure
CN107288642A (en) PBA construction technologies
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN108166989A (en) The asymmetric twin-arch tunnel interval wall construction method of water rich strata " OC " shape
CN106437760A (en) Large-section tunnel novel multi-layer lining structure