CN205935519U - Hang accessory, wall body board and wall body futilely - Google Patents
Hang accessory, wall body board and wall body futilely Download PDFInfo
- Publication number
- CN205935519U CN205935519U CN201620924326.8U CN201620924326U CN205935519U CN 205935519 U CN205935519 U CN 205935519U CN 201620924326 U CN201620924326 U CN 201620924326U CN 205935519 U CN205935519 U CN 205935519U
- Authority
- CN
- China
- Prior art keywords
- plate
- gripper shoe
- baffle
- dry
- hanging fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004575 stone Substances 0.000 claims description 16
- 238000005253 cladding Methods 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 description 7
- 230000000694 effects Effects 0.000 description 5
- 239000002184 metal Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000004888 barrier function Effects 0.000 description 2
- 230000001413 cellular effect Effects 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model provides a hang accessory, wall body board and wall body futilely to solving the panel that exists among the prior art and breaking or even drop, the remounting process very loaded down with trivial details and be difficult to remounting's technical problem again. Hang the accessory futilely, including the backup pad, seted up the edge on it the thickness direction of backup pad runs through the locating hole of backup pad, the picture peg, with the backup pad connect and with be angle setting between the backup pad, the baffle, with the backup pad connect and with be angle setting between the backup pad, the picture peg the baffle reaches the locating hole is followed the length direction of backup pad sets up at the interval in proper order. Be used for hang accessory, wall body board and wall body futilely to be used for fixed panel and prevent that panel is fixed in receiving external force on the wall body and breaking or even come off.
Description
Technical field
The utility model is related to technical field of buildings, especially relates to a kind of dry-hanging fitting, ash wall body plate and body of wall.
Background technology
It is known that current construction, after the body interior construction of building completes, whole main body is a frame
Frame, so people would generally decorate to body interior and outside, in view of the building now built is mostly high-rise, major part is all
It is that body exterior is painted, in order to increase aesthetic feeling, then on body of wall, cladding building board or ceramic tile enter luggage to body of wall
Decorations.
On body of wall, cladding building board needs to be operated by means of metal hanger, and existing metal hanger is " T " word
Type structure, plate above is plate, and plate below is gripper shoe, by 90 ° of " T " font metal hanger rotate counterclockwise during use,
Plate is made to be in vertical state, gripper shoe is horizontality, and two building boards offering installation hole are inserted plate respectively
Two ends, the fixation with body of wall is being carried out away from one end of plate by gripper shoe.But, this mounting means exists, when building
When building plate by lateral external forces, sheet material is easily rupturable, and when particularly horizontal force acts on metal hanger position, sheet material is easily sent out
Raw relative movement, thus causing plate fracture even to come off, benefit dress operation is very loaded down with trivial details again and is difficult to mend dress.
Utility model content
The purpose of this utility model is to provide a kind of dry-hanging fitting, ash wall body plate and body of wall, to solve to deposit in prior art
Plate fracture even come off, again mend dress operation very loaded down with trivial details and be difficult to mend the technical problem of dress.
For reaching above-mentioned purpose, the utility model embodiment employs the following technical solutions:
Dry-hanging fitting, including:
Gripper shoe, offers the location hole that the thickness direction along described gripper shoe runs through described gripper shoe thereon;
Plate, is connected and angled setting and described gripper shoe between with described gripper shoe;
Baffle plate, is connected and angled setting and described gripper shoe between with described gripper shoe, described plate, described baffle plate and
Described location hole is along the length direction interval setting successively of described gripper shoe.
Further, for the position relationship between above-mentioned plate and described gripper shoe, described baffle plate and described gripper shoe
For, described plate is vertically arranged with described gripper shoe;Described baffle plate is vertically arranged with described gripper shoe.
Further, described plate and described baffle plate are integrated board, and described plate is symmetrical with regard to described gripper shoe, described
Baffle plate is symmetrical with regard to described gripper shoe.
As the improvement further of technique scheme, in the utility model, described plate is integrated plate, described baffle plate bag
Include first baffle and second baffle, described first baffle and described second baffle are all connected with described gripper shoe, described first gear
Plate and described second baffle are respectively positioned between described plate and described location hole;Described first baffle and described second baffle are respectively
Both sides positioned at described gripper shoe.
Further, for the position relationship between above-mentioned first baffle and second baffle and described gripper shoe, institute
State first baffle and described second baffle is all vertically arranged with described gripper shoe.
As the improvement further of technique scheme, in the utility model, described gripper shoe is L-type structure, described
Fagging includes the first side plate and the second side plate, and described plate and described baffle plate are connected on the first side plate of described gripper shoe, institute
State location hole to be opened on the second side plate of described gripper shoe.
As the improvement further of technique scheme, in the utility model, described gripper shoe is slide plate, described support
Plate has the first end being oppositely arranged and the second end, and described plate is connected with described first end, and described location hole is located at described the
On two ends;Described location hole is elongate holes, and the bearing of trend of described location hole is identical with the length direction of described gripper shoe.
As the improvement further of technique scheme, in the utility model, described dry-hanging fitting is formed in one structure.
As the improvement further of technique scheme, in the utility model, also provide a kind of ash wall body plate, paste including mutual
The stone plate closing and base plate, also include dry-hanging fitting as above;On the described baffle plate of described dry-hanging fitting and described base plate
Side away from described stone plate is bonded to each other, and the described plate of described dry-hanging fitting is plugged in described stone plate, and institute
State gripper shoe to be vertically arranged with described stone plate.
As the improvement further of technique scheme, in the utility model, also provide a kind of body of wall, including main wall body and
Longitudinal keel, also include ash wall body plate as above, and described ash wall body plate, described longitudinal keel and described main wall body are spaced successively and set
Put, and the described baffle plate of described dry-hanging fitting is near described longitudinal keel, the described plate of described dry-hanging fitting is away from described
Longitudinal keel;
It is equiped with connector on described longitudinal keel, described connector offers connecting hole, the institute of described dry-hanging fitting
State location hole to be correspondingly arranged with described connecting hole, and be equipped with bolt in described location hole and described connecting hole so that described
Dry-hanging fitting is connected with described connector.
During the dry-hanging fitting providing using the utility model, run through support due to offering in gripper shoe along its thickness direction
The location hole of plate, plate and baffle plate are all connected with gripper shoe and equal setting angled and gripper shoe between, and plate, baffle plate and calmly
Two building boards offering location hole, along gripper shoe length direction successively interval setting, are respectively installed in slotting by position hole first
The two ends of plate, next baffle plate is fixed from the thickness direction of building board, is attached with body of wall finally by location hole.
Compared to prior art, this uses the dry-hanging fitting of new offer, due to be provided with is connected with gripper shoe and with prop up
Angled baffle plate between fagging, plate, baffle plate along gripper shoe length direction successively interval setting, when building board is inserted respectively
After entering plate, baffle plate has barrier effect to building board in its thickness direction, and when building board is subject to external force, baffle plate can prevent
Sheet material stress produces relative movement, plate fracture even comes off.
Brief description
In order to be illustrated more clearly that the utility model specific embodiment or technical scheme of the prior art, below will be right
In specific embodiment or description of the prior art the accompanying drawing of required use be briefly described it should be apparent that, below describe
In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness
On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
The structural representation one of the dry-hanging fitting that Fig. 1 provides for the utility model embodiment;
The structural representation two of the dry-hanging fitting that Fig. 2 provides for the utility model embodiment;
The structural representation three of the dry-hanging fitting that Fig. 3 provides for the utility model embodiment;
The structural representation four of the dry-hanging fitting that Fig. 4 provides for the utility model embodiment;
The structural representation one of the ash wall body plate that Fig. 5 provides for the utility model embodiment;
The structural representation two of the ash wall body plate that Fig. 6 provides for the utility model embodiment;
The structural representation one of the body of wall that Fig. 7 provides for the utility model embodiment;
The structural representation two of the body of wall that Fig. 8 provides for the utility model embodiment.
Reference:
4- ash wall body plate, 5- longitudinal direction keel, 6- main wall body;
1- dry-hanging fitting, 2- stone plate, 3- base plate;
11- gripper shoe, 12- plate, 13- baffle plate, 51- connector;
111- location hole, 112- first side plate, 113- second side plate, 131- first baffle, 132- second baffle.
Specific embodiment
Below in conjunction with accompanying drawing, the technical solution of the utility model is clearly and completely described it is clear that described
Embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on the embodiment in the utility model, this
The every other embodiment that field those of ordinary skill is obtained under the premise of not making creative work, broadly falls into this practicality
Novel protected scope.
In description of the present utility model, " " center ", " on ", D score, "left", "right", " perpendicular it should be noted that term
Directly ", the orientation of instruction such as " level ", " interior ", " outward " or position relationship are based on orientation shown in the drawings or position relationship, are only
For the ease of description the utility model with simplify description, rather than instruction or the hint device of indication or element must have specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that indicating or hint relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " peace
Dress ", " being connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly
Connect;Can be to be mechanically connected or electrically connect;Can be to be joined directly together it is also possible to be indirectly connected to by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
Concrete meaning in the utility model for the language.
The structural representation one of the dry-hanging fitting that Fig. 1 provides for the utility model embodiment, refers to Fig. 1, the present embodiment
The dry-hanging fitting 1 providing, including:Gripper shoe 11, offers the thickness direction along described gripper shoe 11 thereon and runs through described support
The location hole 111 of plate 11;Plate 12, is connected and angled setting and described gripper shoe 11 between with described gripper shoe 11;Baffle plate
13, it is connected and angled setting and described gripper shoe 11 between with described gripper shoe 11, described plate 12, described baffle plate 13 and institute
State location hole 111 along the length direction interval setting successively of described gripper shoe 11.
During the dry-hanging fitting 1 being provided using the utility model, run through along its thickness direction due to offering in gripper shoe 11
The location hole 111 of gripper shoe 11, plate 12 and baffle plate 13 are all connected with gripper shoe 11 and all angled and gripper shoe 11 between set
Put, and two, along gripper shoe 11 length direction interval setting successively, are offered by plate 12, baffle plate 13 and location hole 111 first
The building board of location hole 111 is respectively installed in the two ends of plate 12, secondly baffle plate 13 from the thickness direction of building board by its
Fixing, it is attached finally by location hole 111 and body of wall.
Compared to prior art, this uses the dry-hanging fitting 1 of new offer, due to be provided be connected with gripper shoe 11 and with
Angled baffle plate 13 between gripper shoe 11, plate 12, baffle plate 13, along gripper shoe 11 length direction interval setting successively, are built when
Build after sheet material inserts plate 12 respectively, baffle plate 13 has barrier effect to building board in its thickness direction, when building board is subject to
During external force, baffle plate 13 can prevent sheet material stress from producing relative movement, plate fracture or even coming off.
Please continue to refer to Fig. 1, specifically, in order to ensure to install the overall vertical of stone plate 2, described plate 12 with described
Fagging 11 is vertically arranged;Described baffle plate 13 is vertically arranged with described gripper shoe 11.
Please continue to refer to Fig. 1, specifically, the manufacturing for the ease of described plate 12 and described baffle plate 13 was pacified with the later stage
Dress, described plate 12 and described baffle plate 13 are integrated board, and described plate 12 is symmetrical with regard to described gripper shoe 11, described baffle plate 13
Symmetrical with regard to described gripper shoe 11.
Please continue to refer to Fig. 1, specifically, described gripper shoe 11 is slide plate, and described gripper shoe 11 has and is oppositely arranged
First end and the second end, described plate 12 is connected with described first end, and described location hole 111 is located on described second end;Described
Location hole 111 is elongate holes, and the bearing of trend of described location hole 111 is identical with the length direction of described gripper shoe 11.By institute
State gripper shoe 11 and be set to slide plate, simplify manufacturing procedure and be easily installed, described location hole 111 is set to strip
Hole, is easy to described dry-hanging fitting 1 and the connection of other fixtures, also improves fixing stability simultaneously.
The structural representation two of the dry-hanging fitting that Fig. 2 provides for the utility model embodiment, based on plate 12 described above,
Described baffle plate 13, refers to Fig. 2, on the premise of the fixed effect not affecting described dry-hanging fitting 1 and serviceability, in order to save
About material, described plate 12 is integrated plate, and described baffle plate 13 includes first baffle 131 and second baffle 132, described first baffle
13113 and described second baffle 132 be all connected with described gripper shoe 11, described first baffle 13113 and described second baffle 132
It is respectively positioned between described plate 12 and described location hole 111;Described first baffle 131 and described second baffle 132 are located at respectively
The both sides of described gripper shoe 11.
Refer to Fig. 2, specifically, in order to ensure the fixed effect of described baffle plate 13, described first baffle 131 and described
Two baffle plates 132 are all vertically arranged with described gripper shoe 11.
The structural representation three of the dry-hanging fitting that Fig. 3 provides for the utility model embodiment, Fig. 4 is implemented for the utility model
The structural representation four of the dry-hanging fitting 1 that example provides, refers to Fig. 3 and Fig. 4, and described gripper shoe 11 is L-type structure, described support
Plate 11 includes the first side plate 112 and the second side plate 113, and described plate 12 and described baffle plate 13 are connected to the of described gripper shoe 11
On side plate 112, described location hole 111 is opened on the second side plate 113 of described gripper shoe 11.This set-up mode, is easy to institute
State the connection with other fixtures after dry-hanging fitting 1 fixing stone plate 2, the setting of baffle plate 13 described in Fig. 3 is easy to manufacture and is pacified
Dress, and material is more saved in the setting of baffle plate 13 described in Fig. 4.
The structural representation one of the ash wall body plate 4 that Fig. 5 provides for the utility model embodiment, Fig. 6 is implemented for the utility model
The structural representation two of the ash wall body plate 4 that example provides, refers to Fig. 5 and Fig. 6, further, also provides a kind of in the present embodiment
Ash wall body plate 4, including stone plate 2 bonded to each other and base plate 3, also includes dry-hanging fitting 1 as above, described dry-hanging fitting 1
Described baffle plate bonded to each other away from the side of described stone plate 2 with described base plate 3, the described plate of described dry-hanging fitting 1
12 are plugged in described stone plate 2, and described gripper shoe 11 is vertically arranged with described stone plate 2.
The ash wall body plate 4 that the utility model provides, is provided with the described base plate 3 bonded to each other with described stone plate 2, and adopts
This dry-hanging fitting 1 as above is fixed described ash wall body plate 4, not only increases the heat insulation effect of described ash wall body plate 4, and
Enhance the stress performance of described ash wall body plate 4.
The structural representation one of the body of wall that Fig. 7 provides for the utility model embodiment, Fig. 8 carries for the utility model embodiment
For body of wall structural representation two, refer to Fig. 7 and Fig. 8, further, also provide a kind of body of wall in the present embodiment, bag
Include main wall body 6 and longitudinal keel 5, also include ash wall body plate 4 as above, described ash wall body plate 4, described longitudinal keel 5 and described
Main wall body 6 interval setting successively, and the described baffle plate of described dry-hanging fitting 1 is near described longitudinal keel 5, described dry-hanging fitting
1 described plate 12 is away from described longitudinal keel 5;Connector 51 is equiped with described longitudinal keel 5, described connector 51 is opened
Be provided with connecting hole, the described location hole 111 of described dry-hanging fitting 1 and described connecting hole are correspondingly arranged, and described location hole 111 with
It is equipped with bolt so that described dry-hanging fitting 1 is connected with described connector in described connecting hole.
At present, after the completion of many architecture constructions, described main wall body 6 is essentially cellular or hollow form, in order to improve
State the serviceability of main wall body 6, add described longitudinal keel 5, to strengthen the steadiness of described body of wall, meanwhile, also allow for described
The connection of main wall body 6 and described ash wall body plate 4, arranging described connector is so that described main wall body 6 and described ash wall body plate 4
It is more convenient to connect, and with bolts is for the ease of dismounting.
Finally it should be noted that:Various embodiments above is only in order to illustrating the technical solution of the utility model, rather than it is limited
System;Although being described in detail to the utility model with reference to foregoing embodiments, those of ordinary skill in the art should
Understand:It still can be modified to the technical scheme described in foregoing embodiments, or to wherein some or all of
Technical characteristic carries out equivalent;And these modifications or replacement, do not make the essence of appropriate technical solution depart from this practicality new
The scope of type each embodiment technical scheme.
Claims (10)
1. a kind of dry-hanging fitting is it is characterised in that include:
Gripper shoe, offers the location hole that the thickness direction along described gripper shoe runs through described gripper shoe thereon;
Plate, is connected and angled setting and described gripper shoe between with described gripper shoe;
Baffle plate, is connected and angled setting and described gripper shoe between with described gripper shoe, described plate, described baffle plate and described
Location hole is along the length direction interval setting successively of described gripper shoe.
2. dry-hanging fitting according to claim 1 is it is characterised in that described plate is vertically arranged with described gripper shoe;
Described baffle plate is vertically arranged with described gripper shoe.
3. dry-hanging fitting according to claim 2 is it is characterised in that described plate and described baffle plate are integrated board, institute
State plate symmetrical with regard to described gripper shoe, described baffle plate is symmetrical with regard to described gripper shoe.
4. it is characterised in that described plate is integrated plate, described baffle plate includes to dry-hanging fitting according to claim 2
One baffle plate and second baffle, described first baffle and described second baffle are all connected with described gripper shoe, described first baffle and
Described second baffle is respectively positioned between described plate and described location hole;
Described first baffle and described second baffle are respectively positioned at the both sides of described gripper shoe.
5. dry-hanging fitting according to claim 4 it is characterised in that described first baffle and described second baffle all and institute
State gripper shoe to be vertically arranged.
6. dry-hanging fitting according to claim 1 it is characterised in that described gripper shoe be L-type structure, described gripper shoe bag
Include the first side plate and the second side plate, described plate and described baffle plate are connected on the first side plate of described gripper shoe, described positioning
Hole is opened on the second side plate of described gripper shoe.
7. it is characterised in that described gripper shoe is slide plate, described gripper shoe has dry-hanging fitting according to claim 1
There are the first end being oppositely arranged and the second end, described plate is connected with described first end, described location hole is located at described second end
On;
Described location hole is elongate holes, and the bearing of trend of described location hole is identical with the length direction of described gripper shoe.
8. dry-hanging fitting according to claim 1 it is characterised in that described dry-hanging fitting is formed in one structure.
9. a kind of ash wall body plate is it is characterised in that include stone plate bonded to each other and base plate and as arbitrary in claim 1-8
Dry-hanging fitting described in;
The described baffle plate of described dry-hanging fitting is bonded to each other away from the side of described stone plate with described base plate, described cladding joins
The described plate of part is plugged in described stone plate, and described gripper shoe is vertically arranged with described stone plate.
10. a kind of body of wall is it is characterised in that include main wall body and longitudinal keel, and ash wall body plate as claimed in claim 9,
Described ash wall body plate, described longitudinal keel and described main wall body interval setting successively, and the described baffle plate of described dry-hanging fitting leans on
Closely described longitudinal keel, the described plate of described dry-hanging fitting is away from described longitudinal keel;
Be equiped with connector on described longitudinal keel, described connector offer connecting hole, described dry-hanging fitting described fixed
Position hole is correspondingly arranged with described connecting hole, and is equipped with bolt in described location hole and described connecting hole so that described cladding
Accessory is connected with described connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620924326.8U CN205935519U (en) | 2016-08-23 | 2016-08-23 | Hang accessory, wall body board and wall body futilely |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620924326.8U CN205935519U (en) | 2016-08-23 | 2016-08-23 | Hang accessory, wall body board and wall body futilely |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205935519U true CN205935519U (en) | 2017-02-08 |
Family
ID=57951059
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620924326.8U Expired - Fee Related CN205935519U (en) | 2016-08-23 | 2016-08-23 | Hang accessory, wall body board and wall body futilely |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205935519U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677475A (en) * | 2017-02-17 | 2017-05-17 | 吴珈诚 | Dry-hanging fastener for interior and exterior wall decoration material of building and dry-hanging installation structure |
CN107090960A (en) * | 2017-06-14 | 2017-08-25 | 安徽中烟工业有限责任公司 | The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method |
CN108952042A (en) * | 2018-08-31 | 2018-12-07 | 王广胜 | A kind of ceramic tile on-wall system and method |
CN110805225A (en) * | 2019-11-18 | 2020-02-18 | 湖南斯多孚节能科技有限公司 | Heat insulation system for building external wall surface and construction method thereof |
CN114704011A (en) * | 2022-04-12 | 2022-07-05 | 中国十七冶集团有限公司 | Curtain is with installation pendant |
-
2016
- 2016-08-23 CN CN201620924326.8U patent/CN205935519U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677475A (en) * | 2017-02-17 | 2017-05-17 | 吴珈诚 | Dry-hanging fastener for interior and exterior wall decoration material of building and dry-hanging installation structure |
CN107090960A (en) * | 2017-06-14 | 2017-08-25 | 安徽中烟工业有限责任公司 | The cladding supporting and limiting device of wall brick and wall brick assembled dry hanging construction method |
CN108952042A (en) * | 2018-08-31 | 2018-12-07 | 王广胜 | A kind of ceramic tile on-wall system and method |
CN108952042B (en) * | 2018-08-31 | 2024-04-26 | 王广胜 | Ceramic tile wall-mounting system and method |
CN110805225A (en) * | 2019-11-18 | 2020-02-18 | 湖南斯多孚节能科技有限公司 | Heat insulation system for building external wall surface and construction method thereof |
CN110805225B (en) * | 2019-11-18 | 2021-12-21 | 湖南斯多孚节能科技有限公司 | Heat insulation system for building external wall surface and construction method thereof |
CN114704011A (en) * | 2022-04-12 | 2022-07-05 | 中国十七冶集团有限公司 | Curtain is with installation pendant |
CN114704011B (en) * | 2022-04-12 | 2023-04-14 | 中国十七冶集团有限公司 | Mounting structure for curtain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205935519U (en) | Hang accessory, wall body board and wall body futilely | |
CN104956010B (en) | The mounting process of the piecemeal panel and the formwork for placing using the piecemeal panel of formwork for placing | |
CN107327111A (en) | A kind of dried hanging hang structure and finishing systems | |
CN206859565U (en) | A kind of heat insulation decoration integrated plate anchoring piece | |
CN106013669B (en) | The mounting structure and installation method of wallboard | |
CN209637042U (en) | A kind of Curtainwall connector | |
CN211312985U (en) | Ceramic brick curtain wall with built-in aluminum alloy keels | |
CN208329597U (en) | A kind of novel back cord bracket | |
CN215759918U (en) | Arc-shaped suspended ceiling simple and convenient to install | |
CN204531126U (en) | A kind of keel connecting member | |
CN205742832U (en) | The mounting structure of wallboard | |
CN205296536U (en) | Joint formula keel connecting piece | |
CN108035464A (en) | A kind of curtain wall decorative strip connector and curtain wall system | |
CN207484771U (en) | A kind of curtain wall decorative strip connector and curtain wall system | |
CN208219907U (en) | A kind of removable socket assembled wall board | |
CN215563762U (en) | Groove keel structure | |
CN206758073U (en) | Section bar for two-sided clamping panel | |
CN208235743U (en) | Door top component | |
CN207419791U (en) | A kind of novel building curtain wall construction | |
CN206245694U (en) | A kind of construction and decoration ceiling mounting bracket | |
CN104763089A (en) | Keel connecting piece | |
CN220598763U (en) | Keel connecting piece for light steel engineering | |
CN215168074U (en) | Building templates convenient to install fast | |
CN214302269U (en) | Connecting node of external wall panel and building main structure | |
CN218091753U (en) | Dry-hanging composite board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170208 |