CN205935447U - High -efficient pull throughs is used to parapet - Google Patents

High -efficient pull throughs is used to parapet Download PDF

Info

Publication number
CN205935447U
CN205935447U CN201620958420.5U CN201620958420U CN205935447U CN 205935447 U CN205935447 U CN 205935447U CN 201620958420 U CN201620958420 U CN 201620958420U CN 205935447 U CN205935447 U CN 205935447U
Authority
CN
China
Prior art keywords
parapet
motor
spring
cam
efficient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620958420.5U
Other languages
Chinese (zh)
Inventor
姜焕胜
张德光
郑洪云
张振宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO HAIFA REAL ESTATE Co Ltd
Original Assignee
QINGDAO HAIFA REAL ESTATE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO HAIFA REAL ESTATE Co Ltd filed Critical QINGDAO HAIFA REAL ESTATE Co Ltd
Priority to CN201620958420.5U priority Critical patent/CN205935447U/en
Application granted granted Critical
Publication of CN205935447U publication Critical patent/CN205935447U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)

Abstract

The utility model relates to a pull throughs especially relates to a high -efficient pull throughs is used to parapet. The to -be -solved technical problem of the utility model is to provide a high -efficient pull throughs is used to parapet that simple structure, mediation are efficient, the mediation in time. In order to solve the technical problem, the utility model provides a such high -efficient pull throughs is used to parapet, including motor I, the baffle, the cam, motor II, touch roller I, the fixed block, spring I, the deflector, the lifter, the wedge, the pipeline, the slider, a slide rail, touch roller II and spring II, subaerial right side is equipped with the parapet, the left side below of parapet is equipped with the recess, the left wall from the top down of parapet is equipped with motor II in proper order, the deflector, spring II and slide rail, the rear of motor II is connected with the cam, the below of cam is equipped with touch roller I, touch roller I and cam contact cooperation. The utility model discloses simple structure, efficient, the timely effect of mediation of mediation have been reached.

Description

A kind of efficient dredger of parapet
Technical field
The utility model is related to a kind of dredger, more particularly, to a kind of efficient dredger of parapet.
Background technology
Parapet is building roof parapet all around, and Main Function, in addition to safeguarding safety, also can apply anti-in bottom Head received by hydraulic pressure brick, to avoid waterproof layer infiltration or roof rain water cross flow.Fixed, the accessible roof parapet according to national construction standards Highly typically must not be less than 1.2m.Accessible roof parapet typically height is not 0.6m.The effect of the parapet on upper people roof is The safety of protection personnel, and elevation of building is played role in decoration.The effect not going up the parapet on people roof removes decoration for vertical face effect Outward, also fix malthoid.
Existing parapet dredger haves the shortcomings that complex structure, dredging efficiency are low, dredges not in time, therefore urgently Need to research and develop that a kind of structure is simple, dredging efficiency high, the dredging timely efficient dredger of parapet.
Utility model content
(1) technical problem to be solved
Existing parapet dredger complex structure, dredging efficiency are low, it is too late to dredge in order to overcome for the utility model When shortcoming shortcoming, the technical problems to be solved in the utility model be provide that a kind of structure is simple, dredging efficiency high, dredging and When the efficient dredger of parapet.
(2) technical scheme
In order to solve above-mentioned technical problem, the utility model provides the efficient dredger of such a parapet, bag Motor I, baffle plate, cam, motor II, contact wheel I, fixed block, spring I, guide plate, elevating lever, wedge, pipeline, cunning are included Block, slide rail, contact wheel II and spring II, on ground, right side is provided with parapet, is provided with groove, parapet below the left side of parapet Left wall be sequentially provided with motor II, guide plate, spring II and slide rail from top to bottom, the rear of motor II is connected with cam, cam Lower section be provided with contact wheel I, contact wheel I is provided with elevating lever with cam contact cooperation, the bottom of contact wheel I, and elevating lever is provided with Fixed block, guide plate is provided with pilot hole, is provided with spring I between guide plate and fixed block, and elevating lever passes through spring I and guiding Hole, the bottom of elevating lever is provided with contact wheel II, and slide rail is provided with slide block, and slide block is provided with wedge, and the right-hand member of wedge It is connected with spring II, on the left of bottom portion of groove, is provided with pipeline, on the left of groove, top is provided with motor I, and the right-hand member of motor I is connected with gear Plate.
Preferably, also include fixed plate, oscillating cylinder and hydraulic giant, below the right wall of baffle plate, be provided with fixed plate, fixed plate Top is provided with oscillating cylinder, and the top of oscillating cylinder is connected with hydraulic giant.
Preferably, motor I and motor II are servomotor.
Operation principle:When pipeline gathers a certain amount of debris, start motor I first and rotate forward, drive cam rotation, Drive elevating lever to move down, and then drive wedge to promote debris to the left, when the microcephaly of cam is contacted with contact wheel I, Elevating lever is down to minimum, and wedge moves to high order end, makes debris be pushed into high order end, so that the debris cleaning of pipeline accumulation Totally.Then start motor I to invert, drive elevating lever to move up, and then drive wedge to move right, when wedge moves to During initial position, motor I stops operating, and then starts motor I and rotates 180 °, drives baffle plate to rotate 180 °, makes baffle plate block heap Long-pending debris, it is to avoid debris move and are dissipated to other regions, cause secondary blocking.When people will concentrate the debris thorough cleaning piled up to do After net, start motor I and rotate 180 °, drive baffle plate to set back, so can quickly in time by pipeline gather miscellaneous Thing is cleaned out, and reaches the effect of effective dredging.
Because also including fixed plate, oscillating cylinder and hydraulic giant, below the right wall of baffle plate, it is provided with fixed plate, fixed plate top It is provided with oscillating cylinder, the top of oscillating cylinder is connected with hydraulic giant, so when baffle plate rotates 180 °, and block the debris of accumulation When, start oscillating cylinder and hydraulic giant is started working, hydraulic giant is constantly sprayed water, and oscillating cylinder swings, drive and put about hydraulic giant Dynamic, so that the small impurities of pipeline rapidly pours pipeline, and discharge rapidly, strengthen the effect of dredging.
Because motor I and motor II are servomotor it is possible to more precisely adjust rotating speed.
(3) beneficial effect
The utility model has reached that structure is simple, dredging efficiency high, dredging timely effect.
Brief description
Fig. 1 is the first main structure diagram of the present utility model;
Fig. 2 is second main structure diagram of the present utility model.
Being labeled as in accompanying drawing:1- groove, 2- motor I, 3- baffle plate, 4- cam, 5- motor II, 6- contact wheel I, 7- fixes Block, 8- spring I, 9- guide plate, 10- pilot hole, 11- elevating lever, 12- wedge, 13- pipeline, 14- slide block, 15- slide rail, 16- Contact wheel II, 17- spring II, 18- parapet, 19- ground, 20- fixed plate, 21- oscillating cylinder, 22- hydraulic giant.
Specific embodiment
With reference to the accompanying drawings and examples the utility model is further described.
Embodiment 1
A kind of efficient dredger of parapet, as shown in Figure 1-2, includes motor I 2, baffle plate 3, cam 4, motor II 5th, contact wheel I 6, fixed block 7, spring I 8, guide plate 9, elevating lever 11, wedge 12, pipeline 13, slide block 14, slide rail 15, contact Take turns II 16 and spring II 17, on ground 19, right side is provided with parapet 18, is provided with groove 1, parapet below the left side of parapet 18 18 left wall is sequentially provided with motor II 5, guide plate 9, spring II 17 and slide rail 15 from top to bottom, and the rear of motor II 5 is connected with Cam 4, the lower section of cam 4 is provided with contact wheel I 6, and contact wheel I 6 is engaged with cam 4, and the bottom of contact wheel I 6 is provided with lifting Bar 11, elevating lever 11 is provided with fixed block 7, and guide plate 9 is provided with pilot hole 10, is provided with spring between guide plate 9 and fixed block 7 I 8, elevating lever 11 passes through spring I 8 and pilot hole 10, and the bottom of elevating lever 11 is provided with contact wheel II 16, and slide rail 15 is provided with slide block 14, slide block 14 is provided with wedge 12, and the right-hand member of wedge 12 is connected with spring II 17, and groove 1 bottom left is provided with pipe Road 13, groove 1 is provided with motor I 2 above left side, and the right-hand member of motor I 2 is connected with baffle plate 3.
Also include fixed plate 20, oscillating cylinder 21 and hydraulic giant 22, below the right wall of baffle plate 3, be provided with fixed plate 20, fixing Plate 20 top is provided with oscillating cylinder 21, and the top of oscillating cylinder 21 is connected with hydraulic giant 22.
Motor I 2 and motor II 5 are servomotor.
Operation principle:When pipeline 13 surrounding gathers a certain amount of debris, start motor I 2 first and rotate forward, carry moving cam 4 Rotate, drive elevating lever 11 to move down, and then drive wedge 12 to promote debris to the left, when microcephaly and the contact wheel I of cam 4 6 when contacting, and elevating lever 11 is down to minimum, and wedge 12 moves to high order end, makes debris be pushed into high order end, so that pipeline 13 weeks The debris enclosing accumulation are cleaned out.Then start motor I 2 reversion, drive elevating lever 11 to move up, and then drive wedge 12 Move right, when wedge 12 moves to initial position, motor I 2 stops operating, then start motor I 2 and rotate 180 °, drive Baffle plate 3 rotates 180 °, makes baffle plate 3 block the debris of accumulation, it is to avoid debris move and are dissipated to other regions, cause secondary blocking.Work as people The debris thorough cleaning piled up will be concentrated clean after, start motor I 2 and rotate 180 °, drive baffle plate 3 to set back, so i.e. Quickly in time the debris of pipeline 13 surrounding accumulation can be cleaned out, reach the effect of effective dredging.
Because also including fixed plate 20, oscillating cylinder 21 and hydraulic giant 22, below the right wall of baffle plate 3, it is provided with fixed plate 20, Fixed plate 20 top is provided with oscillating cylinder 21, and the top of oscillating cylinder 21 is connected with hydraulic giant 22, so when baffle plate 3 rotates 180 °, And when blocking the debris of accumulation, start oscillating cylinder 21 and hydraulic giant 22 is started working, hydraulic giant 22 is constantly sprayed water, oscillating cylinder 21 swing, and drive hydraulic giant 22 to swing, so that the small impurities around pipeline 13 rapidly pours pipeline 13 and fast Speed is discharged, and strengthens the effect of dredging.
Because motor I 2 and motor II 5 are servomotor it is possible to more precisely adjust rotating speed.
Embodiment described above only have expressed preferred embodiment of the present utility model, and its description is more concrete and detailed, But therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that it is common for this area For technical staff, without departing from the inventive concept of the premise, some deformation, improvement and replacement can also be made, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be defined by claims.

Claims (3)

1. a kind of parapet with efficient dredger it is characterised in that including motor I (2), baffle plate (3), cam (4), motor II (5), contact wheel I (6), fixed block (7), spring I (8), guide plate (9), elevating lever (11), wedge (12), pipeline (13), Slide block (14), slide rail (15), contact wheel II (16) and spring II (17), ground (19) upper right side is provided with parapet (18), daughter It is provided with groove (1), the left wall of parapet (18) is sequentially provided with motor II (5), guide plate from top to bottom below the left side of wall (18) (9), spring II (17) and slide rail (15), the rear of motor II (5) is connected with cam (4), and the lower section of cam (4) is provided with contact wheel I (6), contact wheel I (6) is engaged with cam (4), and the bottom of contact wheel I (6) is provided with elevating lever (11), on elevating lever (11) It is provided with fixed block (7), guide plate (9) is provided with pilot hole (10), is provided with spring I (8) between guide plate (9) and fixed block (7), Elevating lever (11) passes through spring I (8) and pilot hole (10), and the bottom of elevating lever (11) is provided with contact wheel II (16), slide rail (15) It is provided with slide block (14), slide block (14) is provided with wedge (12), and the right-hand member of wedge (12) is connected with spring II (17), Groove (1) bottom left is provided with pipeline (13), and on the left of groove (1), top is provided with motor I (2), and the right-hand member of motor I (2) is connected with Baffle plate (3).
2. a kind of parapet according to claim 1 with efficient dredger it is characterised in that also including fixed plate (20), oscillating cylinder (21) and hydraulic giant (22), is provided with fixed plate (20) below the right wall of baffle plate (3), fixed plate (20) top sets There is oscillating cylinder (21), the top of oscillating cylinder (21) is connected with hydraulic giant (22).
3. a kind of parapet according to claim 1 with efficient dredger it is characterised in that motor I (2) and motor II (5) it is servomotor.
CN201620958420.5U 2016-08-26 2016-08-26 High -efficient pull throughs is used to parapet Expired - Fee Related CN205935447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620958420.5U CN205935447U (en) 2016-08-26 2016-08-26 High -efficient pull throughs is used to parapet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620958420.5U CN205935447U (en) 2016-08-26 2016-08-26 High -efficient pull throughs is used to parapet

Publications (1)

Publication Number Publication Date
CN205935447U true CN205935447U (en) 2017-02-08

Family

ID=57954111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620958420.5U Expired - Fee Related CN205935447U (en) 2016-08-26 2016-08-26 High -efficient pull throughs is used to parapet

Country Status (1)

Country Link
CN (1) CN205935447U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968405A (en) * 2017-05-23 2017-07-21 海宁市锦新轴承有限公司 One kind building eaves dredger

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968405A (en) * 2017-05-23 2017-07-21 海宁市锦新轴承有限公司 One kind building eaves dredger
CN106968405B (en) * 2017-05-23 2018-01-30 重庆市桑麻环保科技有限公司 One kind building eaves dredger

Similar Documents

Publication Publication Date Title
CN202544005U (en) Trash cleaning grab bucket taking vertical trash rack face and trash rack hole sidewall as guide rails
CN104404994A (en) Grabbing-arm type trash remover
CN211816522U (en) Dredging device for hydraulic engineering
CN205935447U (en) High -efficient pull throughs is used to parapet
CN110056033A (en) A kind of building yard gutter backactor
CN203096918U (en) Pipeline dredge silt remover
CN208594533U (en) A kind of water conservancy gate equipment
CN204266277U (en) Gripping arm formula trash rake
CN212865839U (en) Water drain gate for hydraulic engineering
CN103643714A (en) River-crossing tunnel trash remover
CN206721961U (en) A kind of helical blade type dredging robot
CN216586456U (en) Trash-blocking and collecting integrated trash rack
CN212253464U (en) Shield constructs construction dregs processing apparatus
CN212440184U (en) Automatic cleaning device for multifunctional sludge scraping and sucking integrated machine
CN210946931U (en) Sludge removing vehicle for construction site
CN203668991U (en) Removing device of drag head grid blockages
CN209307973U (en) A kind of grid slot structure of high trash rack
CN207829044U (en) A kind of grab bucket removed contamination for water conservancy
CN202023210U (en) Simple culvert type sluice dredging combined vehicle
CN207582444U (en) A kind of continuous type river contaminants-collecting apparatus
CN207056038U (en) A kind of slurry pond
CN113897922B (en) Small-sized underwater dredging device and method suitable for gate grids
CN109356116A (en) A kind of the grid slot structure and cleaning method of high trash rack
CN203999000U (en) The rotatable grid dirt remover of sewage disposal Special back
CN212440183U (en) Raising-inhibiting concentrated absorption bin for submersible mud suction truck

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208

Termination date: 20170826