Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720886440.0U
Other languages
Chinese (zh)
Inventor
金森
施红华
来路刚
吴升光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zheneng Shaoxing Binhai Cogeneration Co Ltd
Original Assignee
Zhejiang Zheneng Shaoxing Binhai Cogeneration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zheneng Shaoxing Binhai Cogeneration Co Ltd filed Critical Zhejiang Zheneng Shaoxing Binhai Cogeneration Co Ltd
Priority to CN201720886440.0U priority Critical patent/CN207056038U/en
Application granted granted Critical
Publication of CN207056038U publication Critical patent/CN207056038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The utility model discloses a kind of slurry pond, including pond body, it is characterized in that:Described pond body slidably connects mud scraper along the length direction of itself, described mud scraper includes frame, transmission mechanism and scraping mechanism, described frame is moved by the transmission mechanism along the length direction of pond body, described scraping mechanism includes cleaning shoe, the upper end of described cleaning shoe is connected with frame, lower end extends toward close to the bottom of pond body, has reached the purpose of improving production efficiency.

Description

A kind of slurry pond
Technical field
It the utility model is related to a kind of slurry pond.
Background technology
In global range, coal reserves is than oil and natural gas more horn of plenty, and price is relatively low, and oil shortage shows As getting worse.Some rich coals national such as U.S., Australia, India, Germany, are all stepping up research or development coal chemical industry item Mesh.China also researchs and develops New Coal Chemical technique in recent years, establishes multiple coal chemical industry demonstration projects, and build up coal the biggest in the world Direct liquefaction project.
At present, slurry pond is needed in existing coal chemical industry technique, slurry pond is injected into by the way that coal waste water will be contained In precipitated, but coal particle by the effect of gravity be deposited in slurry pond formed sludge after, it is necessary to which worker passes through shovel Son shovels out sludge, and production efficiency is relatively low.
Utility model content
In view of the deficienciess of the prior art, the utility model is to provide a kind of slurry pond, mud is scraped by setting Machine, reach the purpose of improving production efficiency.
To achieve the above object, the utility model provides following technical scheme:A kind of slurry pond, including pond body, Length direction of the described pond body along itself slidably connects mud scraper, and described mud scraper includes frame, transmission mechanism and scraped Expect mechanism, described frame is moved by the transmission mechanism along the length direction of pond body, and described scraping mechanism includes scraping mud Plate, the upper end of described cleaning shoe are connected with frame, and lower end extends toward close to the bottom of pond body.
By using above-mentioned technical proposal, when needing to clear up sludge, start transmission mechanism, by frame along pond The length direction movement of body, the sludge of pond body bottom is promoted by cleaning shoe, and sludge is concentrated, so as to be easy to worker Sludge is cleared up, so as to effective improving production efficiency.
The utility model is further arranged to:Described mud scraper also includes suction dredge structure, and described suction dredge structure includes Dredging tube, dredge pump and discharge pipeline, described dredge pump are fixed in frame, and described dredging tube one end is connected with dredge pump, The other end is connected with cleaning shoe, and described discharge pipeline one end is connected with dredge pump, and the other end extends toward the direction away from pond body.
By using above-mentioned technical proposal, during length direction of the transmission mechanism drive frame along pond body moves, Dredge pump starts, and is discharged to after by dredging tube, sludge is sucked from discharge pipeline outside pond body, so as to eliminate worker's shovel Except the complicated processes of sludge, further improving production efficiency.
The utility model is further arranged to:Described cleaning shoe include linkage section and it is multiple scrape mud section, described scrapes mud Section is connected by the linkage section with frame, and multiple described mud sections of scraping form holding tank, and described dredging tube is with scraping mud Duan Lian Connect and be placed in holding tank.
By using above-mentioned technical proposal, during length direction of the cleaning shoe along pond body moves, sludge is past to be held Receive and converge in groove, dredging tube is placed in holding tank, extraction sludge that can be more clean.
The utility model is further arranged to:Described mud-scraping mechanism also includes rubber extension, and described scrapes in mud section It is fixed with the rubber extension.
By using above-mentioned technical proposal, the inwall of pond body has depression, is supported by the inwall of rubber extension and pond body Touch, the sludge hanging fascia of recess can be lifted operating efficiency, while improve the protective effect to the inwall of pond body.
The utility model is further arranged to:The one end of described dredging tube away from dredge pump is provided with anti-plug assembly.
By using above-mentioned technical proposal, there is more impurity and stone in waste water containing coal, pass through setting for anti-plug assembly Put so that dredging tube is not easy to be blocked by stone, extends the service life of dredging tube.
The utility model is further arranged to:Described anti-plug assembly includes contradicting bar and support bar, described support bar One end and dredging tube inwall connect, the other end with conflict bar be connected, described conflict bar stretches out from the dredging tube.
By using above-mentioned technical proposal, supported by support bar to contradicting bar, during dredging tube draws sludge, Stone is not easy to enter in dredging tube with contradicting bar conflict, so that dredging tube is not easy to be blocked.
The utility model is further arranged to:Described anti-plug assembly also includes being used to drive the length for contradicting bar along itself The drive mechanism of direction movement.
By using above-mentioned technical proposal, conflict bar is driven to be moved along the length direction of itself by drive mechanism, by stone Block top is opened, so as to more be not easily accessible in dredging tube, further protective effect of the lifting to dredging tube.
The utility model is further arranged to:Described drive mechanism includes pressing compression leg, spring, connecting rod and transmission group Part, the transmission component include positioning sleeve, the first sliding block, the second sliding block and bootstrap block, and the positioning sleeve is fixed in frame, institute State the first sliding block and the second sliding block is slidably connected in positioning sleeve, first sliding block by compression leg with being fixed, first sliding block The side of second sliding block is provided with the first inclined-plane, the side of second sliding block towards the first sliding block is offered for the The second inclined-plane that one inclined-plane contradicts, bootstrap block are fixed on the outer wall of the second sliding block, and chute is offered in the side wall of positioning sleeve, fixed The 3rd inclined-plane is offered on the end face of position set, the bootstrap block is placed in chute or contradicted with the 3rd inclined-plane, on the conflict bar Lead-in chamfered is offered, described connecting rod one end is connected with the second sliding block, and the other end is contacted in lead-in chamfered.
By using above-mentioned technical proposal, driving is moved by compression leg toward close to the direction of the first sliding block, the first inclined-plane and the Two inclined-planes contradict, and the second sliding block is separated with positioning sleeve, pass through the guiding function on the first inclined-plane and the second inclined-plane, the production of the second sliding block The rotation of raw certain angle, is unclamped after pressing compression leg, and bootstrap block and the 3rd inclined-plane are contradicted, so that contradicting bar can stretch out;Together When reason presses compression leg again, the second sliding block is stretched out from positioning sleeve, and certain angle is rotated by the first inclined-plane and the second inclined-plane Degree, bootstrap block is corresponding with chute, when compression leg is pressed in release, bootstrap block is placed in chute so that contradicting bar can retract, so as to Realize that contradicting bar promotes stone mobile and be not easy to make stone enter in dredging tube.
The utility model is further arranged to:Cast-iron lock gate is provided with described pond body, described cast-iron lock gate is placed in Between sewage pump and mud scraper.
By using above-mentioned technical proposal, cast-iron lock gate is closed, and can be easy to worker to the dredging tube in pond body and be scraped mud Plate is repaired without the water in pond body is all emptied, and has preferable water-saving effect.
In summary, the utility model has the advantages that:
Frame is moved by transmission mechanism along the length direction of pond body, and cleaning shoe is by positioned at the sludge scraping of pond body bottom Walk, meanwhile, dredge pump starts, and is discharged to after by dredging tube, sludge is extracted by discharge pipeline outside pond body, so as to have Imitate improving production efficiency.
Brief description of the drawings
Fig. 1 is the external structure schematic diagram of the present embodiment;
Fig. 2 is the structural representation for embodying anti-plug assembly.
Reference:1st, pond body;2nd, mud scraper;21st, frame;22nd, transmission mechanism;23rd, mud-scraping mechanism;231st, linkage section; 232nd, mud section is scraped;24th, suction dredge structure;241st, dredging tube;242nd, discharge pipeline;25th, guide rail;26th, rubber extension;3rd, holding tank; 4th, anti-plug assembly;41st, drive mechanism;42nd, bar is contradicted;421st, lead-in chamfered;43rd, support bar;431st, connecting portion;432nd, support Portion;5th, support plate;61st, by compression leg;62nd, spring;63rd, connecting rod;64th, transmission component;641st, positioning sleeve;642nd, the first sliding block; 643rd, the second sliding block;644th, bootstrap block;7th, cast-iron lock gate.
Embodiment
The utility model is described further referring to the drawings.
As shown in Figure 1 to Figure 2, a kind of slurry pond, including pond body 1, coal waste water will be contained pond is flow into by oral siphon In body 1, and being precipitated, the coal grain in waste water containing coal is deposited to the bottom of pond body 1, forms sludge by the effect of gravity, The top of pond body 1 is supernatant.Drainage tube (not shown) and square gathering ground are provided with the side wall of pond body 1(Figure Not shown in).One end of drainage tube is connected with pond body 1, and the other end connects with gathering ground, and supernatant is worn by the effect of gravity Cross after drainage tube to be injected into gathering ground and be collected.In order to increase the degree of purity of supernatant, it is remote that drainage tube is placed in pond body 1 One end of oral siphon.
For the ease of the sludge in pond body 1 is removed, mud scraper 2 is set in pond body 1.Mud scraper 2 includes frame 21, passed Motivation structure 22, the structure of mud scraper 2 and suction dredge structure 24.The guide rail 25 of two strips is fixed with the upper edge of pond body 1, guide rail 25 Length direction and the length direction of pond body 1 be arranged in parallel.The section of guide rail 25 is triangular in shape.Frame 21 is in strip, across pond body 1.Above-mentioned transmission mechanism 22 is mounted at the both ends of frame 21.Transmission mechanism 22 include motor (not shown) and Rotating wheel.Rotating wheel it is cylindrical on offer section stopper slot triangular in shape, rotating wheel is placed on guide rail 25 and by guide rail 25 It is bonded with the inwall of stopper slot.Rotating wheel is rotatably connected in frame 21, and frame 21 is supported.Motor is fixed on In frame 21, rotating wheel rotation is driven.
The structure of mud scraper 2 includes cleaning shoe and rubber extension 26, and cleaning shoe includes linkage section 231 and three are scraped mud section 232. Linkage section 231 is fixedly connected in strip and one end with the lower end of frame 21, and the other end is fixedly connected with scraping mud section 232.Scrape mud 232 sections of section are rectangle setting.In order that linkage section 231 is not easy to bend because of the drag effect of water.By linkage section 231 Extend close to the one end for scraping mud section 232 toward the direction away from oral siphon, be obliquely installed linkage section 231.
It is respectively first to scrape mud section 232, second scrape mud section 232 and the 3rd and scrape mud section 232 that three, which are scraped mud section 232,.By Two upper surfaces for scraping mud section 232 are fixedly connected with above-mentioned linkage section 231, and both ends are scraped mud section 232 and second with first and scraped respectively The integrated setting of mud section 232.Make first scrape mud section 232, second scrape mud section 232 and the 3rd scrape mud section 232 formed flare Holding tank 3.
Mud section 232 is scraped first, second to scrape mud section 232 and the 3rd and scrape and be respectively and fixedly provided with mud section 232 above-mentioned be in cuboid The rubber extension 26 of setting.The side wall and bottom wall for making rubber extension 26 and pond body 1 contradict.
Suction dredge structure 24 includes dredging tube 241, dredge pump (not shown) and discharge pipeline 242.Dredge pump is fixed on machine On frame 21, one end of dredge pump is connected with dredging tube 241, the other end connects with discharge pipeline 242.Dredging tube 241 is away from suction mud One end of pump is fixed on second and scrapes in mud section 232 and connected with above-mentioned holding tank 3.After dredge pump startup, by inhaling mud Pipe 241 sucks sludge, is discharged sludge by discharge pipeline 242.The side of pond body 1 is provided with gutter, passes through discharge pipeline 242 are injected into sludge in gutter.
In order to reduce the possibility that dredging tube 241 is blocked by stone.It is provided with the one end of dredging tube 241 away from dredge pump Anti- plug assembly 4.Anti- plug assembly 4 includes drive mechanism 41, contradicts bar 42, multiple support bars 43.Support bar 43 is set including integration The supporting part 432 that the section put is square in fan-shaped connecting portion 431 and section.The connecting portion 431 of multiple support bars 43 splices Into discoid support plate 5.The one end of supporting part 432 away from connecting portion 431 is fixedly connected with the inwall of dredging tube 241.By dirt Passed through in the gap that mud is formed from two adjacent supports portions 432.
Mounting hole is formed in support plate 5, bar 42 will be contradicted and wear and be slidably connected in the mounting hole.Bar 42 will be contradicted One end away from mounting hole is stretched out from dredging tube 241.Drive mechanism 41 is included by compression leg 61, spring 62, connecting rod 63, transmission Component 64, transmission component 64 include positioning sleeve 641, the first sliding block 642, the second sliding block 643 and bootstrap block 644.
First sliding block 642 in the form of annular discs, the second sliding block 643 are placed in positioning sleeve 641 and slided with positioning sleeve 641 Connection.A rounded connecting hole in section is opened up in frame 21.Positioning sleeve 641 is fixed in the connecting hole.Will pressing Post 61 is arranged in positioning sleeve 641, and is fixedly connected with the first sliding block 642.In the first sliding block 642 back to by the one of compression leg 61 Side offers the first inclined-plane, is offered in the side of the second sliding block 643 towards the first sliding block 642 for contradicting with the first inclined-plane Second inclined-plane.The bootstrap block 644 of strip is fixed on the outer wall of the second sliding block 643.Opened up in the side wall of positioning sleeve 641 There is a chute, the length direction of chute is parallel with the length direction of positioning sleeve 641.In positioning sleeve 641 back to the side by compression leg 61 The 3rd inclined-plane is offered, bootstrap block 644 is placed in chute, or is embedded on the 3rd inclined-plane.
The one end of connecting rod 63 is fixed on side of second sliding block 643 away from the first sliding block 642, the other end in round table-like and Contradicted with contradicting the lead-in chamfered 421 on bar 42.One end of spring 62 is fixedly connected with frame 21, the other end and the second sliding block 643 contradict.And spring 62 applies elastic force to the second sliding block 643 all the time.
When there is stone to block dredging tube 241, it will move, drive toward close to the direction of the second sliding block 643 by compression leg 61 The direction of first sliding block 642 and the second sliding block 643 toward remotely located set 641 is moved, and the second sliding block 643 takes off from positioning sleeve 641 Go out, by the guiding function on the first inclined-plane and the second inclined-plane, the second sliding block 643 is produced the rotation of certain angle, meanwhile, guiding Block 644 is corresponding with the 3rd inclined-plane after deviating from from chute, after stopping to applying active force by compression leg 61, passes through the elastic force of spring 62 Effect, bootstrap block 644 is embedded on the 3rd inclined-plane.Now, the second sliding block 643 produces position toward close to the direction of connecting rod 63 Move, by the conflict of connecting rod 63 and lead-in chamfered 421, promote conflict bar 42 to be moved toward the direction away from dredging tube 241, by stone Block top is opened, and stone is no longer blocked dredging tube 241.When again to applying active force by compression leg 61, similarly, the second sliding block 643 is logical The effect for crossing the first inclined-plane and the second inclined-plane produces the rotation of certain angle, makes after bootstrap block 644 separates with the 3rd inclined-plane, with Chute is corresponding, and compression leg 61 is pressed in release, is acted on by the elastic force of spring 62 and bootstrap block 644 is placed in chute, make connecting rod 63 past Moved close to the direction of the second sliding block 643, acted on by the suction of dredging tube 241 and the conflict of connecting rod 63, make conflict Bar 42 resets.
When dredging tube 241 or cleaning shoe are damaged, for the ease of maintenance.One cast iron is installed in pond body 1 Gate 7.Cast-iron lock gate 7 is driven by motor.Cast-iron lock gate 7 is closed, and pond body 1 is divided for maintenance area and water reserve.Mud scraper 2 In maintenance area, the water in maintenance area is drained, you can be easy to repair.And now, still there is certain storage in water reserve Water, from without whole pond body 1 is allowed to dry.
Described above is only preferred embodiment of the present utility model, and the scope of protection of the utility model is not limited merely to Above-described embodiment, all technical schemes belonged under the utility model thinking belong to the scope of protection of the utility model.It should refer to Go out, for those skilled in the art, some improvement under the premise of the utility model principle is not departed from and Retouching, these improvements and modifications also should be regarded as the scope of protection of the utility model.

Claims (9)

1. a kind of slurry pond, including pond body (1), it is characterized in that:Length direction of the described pond body (1) along itself, which slides, to be connected Mud scraper (2) is connected to, described mud scraper (2) includes frame (21), transmission mechanism (22) and scraping mechanism, described frame (21) moved by length direction of the transmission mechanism (22) along pond body (1), described scraping mechanism includes cleaning shoe, described The upper end of cleaning shoe be connected with frame (21), lower end extends toward close to the bottom of pond body (1).
2. a kind of slurry pond according to claim 1, it is characterized in that:Described mud scraper (2) also includes suction dredge Structure (24), described suction dredge structure (24), which includes dredging tube (241), dredge pump and discharge pipeline (242), described dredge pump, to be fixed In in frame (21), described dredging tube (241) one end is connected with dredge pump, and the other end is connected with cleaning shoe, described spoil disposal Pipe (242) one end is connected with dredge pump, and the other end extends toward the direction away from pond body (1).
3. a kind of slurry pond according to claim 2, it is characterized in that:Described cleaning shoe includes linkage section (231) Mud section (232) is scraped with multiple, described mud section (232) of scraping is connected by the linkage section (231) with frame (21), multiple described Mud section (232) of scraping form holding tank (3), described dredging tube (241) is connected with scraping mud section (232) and is placed in holding tank (3) In.
4. a kind of slurry pond according to claim 3, it is characterized in that:Described mud scraper (2) structure also includes rubber Extension (26), described scraping are fixed with the rubber extension (26) in mud section (232).
5. a kind of slurry pond according to Claims 2 or 3 or 4, it is characterized in that:Described dredging tube (241) is remote One end of dredge pump is provided with anti-plug assembly (4).
6. a kind of slurry pond according to claim 5, it is characterized in that:Described anti-plug assembly (4) includes contradicting bar (42) it is connected with support bar (43), one end of described support bar (43) with the inwall of dredging tube (241), the other end is with contradicting bar (42) connect, described conflict bar (42) stretches out from the dredging tube (241).
7. a kind of slurry pond according to claim 6, it is characterized in that:Described anti-plug assembly (4) also includes being used for Driving contradicts the drive mechanism (41) that length direction of the bar (42) along itself moves.
8. a kind of slurry pond according to claim 7, it is characterized in that:Described drive mechanism (41) includes pressing compression leg (61), spring (62), connecting rod (63) and transmission component (64), the transmission component (64) include positioning sleeve (641), the first cunning Block (642), the second sliding block (643) and bootstrap block (644), the positioning sleeve (641) are fixed in frame (21), and described first slides Block (642) and the second sliding block (643) are slidably connected in positioning sleeve (641), and first sliding block (642) is solid with pressing compression leg (61) Fixed, first sliding block (642) is provided with the first inclined-plane, the second sliding block (643) court towards the side of the second sliding block (643) The second inclined-plane for being contradicted with the first inclined-plane is offered to the side of the first sliding block (642), bootstrap block (644) is fixed on second On the outer wall of sliding block (643), chute is offered in the side wall of positioning sleeve (641), the 3rd is offered on the end face of positioning sleeve (641) Inclined-plane, the bootstrap block (644) are placed in chute or contradicted with the 3rd inclined-plane, and lead-in chamfered is offered on the conflict bar (42) (421), described connecting rod (63) one end is connected with the second sliding block (643), and the other end is contacted in lead-in chamfered (421).
9. a kind of slurry pond according to claim 8, it is characterized in that:Cast iron lock is provided with described pond body (1) Door (7), described cast-iron lock gate (7) are placed between sewage pump and mud scraper (2).
CN201720886440.0U 2017-07-20 2017-07-20 A kind of slurry pond Active CN207056038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720886440.0U CN207056038U (en) 2017-07-20 2017-07-20 A kind of slurry pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720886440.0U CN207056038U (en) 2017-07-20 2017-07-20 A kind of slurry pond

Publications (1)

Publication Number Publication Date
CN207056038U true CN207056038U (en) 2018-03-02

Family

ID=61512084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720886440.0U Active CN207056038U (en) 2017-07-20 2017-07-20 A kind of slurry pond

Country Status (1)

Country Link
CN (1) CN207056038U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108837562A (en) * 2018-07-02 2018-11-20 成都赋阳技术开发有限公司 A kind of sewage treatment mud cleaning equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108837562A (en) * 2018-07-02 2018-11-20 成都赋阳技术开发有限公司 A kind of sewage treatment mud cleaning equipment
CN108837562B (en) * 2018-07-02 2021-02-26 海南诚和源水务工程质量检测有限公司 Silt clean-up equipment for sewage treatment

Similar Documents

Publication Publication Date Title
CN107399850A (en) A kind of method of wastewater treatment containing coal
CN206752244U (en) A kind of anti-blocking desilting drainage system of urban road
CN111720665B (en) Pipeline trash-cleaning robot
CN103670512A (en) Underwater continuous automatic dredging system of underground oversized water sump of mine
CN207891807U (en) A kind of town road drainage arrangement
CN207056038U (en) A kind of slurry pond
CN208309325U (en) A kind of novel town road discharge structure
CN208857946U (en) A kind of pipe dredging device
CN113333457A (en) Wheel-driven discharge conversion type hazardous solid waste landfill treatment device
CN207667810U (en) A kind of environmental protection and energy saving crawler type hydraulic pressure magnetic separator
CN218374262U (en) Sponge urban pavement system
CN203043648U (en) Slag separation mechanism of sludge scrapping and sucking machine
CN206941775U (en) Construction trap drainage well lid
CN216640744U (en) Grass planting ditch structure for hydraulic engineering
CN202055248U (en) Pile foundation mud pit
CN201737941U (en) Chain scraping methane project desanding device
CN203603980U (en) Continuous and automatic desilting system under water body of underground huge water bins
CN107115698A (en) A kind of aerated grit chamber of closing
CN210482517U (en) Integrated sewage lifting pump station with dredging device
CN208763168U (en) A kind of catch-basin is removed contamination bamboo cage and dedicated delivery tool
CN102743905A (en) Scumming mechanism of scum scraping and sucking machine
CN206809836U (en) A kind of retracting device for being used in middle and low grade bauxite production process produce the sediment containing antimony
CN208927686U (en) Band pushes away the mud scraper of mud device
CN207714225U (en) A kind of road ditch clearing apparatus
CN207176439U (en) A kind of highway engineering torrent drain tank