CN205919001U - Add air parcel wall body pipeline fixing device - Google Patents

Add air parcel wall body pipeline fixing device Download PDF

Info

Publication number
CN205919001U
CN205919001U CN201620668408.0U CN201620668408U CN205919001U CN 205919001 U CN205919001 U CN 205919001U CN 201620668408 U CN201620668408 U CN 201620668408U CN 205919001 U CN205919001 U CN 205919001U
Authority
CN
China
Prior art keywords
fixed plate
wall body
lead screw
air parcel
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620668408.0U
Other languages
Chinese (zh)
Inventor
王兆祥
陈亮
陈福东
王修琛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Bohai Construction Group Co Ltd
Original Assignee
Qingdao Bohai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Bohai Construction Group Co Ltd filed Critical Qingdao Bohai Construction Group Co Ltd
Priority to CN201620668408.0U priority Critical patent/CN205919001U/en
Application granted granted Critical
Publication of CN205919001U publication Critical patent/CN205919001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a construction technical field, concretely relates to add air parcel wall body pipeline fixing device. It includes the fixed plate, the fixed plate on the perpendicular strutting arrangement who is used for supporting the pipeline that sets up, the fixed plate both ends set up the mounting hole, and two T shape lead screws pass and are fixed in through the mounting hole with the air parcel wall body the fixed plate, T shape lead screw includes the lead screw of a harness cord, the one end of lead screw sets up the square steel board perpendicularly, lead screw length is greater than add air parcel wall body thickness. The utility model discloses on adding the air parcel wall body, utilize T shape lead screw toughness and rigidity better, wear the fixed pipeline bracket of wall, do not need to reserve in advance, it can only to need to process the installation of wall spare in the later stage when installing. Reduce overlapping jobs, improve the efficiency of construction, can shorten construction period effectively, reduce the construction degree of difficulty, it is pleasing to the eye that the brick is arranged to the brickwork, reduce the waste, once survive, economic nature is good, reduces manual work and concrete, template consumption.

Description

A kind of aerated blocks body of wall pipeline fixing device
Technical field
This utility model is related to technical field of building construction and in particular to a kind of aerated blocks body of wall pipeline fixing device.
Background technology
In modern architecture, aerated blocks brick, because it is cheap, unit weight is light, heat-insulating property is high, sound-absorbing effect is good, has certain strong The advantages of degree and machinability, be that China's popularization and application are earliest, one of most popular light wall material.But because of its material Softer, during installation, the fixation of pipeline becomes a difficult problem.Prior art during aerated blocks building wall, in advance Bury prefabricated concrete block.Concrete block fixed -piping is relied in later stage installation process.Prior art shortcoming is: cross-operation Many, during reserved concrete block, increase and cooperate between professional contingent, increase management difficulty, easily omit;Difficulty of construction is big, reserved coagulation Soil block size can not be overlapped very well with brick envelope, unsightly;Because of reasons such as changes and reserved excessive with construction interval, cause to reserve Concrete block position have deviation, cause waste and the later stage cannot construct;Precast concrete block needs many consumption artificial and auxiliary material, no Economical.
Utility model content
For not enough present on prior art, this utility model provides one kind not need prefabricated in advance, easy construction, letter Clean, efficiency high, reduces cost aerated blocks body of wall pipeline fixing device.
To achieve these goals, this utility model is to realize by the following technical solutions:
A kind of aerated blocks body of wall pipeline fixing device, it includes fixed plate, described fixed plate is vertically arranged for propping up The support meanss in stay tube road, described fixed plate two ends arrange installing hole, and two t shape screw mandrels pass through aerated blocks body of wall to pass through installing hole It is fixed on described fixed plate, described t shape screw mandrel includes the screw mandrel of a harness cord, and one end of described screw mandrel is vertically arranged square steel Plate, described screw mandrel length is more than described aerated blocks thickness of wall body.
A kind of above-mentioned aerated blocks body of wall pipeline fixing device, its described fixed plate is surface plate or angle steel.
A kind of above-mentioned aerated blocks body of wall pipeline fixing device, its described support means is surface plate or angle steel.
Beneficial effect:
This utility model is on aerated blocks body of wall, preferable using t shape leading screw toughness and rigidity, fixed -piping support through walls, Do not need advance reservation, only need to process part through walls when installing in the later stage and install.Reduce cross-operation, improve construction effect Rate, can shorten the construction period effectively;Reduce difficulty of construction, masonry row's brick is attractive in appearance;Reduce and waste, once survive;Economy Good, reduce artificial and concrete, template consumption.
Brief description
To describe this utility model with reference to the accompanying drawings and detailed description in detail;
Fig. 1 is structural representation of the present utility model.
Specific embodiment
Technological means, creation characteristic, reached purpose and effect for making this utility model realize are easy to understand, below In conjunction with specific embodiment, this utility model is expanded on further.
With reference to Fig. 1, this utility model includes fixed plate 1, and fixed plate 1 is made up of angle steel.The intermediate vertical of fixed plate 1 is in solid Fixed board 1 welding is provided with the support meanss 2 for supporting pipeline, and support meanss 2 are made up of angle steel, and fixed plate 1 two ends set respectively Put an installing hole 3, two t shape screw mandrels 4 pass through aerated blocks body of wall 5 and installing hole 3 to be connected and fixed on fixed plate 1 by nut 6, T shape screw mandrel 4 includes the screw mandrel 4-1 of a harness cord, and one end of screw mandrel 4-1 is vertically arranged square steel plate 4-2, and the length of screw mandrel 4-1 is big Thickness in aerated blocks body of wall 5.
Improve as further, fixed plate and support meanss can also be made up of plane steel plate.
During use, need the position of fixed -piping in aerated blocks body of wall, hole is got through in reconnaissance, fixed plate of the present utility model is leaned on Stand on aerated blocks body of wall, after the t shape screw mandrel other end passes through aerated blocks body of wall, installing hole, fixed with nut screwing clamping.
This utility model is on aerated blocks body of wall, preferable using t shape leading screw toughness and rigidity, fixed -piping support through walls, Do not need advance reservation, only need to process part through walls when installing in the later stage and install.Reduce cross-operation, improve construction effect Rate, can shorten the construction period effectively;Reduce difficulty of construction, masonry row's brick is attractive in appearance;Reduce and waste, once survive;Economy Good, reduce artificial and concrete, template consumption.
Of the present utility model ultimate principle and principal character and of the present utility model advantage have been shown and described above.One's own profession The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model is also Have various changes and modifications, these changes and improvements both fall within the range of claimed this utility model.This utility model Claimed scope is by appending claims and its equivalent thereof.

Claims (3)

1. a kind of aerated blocks body of wall pipeline fixing device, it is characterised in that including fixed plate, described fixed plate is vertically arranged For supporting the support meanss of pipeline, described fixed plate two ends arrange installing hole, and two t shape screw mandrels pass through through aerated blocks body of wall Installing hole is fixed on described fixed plate, and described t shape screw mandrel includes the screw mandrel of a harness cord, and one end of described screw mandrel is vertically arranged Square steel plate, described screw mandrel length is more than described aerated blocks thickness of wall body.
2. a kind of aerated blocks body of wall pipeline fixing device according to claim 1 is it is characterised in that described fixed plate is Surface plate or angle steel.
3. a kind of aerated blocks body of wall pipeline fixing device according to claim 1 is it is characterised in that described support meanss For surface plate or angle steel.
CN201620668408.0U 2016-06-28 2016-06-28 Add air parcel wall body pipeline fixing device Expired - Fee Related CN205919001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620668408.0U CN205919001U (en) 2016-06-28 2016-06-28 Add air parcel wall body pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620668408.0U CN205919001U (en) 2016-06-28 2016-06-28 Add air parcel wall body pipeline fixing device

Publications (1)

Publication Number Publication Date
CN205919001U true CN205919001U (en) 2017-02-01

Family

ID=57874833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620668408.0U Expired - Fee Related CN205919001U (en) 2016-06-28 2016-06-28 Add air parcel wall body pipeline fixing device

Country Status (1)

Country Link
CN (1) CN205919001U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109953673A (en) * 2019-04-19 2019-07-02 中建八局装饰工程有限公司 A kind of marble wash platform and mounting process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109953673A (en) * 2019-04-19 2019-07-02 中建八局装饰工程有限公司 A kind of marble wash platform and mounting process
CN109953673B (en) * 2019-04-19 2024-04-16 中建八局装饰工程有限公司 Marble wash platform and installation process

Similar Documents

Publication Publication Date Title
CN104405128B (en) Infilled wall concealed distribution box is direct installation method in advance
CN206428879U (en) A kind of adjustable environmentally friendly grid ceiling
CN203603452U (en) Folded plate small space formwork assembly
CN100570099C (en) A kind of building plastering leveling method and construction wall thereof
CN205919001U (en) Add air parcel wall body pipeline fixing device
CN203247842U (en) Reinforcing device of concrete structure expansion joint formwork
CN207988159U (en) A kind of assembled watertight building
CN200968042Y (en) Ceramic tile for architectural decoration
CN202500296U (en) Embedded prearranged pipe locking pin used for fixing veneer
CN102400440B (en) Outer template
CN203373963U (en) Installation structure of formwork of inner side of elevator shaft shear wall
CN200949584Y (en) Sleeve type rubber screw cap and boil
CN206607709U (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN212613727U (en) Be applied to mould shell of close rib structure superstructure building
CN205189403U (en) A steel instrument for making enclosure bears down on one
CN203174837U (en) Combination hanging piece and beam-free reinforced ceramic gravel curtain wall system
CN205875621U (en) Sound partition wall is inhaled to bathroom pipeline
CN203174835U (en) Combination hanging piece and beam-free ceramic gravel curtain wall system
CN206123902U (en) A light -duty side form system for precast concrete wall panel production
CN205636936U (en) Structure of making an uproar falls in pipeline sound insulation
CN206467926U (en) The glass fitting structure of guardrail
CN205688736U (en) A kind of many curved surfaces concavo-convex moulding GRG mounting structure
CN205444592U (en) Ceramic tile curtain installing the system
CN215594952U (en) External wall wallboard root reinforcing tool
CN205531285U (en) Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170201

Termination date: 20180628

CF01 Termination of patent right due to non-payment of annual fee