CN205909289U - Incinerator for sludge treatment - Google Patents
Incinerator for sludge treatment Download PDFInfo
- Publication number
- CN205909289U CN205909289U CN201620686042.XU CN201620686042U CN205909289U CN 205909289 U CN205909289 U CN 205909289U CN 201620686042 U CN201620686042 U CN 201620686042U CN 205909289 U CN205909289 U CN 205909289U
- Authority
- CN
- China
- Prior art keywords
- drive rod
- passage
- treatment
- impurities removal
- mounting blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treatment Of Sludge (AREA)
Abstract
The utility model provides an incinerator for sludge treatment, include install bin, a conveying mechanism, the 2nd conveying mechanism, a plurality of transport complementary unit, burn the mechanism and arrange miscellaneous mechanism, be equipped with the gas outlet on the install bin, a conveying mechanism includes first passage, first actuating lever, a driving motor, air exhauster and a helical blade, is equipped with the wind -guiding passageway in the first actuating lever, is equipped with a plurality of mounting holes on the helical blade, is equipped with first feed inlet and first discharge gate on the first passage, the 2nd conveying mechanism includes second passage, second actuating lever, the 2nd driving motor and the 2nd helical blade, is equipped with second feed inlet and second discharge gate on the second passage, carry complementary unit to include first installation piece, second installation piece, screw and two stirring framves, be equipped with the through hole on the first installation piece, be equipped with the screw hole on the second installation piece. The utility model discloses convenient to use, and getting rid of and heating up of sludge water branch has been realized to the efficient.
Description
Technical field
This utility model is related to field of sludge treatment and in particular to a kind of Treatment of Sludge burning facility.
Background technology
Sludge incineration is a kind of technique of Treatment of Sludge.It utilizes incinerator by dewatered sludge heat drying, then uses high temperature
Organic substance in oxidized sludge, makes mud become a small amount of ashes.After burning, ash can reuse as resource.If still contained
The noxious substances such as heavy metal ion, must also do final process, and solidification is buried.The degree of drying of mud and temperature when being burned
Affect the effect of Treatment of Sludge, but the Treatment of Sludge burning facility on market not only manages and has high demands, and is also difficult to reach
The demand of client.
Utility model content
The technical problem being existed based on background technology, the utility model proposes a kind of Treatment of Sludge burning facility.
The utility model proposes a kind of Treatment of Sludge burning facility, including installing case, the first conveying mechanism, second defeated
Send mechanism, multiple conveying auxiliary body, burn mechanism and impurities removal mechanism;
Case is installed and is provided with gas outlet, case is installed and includes heat-insulation layer and be arranged on the fire brick layer within heat-insulation layer;
First conveying mechanism includes the first passage, the first drive rod, the first motor, air exhauster and the first helical-blade
Piece, the first passage is arranged on installation case, and the first drive rod is located in the first passage, the first motor drive connection the
One drive rod first end, the first motor drives the first drive rod to rotate, and is provided with air-guiding aisle in the first drive rod, and wind-guiding leads to
Along the first drive rod axially across the first drive rod, air exhauster pipeline connection air-guiding aisle, air exhauster is connected with air-guiding aisle in road
Position is located at the first drive rod first end, and the first helical blade is arranged on the first drive rod periphery, corresponding the on the first passage
One drive rod first end and the second end are respectively equipped with first charging aperture and the first discharging opening;
Second conveyor structure includes the second passage, the second drive rod, the second motor and the second helical blade, and second
Passage is arranged on installation case, and is located at below the first passage, and the second passage is provided with second charging aperture and second and goes out
Material mouth, second charging aperture position is corresponding with the first discharging opening position row, and the second drive rod is located in the second passage, the second driving
Motor drive connects the second drive rod, and the second motor drives the second drive rod to rotate, and the second helical blade is arranged on second
Drive rod periphery;
First helical blade is provided with multiple installing holes, and conveying auxiliary body and installing hole correspond, and convey auxiliary machine
Structure includes the first mounting blocks, the second mounting blocks, screw and two puddle supports, and the threaded rod that the first mounting blocks are provided with for screw is worn
The through hole crossed, the second mounting blocks are provided with the screwed hole being adapted with the threaded rod of screw, and the threaded rod priority of screw passes through
Through hole and its corresponding installing hole, and be connected with the second mounting blocks by screwed hole, two puddle supports are separately mounted to the first peace
On dress block and the second mounting blocks;
Burn mechanism second discharging opening position corresponding with impurities removal mechanism to be arranged in installation case.
Preferably, the first passage and the second passage diameter parallel, the second discharging opening is located at second charging aperture near the
The side of one charging aperture.
Preferably, two puddle supports are semi-circular.
Preferably, the first mounting blocks and the second mounting blocks side close to each other are all provided with elasticity layer.
Preferably, screw thread in the hole is provided with elastic layer.
Preferably, gas outlet with burn mechanism be located at install case in the second passage axial direction relative to both sides, install case
Interior positioned at gas outlet and burn mechanism between vertically-mounted have multiple windbreaks, windbreak gas outlet and burn mechanism between shape
Become s shape air-guiding aisle.
Preferably, first drive rod the second end is provided with impurities removal cylinder, and impurities removal cylinder is connected with air-guiding aisle, impurities removal cylinder internal diameter edge
The direction internal diameter away from the first drive rod gradually to increase and decrease, impurities removal cylinder axis horizontal.
Preferably, impurities removal mechanism includes splicing frame and at least one impurities removal auxiliary device, and impurities removal auxiliary device includes the 3rd
Drive rod and two the 3rd helical blades, the 3rd drive rod may be rotatably mounted on splicing frame, and two the 3rd helical blades are all pacified
It is contained on the 3rd drive rod, and the feed direction of two the 3rd helical blades is contrary.
Preferably, the second helical blade is provided with multiple feeding via holes.
This utility model preferably, adds mud, the first motor by first charging aperture when this utility model uses
Drive the first helical blade to rotate by the first drive rod, realize mud and smoothly push, the internal burning sludge of case is installed and is produced
Raw heat is preheated to mud by the first passage, effectively improves the effect of moisture vaporization in the first passage, convulsion
Machine is closed with wind-guiding wildcard, and by first drive rod the second end, nearby the air containing moisture siphons away, turning with the first helical blade
Dynamic, two puddle supports are constantly stirred to mud, improve the effect that mud crushing effect and mud internal moisture are discharged,
And conveying auxiliary body's installation and removal conveniently, the mud being entered the second passage by the first discharging opening can be in the second driving
Deliver to burning mechanism by the second discharging opening under bar, the second motor and the cooperation of the second helical blade to go out, due to the first drive rod
Keep subnormal ambient near second end, therefore heat can be passed through the second discharging opening and suck the second passage, improve further
The effect that this utility model removes to sludge water content.This utility model is easy to use, and efficiently achieves going of sludge water content
Remove and heat up.
Brief description
Fig. 1 be the utility model proposes a kind of Treatment of Sludge burning facility structural representation;
Fig. 2 is this utility model conveying auxiliary body structural representation.
Specific embodiment
Shown in seeing figures.1.and.2, the utility model proposes a kind of Treatment of Sludge burning facility, include installation case 1,
First conveying mechanism, second conveyor structure, multiple conveying auxiliary body, burning mechanism 5 and impurities removal mechanism;
Case 1 is installed and is provided with gas outlet 101, case 1 is installed and includes heat-insulation layer and be arranged on the fire brick layer within heat-insulation layer;
First conveying mechanism includes the first passage 21, the first drive rod 22, the first motor 23, air exhauster 24 and
One helical blade 25, the first passage 21 is arranged on installation case 1, and the first drive rod 22 is located in the first passage 21, and first
Motor 23 drive connection the first drive rod 22 first end, the first motor 23 drives the first drive rod 22 to rotate, and first
It is provided with air-guiding aisle, air-guiding aisle along the first drive rod 22 axially across the first drive rod 22, manage by air exhauster 24 in drive rod 22
Road connects air-guiding aisle, and air exhauster 24 is located at the first drive rod 22 first end, the first helical blade with air-guiding aisle communicating position
25 are arranged on the first drive rod 22 periphery, and on the first passage 21, corresponding first drive rod 22 first end and the second end are respectively equipped with
First charging aperture and the first discharging opening;
Second conveyor structure includes the second passage 31, the second drive rod 32, the second motor 33 and the second helical-blade
Piece 34, the second passage 31 is arranged on installation case 1, and is located at below the first passage 21, and the second passage 31 is provided with the
Two charging apertures and the second discharging opening, second charging aperture position is corresponding with the first discharging opening position row, and the second drive rod 32 is located at the
In two passages 31, the second motor 33 drive connection the second drive rod 32, the second motor 33 drives the second drive rod
32 rotations, the second helical blade 34 is arranged on the second drive rod 32 periphery;
First helical blade 25 is provided with multiple installing holes, and conveying auxiliary body and installing hole correspond, conveying auxiliary
Mechanism includes the first mounting blocks 41, the second mounting blocks 42, screw 43 and two puddle supports 44, and the first mounting blocks 41 are provided with and supply spiral shell
The through hole that the threaded rod of nail 43 passes through, the second mounting blocks 42 are provided with the screwed hole being adapted with the threaded rod of screw 43, spiral shell
The threaded rod priority of nail 43 passes through through hole and its corresponding installing hole, and is connected with the second mounting blocks 42 by screwed hole, two
Puddle support 44 is separately mounted on the first mounting blocks 41 and the second mounting blocks 42;
Burn mechanism 5 second discharging opening position corresponding with impurities removal mechanism to be arranged in installation case 1.
This utility model preferably, adds mud, the first motor by first charging aperture when this utility model uses
23 drive the first helical blade 25 to rotate by the first drive rod 22, realize mud and smoothly push, and install the internal burning of case 1 dirty
Heat produced by mud is preheated to mud by the first passage 21, effectively improves moisture vaporization in the first passage 21
Effect, air exhauster 24 is closed with wind-guiding wildcard, and by the first drive rod 22 second end, nearby the air containing moisture siphons away, with first
The rotation of helical blade 25, two puddle supports 44 are constantly stirred to mud, improve in mud crushing effect and mud
The effect that portion's moisture is discharged, and it is convenient, by first discharging opening entrance the second passage 31 to convey auxiliary body's installation and removal
Mud can be delivered to by the second discharging opening and burn under the cooperation of the second drive rod 32, the second motor 33 and the second helical blade 34
Burn mechanism 5 to go out, keep subnormal ambient due near the first drive rod 22 second end, therefore heat can be passed through the second discharging opening
Suck the second passage 31, improve the effect that this utility model removes to sludge water content further.
In present embodiment, the first passage 21 and the second passage 31 diameter parallel, the second discharging opening enters positioned at second
Material mouth, near the side of first charging aperture, is conducive to reducing the volume of intrinsic safety vanning 1.
In present embodiment, two puddle supports 44 are semi-circular, simply efficiently realize the pulverizing of mud.
In present embodiment, the first mounting blocks 41 and the second mounting blocks 42 side close to each other are all provided with elasticity layer, have
Effect adapts to the structure of the first helical blade 25 bending.
In present embodiment, screw thread in the hole is provided with elastic layer, is conducive to screw 43 to be fitted close with the second mounting blocks 42.
In present embodiment, gas outlet 101 is relative in the second passage 31 axial direction positioned at installing case 1 with burning mechanism 5
Both sides, install and be located at gas outlet 101 in case 1 and burn and vertically-mounted between mechanism 5 have multiple windbreaks 102, windbreak 102
In gas outlet 101 and burn and form s shape air-guiding aisle between mechanism 5, be conducive to improving hot-air and the first passage 21 and the
The time of two passage 31 contact.
In present embodiment, the first drive rod 22 second end is provided with impurities removal cylinder 221, and impurities removal cylinder 221 is with air-guiding aisle even
Logical, impurities removal cylinder 221 internal diameter gradually increases and decreases along the direction internal diameter away from the first drive rod 22, impurities removal cylinder 221 axis horizontal, reduces
Mud enters the possibility of air-guiding aisle.
In present embodiment, impurities removal mechanism includes splicing frame 61 and at least one impurities removal auxiliary device, impurities removal auxiliary device
Including the 3rd drive rod 621 and two the 3rd helical blades 622, the 3rd drive rod 621 may be rotatably mounted on splicing frame 61, and two
Individual 3rd helical blade 622 is installed on the 3rd drive rod 621, and the feed direction of two the 3rd helical blades 622 is contrary,
Realize while efficient impurities removal, reducing the loss of furnace temperature.
In present embodiment, the second helical blade 34 is provided with multiple feeding via holes, increases the effect of sludge crushing.
The above, only this utility model preferably specific embodiment, but protection domain of the present utility model is not
Be confined to this, any those familiar with the art in the technical scope that this utility model discloses, according to this practicality
New technical scheme and its utility model design in addition equivalent or change, all should cover in protection model of the present utility model
Within enclosing.
Claims (9)
1. a kind of Treatment of Sludge burning facility it is characterised in that: include install case (1), the first conveying mechanism, second conveyor
Structure, multiple conveying auxiliary body, burning mechanism (5) and impurities removal mechanism;
Case (1) is installed and is provided with gas outlet (101), case (1) is installed and includes heat-insulation layer and be arranged on the refractory brick within heat-insulation layer
Layer;
First conveying mechanism includes the first passage (21), the first drive rod (22), the first motor (23), air exhauster (24)
With the first helical blade (25), the first passage (21) is arranged on to be installed on case (1), and the first drive rod (22) is located at the first guide
In pipe (21), the first motor (23) drive connection the first drive rod (22) first end, the first motor (23) drives the
One drive rod (22) rotates, and the first drive rod is provided with air-guiding aisle in (22), and air-guiding aisle is axially worn along the first drive rod (22)
Cross the first drive rod (22), air exhauster (24) pipeline connection air-guiding aisle, air exhauster (24) and air-guiding aisle communicating position are located at
First drive rod (22) first end, the first helical blade (25) is arranged on the first drive rod (22) periphery, the first passage (21)
Upper correspondence first drive rod (22) first end and the second end are respectively equipped with first charging aperture and the first discharging opening;
Second conveyor structure includes the second passage (31), the second drive rod (32), the second motor (33) and the second spiral
Blade (34), the second passage (31) is arranged in installation case (1), and is located at below the first passage (21), the second passage
(31) it is provided with second charging aperture and the second discharging opening, second charging aperture position is corresponding with the first discharging opening position row, the second drive
Lever (32) is located in the second passage (31), the second motor (33) drive connection the second drive rod (32), the second driving
Motor (33) drives the second drive rod (32) to rotate, and the second helical blade (34) is arranged on the second drive rod (32) periphery;
First helical blade (25) is provided with multiple installing holes, and conveying auxiliary body and installing hole correspond, and convey auxiliary machine
Structure includes the first mounting blocks (41), the second mounting blocks (42), screw (43) and two puddle supports (44), on the first mounting blocks (41)
It is provided with the through hole that the threaded rod for screw (43) passes through, the second mounting blocks (42) are provided with suitable with the threaded rod phase of screw (43)
The screwed hole joined, the threaded rod priority of screw (43) passes through through hole and its corresponding installing hole, and by screwed hole and the second peace
Dress block (42) connects, and two puddle supports (44) are separately mounted on the first mounting blocks (41) and the second mounting blocks (42);
Burn mechanism (5) second discharging opening position corresponding with impurities removal mechanism to be arranged in installation case (1).
2. Treatment of Sludge burning facility according to claim 1 it is characterised in that: the first passage (21) is led with second
Expects pipe (31) diameter parallel, the second discharging opening is located at second charging aperture near the side of first charging aperture.
3. Treatment of Sludge burning facility according to claim 1 it is characterised in that: two puddle supports (44) are semi-ring
Shape.
4. Treatment of Sludge burning facility according to claim 1 it is characterised in that: the first mounting blocks (41) and second peace
Dress block (42) side close to each other is all provided with elasticity layer.
5. Treatment of Sludge burning facility according to claim 1 it is characterised in that: screw thread in the hole is provided with elastic layer.
6. Treatment of Sludge burning facility according to claim 1 it is characterised in that: gas outlet (101) with burn mechanism
(5) be located at install case (1) on the second passage (31) axial direction relative to both sides, install in case (1) positioned at gas outlet (101) and
Vertically-mounted between burning mechanism (5) have multiple windbreaks (102), and windbreak (102) is in gas outlet (101) and burning mechanism
(5) form s shape air-guiding aisle between.
7. Treatment of Sludge burning facility according to claim 1 it is characterised in that: the first drive rod (22) second end peace
Equipped with impurities removal cylinder (221), impurities removal cylinder (221) is connected with air-guiding aisle, and impurities removal cylinder (221) internal diameter is along away from the first drive rod
(22) direction internal diameter gradually increases and decreases, impurities removal cylinder (221) axis horizontal.
8. Treatment of Sludge burning facility according to claim 1 it is characterised in that: impurities removal mechanism includes splicing frame (61)
With at least one impurities removal auxiliary device, impurities removal auxiliary device includes the 3rd drive rod (621) and two the 3rd helical blades
(622), the 3rd drive rod (621) may be rotatably mounted on splicing frame (61), and two the 3rd helical blades (622) are installed in
On three drive rods (621), and the feed direction of two the 3rd helical blades (622) is contrary.
9. Treatment of Sludge burning facility according to claim 1 it is characterised in that: the second helical blade (34) is provided with
Multiple feeding via holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620686042.XU CN205909289U (en) | 2016-06-30 | 2016-06-30 | Incinerator for sludge treatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620686042.XU CN205909289U (en) | 2016-06-30 | 2016-06-30 | Incinerator for sludge treatment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205909289U true CN205909289U (en) | 2017-01-25 |
Family
ID=57813747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620686042.XU Expired - Fee Related CN205909289U (en) | 2016-06-30 | 2016-06-30 | Incinerator for sludge treatment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205909289U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105972613A (en) * | 2016-06-30 | 2016-09-28 | 安徽未名鼎和环保有限公司 | Incineration device for sludge treatment |
CN108870408A (en) * | 2018-06-28 | 2018-11-23 | 谢远平 | Treatment of Sludge burning facility |
-
2016
- 2016-06-30 CN CN201620686042.XU patent/CN205909289U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105972613A (en) * | 2016-06-30 | 2016-09-28 | 安徽未名鼎和环保有限公司 | Incineration device for sludge treatment |
CN105972613B (en) * | 2016-06-30 | 2018-07-20 | 安徽未名鼎和环保有限公司 | A kind of Treatment of Sludge burning facility |
CN108870408A (en) * | 2018-06-28 | 2018-11-23 | 谢远平 | Treatment of Sludge burning facility |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100557676B1 (en) | Method for carbonizing organic waste and the apparatus therefor | |
CN205909289U (en) | Incinerator for sludge treatment | |
CN205679018U (en) | A kind of organic garbage treatment drying unit | |
KR101239581B1 (en) | Food waste disposer | |
CN107321770B (en) | Kitchen and household organic garbage comprehensive treatment device | |
CN113830991A (en) | Dry-wet separating device for fecal sewage treatment | |
CN110201982A (en) | A kind of classification recovery system of waste lead storage battery | |
CN108689579A (en) | A kind of continuous compound catenary mud drying device | |
CN205907172U (en) | Sludge treatment facility | |
CN105972613B (en) | A kind of Treatment of Sludge burning facility | |
CN205909304U (en) | Sludge incineration device | |
CN202066323U (en) | Efficient belt type drier | |
CN205907151U (en) | High efficiency somatotype sludge processing apparatus that anhydrates | |
CN205907173U (en) | Type sludge treatment equipment is preheated to high efficiency | |
CN205909291U (en) | Novel sludge incineration device | |
KR100645494B1 (en) | Drying Apparatus of Sludge of Cool and Warm Form | |
CN110788109A (en) | Rapid aerobic fermentation process for muddy organic matter | |
CN205907164U (en) | Easy dry sludge processing apparatus | |
CN211413156U (en) | Coal chemical industry residue is collected and is polluted emergency treatment device | |
CN205115261U (en) | Collection preheats and dry second grade jar as an organic whole | |
CN206940706U (en) | A kind of smoke sludge drying machine | |
CN208990768U (en) | A kind of charging removal of impurities pipeline of fine grained impurity | |
CN206352931U (en) | Tower grinds formula dryer | |
CN2137347Y (en) | Fast baking equipment for high moisture-containing stock | |
CN105923955A (en) | Efficient moisture-removing type sludge treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170125 Termination date: 20190630 |
|
CF01 | Termination of patent right due to non-payment of annual fee |