CN205907922U - SBS modified asphalt waterproofing membrane construction hand push compaction frame - Google Patents

SBS modified asphalt waterproofing membrane construction hand push compaction frame Download PDF

Info

Publication number
CN205907922U
CN205907922U CN201620834911.9U CN201620834911U CN205907922U CN 205907922 U CN205907922 U CN 205907922U CN 201620834911 U CN201620834911 U CN 201620834911U CN 205907922 U CN205907922 U CN 205907922U
Authority
CN
China
Prior art keywords
hand push
modified asphalt
sbs modified
coiled material
asphalt waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620834911.9U
Other languages
Chinese (zh)
Inventor
王永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201620834911.9U priority Critical patent/CN205907922U/en
Application granted granted Critical
Publication of CN205907922U publication Critical patent/CN205907922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a SBS modified asphalt waterproofing membrane construction hand push compaction frame, a serial communication port, including hand push compaction frame, hand push compaction frame is by hand push frame, the truckle wheel, the retainer plate, fixation nut, the threaded rod axle is constituteed, hand push frame welds with fixation nut with the retainer plate and is in the same place, hand push frame loads onto the truckle wheel, the thread end of threaded rod axle inserts in the retainer plate, the SBS modified asphalt waterproofing membrane who rolls up through batching rolls up the hole, and twist soon in the fixation nut of the other end into, hand push frame uses the diameter to form as 26 2.0 ordinary pipe welding of phi, high 1m, length 1.5m, handle interval 450mm, retainer plate and fixation nut interval 1050mm. Behind having avoided SBS modified asphalt waterproofing membrane construction to accomplish the line have some setbacks straight, defect that apparent mass is poor, the relevant quality hidden danger who from this produces has been stopped in the harm that has caused the coiled material when having avoided adopting stick, steel pipe etc. Pushing away SBS modified asphalt waterproofing membrane and go forward.

Description

A kind of sbs modified asphalt waterproof coiled material construction hand push compression frame
Technical field
This utility model belongs to sbs modified asphalt waterproof coiled material construction hand push compression frame, is particularly suited for adopting hot melt The sbs modified asphalt waterproof coiled material of construction.
Background technology
Flourishing with building industry, novel building water-proofing material quickly grows, wherein again with the application of waterproof roll The most extensive.Here, we research to as if using Hot-melt construction sbs modified asphalt waterproof coiled material.The modified drip of sbs Blue or green waterproof roll has good resistance to elevated temperatures, can use, have higher bullet within the temperature range of -25 to+100 DEG C of degree Property and fatigue durability, and good percentage elongation and stronger puncture-resistant ability, tear-resistant ability.It is suitable for cold district, with And deformation and the waterproofing work vibrating larger industry and civil buildings.Hot melt is to be rolled up heat molten type with special heating equipment The PUR heating of material bottom surface is melted and is made the construction method being bondd between waterproof roll and basic unit or coiled material and coiled material.Heat The key technology of molten method construction is baking PUR and the sbs after hot melt is compacted, and to promote adhesive effect, and then guarantees Construction quality.
Currently used construction method is that a people heats to sbs modified asphalt waterproof coiled material, and another person uses Waddy or steel pipe push coiled material and go ahead.After to using produced by the construction of this method, quality problems sort out, substantially Have several as follows: one, loosely, especially along at the long edge lap of sbs, bonding is not or not sbs modified asphalt waterproof coiled material and base adhesive Jail, easy leak;2nd, damaged, easy leak in sbs modified asphalt waterproof coiled material surface;3rd, sbs modified asphalt waterproof coiled material After the completion of construction, sideline is not straight, and apparent mass is poor.
For solving the above problems, and improve the construction quality of sbs modified asphalt waterproof coiled material, a kind of sbs is modified for special invention Asphalt water-proof coiled material construction hand push compression frame.
Utility model content
This utility model provides a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame, solves current sbs and changes Property asphalt water-proof coiled material and base adhesive loosely, especially along at the long edge lap of sbs bonding loosely, easy leak;The modified drip of bs Damaged, easy leak in blue or green waterproof roll surface;After the completion of the construction of sbs modified asphalt waterproof coiled material, sideline is not straight, apparent matter The problem of amount difference.
In order to solve above-mentioned technical problem, this utility model provides following technical scheme:
This utility model provides described in a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame, hand push compression frame, Described hand push compression frame is made up of hand push frame, castor wheel, ring for fixing, fixing nut, threaded rod axle, described hand push frame with solid Fixed circle and fixing nut weld together, and hand push frame loads onto castor wheel, in the end of thread insertion ring for fixing of described threaded rod axle, Hole is rolled up by the sbs modified asphalt waterproof coiled material of rolled, and is screwed in the fixing nut of the other end.
As a kind of optimal technical scheme of the present utility model, described hand push frame is with a diameter of φ 26 × 2.0 common steel tube It is welded, height 1m, length 1.5m, handle spacing 450mm, described ring for fixing and fixing nut spacing 1050mm.
As a kind of optimal technical scheme of the present utility model, described castor wheel is made of that have rubber, wheel diameter 150mm, wheel width 70mm.
As a kind of optimal technical scheme of the present utility model, described ring for fixing is formed with a diameter of 100mm reinforcement welding, Internal diameter 40mm.
As a kind of optimal technical scheme of the present utility model, described fixing nut is the matching nut of m26 screw rod;
As a kind of optimal technical scheme of the present utility model, described threaded rod axle is formed with m26 screw rod and steel-pipe welding, Wherein m26 spiro rod length 200mm, length of steel pipe 1100mm.
The beneficial effect that this utility model is reached is: one, avoids the construction of sbs modified asphalt waterproof coiled material and completes back Line is not straight, the defect of apparent mass difference;2nd, avoid and the advance of sbs modified asphalt waterproof coiled material is push using waddy, steel pipe etc. When infringement that coiled material is caused, prevented consequent correlated quality hidden danger;3rd, personnel are modified in the sbs completing that constructs Asphalt water-proof coiled material surface pushes hand push frame walking, through trampling, virtually promotes the stickup of coiled material and basic unit, this right-hand side The spacing of two castor wheels of push bracket is consistent with web width, and each castor wheel has 70mm width, is pressed in coiled material both sides, just Promote well two long sides of coiled material bonding with basic unit;4th, because hand push frame has the length of 1.5m, in baking hot melt made above The torch flame that used of workmen will not injure hand push frame operator, before hand push frame operator can also help simultaneously The situation of its behind of hot melt personal observations of side, unsafe factor is preferably minimized, is to achieve many things at one stroke.
Brief description
Accompanying drawing is used for providing further understanding to of the present utility model, and constitutes a part for description, with this practicality New embodiment is used for explaining this utility model together, does not constitute to restriction of the present utility model.In the accompanying drawings:
Fig. 1 is this utility model overall structure diagram;
Fig. 2 is one of this utility model partial structural diagram;
Fig. 3 is the two of this utility model partial structural diagram;
Fig. 4 is the three of this utility model partial structural diagram;
In figure: 1, hand push frame;2nd, castor wheel;3rd, ring for fixing;4th, fixing nut;5th, threaded rod axle;6th, sbs modified pitch Waterproof roll.
Specific embodiment
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is illustrated it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain this utility model, be not used to limit this utility model.
Embodiment 1
As Figure 1-4, this utility model provides a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame, and it is special Levying is: a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame is mainly by hand push frame 1, castor wheel 2, ring for fixing 3, solid Determine nut 4, threaded rod axle 5 forms.Hand push frame is welded with φ 26 × 2.0 common steel tube, height 1m, length 1.5m, handle Spacing 450mm, ring for fixing 3 and fixing nut 4 clear spacing 1050mm(sbs modified asphalt waterproof coiled material width 1000mm);Castor Wheel 2 is the rubber wheels that market is bought, wheel diameter 150mm, wheel width 70mm, two castor wheel outward flange spacing 1000mm;Ring for fixing 3 is to be formed with φ 10 reinforcement welding, internal diameter 40mm;Threaded rod axle 5 is common with φ 26 × 2.0 by m26 screw rod Steel-pipe welding forms, wherein m26 spiro rod length 200mm, φ 26 × 2.0 common steel tube length 1100mm;Fixing nut 4 is m26 Screw rod matching nut.
During use, one end elder generation hot melt application of sbs modified asphalt waterproof coiled material in place for unwrapping wire is fixed, then by residue Part rolls up, afterwards by hand push frame from one end sbs modified asphalt waterproof coiled material of completing of construction towards the other end, by hand push Fixing nut on frame, ring for fixing are alignd with the sbs modified asphalt waterproof coiled material hole of rolled, finally by the screw thread of threaded rod axle Hold the fixing nut inserting and being screwed into the other end from ring for fixing can start the hot melt application of sbs modified asphalt waterproof coiled material, During construction, one people is above carrying out baking hot melt to sbs modified asphalt waterproof coiled material, another people push later hand push frame with front Person's advanced in unison and control sbs modified asphalt waterproof coiled material construction straight degree.
Using the construction of this utility model instrument, have many advantages, such as: one, avoid sbs modified asphalt waterproof coiled material and constructed After one-tenth, sideline has some setbacks directly, the defect of apparent mass difference;2nd, avoid and sbs modified asphalt waterproof volume is push using waddy, steel pipe etc. The infringement that material causes to coiled material when advancing, has prevented consequent correlated quality hidden danger;3rd, personnel complete constructing Sbs modified asphalt waterproof coiled material surface pushes hand push frame walking, through trampling, virtually promotes the viscous of coiled material and basic unit Patch, the spacing of the two of hand push frame castor wheel is consistent with web width in addition, and each castor wheel has 70mm width, is pressed in volume Material both sides, just promote two long sides of coiled material bonding with basic unit;4th, because hand push frame has the length of 1.5m, above entering The torch flame that the workmen of row baking hot melt is used will not injure hand push frame operator, hand push frame operator simultaneously Member can also help the situation of its behind of hot melt personal observations in front, unsafe factor is preferably minimized, is to achieve many things at one stroke.
Finally it is noted that the foregoing is only preferred embodiment of the present utility model, it is not limited to this Utility model, although being described in detail to this utility model with reference to the foregoing embodiments, for those skilled in the art For, it still can be modified to the technical scheme described in foregoing embodiments, or to wherein some technical characteristics Carry out equivalent.All of the present utility model spirit and principle within, any modification, equivalent substitution and improvement made etc., all Should be included within protection domain of the present utility model.

Claims (6)

1. a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame is it is characterised in that include hand push compression frame, described handss Push away compression frame to be made up of hand push frame (1), castor wheel (2), ring for fixing (3), fixing nut (4), threaded rod axle (5), described handss Push bracket (1) is welded together with ring for fixing (3) and fixing nut (4), and described hand push frame (1) loads onto castor wheel (2), described spiral shell In end of thread insertion ring for fixing (3) of rasp bar axle (5), hole is rolled up by the sbs modified asphalt waterproof coiled material of rolled, and is screwed into In the fixing nut (4) of the other end.
2. a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame according to claim 1 is it is characterised in that institute State hand push frame (1) to be welded with a diameter of φ 26 × 2.0 common steel tube, height 1m, length 1.5m, handle spacing 450mm, institute State ring for fixing (3) and fixing nut (4) spacing 1050mm.
3. a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame according to claim 1 is it is characterised in that institute Stating castor wheel (2) is made of to have rubber, wheel diameter 150mm, wheel width 70mm.
4. a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame according to claim 1 is it is characterised in that institute State ring for fixing (3) to be formed with a diameter of 100mm reinforcement welding, internal diameter 40mm.
5. a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame according to claim 1 is it is characterised in that institute State the matching nut that fixing nut (4) is m26 screw rod.
6. a kind of sbs modified asphalt waterproof coiled material construction hand push compression frame according to claim 1 is it is characterised in that institute State threaded rod axle (5) to be formed with m26 screw rod and steel-pipe welding, wherein m26 spiro rod length 200mm, length of steel pipe 1100mm.
CN201620834911.9U 2016-08-04 2016-08-04 SBS modified asphalt waterproofing membrane construction hand push compaction frame Active CN205907922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620834911.9U CN205907922U (en) 2016-08-04 2016-08-04 SBS modified asphalt waterproofing membrane construction hand push compaction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620834911.9U CN205907922U (en) 2016-08-04 2016-08-04 SBS modified asphalt waterproofing membrane construction hand push compaction frame

Publications (1)

Publication Number Publication Date
CN205907922U true CN205907922U (en) 2017-01-25

Family

ID=57804078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620834911.9U Active CN205907922U (en) 2016-08-04 2016-08-04 SBS modified asphalt waterproofing membrane construction hand push compaction frame

Country Status (1)

Country Link
CN (1) CN205907922U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577572A (en) * 2017-09-29 2019-04-05 北京韩建集团有限公司 Plane waterproof roll heats edge banding machine
CN111677297A (en) * 2020-06-15 2020-09-18 中国十七冶集团有限公司 A waterproofing membrane integration operating means for hot melt method construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577572A (en) * 2017-09-29 2019-04-05 北京韩建集团有限公司 Plane waterproof roll heats edge banding machine
CN111677297A (en) * 2020-06-15 2020-09-18 中国十七冶集团有限公司 A waterproofing membrane integration operating means for hot melt method construction

Similar Documents

Publication Publication Date Title
CN205907922U (en) SBS modified asphalt waterproofing membrane construction hand push compaction frame
MX2009012146A (en) Method for manufacturing tanks.
CN205702920U (en) A kind of pipeline preheating heater
CN102581450A (en) Multi-wire submerged-arc multi-layer multi-pass welding process
CN201874164U (en) Waterproof coil of modified asphalt polyester tire
CN212562554U (en) A waterproofing membrane integration operating means for hot melt method construction
CN101791746A (en) Large high-temperature refractory steel pipeline welding process
CN208830702U (en) A kind of band abdomen silk concreting exempts to tear compound heat preservation die plate open
CN105728893A (en) Manual arc welding process for pipeline
CN202187437U (en) Insulating composite member for building
CN205208051U (en) Thermal insulation pipe with polyurethane and polyethylene bridging substance
CN102927378A (en) Vacuum vertical burying heating pipe
CN111677297A (en) A waterproofing membrane integration operating means for hot melt method construction
CN206561605U (en) Waterproof roll thermofusion device
CN105299385A (en) Thermal insulation pipe with polyurethane and polyethylene bridging substances and manufacturing method
CN108655546A (en) Dissimilar steel welding technology method
CN216041080U (en) Automatic laying device of geomembrane on oil field operation site
CN102864374B (en) Low-yield ratio and high-strength stirrup provided with bainite structure and used for buildings and production process
CN206928536U (en) A kind of polymer modified bituminous waterproof sheet material edge banding apparatus
CN205476142U (en) Waterproofing membrane compaction device
CN211710255U (en) Waterproofing membrane with temperature indicator strip
CN102900015B (en) The seamless thermal weld construction technology in semi-rigid asphalt pavement crack
CN103726617A (en) Building roof afforestation three-layer root thorn precontrol method
CN206268633U (en) A kind of socket fitting type structure wall winding tube
CN204299062U (en) The construction of hot melt waterproof coiled material pushes away fishing jig

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant