CN111677297A - A waterproofing membrane integration operating means for hot melt method construction - Google Patents
A waterproofing membrane integration operating means for hot melt method construction Download PDFInfo
- Publication number
- CN111677297A CN111677297A CN202010543798.XA CN202010543798A CN111677297A CN 111677297 A CN111677297 A CN 111677297A CN 202010543798 A CN202010543798 A CN 202010543798A CN 111677297 A CN111677297 A CN 111677297A
- Authority
- CN
- China
- Prior art keywords
- gas transmission
- coiled material
- waterproof coiled
- transmission pipe
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 238000000034 method Methods 0.000 title claims abstract description 26
- 239000012943 hotmelt Substances 0.000 title claims abstract description 24
- 238000004078 waterproofing Methods 0.000 title claims abstract description 15
- 239000012528 membrane Substances 0.000 title claims abstract description 12
- 230000010354 integration Effects 0.000 title claims abstract description 7
- 230000005540 biological transmission Effects 0.000 claims abstract description 40
- 239000000463 material Substances 0.000 claims abstract description 39
- 239000007921 spray Substances 0.000 claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 238000002844 melting Methods 0.000 claims description 10
- 230000008018 melting Effects 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 abstract description 3
- 239000004831 Hot glue Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000010438 heat treatment Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D15/00—Apparatus or tools for roof working
- E04D15/06—Apparatus or tools for roof working for handling roofing or sealing material in roll form
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a waterproof coiled material integrated operation device for hot-melt construction, and relates to the technical field of constructional engineering. The waterproof coiled material integrated operation device for hot-melt construction comprises a waterproof coiled material, a hand-push frame and a gas transmission pipe frame, wherein a spray head ignition and regulation integrated valve and a gas transmission hose are respectively arranged on the gas transmission pipe frame, trundles are arranged at the bottoms of the hand-push frame and the gas transmission pipe frame, a threaded rod shaft is arranged on the hand-push frame through a fixing nut, a roller is sleeved on the surface of the threaded rod shaft, and a flame spray head is arranged on the gas transmission pipe frame. This a waterproofing membrane integration operating means for hot melt method construction, the modern design, simple structure, easy installation, easy to use, through the operation mode of "fool" formula, can single completion adopt the hot melt method to carry out the coiled material waterproofing work procedure of being under construction, effectively avoided traditional operation mode's various drawbacks. The operation efficiency is greatly improved, the operation quality is ensured, the operation safety is improved, and the practicability is high.
Description
Technical Field
The invention relates to the technical field of constructional engineering, in particular to a waterproof coiled material integrated operation device for hot melting method construction.
Background
With the vigorous development of the construction industry, the development of novel building waterproof materials is rapid, and the application of waterproof coiled materials is the most extensive. Here, we studied the waterproof roll constructed by the hot-melt method. The waterproof coiled material constructed by the hot melting method has good high temperature resistance, can be used in the temperature range of-25 to +100 ℃, and has higher elasticity and fatigue resistance. The hot melting method is a construction method for bonding the waterproof coiled material and the base layer or between the coiled material and the coiled material by heating and melting the hot melt adhesive on the bottom surface of the hot melt coiled material by a special heating machine. The key technology of the hot-melt construction method is to bake the hot-melt adhesive and compact the hot-melted waterproof coiled material so as to promote the bonding effect and further ensure the construction quality.
The construction method adopted at present is that one person holds a hot melting tool to heat the waterproof coiled material, and the other person pushes the coiled material to move forwards by a wooden stick or a steel pipe. After the quality problems generated by the construction method are classified, the following problems are approximately found: firstly, operators are easily scalded, and potential safety hazards exist; secondly, the waterproof coiled material is not firmly bonded with the base layer, particularly along the lap joint of the long edge, and water leakage is easy to occur; thirdly, the surface of the waterproof roll has hidden damage danger; fourthly, the line is not straight after the construction of the waterproof coiled material is finished, and the apparent quality is poor.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a waterproof coiled material integrated operation device for hot-melt construction, which solves the problems that operators are easily scalded, potential safety hazards exist, a waterproof coiled material is not firmly bonded with a base layer, particularly, the waterproof coiled material is not firmly bonded along a long-edge lap joint, water leakage is easy to occur, potential damage hazards exist on the surface of the waterproof coiled material, the line is not straight after the waterproof coiled material is constructed, and the apparent quality is poor.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a waterproofing membrane integration operating means for hot melt method construction, includes waterproofing membrane, hand push frame and gas transmission pipe support, be provided with shower nozzle ignition regulation body valve and gas transmission hose respectively on the gas transmission pipe support, the bottom of hand push frame and gas transmission pipe support is provided with the truckle, be provided with the screw thread pole through fixation nut on the hand push frame, the surface cover of screw thread pole is equipped with the cylinder, be provided with the flame shower nozzle on the gas transmission pipe support.
Preferably, the pushing frame and the gas transmission pipe frame are formed by welding phi 26 multiplied by 2.0 common steel pipes, the height is 1m, the length is 1.5m, the distance between handles is 450mm, the net distance between a fixing ring and a fixing nut is 1050mm, the width of a waterproof coiled material is 1000mm, the interior of the steel pipe of the gas transmission pipe frame part is continuously communicated, and the range is from the root of a flame nozzle to the right handle where a gas transmission hose is located along the right half side of the pushing frame.
Preferably, the caster is a commercially available finished rubber wheel, the diameter of the wheel is 150mm, the width of the wheel is 70mm, and the distance between the outer edges of the two caster wheels is 1000 mm.
Preferably, the flame nozzle, the nozzle ignition and adjustment integrated valve and the gas transmission hose are spare and accessory parts of a matched finished tool which is purchased from the market and used for constructing the waterproof coiled material by a hot melting method.
Preferably, the threaded rod shaft is formed by welding an M26 screw and a phi 26 multiplied by 2.0 common steel pipe, wherein the length of the M26 screw is 200mm, and the length of the phi 26 multiplied by 2.0 common steel pipe is 1100 mm; the fixing nut is an M26 screw matching nut.
(III) advantageous effects
The invention provides a waterproof coiled material integrated operation device for hot melting method construction. The method has the following beneficial effects: this a waterproofing membrane integration operating means for hot melt method construction, the modern design, simple structure, easy installation, easy to use, through the operation mode of "fool" formula, can single completion adopt the hot melt method to carry out the coiled material waterproofing work procedure of being under construction, effectively avoided traditional operation mode's various drawbacks. The operation efficiency is greatly improved, the operation quality is ensured, the operation safety is improved, and the practicability is high.
Drawings
FIG. 1 is a schematic diagram of the apparatus of the present invention;
FIG. 2 is a schematic diagram of the operation of the apparatus of the present invention.
In the figure: 1. a hand-push frame; 2. a caster wheel; 3. a gas pipe frame; 4. a flame spray head; 5. a nozzle ignition and adjustment integrated valve; 6. a gas hose; 7. fixing a nut; 8. a threaded rod shaft; 9. a waterproof roll.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a waterproof coiled material integrated operation device for hot melt construction comprises a waterproof coiled material 9, a hand-push frame 1 and a gas transmission pipe frame 3, wherein the hand-push frame 1 and the gas transmission pipe frame 3 are formed by welding phi 26 multiplied by 2.0 common steel pipes, the height is 1m, the length is 1.5m, the distance between handles is 450mm, the net distance between a fixing ring and a fixing nut is 1050mm, the width of the waterproof coiled material is 1000mm, the insides of the steel pipes of the gas transmission pipe frame 3 are continuously communicated in a range from the root of a flame nozzle to the right handle where a gas transmission hose is located along the right half side of the hand-push frame, a nozzle ignition and adjustment integrated valve 5 and a gas transmission hose 6 are respectively arranged on the gas transmission pipe frame 3, trundles 2 are arranged at the bottoms of the hand-push frame 1 and the gas transmission pipe frame 3, the trundles 2 are finished rubber wheels purchased from the market, the diameters of the wheels are 150mm, the widths of the wheels are 70mm, the distance between, the threaded rod shaft 8 is formed by welding an M26 screw and a phi 26 multiplied by 2.0 common steel pipe, wherein the length of the M26 screw is 200mm, and the length of the phi 26 multiplied by 2.0 common steel pipe is 1100 mm; the fixing nut 7 is a nut matched with an M26 screw, a roller is sleeved on the surface of the threaded rod shaft 8, a flame spray nozzle 4 is arranged on the gas transmission pipe frame 3, and the flame spray nozzle 4, the spray nozzle ignition and adjustment integrated valve 5 and the gas transmission hose 6 are spare and accessory parts of a matched finished tool which is purchased in the market and used for constructing the waterproof coiled material by a hot melting method.
After the hand-push frame 1 and the gas transmission pipe frame 3 are welded, a pair of trundles 2 are fixed at the bottom of the hand-push part, two fixing nuts 7 are welded at the end parts of two steel pipes of the frame body, a threaded rod shaft 8 is ensured to rotate smoothly on the two fixing nuts, then a gas transmission hose 6 is inserted from the root part of a handle of the gas transmission pipe frame 3 and penetrates out of the other end of the gas transmission pipe frame to be connected and fixed with a flame spray nozzle 4, and finally a spray nozzle ignition and adjustment integrated valve 5 is installed on the gas transmission hose through the side wall of the handle of the gas transmission pipe frame to ensure that the whole hot melting part is sealed and air-tight.
During the use, take place the one end of waterproofing membrane with the unwrapping wire and firstly the hot melt construction is fixed, then with the batching of surplus portion, later with hand push frame from the one end waterproofing membrane that the construction was accomplished towards the other end, with the fixation nut on the hand push frame, the fixation ring aligns with the waterproofing membrane pore pair who rolls up the batching, insert and twist into the fixation nut of the other end from the fixation ring with the threaded end of screw thread pole axle at last, alone hold hand push frame handle during the construction, ignite through the shower nozzle and adjust integrative valve and start and adjust the size of hot melt flame, alright start the construction of hot melt waterproofing membrane. The device disclosed by the invention is adopted for construction, so that the operation efficiency is greatly improved, the operation quality is ensured, the safety of operators is improved, and multiple purposes are achieved.
To sum up, this a waterproofing membrane integration operating means for hot melt method construction, the modern design, simple structure, easy installation, easy to use, through the operation mode of "fool" formula, can single completion adopt the hot melt method to carry out the coiled material waterproofing work procedure of being under construction, effectively avoided traditional operation mode's various drawbacks. The operation efficiency is greatly improved, the operation quality is ensured, the operation safety is improved, and the practicability is high.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a waterproofing membrane integration operating means for hot melt method construction which characterized in that: the gas transmission pipe support is characterized by comprising a waterproof coiled material (9), a hand push frame (1) and a gas transmission pipe support (3), wherein a spray head ignition and regulation integrated valve (5) and a gas transmission hose (6) are arranged on the gas transmission pipe support (3) respectively, trundles (2) are arranged at the bottoms of the hand push frame (1) and the gas transmission pipe support (3), a threaded rod shaft (8) is arranged on the hand push frame (1) through a fixing nut (7), a roller is sleeved on the surface of the threaded rod shaft (8), and a flame spray head (4) is arranged on the gas transmission pipe support (3).
2. The integrated operation device of waterproof coiled material for hot melt construction according to claim 1, wherein: the gas transmission hose pushing frame is characterized in that the pushing frame (1) and the gas transmission pipe frame (3) are formed by welding phi 26 multiplied by 2.0 common steel pipes, the height is 1m, the length is 1.5m, the distance between handles is 450mm, the net distance between a fixing ring and a fixing nut is 1050mm, the width of a waterproof coiled material is 1000mm, the interior of the steel pipe of the gas transmission pipe frame (3) is continuously communicated, and the range of the waterproof coiled material is from the flame nozzle root to the right handle where the gas transmission hose is located along the right half side of the pushing frame.
3. The integrated operation device of waterproof coiled material for hot melt construction according to claim 1, wherein: the caster wheel (2) is a finished rubber wheel purchased from the market, the diameter of the wheel is 150mm, the width of the wheel is 70mm, and the distance between the outer edges of the two caster wheels is 1000 mm.
4. The integrated operation device of waterproof coiled material for hot melt construction according to claim 1, wherein: the flame nozzle (4), the nozzle ignition and adjustment integrated valve (5) and the gas transmission hose (6) are spare and accessory parts of a matched finished tool which is purchased from the market and used for constructing the waterproof coiled material by adopting a hot melting method.
5. The integrated operation device of waterproof coiled material for hot melt construction according to claim 1, wherein: the threaded rod shaft (8) is formed by welding an M26 screw and a phi 26 multiplied by 2.0 common steel pipe, wherein the length of the M26 screw is 200mm, and the length of the phi 26 multiplied by 2.0 common steel pipe is 1100 mm; the fixing nut (7) is an M26 screw rod matching nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010543798.XA CN111677297A (en) | 2020-06-15 | 2020-06-15 | A waterproofing membrane integration operating means for hot melt method construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010543798.XA CN111677297A (en) | 2020-06-15 | 2020-06-15 | A waterproofing membrane integration operating means for hot melt method construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111677297A true CN111677297A (en) | 2020-09-18 |
Family
ID=72435947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010543798.XA Pending CN111677297A (en) | 2020-06-15 | 2020-06-15 | A waterproofing membrane integration operating means for hot melt method construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111677297A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112848326A (en) * | 2021-01-06 | 2021-05-28 | 北京世纪蓝箭防水材料有限公司 | Coiled material joint welding device for waterproof construction and paving method |
CN114248449A (en) * | 2021-12-27 | 2022-03-29 | 宏源防水科技集团有限公司 | A hot-blast welding set for waterproofing membrane construction |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205907922U (en) * | 2016-08-04 | 2017-01-25 | 中国十七冶集团有限公司 | SBS modified asphalt waterproofing membrane construction hand push compaction frame |
CN206561605U (en) * | 2017-01-13 | 2017-10-17 | 中国建筑第五工程局有限公司 | Waterproof roll thermofusion device |
CN208329415U (en) * | 2018-05-30 | 2019-01-04 | 上海宝冶集团有限公司 | A kind of viscous device of waterproof roll Rapid hot-melting paving |
CN109372200A (en) * | 2018-10-18 | 2019-02-22 | 巴中市正大防水保温工程有限公司 | A kind of waterproof roll of roof device for baking |
CN109577572A (en) * | 2017-09-29 | 2019-04-05 | 北京韩建集团有限公司 | Plane waterproof roll heats edge banding machine |
CN209320323U (en) * | 2018-11-26 | 2019-08-30 | 中新合创城市建设发展有限公司 | A kind of asphalt water-proof coiled material spray gun |
CN210026348U (en) * | 2019-06-13 | 2020-02-07 | 河南省华瑞防水防腐有限公司 | Quick hot melt of waterproofing membrane is spread and is glued device |
CN212562554U (en) * | 2020-06-15 | 2021-02-19 | 中国十七冶集团有限公司 | A waterproofing membrane integration operating means for hot melt method construction |
-
2020
- 2020-06-15 CN CN202010543798.XA patent/CN111677297A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205907922U (en) * | 2016-08-04 | 2017-01-25 | 中国十七冶集团有限公司 | SBS modified asphalt waterproofing membrane construction hand push compaction frame |
CN206561605U (en) * | 2017-01-13 | 2017-10-17 | 中国建筑第五工程局有限公司 | Waterproof roll thermofusion device |
CN109577572A (en) * | 2017-09-29 | 2019-04-05 | 北京韩建集团有限公司 | Plane waterproof roll heats edge banding machine |
CN208329415U (en) * | 2018-05-30 | 2019-01-04 | 上海宝冶集团有限公司 | A kind of viscous device of waterproof roll Rapid hot-melting paving |
CN109372200A (en) * | 2018-10-18 | 2019-02-22 | 巴中市正大防水保温工程有限公司 | A kind of waterproof roll of roof device for baking |
CN209320323U (en) * | 2018-11-26 | 2019-08-30 | 中新合创城市建设发展有限公司 | A kind of asphalt water-proof coiled material spray gun |
CN210026348U (en) * | 2019-06-13 | 2020-02-07 | 河南省华瑞防水防腐有限公司 | Quick hot melt of waterproofing membrane is spread and is glued device |
CN212562554U (en) * | 2020-06-15 | 2021-02-19 | 中国十七冶集团有限公司 | A waterproofing membrane integration operating means for hot melt method construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112848326A (en) * | 2021-01-06 | 2021-05-28 | 北京世纪蓝箭防水材料有限公司 | Coiled material joint welding device for waterproof construction and paving method |
CN114248449A (en) * | 2021-12-27 | 2022-03-29 | 宏源防水科技集团有限公司 | A hot-blast welding set for waterproofing membrane construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212562554U (en) | A waterproofing membrane integration operating means for hot melt method construction | |
CN111677297A (en) | A waterproofing membrane integration operating means for hot melt method construction | |
CN101504104B (en) | Mouth compensating method for pipeline corrosion protection layer and integrated mouth compensating machine | |
US3547731A (en) | Portable joint wrapper for pipelines | |
CN104907673A (en) | Installation method of outdoor carbon steel oxygen transferring pipeline | |
CN205763118U (en) | A kind of pipe fitting bending machine with rust removing function | |
CN105983754A (en) | Pipeline welding process | |
CN104607773A (en) | Tubulation welding method of stainless steel outer composite tube | |
CN206106402U (en) | Forming device of compound sponge tubular product | |
CN205907922U (en) | SBS modified asphalt waterproofing membrane construction hand push compaction frame | |
CN204372922U (en) | Duct products external heating device | |
CN206928536U (en) | A kind of polymer modified bituminous waterproof sheet material edge banding apparatus | |
CN214220664U (en) | Waterproofing membrane hot melt is spread and is glued integrated device | |
KR200187498Y1 (en) | A manufacturing Apparatus of waveform steel pipe which Polyethylene sheet welded to the inside and outside wall by high - frequency induction heating | |
CN204402004U (en) | A kind of Simple general type outer scaffold wall connector | |
CN209935024U (en) | Rust-resistant spraying device that loses of city view steel construction | |
CN204477602U (en) | A kind of repaired mouth facility | |
CN105880809A (en) | Online upward multi-wire submerged-arc welding process for medium longitudinally-welded steel pipe, and used welding pad roll | |
CN215088548U (en) | Metal pipeline rotating and clamping device | |
CN216551501U (en) | Highway crack processing apparatus | |
CN104646954A (en) | Online continuous plating process | |
CN211566032U (en) | Cutting device for heat-preservation pipe | |
CN213469920U (en) | Welding wire preheating automatic welding device for TKY structural member backing welding | |
KR101222680B1 (en) | The resin coating device of corrugated steel pipe and coating method | |
KR101934586B1 (en) | pipe bead pressure apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |