CN205896401U - A anchor assembly for pipeline anchor - Google Patents

A anchor assembly for pipeline anchor Download PDF

Info

Publication number
CN205896401U
CN205896401U CN201620761931.8U CN201620761931U CN205896401U CN 205896401 U CN205896401 U CN 205896401U CN 201620761931 U CN201620761931 U CN 201620761931U CN 205896401 U CN205896401 U CN 205896401U
Authority
CN
China
Prior art keywords
reinforced pipe
pipe
anchor
pipeline
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620761931.8U
Other languages
Chinese (zh)
Inventor
任大为
李津
徐兴文
刘高明
程继元
豆宝宜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Engineering Group Co Ltd
Sinopec Luoyang Guangzhou Engineering Co Ltd
Original Assignee
Sinopec Luoyang Petrochemical Engineering Corp
Sinopec Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Luoyang Petrochemical Engineering Corp, Sinopec Engineering Group Co Ltd filed Critical Sinopec Luoyang Petrochemical Engineering Corp
Priority to CN201620761931.8U priority Critical patent/CN205896401U/en
Application granted granted Critical
Publication of CN205896401U publication Critical patent/CN205896401U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an anchor assembly for pipeline anchor to it can't be at on -the -spot manufacturing to solve the current anchor flange that is used for pipeline anchor, buy the anchor flange again can cause project delay and engineering cost to increase the scheduling problem. The utility model discloses be equipped with female pipe (1), the middle part overcoat of female pipe (1) has reinforced pipe (4). Two parts about reinforced pipe (4) are cut apart to become along the horizontal direction all are equipped with test holes (5) on upper portion reinforced pipe and the lower part reinforced pipe. (1) welded connection is all managed with mother in the bottom of upper portion reinforced pipe and the top of both ends and lower part reinforced pipe and both ends. The middle part overcoat of reinforced pipe (4) has lock ring (3), lock ring (3) and reinforced pipe (4) welded connection. It has gusset (2) to weld between the both sides of lock ring (3) and reinforced pipe (4). The utility model discloses can be used to replace the current anchor flange that is used for pipeline anchor.

Description

A kind of anchoring piece for pipeline anchor
Technical field
The utility model is related to a kind of anchoring piece for pipeline anchor.
Background technology
Long distance pipeline is the main tool of long-distance transportation oil and natural gas, has the advantages that economical, safe and environment-friendly. Long distance pipeline is mainly by the way of buried-pipe laying;In order to meet the requirement of pipeline axial stability, go out to bury end, big in pipeline Type is worn the places such as leap both sides and need to be added pipeline anchor.Used by the long distance pipeline being 200~500 millimeters for nominal diameter Pipeline anchor, has at present and embeds fixture using anchoring flange as pipeline anchor;But anchoring flange can only be in factory Produce it is impossible to fabricate at the scene.And uncertain factor in process of deployment for the long distance pipeline is many, often designs and purchase Anchoring flange quantity is variant with actual engineering demand amount, and anchoring flange quantity needs again to purchase when inadequate, thus causing Construction delay and engineering cost increase.
Content of the invention
The purpose of this utility model is to provide a kind of anchoring piece for pipeline anchor, to solve to be currently used for pipeline admittedly The anchoring flange determining pier cannot fabricate at the scene, again buying anchoring flange construction delay and engineering cost can be caused to increase The problems such as.
For solving the above problems, the technical solution adopted in the utility model is: a kind of anchoring piece for pipeline anchor, It is characterized in that: it is provided with main pipe, is cased with reinforced pipe outside the middle part of main pipe, and reinforced pipe is divided into upper and lower two in the horizontal direction Point, top reinforced pipe and bottom reinforced pipe are equipped with test hole, the bottom of top reinforced pipe and two ends and bottom reinforced pipe Top and two ends be all welded to connect with main pipe, be cased with bracing ring outside the middle part of reinforced pipe, bracing ring is welded to connect with reinforced pipe, It is welded with gusset between the both sides of bracing ring and reinforced pipe.
Using the utility model, there is following beneficial effect: main pipe, reinforced pipe, bracing ring, gusset can be defeated using length The steel plate of pipe laying on-the-spot purchasing, steel pipe carry out on-site cutting, then welding cost utility model anchoring piece, then manufacture pipeline Anchor block.Lay scene in long distance pipeline, can easily produce when anchoring flange quantity is inadequate of the present utility model Anchoring piece to replace anchoring flange, without again purchasing anchoring flange, thus avoiding causing construction delay and engineering cost Increase, brought problem cannot be manufactured at the scene efficiently against existing anchoring flange.
Structure of the present utility model is simple, be easy to making in site, low cost.Pipeline using the utility model anchoring piece is solid Determine pier, long distance pipeline can be born due to axial thrust produced by the temperature difference under extreme condition it is ensured that the axial direction of long distance pipeline Stability and its safe operation.
With reference to the accompanying drawings and detailed description the utility model is described in further detail.Accompanying drawing and specifically reality The mode of applying is not intended to limit the scope that the utility model claims.
Brief description
Fig. 1 shows that the utility model is used for the anchoring piece of pipeline anchor further it is shown that reinforced concrete member.
Fig. 2 is a a sectional view in Fig. 1.
In Fig. 1 and Fig. 2, same reference numerals represent identical technical characteristic.
Specific embodiment
Referring to Fig. 1 and Fig. 2, the anchoring piece (referred to as anchoring piece) that the utility model is used for pipeline anchor is provided with main pipe 1, It is cased with reinforced pipe 4 outside the middle part of main pipe 1.Reinforced pipe 4 is divided into upper and lower two parts in the horizontal direction, and top reinforced pipe and bottom add It is equipped with test hole 5 on strong pipe.The top of the bottom of top reinforced pipe and two ends and bottom reinforced pipe and two ends all with main pipe 1 It is welded to connect.It is cased with bracing ring 3, bracing ring 3 is welded to connect with reinforced pipe 4 outside the middle part of reinforced pipe 4.The both sides of bracing ring 3 with It is welded with gusset 2, gusset 2 can equably weld polylith between reinforced pipe 4.
The material that each component of the utility model adopts is generally No. 20 carbon steels.The shape of cross section of main pipe 1 and reinforced pipe 4 is Circle, bracing ring 3 be shaped as annular.Generally 200~500 millimeters of the nominal diameter of main pipe 1, length generally 1~2 Rice.
Test hole 5 is circular hole, generally 5~8 millimeters of diameter.After the completion of anchoring piece welding, strengthen to top through test hole 5 Gap between gap between pipe and main pipe 1, bottom reinforced pipe and main pipe 1 is passed through gas and carries out air seal test, checks top Weld seam between the top of the bottom of reinforced pipe and two ends and bottom reinforced pipe and two ends and main pipe 1 whether there is defect.Anchor After the completion of firmware welding, also should carry out magnetic or dye penetrant inspection to all of weld seam, intensity pressure test is carried out to anchoring piece.It Afterwards, the surface of anchoring piece is applied anticorrosive coat and carry out electric insulation test.
After all of inspection and pass the test, outside anchoring piece, setting reinforcing bar casting concrete, make reinforced concrete Native component 6;Anchoring piece is all embedded in reinforced concrete member 6 in addition to the two ends of main pipe 1.The utility model anchoring piece and steel Reinforced concrete component 6 combines, and becomes pipeline anchor.Pipeline anchor when using, the two ends of main pipe 1 and long distance pipeline It is welded to connect, then pipeline anchor imbeds underground together with long distance pipeline.

Claims (1)

1. a kind of anchoring piece for pipeline anchor it is characterised in that: it is provided with main pipe (1), is cased with outside the middle part of main pipe (1) Reinforced pipe (4), reinforced pipe (4) is divided in the horizontal direction and is equipped with upper and lower two parts, top reinforced pipe and bottom reinforced pipe Test hole (5), the top of the bottom of top reinforced pipe and two ends and bottom reinforced pipe and two ends are all welded even with main pipe (1) Connect, outside the middle part of reinforced pipe (4), be cased with bracing ring (3), bracing ring (3) is welded to connect with reinforced pipe (4), the two of bracing ring (3) It is welded with gusset (2) between side and reinforced pipe (4).
CN201620761931.8U 2016-07-20 2016-07-20 A anchor assembly for pipeline anchor Active CN205896401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620761931.8U CN205896401U (en) 2016-07-20 2016-07-20 A anchor assembly for pipeline anchor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620761931.8U CN205896401U (en) 2016-07-20 2016-07-20 A anchor assembly for pipeline anchor

Publications (1)

Publication Number Publication Date
CN205896401U true CN205896401U (en) 2017-01-18

Family

ID=57773647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620761931.8U Active CN205896401U (en) 2016-07-20 2016-07-20 A anchor assembly for pipeline anchor

Country Status (1)

Country Link
CN (1) CN205896401U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291980A (en) * 2017-05-16 2017-10-24 胜利油田森诺胜利工程有限公司 A kind of determination method of deep fat buried pipeline least commitment power

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291980A (en) * 2017-05-16 2017-10-24 胜利油田森诺胜利工程有限公司 A kind of determination method of deep fat buried pipeline least commitment power

Similar Documents

Publication Publication Date Title
CN106624639B (en) Manufacturing and hoisting method for pre-spliced short joint of large valve and large-diameter pipeline
WO2018028087A1 (en) Box-type pipeline with circumferential obtuse angle connection
US10030792B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN104500095B (en) Class rectangular shield duct piece connector structure
WO2012155727A1 (en) Water conveyance tunnel with prestressed composite lining for shield tunnel
CN205896401U (en) A anchor assembly for pipeline anchor
CN105240626B (en) Precast assembly steel concrete combinative structure pipeline and preparation method thereof
CN202769112U (en) Double sealed water stop interface for steel bell end reinforced concrete pipelines
CN205839796U (en) Pipe gallery internode attachment structure
CN204852606U (en) Curve push pipe tube coupling bell and spigot connection form
CN105971016A (en) Connection structure between joints of comprehensive pipe rack
CN203684403U (en) Annular opening sleeve for reinforcing tubular joints of steel tube truss
CN207228110U (en) A kind of dismountable multistage dry type pneumatic full-sleeve rock drilling bored pile steel tube retaining wall
CN202302366U (en) Prestressed steel cylinder concrete jacking pipe
CN205013897U (en) Prefabricated steel - concrete integrated configuration pipeline of assembling
CN102207229B (en) Modular glass steel pipeline and method for repairing underground broken pipeline by using same
CN205426168U (en) Subassembly is buried underground to tunnel vault settlement monitoring point
JP2013064485A (en) Connection pipe for putting in and replacing new and old pipes for buried pipe and construction method for putting in and replacing new and old pipes for buried pipe
CN105908901B (en) A kind of perforation positioning grout sleeve
CN202972253U (en) Reinforced water drainage pipe connector and connection structure thereof
CN205013895U (en) Prefabricated steel reinforced concrete combined type steel pipe of assembling
CN105240627B (en) Precast assembly steel reinforced concrete combined type steel pipe and preparation method thereof
CN203977583U (en) Regional perfusion's cement slurry Enhanced intersecting joint
WO2017045426A1 (en) Bimetal spiral steel pipe and manufacturing method therefor
CN208169729U (en) A kind of low pressure Prestressed concrete cylinder pipe and defeated drainage pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant