CN205426168U - Subassembly is buried underground to tunnel vault settlement monitoring point - Google Patents

Subassembly is buried underground to tunnel vault settlement monitoring point Download PDF

Info

Publication number
CN205426168U
CN205426168U CN201620221195.7U CN201620221195U CN205426168U CN 205426168 U CN205426168 U CN 205426168U CN 201620221195 U CN201620221195 U CN 201620221195U CN 205426168 U CN205426168 U CN 205426168U
Authority
CN
China
Prior art keywords
monitoring point
reflecting piece
settlement monitoring
tunnel vault
vault settlement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620221195.7U
Other languages
Chinese (zh)
Inventor
谭学林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201620221195.7U priority Critical patent/CN205426168U/en
Application granted granted Critical
Publication of CN205426168U publication Critical patent/CN205426168U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses a subassembly is buried underground to tunnel vault settlement monitoring point, the package rubbing board body, piece and be equipped with the expansion bolts of couple reflects light, the one side of plate body is for being used for the reflection of light piece connection face of being connected with reflection of light piece, relative another side to connect the face for the couple that is used for and the couple is connected, be equipped with on the couple connection face and be used for and link up with the location checkpost that the cooperation was fixed a position, the border of reflection of light piece connection face upwards extends and forms the protruding edge that is used for encirclement reflection of light piece, the utility model discloses a subassembly is buried underground to tunnel vault settlement monitoring point is equipped with the location checkpost that is used for and links up with the cooperation to fix a position on the couple connection face for the couple need not can fix at couple connection face through the welding mode, reduces staff's intensity of labour, makes reflection of light piece and plate body stably link to each other, prevents to drop, simultaneously, reflection of light piece is connected protruding edge on the face and can also be prevented to reflect light the piece and drenched by groundwater, guarantees going on smoothly of observation work.

Description

Tunnel vault settlement monitoring point buries assembly underground
Technical field
This utility model relates to a kind of relative displacement measurement apparatus parts monitoring the hole walls such as tunnels and underground engineering and structure, buries assembly underground particularly to a kind of tunnel vault settlement monitoring point.
Background technology
Tunnel Mining Method boring construction process often causes the redistribution of surrouding rock stress and the release of initial field stress, and after this will cause tunnel excavation, tunnel radially occurs convergent deformation, and vault occurs sedimentation or protuberance deformation;Vibration wave produced by face explosion also can produce impact in various degree to adjoining rock stability and surface buildings safety;After propping up at the beginning of tunnel spray concrete, these impacts will cause surrouding rock deformation, intuitively show as tunnel surrounding and supporting displacement etc.;These change whether entail dangers to building safety, if can affect order orthobiosis in city, it is necessary to depend on and measure in effective construction monitoring;Reflected and supervise and guide construction by monitoring, thus reach safety, economic purpose.
Existing tunnel vault settlement monitoring point is buried assembly underground and is generally comprised plate body, reflecting piece and be provided with the expansion bolt of hook, the one side of plate body be for the reflecting piece joint face that reflecting piece connects, relative another side be for the hook connecting junction that is connected of hook;Plate body uses metal material to make, and hook is fixed on hook connecting junction by welding manner, and welding process is relatively complicated, improve the labor intensity of staff, and it is easily caused reflecting piece joint face appearance protuberance, and cause reflecting piece to be stably connected with plate body completely, reflecting piece easily comes off;Additionally, due to tunnel seepage in underground is more, a lot of reflecting piece come off after being drenched by subsoil water, cause observing.
Therefore, it is accomplished by a kind of tunnel vault settlement monitoring point and buries assembly underground, hook is without being fixed on hook connecting junction by welding manner, reduce the labor intensity of staff, reflecting piece is made stably to be connected with plate body, prevent from coming off, can also prevent reflecting piece from being drenched by subsoil water simultaneously, it is ensured that being smoothed out of observation work.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of tunnel vault settlement monitoring point to bury assembly underground, hook is without being fixed on hook connecting junction by welding manner, reduce the labor intensity of staff, reflecting piece is made stably to be connected with plate body, prevent from coming off, can also prevent reflecting piece from being drenched by subsoil water simultaneously, it is ensured that being smoothed out of observation work.
Tunnel vault settlement monitoring point of the present utility model buries assembly underground, including plate body, reflecting piece and the expansion bolt being provided with hook, the one side of described plate body be for the reflecting piece joint face that reflecting piece connects, relative another side be for the hook connecting junction that is connected of hook;Described hook connecting junction is provided with the positioning checkpoint for coordinating location with hook, and the edge of described reflecting piece joint face upwardly extends formation for the convex edge surrounding reflecting piece.
Further, at least provided with three positioning checkpoints, described positioning checkpoint is circumferentially distributed.
Further, described positioning checkpoint is uniformly distributed circumferentially.
Further, the highest face of described convex edge is positioned on reflecting piece.
Further, described reflecting piece is connected on plate body with bonding way.
Further, described expansion bolt includes screw rod, it is combined with expansion sleeve on described screw rod, the two ends of described screw rod are respectively arranged with long thread segment and short thread segments, long thread segment and short thread segments mid portion are non-threaded section, it is provided with the nut matched with its screw thread on long thread segment, short thread segments is provided with the concentric reducer nut matched with its screw thread.
Further, described plate body uses elastomeric material to make.
The beneficial effects of the utility model: tunnel vault settlement monitoring point of the present utility model buries assembly underground, hook connecting junction is provided with the positioning checkpoint for coordinating location with hook, make hook without hook connecting junction can be fixed on by welding manner, reduce the labor intensity of staff, make reflecting piece stably be connected with plate body, prevent from coming off;Meanwhile, the convex edge on reflecting piece joint face can also prevent reflecting piece from being drenched by subsoil water, it is ensured that being smoothed out of observation work.
Accompanying drawing explanation
With embodiment, this utility model is further described below in conjunction with the accompanying drawings:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is A-A sectional view in Fig. 1.
Detailed description of the invention
Fig. 1 is structural representation of the present utility model, Fig. 2 is A-A sectional view in Fig. 1, as shown in the figure: the tunnel vault settlement monitoring point of the present embodiment buries assembly underground, including plate body 1, reflecting piece 2 and the expansion bolt being provided with hook 3, the one side of described plate body 1 be the reflecting piece joint face 11 for connecting with reflecting piece 2, relative another side be for link up with the 3 hook connecting junctions 12 being connected;Described hook connecting junction 12 is provided with the positioning checkpoint 5 for coordinating location with hook 3, and the edge of described reflecting piece joint face 11 upwardly extends formation for the convex edge 13 surrounding reflecting piece 2;Hook connecting junction 12 is provided with the positioning checkpoint 5 for coordinating location with hook 3 so that hook 3, without being fixed on hook connecting junction 12 by welding manner, reduces the labor intensity of staff, makes reflecting piece 2 stablize with plate body 1 and is connected, prevents from coming off;Meanwhile, the convex edge 13 on reflecting piece joint face 11 can also prevent reflecting piece 2 from being drenched by subsoil water, it is ensured that being smoothed out of observation work;The highest face of described convex edge 13 is positioned on reflecting piece 2, effectively to stop subsoil water;The height of convex edge 13 is about 1.0cm;Described reflecting piece 2 is connected on plate body 1 with bonding way, convenient and reliable;Owing to without welding plate body 1, plate body 1 can use the elastomeric material of hard to make.
In the present embodiment, at least provided with three positioning checkpoints 5, described positioning checkpoint 5 is circumferentially distributed;Preferably, described positioning checkpoint 5 is uniformly distributed circumferentially, and the extended line of each positioning checkpoint 5 intersects at a point (i.e. the center of circle of place circumference);This structure can effective fixed hook 3, improve the stability of location.
In the present embodiment, described expansion bolt includes screw rod 41, it is combined with expansion sleeve 42 on described screw rod 41, the two ends of described screw rod 41 are respectively arranged with long thread segment (not shown) and short thread segments (not shown), long thread segment and short thread segments mid portion are non-threaded section (not shown), it is provided with the nut 43 matched with its screw thread on long thread segment, short thread segments is provided with the concentric reducer nut 44 matched with its screw thread;The diameter of the non-threaded section external diameter not less than screw rod 41 internal diameter less than expansion sleeve 42, the big end external diameter of concentric reducer nut 44 is more than the internal diameter of expansion sleeve 42;The tail end of screw rod 41 is connected with hook 3 one;The expansion bolt of this structure can adjust its exposed part at body of wall outer bolt can regulate height as required with smooth, also can exchange mutually use between the bolt of same model difformity difference purposes, can firmly fix again, conveniently dismantle and can reuse.
Finally illustrate is, above example is only in order to illustrate the technical solution of the utility model and unrestricted, although this utility model being described in detail with reference to preferred embodiment, it will be understood by those within the art that, the technical solution of the utility model can be modified or equivalent, without deviating from objective and the scope of technical solutions of the utility model, it all should be contained in the middle of right of the present utility model.

Claims (7)

1. tunnel vault settlement monitoring point buries an assembly underground, including plate body, reflecting piece and the expansion bolt being provided with hook, the one side of described plate body be for the reflecting piece joint face that reflecting piece connects, relative another side be for the hook connecting junction that is connected of hook;It is characterized in that: described hook connecting junction is provided with the positioning checkpoint for coordinating location with hook, the edge of described reflecting piece joint face upwardly extends formation for the convex edge surrounding reflecting piece.
Tunnel vault settlement monitoring point the most according to claim 1 buries assembly underground, it is characterised in that: at least provided with three positioning checkpoints, described positioning checkpoint is circumferentially distributed.
Tunnel vault settlement monitoring point the most according to claim 2 buries assembly underground, it is characterised in that: described positioning checkpoint is uniformly distributed circumferentially.
Tunnel vault settlement monitoring point the most according to claim 1 buries assembly underground, it is characterised in that: the highest face of described convex edge is positioned on reflecting piece.
Tunnel vault settlement monitoring point the most according to claim 1 buries assembly underground, it is characterised in that: described reflecting piece is connected on plate body with bonding way.
Tunnel vault settlement monitoring point the most according to claim 1 buries assembly underground, it is characterized in that: described expansion bolt includes screw rod, it is combined with expansion sleeve on described screw rod, the two ends of described screw rod are respectively arranged with long thread segment and short thread segments, long thread segment and short thread segments mid portion are non-threaded section, it is provided with the nut matched with its screw thread on long thread segment, short thread segments is provided with the concentric reducer nut matched with its screw thread.
Tunnel vault settlement monitoring point the most according to claim 1 buries assembly underground, it is characterised in that: described plate body uses elastomeric material to make.
CN201620221195.7U 2016-03-22 2016-03-22 Subassembly is buried underground to tunnel vault settlement monitoring point Expired - Fee Related CN205426168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620221195.7U CN205426168U (en) 2016-03-22 2016-03-22 Subassembly is buried underground to tunnel vault settlement monitoring point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620221195.7U CN205426168U (en) 2016-03-22 2016-03-22 Subassembly is buried underground to tunnel vault settlement monitoring point

Publications (1)

Publication Number Publication Date
CN205426168U true CN205426168U (en) 2016-08-03

Family

ID=56547624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620221195.7U Expired - Fee Related CN205426168U (en) 2016-03-22 2016-03-22 Subassembly is buried underground to tunnel vault settlement monitoring point

Country Status (1)

Country Link
CN (1) CN205426168U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112595286A (en) * 2020-11-17 2021-04-02 贵州大学 Device and method for monitoring vault settlement and tunnel convergence of tunnel in real time
CN115127531A (en) * 2022-06-22 2022-09-30 保利长大工程有限公司 Device for rapidly arranging tunnel monitoring measuring points and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112595286A (en) * 2020-11-17 2021-04-02 贵州大学 Device and method for monitoring vault settlement and tunnel convergence of tunnel in real time
CN115127531A (en) * 2022-06-22 2022-09-30 保利长大工程有限公司 Device for rapidly arranging tunnel monitoring measuring points and construction method

Similar Documents

Publication Publication Date Title
CN100529329C (en) Socket shield machine construction method
CN203756182U (en) Support structure applied to shallow road tunnel in weak rock area
CN108979662A (en) Tunnel prefabrication and assembly construction lining cutting splicing structure and its method
CN105887813A (en) Large-diameter super-long pile construction method in karst area through full-casing pipe full rotating and rotary drilling
CN106640147B (en) Tunnel steel arch frame lock foot fixed form
CN103821520B (en) The method of fixing mine vertical shaft shaft equipment
CN205426168U (en) Subassembly is buried underground to tunnel vault settlement monitoring point
US10976455B2 (en) Test system for microseismic test of rock mass fractures
CN106704708B (en) The supporting structure and its construction method of heat distribution pipeline in pipe gallery
CN104099946B (en) Inspection-pit between a kind of Novel top pipeline section
CN205823305U (en) A kind of mounting structure reinforced for large section tunnel arch wall lining cutting reinforcing bar location
CN112539066A (en) Rapid construction method for karst development long tunnel
CN203498843U (en) Supporting connecting piece for ultra-long double spliced steel pipes
CN208845183U (en) Assembled tube coupling
CN208950162U (en) It is easily installed the concrete column of supporting beam and the connection structure of itself and supporting beam
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN105672677A (en) Support tool used for fabricated building wallboard installation and use method of support tool
CN105909280A (en) Installing structure for super-large section tunnel arch wall lining rebar positioning and reinforcing
CN105863673B (en) Pusher fuselage can return to formula pipe jacking construction method and constructing structure
CN208184230U (en) Self-stabilising combined triangular frame single side formwork system
CN105804418A (en) Prefabricated wallboard fixed supporting system and construction method
CN204080861U (en) Inspection-pit between a kind of Novel top pipeline section
CN114278351A (en) Tunnel invasion contact broken zone reinforcement treatment method and equipment
KR101291705B1 (en) Extended vertical support power reinforcing device of pile
CN206090652U (en) Novel monitoring pipe low tube device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20170322

CF01 Termination of patent right due to non-payment of annual fee