CN205896384U - Ground pipe laying way specialized tool that is geared to needs of job - Google Patents
Ground pipe laying way specialized tool that is geared to needs of job Download PDFInfo
- Publication number
- CN205896384U CN205896384U CN201620917286.4U CN201620917286U CN205896384U CN 205896384 U CN205896384 U CN 205896384U CN 201620917286 U CN201620917286 U CN 201620917286U CN 205896384 U CN205896384 U CN 205896384U
- Authority
- CN
- China
- Prior art keywords
- clamping device
- pipeline
- pipeline clamping
- thread
- brace rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a ground pipe laying way specialized tool that is geared to needs of job, pipeline clamping device including two parallel arrangement, pipeline clamping device's bilateral symmetry is installed two the thread brace rod that pipeline clamping device linked together, thread brace rod and one pipeline clamping device threaded connection, thread brace rod and another pipeline clamping device rotates connection, every the last fixed mounting of thread brace rod has a hand wheel, during the use, cup jointing two pipeline clamping device in the pipeline mouth department that needs docked respectively, with pipeline clamping device and pipeline fixed connection, rotating the hand wheel, thread brace rod rotates, with thread brace rod threaded connection's pipeline clamping device along thread brace rod removal to the drive pipeline removes, up to the port butt joint of two pipelines, the utility model discloses simple structure, convenient operation has avoided the pipeline atress inhomogeneous, and the flat straightness who guarantees the pipeline has improved installation accuracy and installation effectiveness greatly in standard range.
Description
Technical field
This utility model is related to pipe installation technology field, the instrument that more particularly, to a kind of buried pipe is installed and used.
Background technology
Using jack carry out pipeline butt install when, find workmen must stand in bangle wheel same plane in drag
Start chain.When dropping bangle bar, stress point on line, leads to whole pipeline section discontinuity boil on the nape opposite the mouth glacing flatness excessive, also holds
Easily cause security incident.In order to prevent jumping the phenomenons such as chain, snap ring, pulling force should not be excessive.And installing is to carry out below zero meter
, construction space is narrow, needs three to four people to carry out using trouble during jack pipe laying, has had a strong impact on the installation of underground pipe
Efficiency.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of easy to operate, solid and reliable buried pipe boil on the nape opposite the mouth
Specific purpose tool.
For solving above-mentioned technical problem, the technical solution of the utility model is: buried pipe boil on the nape opposite the mouth specific purpose tool, including two
The individual pipeline clamping device be arrangeding in parallel, the both sides of described pipeline clamping device are symmetrically installed with two described pipeline clamping dresses
Put the thread linking together, described thread is threadeded with a described pipeline clamping device, and described screw thread draws
Bar is rotated with pipeline clamping device another described and is connected, and each described thread is installed with a handwheel.
As a kind of preferred technical scheme, described pipeline clamping device includes a pair semicircle pipe clamp, and each described half
The two ends of circular pipe clamp are symmetrically arranged with horizontal-extending engaging lug, two described semicircle pipe clamps being docking together described
Fastening bolt is installed between engaging lug.
As a kind of preferred technical scheme, on the described pipeline clamping device of described handwheel, it is installed with two
Symmetrically arranged swivel nut, described swivel nut is arranged between two described engaging lugs and is fixed even with underlying described engaging lug
Connect, two described threads are each passed through described swivel nut.
As a kind of preferred technical scheme, symmetrically arranged away from being installed with two on described pipeline clamping device
Pivoted housing, described pivoted housing is arranged between two described engaging lugs and is fixedly connected with underlying described engaging lug, two institutes
The free end stating thread stretches in described pivoted housing.
Due to employing technique scheme, buried pipe boil on the nape opposite the mouth specific purpose tool, including two pipeline folders be arrangeding in parallel
Hold device, the both sides of described pipeline clamping device are symmetrically installed with the screw thread that two described pipeline clamping devices link together
Pull bar, described thread is threadeded with a described pipeline clamping device, described thread and another described pipeline
Clamping device rotates and connects, and each described thread is installed with a handwheel;During use, by two pipeline clamping dresses
Put and be socketed in respectively at the pipeline opening needing docking, pipeline clamping device is fixedly connected with pipeline, rotate handwheel, thread
Rotate, threadingly pull bar moves the pipeline clamping device threadeded with thread, thus driving pipeline to move, until two
The port docking of pipeline;This utility model structure is simple, easy to operate, it is to avoid pipeline discontinuity it is ensured that pipeline flat
Directly spend in critical field, substantially increase installation accuracy and installation effectiveness.
Brief description
The following drawings is only intended to, in this utility model is done with schematic illustration and explanation, not limit model of the present utility model
Enclose.Wherein:
Fig. 1 is the structural representation of this utility model embodiment;
Fig. 2 is the use state figure of this utility model embodiment;
In figure: 11- semicircle pipe clamp;12- engaging lug;13- fastening bolt;2- thread;3- handwheel;41- swivel nut;
42- pivoted housing;5- connection-peg.
Specific embodiment
With reference to the accompanying drawings and examples, this utility model is expanded on further.In the following detailed description, only pass through to say
Bright mode describes some one exemplary embodiment of the present utility model.Undoubtedly, those of ordinary skill in the art is permissible
Recognize, in the case of without departing from spirit and scope of the present utility model, can by with various different in the way of to described
Embodiment is modified.Therefore, accompanying drawing and description are inherently illustrative, rather than for limiting the protection of claim
Scope.
As depicted in figs. 1 and 2, buried pipe boil on the nape opposite the mouth specific purpose tool, including two pipeline clamping devices be arrangeding in parallel, institute
State pipeline clamping device and include a pair semicircle pipe clamp 11, the two ends of each described semicircle pipe clamp 11 are symmetrically arranged with level and prolong
The engaging lug 12 stretched, is provided with fastening bolt between two described engaging lugs 12 of described semicircle pipe clamp 11 being docking together
13, it is provided with two fastening bolts 13 between each pair engaging lug 12;The both sides of described pipeline clamping device are symmetrically installed with two
The thread 2 that individual described pipeline clamping device links together, described thread 2 and a described pipeline clamping device spiral shell
Stricture of vagina connects, and described thread 2 is rotated with pipeline clamping device another described and is connected, fixing on each described thread 2
One handwheel 3 is installed.It is installed with two symmetrically arranged swivel nuts on the described pipeline clamping device of described handwheel 3
41, described swivel nut 41 is arranged between two described engaging lugs 12 and is fixedly connected with underlying described engaging lug 12, two
Individual described thread 2 is each passed through described swivel nut 41, near described handwheel 3 described pipeline port be provided with internal diameter with right
The connection-peg 5 of the major diameter fit in adapter road, the external diameter of described connection-peg 5 is bigger than the external diameter of pipeline, has and prevents described pipeline folder
Hold the effect that device slips from pipeline.It is installed with two symmetrically arranged pivoted housings away from described pipeline clamping device
42, described pivoted housing 42 is arranged between two described engaging lugs 12 and is fixedly connected with underlying described engaging lug 12, two
The free end of individual described thread 2 stretches in described pivoted housing 42.
As shown in Fig. 2 when using, two pairs of semicircular pipes are pressed from both sides 11 and are socketed in respectively to be needed, at the pipeline opening of docking, to tighten
Fastening bolt 13, pipeline clamping device is fixedly connected with pipeline, rotates handwheel 3, thread 2 rotates, with thread 2 spiral shell
The pipeline clamping device that stricture of vagina connects threadingly pull bar 2 movement, enters pipeline clamping device threadingly pull bar 2 movement near handwheel 3,
This pipeline clamping device drives the pipeline being secured to connect to another pipe motion, until by the port pair of two pipelines
Connect;This utility model structure is simple, easy to operate, it is to avoid pipeline discontinuity is it is ensured that the glacing flatness of pipeline is in standard model
In enclosing, substantially increase installation accuracy and installation effectiveness.
Of the present utility model ultimate principle, principal character and of the present utility model advantage have been shown and described above.One's own profession
The technical staff of industry it should be appreciated that this utility model is not restricted to the described embodiments, described in above-described embodiment and description
Principle of the present utility model is simply described, on the premise of without departing from this utility model spirit and scope, this utility model is also
Have various changes and modifications, these changes and improvements both fall within the range of claimed this utility model.This utility model
Claimed scope is by appending claims and its equivalent thereof.
Claims (4)
1. buried pipe boil on the nape opposite the mouth specific purpose tool it is characterised in that: include two pipeline clamping devices be arrangeding in parallel, described pipeline
The both sides of clamping device are symmetrically installed with the thread that two described pipeline clamping devices link together, and described screw thread draws
Bar is threadeded with a described pipeline clamping device, and described thread is rotated even with another described pipeline clamping device
Connect, each described thread is installed with a handwheel.
2. buried pipe boil on the nape opposite the mouth specific purpose tool as claimed in claim 1 it is characterised in that: described pipeline clamping device includes one
Semicircular pipe is pressed from both sides, the two ends of each described semicircle pipe clamp are symmetrically arranged with horizontal-extending engaging lug, and two are docked at one
Between the described engaging lug of described semicircle pipe clamp rising, fastening bolt is installed.
3. buried pipe boil on the nape opposite the mouth specific purpose tool as claimed in claim 2 it is characterised in that: near described handwheel described pipeline
Two symmetrically arranged swivel nuts are installed with clamping device, described swivel nut be arranged between two described engaging lugs and with position
Described engaging lug in lower section is fixedly connected, and two described threads are each passed through described swivel nut.
4. buried pipe boil on the nape opposite the mouth specific purpose tool as claimed in claim 2 it is characterised in that: away from described pipeline clamping device
Be installed with two symmetrically arranged pivoted housings, described pivoted housing be arranged between two described engaging lugs and with underlying institute
State engaging lug to be fixedly connected, the free end of two described threads stretches in described pivoted housing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620917286.4U CN205896384U (en) | 2016-08-22 | 2016-08-22 | Ground pipe laying way specialized tool that is geared to needs of job |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620917286.4U CN205896384U (en) | 2016-08-22 | 2016-08-22 | Ground pipe laying way specialized tool that is geared to needs of job |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205896384U true CN205896384U (en) | 2017-01-18 |
Family
ID=57777791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620917286.4U Active CN205896384U (en) | 2016-08-22 | 2016-08-22 | Ground pipe laying way specialized tool that is geared to needs of job |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205896384U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108747190A (en) * | 2018-07-03 | 2018-11-06 | 潘丽华 | A kind of butting joint alignment device for butt welding of tubes |
CN109399187A (en) * | 2018-10-15 | 2019-03-01 | 山东陆宇塑胶工业有限公司 | Portable tubular product centre gripping distributor |
CN109604923A (en) * | 2018-11-21 | 2019-04-12 | 黑龙江科技大学 | Spot welding contra-aperture device and counterpart method for pipe aligning welding |
CN110076515A (en) * | 2018-01-26 | 2019-08-02 | 中国石油天然气集团有限公司 | Device for aligning pipeline |
CN110170212A (en) * | 2019-06-12 | 2019-08-27 | 湖南有色郴州萤石球团有限公司 | A kind of dust pelletizing system of fluorite pelletizing workshop |
CN111520540A (en) * | 2020-04-13 | 2020-08-11 | 中建三局集团有限公司 | Mounting device and method for T-shaped interface nodular cast iron pipe |
CN111810716A (en) * | 2020-07-20 | 2020-10-23 | 谢祥松 | Long distance energy pipeline intelligence construction equipment |
CN112709258A (en) * | 2021-01-18 | 2021-04-27 | 浙江广厦建设职业技术大学 | Equipment is assembled in prefabrication of wisdom piping lane |
CN114952143A (en) * | 2021-02-26 | 2022-08-30 | 杨国庆 | Quick positioning and connecting device for oil pipeline of drilling platform |
-
2016
- 2016-08-22 CN CN201620917286.4U patent/CN205896384U/en active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110076515A (en) * | 2018-01-26 | 2019-08-02 | 中国石油天然气集团有限公司 | Device for aligning pipeline |
CN108747190A (en) * | 2018-07-03 | 2018-11-06 | 潘丽华 | A kind of butting joint alignment device for butt welding of tubes |
CN109399187A (en) * | 2018-10-15 | 2019-03-01 | 山东陆宇塑胶工业有限公司 | Portable tubular product centre gripping distributor |
CN109604923A (en) * | 2018-11-21 | 2019-04-12 | 黑龙江科技大学 | Spot welding contra-aperture device and counterpart method for pipe aligning welding |
CN109604923B (en) * | 2018-11-21 | 2020-08-07 | 广东石油化工学院 | Spot welding aligning device and aligning method for pipeline aligning welding |
CN110170212A (en) * | 2019-06-12 | 2019-08-27 | 湖南有色郴州萤石球团有限公司 | A kind of dust pelletizing system of fluorite pelletizing workshop |
CN111520540A (en) * | 2020-04-13 | 2020-08-11 | 中建三局集团有限公司 | Mounting device and method for T-shaped interface nodular cast iron pipe |
CN111810716A (en) * | 2020-07-20 | 2020-10-23 | 谢祥松 | Long distance energy pipeline intelligence construction equipment |
CN111810716B (en) * | 2020-07-20 | 2021-12-14 | 江苏优霸五金工具有限公司 | Long distance energy pipeline intelligence construction equipment |
CN112709258A (en) * | 2021-01-18 | 2021-04-27 | 浙江广厦建设职业技术大学 | Equipment is assembled in prefabrication of wisdom piping lane |
CN112709258B (en) * | 2021-01-18 | 2022-02-22 | 浙江广厦建设职业技术大学 | Equipment is assembled in prefabrication of wisdom piping lane |
CN114952143A (en) * | 2021-02-26 | 2022-08-30 | 杨国庆 | Quick positioning and connecting device for oil pipeline of drilling platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205896384U (en) | Ground pipe laying way specialized tool that is geared to needs of job | |
CN203367893U (en) | Cable traction head | |
CN202753075U (en) | Wrench for pipelines | |
CN105782567B (en) | A kind of mounting device of glass fiber reinforced plastic pipe | |
CN212900227U (en) | Novel slip convenient to operate | |
CN204772359U (en) | Big circular article of specification device that spirals | |
CN103074997B (en) | Steel tube scaffold wall connecting piece | |
CN205716171U (en) | A kind of reducingreduce tee | |
CN205592504U (en) | Biaxial ferrule device for unmanned aerial vehicle | |
CN105736828A (en) | Safety rope device for pipe connection | |
CN206811833U (en) | A kind of portable elevator reparing combination rope clamp | |
CN104214177A (en) | Locking device and stretching rod | |
CN109519635A (en) | Large-sized plastic rubber pipeline butt-joint mounting device | |
CN203685077U (en) | Chain for guiding continuous oil pipe to be rapidly inserted into injection head | |
CN103939686B (en) | A kind of Pipe joint assembly and a kind of haulage device | |
CN208123706U (en) | Novel quick connector | |
CN207233394U (en) | A kind of non-rectilinear length of tube debugging apparatus | |
CN201160206Y (en) | Wire lead apparatus of underground cable yarn tube | |
CN204277920U (en) | Dismounting device | |
CN205421901U (en) | Fast -assembling, quick detach tubular product connecting piece | |
CN209353733U (en) | A kind of tensioning fixture | |
CN109944393A (en) | A kind of steel strand wires attachment device | |
CN214292805U (en) | Fixing structure of rolling mill flange | |
CN202431234U (en) | Back-up tong for petroleum pipe make-and-break testing system | |
CN203698542U (en) | Bicycle folding mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250100 No. 297 industrial North Road, Licheng District, Shandong, Ji'nan Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. |