CN205894761U - Production area structure in solid preparation workshop - Google Patents

Production area structure in solid preparation workshop Download PDF

Info

Publication number
CN205894761U
CN205894761U CN201620262715.9U CN201620262715U CN205894761U CN 205894761 U CN205894761 U CN 205894761U CN 201620262715 U CN201620262715 U CN 201620262715U CN 205894761 U CN205894761 U CN 205894761U
Authority
CN
China
Prior art keywords
corridor
clean
area
clean area
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620262715.9U
Other languages
Chinese (zh)
Inventor
王善春
徐健
姚玉成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chia Tai Tianqing Pharmaceutical Group Co Ltd
Original Assignee
Chia Tai Tianqing Pharmaceutical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chia Tai Tianqing Pharmaceutical Group Co Ltd filed Critical Chia Tai Tianqing Pharmaceutical Group Co Ltd
Priority to CN201620262715.9U priority Critical patent/CN205894761U/en
Application granted granted Critical
Publication of CN205894761U publication Critical patent/CN205894761U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Agricultural Chemicals And Associated Chemicals (AREA)

Abstract

The utility model relates to a production area structure in solid preparation workshop particularly relates to the solid preparation workshop production area structure that a clean district corridor partition designed, the utility model discloses a clean district corridor divide into clean corridor in district and clean district filth corridor to to the cup in endocyst district with leave the passageway and has carried out the optimal design, on the whole, stream of people's commodity circulation gets into from the clean clean corridor in district and respectively produces between the dirt function, and leaves from clean district filth corridor. The utility model discloses a production area structure in solid preparation workshop overall arrangement is simple, can effectively reduce cross contamination and reduce the dust volume of subregion, be particularly useful for ampere sieve for buddhist nun, imatinib, reach husky production for the great solid preparation of toxic and side effect such as buddhist nun.

Description

A kind of production plot structure of pharmaceutical workshop
Technical field
This utility model is related to a kind of construction of building, in particular to a kind of production district knot of pharmaceutical workshop Structure.
Background technology
Solid preparation is a kind of important formulation products of field of medicaments, and common solid dosage formss have powder, granule, piece Being most widely used of agent, capsule, drop pill etc., wherein tablet, capsule and granule.The life of different solid preparation products Production. art has certain identical point, for example, the operation such as pulverize, sieve, weighing, always mixing, in various solid preparation production processes It is all indispensable.The difference of dosage form, essentially consists in the operations such as tabletting, capsule filling and makes a distinction.
The operation of one important feature dust of pharmaceutical workshop is many, and order of classes or grades at school differs.Factory in solid preparation In, conventional production has focused largely in a big flat bed, and material powder or tablet, capsule are deposited in rustless steel charging basket And operating, in recent years, with the development of solid preparation equipment, rely on the pattern that material self gravitation carries out vertical transport to start Existing, corresponding to typical solid preparation production technology, the production facility that vertical material conveys in flow process can be distributed in multiple floors, Material first passes through baggage elevator and serves top, with production procedure operation, utilizes material self gravitation successively down as much as possible Layer conveying.In addition, different types of solid preparation carries out downstream production in same production district, then by different packaging wire wrappings Pattern also increasing prevalence.
New equipment, the offering convenience with the modern production being constantly oral solid formulation of new concept, but tradition is solid The topology layout in body preparation Workshop Production area still needs to be followed up:
1. the corridor of the production district of traditional solid preparation is provided only with clean area corridor, needs as far as possible full in design The unidirectional artificial abortion of foot, logistics design, and with the sensible each function of the route of simple and fast as far as possible between, it is whole that this often increased production district The layout difficulty of body.
2., when the production district of traditional solid preparation has multiple Nei Bao area, the outlet between multiple Nei Bao areas and corridor is led to Road setting is unreasonable, and it is current convenient often to have impact on because packing the presence of train line.
3. the Nei Bao area of the production district of traditional solid preparation, multiple Nei Bao areas share same cup, and Nei Bao area is to produce Between dirt function, the dosage form of different Nei Bao areas product to be packaged, adjuvant, active component may differ, and easily cause cross-contamination.
Utility model content
The purpose of this utility model is the pharmaceutical workshop structure providing a kind of structure simple, rationally distributed, to reduce Cross-contamination, and facilitate artificial abortion, logistics to pass through.
This utility model one side provides a kind of production of the pharmaceutical workshop of cleannes classification in clean area corridor Plot structure.
The production plot structure of described pharmaceutical workshop includes between clean area corridor and dust function, described clean area corridor It is divided into the clean corridor in clean area and clean area dirt corridor, between the clean corridor in described clean area and described clean area dirt corridor Be provided with leave the clean corridor in clean area dirt corridor entrance clean area people is net, the net passage of thing, between described dust function with described The clean corridor in clean area, clean area are equipped with passage between dirt corridor, totally walk with described clean area between described dust function The passage of corridor is by arranging cup connection, and the passage and the dirt corridor of described clean area between is not provided with cup, described It is provided with, and the dirt corridor of described clean area between, unidirectional leaving channel, logistics and the personnel leaving between dust function between dust function All do not return between dust function from clean area dirt corridor.
In a preferred version of the present utility model, can be a group or several groups in following groups between dust function Combination, and can between one or many between:
(1) between capsule charge;
(2) between tabletting, between coating;
(3) between tabletting;
(4) Nei Bao area;
Connected by independent cup with the passage in the clean corridor in described clean area between every dust function, and described product Between dirt function, the passage and the clean corridor in described clean area between is the unidirectional entrance passage of artificial abortion and object, optionally acceptable Set up entrance and/or the leaving channel of material.It is described as " optional between dust function with the material channel in clean area corridor herein ... enter and/or leaving channel ", it is because the upstream product entering between dust function and/or leave treating between dust function Packaging product can also be by the vertical material transmission means described in background technology, by incoming production plot structure of upper floors And/or by this production district structural transmission to lower floor.
In a preferred version of the present utility model, this production district superstructure is additionally provided with upper floors, described upper strata Floor can be used for the pulverizing of solid preparation, the upstream process such as sieve, weigh, always mixing, or be only used for will be downward for upstream intermediate products Transmit to production plot structure described in the utility model, upper strata is provided with upper materials passage and connects the capsule charge to understructure Between and/or tabletting between and/or coating between;It is further preferred that being additionally provided with lower floor, this production district below this production plot structure Structure is provided with lower floor's material channel and by material channel, the solid preparation product to be packaged producing is transported to lower floor, towards lower floor And the Nei Bao area via lower floor's setting and outsourcing area complete to pack.
In a preferred version of the present utility model, the described clean corridor in clean area producing plot structure is provided with personnel's Enter, leaving channel is communicated with production district structural outer, clean area dirt corridor is provided with garbage leaving channel and is tied with production district Communicate outside structure, and the material channel communicating with production district structural outer include one of following design:
(1) described production district structure top is provided with material entrance passage and connects to described production plot structure;
(2) the described material producing plot structure enters passage and is located at the clean corridor in clean area;
One of with following design:
(1) the material leaving channel of described production district is located at the clean corridor in clean area;
(2) the described material leaving channel producing plot structure connects to the lower floor producing plot structure;
(3) when described production plot structure Zhong Youneibao area, described production district no material leaving channel, directly in this production Area packs;
Or a combination thereof.
People in a preferred version of the present utility model, between the clean corridor in clean area and clean area dirt corridor Only, the net passage of thing is divided into four passages: device channels, sanitary equipment passage, medicated clothing passage and personnel channel.
In a preferred version of the present utility model, above-mentioned opposed area pressure is set to: clean area is totally walked Corridor > between dust > clean area dirt corridor.
This utility model another aspect is optimized further to above-mentioned production plot structure, devises a kind of tablet and glue The production of wafer, packaging integrated production plot structure:
In a preferred version of the present utility model, between the dust function of described production plot structure, include capsule charge Between, between tabletting, between coating, Nei Bao area and outsourcing area, as it was previously stated, between capsule charge, between tabletting, between coating, Nei Bao area be to produce Between dirt function, and the clean corridor in clean area, clean area are equipped with artificial abortion, logistics corridor between dirt corridor, and clean with clean area Passage between corridor is artificial abortion, the logistics unidirectional entrance passage entering Nei Bao area, the passage and the dirt corridor of clean area between For leaving artificial abortion, the unidirectional leaving channel of logistics in Nei Bao area, between capsule charge, between tabletting, between coating, Nei Bao area and clean area do The passage in net corridor is connected by cup, and is not provided with cup at the passage and the dirt corridor of clean area between, with cleaning Area dirt corridor directly connects.
In a preferred version of the present utility model, the described upper strata producing plot structure is additionally provided with upper floors, described Upper floors can be used for the pulverizing of solid preparation, the upstream process such as sieve, weigh, always mixing, or is only used for upstream intermediate products Transmit downwards to production plot structure described in the utility model, upper strata is provided with material channel and connects the capsule charge to understructure Between and/or tabletting between and/or coating between;Material channel due to upstream product connects to upper floors, therefore this production plot structure It is as follows with the passage design that outside non-clean area communicates: personnel ingress and egress out passage corridor clean with described clean area and communicate, Garbage leaving channel is communicated with described clean area dirt corridor, and the leaving channel having packed product is communicated with outsourcing area.
In a preferred version of the present utility model, described production plot structure also include solid preparation product keep between And/or between interior packaging material is kept in, between described solid preparation product is kept in and/or between the clean corridor in interior packaging material working area and clean area It is provided with the logistics corridor for transporting interior packaging material.
This utility model third aspect, is transformed further to the bagging area part of above-mentioned production plot structure:
In a preferred version of the present utility model, described Nei Bao area has more than one, and each Nei Bao area is provided with of the same race The packaging train line of product line connects to outsourcing area, and the substantially parallel design of each packaging train line, and clean area dirt corridor sets There is clean area dirt branch corridor adjacent with Ge Neibao area and be provided with passage and communicate, and each Nei Bao area and the clean corridor in clean area Between be respectively provided with cup connection, the mode that clean area dirt branch corridor is connected with Ge Neibao area is: clean area dirt is divided Prop up corridor and cross-over design is carried out to Ge Neibao area, and passage is arranged on the metope adjacent with Nei Bao area, simultaneously that clean area is dirty The packaging train line that thing branch corridor has influence on after embedding is raised to the height not affecting that personnel pass through, with clean area dirt branch The packaging train line of corridor cross section only has transfer function, relates generally to lifting, translation and declines three steps, this fortune Line mode can be achieved on according to prior art, will not be described here.
Preferably, described clean area dirt branch corridor be located at Nei Bao area and outsourcing area intersection and with Ge Neibao area phase Adjacent, communicate, described clean area dirt branch corridor might not be in Nei Bao area and outsourcing area intersection by Nei Bao area and outsourcing area Completely separated, only need to ensure that each Nei Bao area has with described clean area dirt branch corridor that the region being available for arranging passage is adjacent to be Can.It is furthermore preferred that described packaging train line from Nei Bao area across clean area dirt branch corridor place space or place space Top, the height setting across part is higher than Human Height, for example a kind of inverted u shape design, and generally height is more than 1.8 meters, excellent Elect more than 2.0 meters as, do not affect most personnel and pass through.
In a preferred version of the present utility model, the clean corridor in clean area and clean area dirt corridor are by described production Be separated into three function groups between each dust function of plot structure: the first function group include solid preparation product keep between and/or interior Packaging material working area, the second function group includes between capsule charge, between tabletting, between coating, and the 3rd function group includes Nei Bao area and outsourcing Area, is not separated by the clean corridor in clean area or clean area dirt corridor between each dust function between each function group, this place State clean area dirt corridor and do not include clean area dirt branch corridor.
The production plot structure that this utility model fourth aspect is related to above-mentioned pharmaceutical workshop is used for preparing solid preparation Purposes, particularly prepare toxicity, the purposes larger or that have sensitization solid preparation product of activity, such as antitumor, hormoness Medicine.
The production plot structure of pharmaceutical workshop of the present utility model, has the advantage that compared to existing technology
1. traditional single clean area corridor is subdivided into the clean corridor in clean area and clean area dirt corridor, factory on surface Room structure is more complicated, actually reduces in traditional plant layout and only will meet not reflux, no using clean area corridor Roundabout and artificial abortion's logistics such as does not intersect at the design difficulty of condition;In addition, being conducive to avoiding cross-contamination;In addition, traditional dust It is typically provided cup at (such as: between tabletting, between capsule filling) and the passage in clean area corridor, this utility model only need to be between function Cup is set at the passage between dust function adjacent with the clean corridor in clean area, adjacent with non-clean area of the present utility model corridor Dust function between passage then do not need arrange cup, save cost and space;
2. multiple Nei Bao areas of the present utility model correspond to multiple independent cups, it is to avoid in prior art, different Nei Bao areas make Produce cross-contamination with same cup;
3. of the present utility model Nei Bao area is embedded by setting branch corridor on corridor, and train line will be packed accordingly Raise design, with simplest route, corridor is communicated with Ge Neibao area, ensure that technology of the package route, Nei Bao people from area simultaneously The short circuit of member's (leaving Nei Bao area entrance clean area corridor) passage is smooth, further simplify the integral layout of production district.
Vocabulary illustrates:
Passage: passage described in this utility model both can communicate for directly communicating or indirectly, indirectly communicates Passage can be included as realizing or facilitate implementation equipment or the room of this channel function, such as: can be provided with sanitary equipment cleaning in sanitary equipment passage Between, sanitary equipment storage between.
Between dust function: the room of dust in solid preparation production district, usually it is related to the room of preparation process, dust It is typically provided with cup and corridor between function, and between dust function and be necessarily confined to a room or inner room.
Packaging train line: the automatization of product packaging or the streamline of semi-automation, by the interior bag train line in Nei Bao area It is formed by connecting with the outsourcing train line in outsourcing area.
Material: refer to the middle product for preparing solid preparation, or made solid preparation but unpacked product.
Object: refer to non-product, such as instrument, equipment.
Clean area dirt branch corridor: belong to the part in clean area dirt corridor, depending on quoting from this part for convenience Justice.
Brief description
A kind of concrete scheme of the production plot structure of the pharmaceutical workshop of Fig. 1 clean area of the present utility model corridor classification
The production of a kind of Fig. 2 tablet of the present utility model and capsule, the concrete side of packaging integrated production plot structure Case
The production of Fig. 3 another kind of the present utility model tablet and capsule, packaging integrated production plot structure concrete Scheme
A kind of Fig. 4 sectional view of packaging train line design of the present utility model
Specific embodiment
In order to be more clearly understood to technical characteristic of the present utility model, purpose and effect, now compare brief description Specific embodiment of the present utility model.
Embodiment 1
Clean area is walkedCorridorThe solid preparation of the pharmaceutical workshop of classification produces plot structure.
As shown in figure 1, present embodiments providing a kind of production plot structure of the pharmaceutical workshop of clean area corridor classification Concrete scheme, including between clean area corridor, capsule charge, between tabletting, between coating, described clean area corridor is divided into clean area to do Net corridor and clean area dirt corridor.
Wherein it is provided between the clean corridor in clean area and clean area dirt corridor and leave the entrance cleaning of clean area dirt corridor The people in the clean corridor in area is net, the net passage of thing, specifically includes: device channels, sanitary equipment passage, medicated clothing passage and personnel channel, Between described capsule charge, between tabletting, the clean corridor between coating and clean area, clean area be equipped with artificial abortion, thing between dirt corridor Between circulation road, and above-mentioned dust function the passage and the clean corridor in clean area between be enter dust function between personnel, object Passage between single admission passage, and clean area dirt corridor is the personnel between dust function of leaving, the unidirectional outlet of object Passage.
This production plot structure and the outside passage design communicating are as follows: the entrance of personnel, leaving channel and described clean area Clean corridor communicates, and garbage leaving channel is communicated with described clean area dirt corridor.The upper strata of this production plot structure is as upper Trip operation workshop, is provided with material channel and connects to this production plot structure, for transmitting upper materials to this production plot structure;This The lower floor producing plot structure, as packing shop, also is provided with material channel and connects to this production plot structure, for by this production district The product to be packaged of structure is transmitted to lower floor.
Can be seen that artificial abortion's logistics in the production plot structure corridor of the present embodiment by the production plot structure of above-mentioned solid preparation Not reflux, not roundabout, do not intersect;Due to the clean corridor in clean area and clean area dirt corridor compartmentalized design, clean area dirt is walked Corridor can be used as the leaving channel of production district personnel and garbage, and this passage itself does not have too high request to cleanliness factor, therefore dust Do not need between the dirt corridor of between function and clean area to arrange cup.
Embodiment 2
The production of tablet and capsule, packaging integrated solid preparation produce plot structure.
As shown in Fig. 2 present embodiments providing the production of a kind of tablet and capsule, packaging integrated production district knot Structure, this production plot structure includes between dust function and clean area corridor, includes between capsule charge, tabletting wherein between dust function Between, between coating, solid preparation product keep between, Nei Bao area and outsourcing area, clean area corridor includes the clean corridor in clean area and clean Net area dirt corridor.
Wherein between capsule charge, between tabletting, between coating, the clean corridor in Nei Bao area and clean area, between the dirt corridor of clean area It is equipped with artificial abortion, logistics corridor, and the passage and the clean corridor in clean area between is the unidirectional entrance passage entering Nei Bao area, with Passage between the dirt corridor of clean area is the unidirectional leaving channel leaving Nei Bao area, the clean corridor in clean area and clean area dirt Be provided between corridor leave the clean corridor in clean area dirt corridor entrance clean area unidirectional people is net, the net passage of thing, concrete wrap Include: device channels, sanitary equipment passage, medicated clothing passage and personnel channel, between capsule charge, between tabletting, between coating, Nei Bao area with clean The passage in the clean corridor in area is connected by cup, and is not provided with cup at the passage and the dirt corridor of clean area between, with Clean area dirt corridor directly connects.
The present embodiment to produce the passage design that plot structure and outside non-clean area communicate as follows: personnel's entrance passage, people Member leaving channel corridor clean with described clean area communicates, and garbage leaving channel is communicated with described clean area dirt corridor, raw The material channel that the upper strata in producing region is provided with upstream product is communicated between the capsule charge of this production plot structure and between tabletting, and wraps The leaving channel of dress product is arranged on outsourcing area.
Conventional materials enter passage and are generally arranged at This floor, need to process through chalk dust removing, even and if carrying out before entrance Process, because some objective factors still inevitably bring certain pollution, above-mentioned production plot structure in the transportation of corridor On the basis of embodiment 1, material entrance passage is changed to longitudinal design so that the clean corridor in the clean area of this production plot structure Dust pollution source reduce further, thus the cross-contamination between further avoid between each dust function.
Meanwhile, the production district structural packaging area of the solid preparation of the present embodiment is additionally arranged solid preparation with respect to embodiment 1 Between product is kept in, interior packaging material enter passage, Nei Bao area and outsourcing area, in the case that production district structure complexity improves, this reality Apply example according between dust function with the clean corridor in clean area setting single admission passage, unidirectional with the setting of clean area dirt corridor go out The design principle of mouth passage, had both maintained the simplification of space layout, can meet not reflux, not roundabout, Uncrossed requirement again.
Embodiment 3
Tablet containing a plurality of packaging train line and glueCapsuleThe production of agent, the concrete side of packaging integrated production plot structure Case.
As shown in figure 3, present embodiments providing the production containing a plurality of tablet packing train line and capsule, packaging one The solid preparation of body produces plot structure, and this production plot structure includes between dust function and clean area corridor, wherein dust function Between include between capsule charge, between tabletting, between coating between solid preparation product is kept in, Nei Bao area and outsourcing area, wherein clean area is walked Corridor includes the clean corridor in clean area and clean area dirt corridor, and the quantity in Nei Bao area is 3.The production plot structure cloth of the present embodiment Office and embodiment 2 are essentially identical, and here does not just repeat one by one, differs only in the quantity in Nei Bao area.
As shown in Figure 3,4, described Nei Bao area has 3, is equipped with single packaging connection between each Nei Bao area and outsourcing area The substantially parallel design of moving-wire, Ge Neibao area and its packaging train line, clean area dirt corridor is provided with clean area dirt branch and walks Corridor is adjacent with Ge Neibao area and is provided with passage and communicates, and is respectively provided with cup between the clean corridor in each Nei Bao area and clean area even Logical, the mode that clean area dirt branch corridor connects with Ge Neibao area is: by clean area dirt branch corridor in Nei Bao area and outward The intersection in bag area carries out embedded design, and arranges the exit passageway in corresponding Nei Bao area on the metope adjacent to Nei Bao area, The packaging train line having influence on after simultaneously embedding clean area dirt branch corridor is raised to the height not affecting that personnel pass through.Point The train line propping up corridor embedded part only has transfer function, relates generally to lifting, translation and declines three steps, this operation Mode can achieve according to prior art.
As can be seen here, the embedded design scheme in clean area dirt branch corridor is hardly affected by Nei Bao area quantity, The packaging train line being affected by clean area dirt branch corridor is raised to 2.5 meters of height, do not affect personnel leave Nei Bao area via Clean area dirt branch corridor entrance clean area dirt corridor current, compact in design is brief, and personnel pass through convenient.
The foregoing is only specific embodiment of the present utility model, be not limited to scope of the present utility model.Appoint What those skilled in the art, the equivalent variations made on the premise of without departing from design of the present utility model and principle, modification With combination, the scope of this utility model protection all should be belonged to.

Claims (15)

1. the production plot structure of a kind of pharmaceutical workshop, including between clean area corridor and dust function it is characterised in that described Clean area corridor is divided into the clean corridor in clean area and clean area dirt corridor, the clean corridor in described clean area and described clean area dirty Be provided with the passage leaving the clean corridor in clean area dirt corridor entrance clean area between thing corridor, between described dust function with described The clean corridor in clean area, clean area are equipped with passage between dirt corridor, totally walk with described clean area between described dust function The passage of corridor is by arranging cup connection, and the passage and the dirt corridor of described clean area between is not provided with cup.
2. the production plot structure described in claim 1 is it is characterised in that the clean corridor in described clean area and described clean area dirt Corridor is equipped with passage with the described outside producing plot structure.
3. described in claim 1 produce plot structure it is characterised in that the species between described dust function be following one group or Between several groups of combination, and every kind of dust function be between one or many between:
(1) between capsule charge;
(2) between tabletting, between coating;
(3) between tabletting;
(4) Nei Bao area.
4. the production plot structure described in claim 3 is it is characterised in that include Nei Bao area, described Nei Bao area between described dust function Have more than between one, Nei Bao area is provided with packaging train line, and Mei Jianneibao area is to pass through with the passage in the clean corridor in described clean area Independent cup connection.
5. the production plot structure described in claim 4 divides it is characterised in that being additionally provided with clean area dirt on the dirt corridor of clean area Corridor is adjacent with all Nei Bao areas, and has with all or part of packaging train line and intersect, and each Nei Bao area is in clean area dirt Thing corridor or clean area dirt branch corridor are provided with exit passageway.
6. the production plot structure described in claim 5 is it is characterised in that described packaging train line and clean area dirt branch corridor The partly at relatively raised design intersecting.
7. the production plot structure described in claim 1 it is characterised in that include capsule charge between, between tabletting, between coating, interior bag Between area, outsourcing area, solid preparation product are kept in, between described solid preparation product is kept in, corridor clean with clean area communicates, and clean Net area dirt corridor is not communicated with;Clean corridor and clean area dirt corridor are all not communicated with clean area in described outsourcing area.
8. the production plot structure described in claim 7 is it is characterised in that the clean corridor in described clean area and clean area dirt corridor Three function groups will be separated into: the first function group includes between osd product keeps in, the second work(between described production each function of plot structure Can group include between capsule charge, between tabletting, between coating, the 3rd function group includes Nei Bao area, outsourcing area.
9. the arbitrary production plot structure described in claim 1-8 is included it is characterised in that producing plot structure with outside passage: institute Material channel between stating between production district structure top and described production plot structure tabletting, between capsule charge;Clean area is totally walked Interior packaging material between corridor and production district structural outer enters the leaving channel entering passage and personnel of passage, personnel, clean area Garbage leaving channel between dirt corridor and production district structural outer.
10. the arbitrary production plot structure described in claim 1-8 is it is characterised in that the clean corridor in clean area and clean area dirt are walked People between corridor is net, the net passage of thing is divided into four passages: device channels, sanitary equipment passage, medicated clothing passage and personnel channel.
Production plot structure described in 11. claim 1-8 is it is characterised in that totally walk with described clean area between described dust function Passage between corridor is the entrance passage of personnel and object, optionally can also do and change as follows:
(1) entrance and/or the leaving channel of material are set up;(2) personnel enter passage and also serve as the entrance of material and/or leave logical It is provided with, and the dirt corridor of described clean area between, the leaving channel leaving between dust function between road, and described dust function.
Production plot structure described in 12. claim 1-8 is it is characterised in that the clean corridor in clean area of described production plot structure sets Have the entrance of personnel, leaving channel to communicate with production district structural outer, clean area dirt corridor be provided with garbage leaving channel with Production district structural outer communicates, and the stock product passage communicating with production district structural outer includes in following design one Kind:
(1) described production district structure top is provided with material entrance passage and connects to described production plot structure;
(2) the described material producing plot structure enters passage and is located at the clean corridor in clean area;
One of with following design:
(1) the material leaving channel of described production district is located at the clean corridor in clean area;
(2) the described material leaving channel producing plot structure connects to the lower floor producing plot structure;
(3) when described production plot structure Zhong Youneibao area, described production district no material leaving channel;
Combination.
Production plot structure described in 13. claim 1-8 is it is characterised in that each region relative pressure is: the clean corridor in clean area > Between dust > clean area dirt corridor.
Production plot structure described in 14. claim 1-8 it is characterised in that described pharmaceutical workshop be toxicity, activity or cause The pharmaceutical workshop of quick property medicine.
Production plot structure described in 15. claim 14 is it is characterised in that described pharmaceutical workshop is the solid of antineoplastic agent Formulating plant.
CN201620262715.9U 2016-03-31 2016-03-31 Production area structure in solid preparation workshop Active CN205894761U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620262715.9U CN205894761U (en) 2016-03-31 2016-03-31 Production area structure in solid preparation workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620262715.9U CN205894761U (en) 2016-03-31 2016-03-31 Production area structure in solid preparation workshop

Publications (1)

Publication Number Publication Date
CN205894761U true CN205894761U (en) 2017-01-18

Family

ID=57765745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620262715.9U Active CN205894761U (en) 2016-03-31 2016-03-31 Production area structure in solid preparation workshop

Country Status (1)

Country Link
CN (1) CN205894761U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288380A (en) * 2016-03-31 2017-10-24 正大天晴药业集团股份有限公司 A kind of production plot structure of pharmaceutical workshop
CN112163688A (en) * 2019-08-16 2021-01-01 重庆华森制药股份有限公司 Full-flow intelligent manufacturing system for multi-dosage form Chinese and western medicine products and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288380A (en) * 2016-03-31 2017-10-24 正大天晴药业集团股份有限公司 A kind of production plot structure of pharmaceutical workshop
CN112163688A (en) * 2019-08-16 2021-01-01 重庆华森制药股份有限公司 Full-flow intelligent manufacturing system for multi-dosage form Chinese and western medicine products and construction method

Similar Documents

Publication Publication Date Title
CN205894761U (en) Production area structure in solid preparation workshop
CN206520783U (en) A kind of biscuit descends support support reason material equipment automatically
CN102530457B (en) Automatic Chinese herbal medicine pharmacy and prescription filling method thereof
CN106934748A (en) A kind of automatic medicine-dispensing allocator
West et al. 3D printing: a case of ZipDose® technology–world's first 3D printing platform to obtain FDA approval for a pharmaceutical product
CN105151404B (en) Weighing type system and method for intelligent filling a prescription of Chinese herbal medicine
CN207463670U (en) A kind of full-automatic sorting and packaging system of logistics distribution cargo
CN108466707A (en) A kind of hospital pharmacy drug automated dispensing, sorting packaging system and its application method
CN108160506A (en) Logistics sorting, conveying and the integration apparatus being packaged
CN110282180A (en) A kind of flexible dress joint sealing system and technique
CN107288380A (en) A kind of production plot structure of pharmaceutical workshop
CN109431807A (en) A kind of prepared slices of Chinese crude drugs decoction system
CN107080286B (en) A kind of material selecting system and method for concentrating
CN207645126U (en) A kind of blood plasma enters library storage and selection system
CN105583997A (en) Ultra-thin injection molding production process integrated comprehensive workshop
CN206437302U (en) A kind of several pieces point of pushing device of product
CN210086919U (en) GMP workshop with figure flow dual vertical through layout
CN104590900A (en) High-speed cigarette sorting unit
CN208439809U (en) Tiered warehouse facility
CN108686962B (en) Sorting system, sorting platform and sorting unit thereof
CN215576265U (en) Intelligent medicine dispensing, feeding, supplementing and decocting system for traditional Chinese medicine decoction piece prescription
CN206437320U (en) Size particles sand sieve selects transmission system
CN207238510U (en) A kind of packages platform
CN109353601A (en) A kind of ceramic tile is automatically packaged production line
CN107000945B (en) For run lattice body commodity shelf system method and corresponding lattice body commodity shelf system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant