CN205894061U - Underground structure interior lining wall and underground continuous wall coincide face structure - Google Patents
Underground structure interior lining wall and underground continuous wall coincide face structure Download PDFInfo
- Publication number
- CN205894061U CN205894061U CN201620375451.8U CN201620375451U CN205894061U CN 205894061 U CN205894061 U CN 205894061U CN 201620375451 U CN201620375451 U CN 201620375451U CN 205894061 U CN205894061 U CN 205894061U
- Authority
- CN
- China
- Prior art keywords
- underground
- underground structure
- wall
- channel
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model belongs to underground works builds the field, especially relates to an underground structure interior lining wall and underground continuous wall coincide face structure, its characterized in that: including underground structure interior lining wall and underground continuous wall, underground structure interior lining wall executes in the outside and has been underground continuous wall as its envelope, underground continuous wall leans on underground structure interior lining wall one side to improve level the direction and is equipped with the channel -section steel, it is firm with the inboard welded steel of underground continuous wall that the channel -section steel passes through the mounting, the U -shaped groove of channel -section steel is filled up by the underground structure interior lining wall concrete, and the coincide face between underground structure interior lining wall and the underground continuous wall is except having the coarse coincide off -plate of nature, have a plurality of unsmooth tongue -and -grooves between underground continuous wall and underground structure interior lining wall. The utility model discloses adopt the coincide face of taking unsmooth tongue -and -groove between underground structure interior lining wall and the underground continuous wall, save the labour, convenient construction, coincide face quality is reliable.
Description
Technical field
This utility model belongs to underground engineering construction field, and more particularly, to one kind is applied to subway station and shield well underground
Structure inwall overlaps surface construction with diaphram wall.
Background technology
When having performed diaphram wall outside underground structure inwall as its foundation pit enclosure structure, general underground structure
Design will consider that diaphram wall participates in underground structure stress, often carries out calculating design by composite wall or overlapping wall at present.Overlapping
Wall be by diaphram wall with after pour underground structure inwall and form a whole force structure component, that is, pass through artificial by underground
Dig into male and fomale(M&F) inside diaphragm wall or pre-buried steel tie makes diaphram wall couple together with underground structure inwall, underground is even
Positive pressure and shearing can be transmitted, general underground structure liner wall thickness can use between continuous wall and underground structure inwall
400mm, the bending rigidity of overlapping wall is larger, and the arrangement of reinforcement outside underground structure inwall is less.
According to " urban track traffic design specification ", when superposed surfaces do not join lacing wire, diaphram wall medial surface dabbing will
Ask: dig out cordierite and show up, male and fomale(M&F) mean depth 20mm.Diaphram wall medial surface digs male and fomale(M&F), needs a large amount of manpowers, applies
Work order position, through conventional excavator dabbing, is easily destroyed continuous wall concrete, and the quality of superposed surfaces is also not easy to detect.
Utility model content
Perform manpower needed for male and fomale(M&F) in order to save diaphram wall, the purpose of this utility model is to provide a kind of ground
Lower structure inwall overlaps surface construction with diaphram wall.
The technical scheme that this utility model is adopted is:
A kind of underground structure inwall and diaphram wall overlapping surface construction it is characterised in that: include underground structure liner
Wall and diaphram wall, have performed diaphram wall as its building enclosure, described underground outside described underground structure inwall
Diaphragm wall leans on horizontal direction on underground structure inwall side to be provided with channel-section steel, and described channel-section steel passes through in fixture and diaphram wall
Side reinforcement welding firmly, in the u shape groove of described channel-section steel, filled up by the concrete of underground structure inwall by space.
Described reinforcing bar is vertical reinforcement or transverse steel.
Described fixture is u shape reinforcing bar.
It is provided with dowel, one end of described dowel is welded with channel-section steel and its other end anchors in the u shape groove of described channel-section steel
In the concrete of underground structure inwall.
Described dowel is u shape dowel.
The beneficial effects of the utility model are:
1st, horizontally arranged some channel-section steels inside diaphram wall in this utility model, with ground inside diaphram wall
Lower structure inwall forms concavo-convex tongue and groove it is not necessary to artificial chisel diaphram wall medial surface, saves manpower;
2nd, between underground structure inwall and diaphram wall, concavo-convex tongue and groove quality is more reliable than artificial chisel male and fomale(M&F), superposed surfaces
Shear-carrying capacity significantly improves;
3rd, the quality of superposed surfaces easily detects;
4th, structure and construction method are all very simple, and operating performance is by force it is easy to construct.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the recess schematic diagram of setting on diaphram wall of the present utility model.
Fig. 3 is the recess of setting and dowel schematic diagram on diaphram wall of the present utility model.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
In figure, 1- diaphram wall, 2- underground structure inwall, 3- reinforcing bar, 4- fixture, 5- channel-section steel, 6- dowel.
Embodiment 1
As shown in Fig. 2 having performed diaphram wall 1 outside underground structure inwall 2, from underground structure top board top surface to ground
Between lower structure base slab bottom surface, inside diaphram wall 1, level is provided with some channel-section steels 5, and channel-section steel 5 is hot rolling thin-wall channel, groove
Steel 5 height 80mm, width 40mm, vertically spacing is 1.5m to channel-section steel 5, and every channel-section steel 5 is continuous with underground by some fixtures 4
Wall vertical reinforcement 3 firm welding, channel-section steel 5 compound plate outer surface has 10mm distance with diaphram wall 1 inner side vertical reinforcement 3 surface;
Wherein, fixture 4 is u shape reinforcing bar.
Construction procedure: (1) first press usual method make diaphram wall 1 steel reinforcement cage, steel reinforcement cage top surface vertically between
Multiple rows of fixture 4 is set every 1.5m, fixture 4 is u shape reinforcing bar, a diameter of 8mm of u shape reinforcing bar, and transversely spacing is fixture 4
1.0m, passes through between the vertical reinforcement 3 of fixture 4 and diaphram wall 1 to be welded and fixed, then channel-section steel 5 is laid on every row solid
Determine on part 4, channel-section steel 5 and fixture 4 firm welding;(2) the interior polystyrene board of u shape groove of channel-section steel 5 is filled up;(3) press generally
Method pours diaphram wall;(4) soil body stage excavation in foundation ditch, often excavates one layer of earthwork, to diaphram wall 1 inner surface
It is carried out, diaphram wall 1 inner surface additional soil is cleaned up, and the polystyrene board of filling in channel-section steel 5 is removed;(5)
When pouring underground structure inwall 2, the u shape slot space of channel-section steel 5 is filled up by concrete.
Between underground structure inwall 2 and diaphram wall 1, superposed surfaces, in addition to having the coarse superposed surfaces of nature, connect in underground
Form some concavo-convex shearing resistance tongue and grooves between continuous wall and underground structure inwall 2;Diaphram wall 1 and underground structure inwall 2 shape
Integral force structure component.
Embodiment 2
As shown in figure 3, having performed diaphram wall 1 outside underground structure inwall 2, from underground structure top board top surface to ground
Between lower structure base slab bottom surface, inside diaphram wall 1, level is provided with some channel-section steels 5, and channel-section steel 5 is clod wash channel-section steel, cold bending tank
Steel height 100mm, width 35mm, steel plate thickness 4mm, vertically spacing is 1.5m to channel-section steel 5, and every channel-section steel 5 is by some fixations
Part 4 and diaphram wall vertical reinforcement 3 firm welding, channel-section steel 5 compound plate outer surface and diaphram wall 1 inner side vertical reinforcement 3 table
There is 10mm spacing in face, is provided with u shape dowel 6 in the u shape groove of channel-section steel 5, and one end of dowel 6 is welded with channel-section steel 5 and it is another
End anchors in the concrete of underground structure inwall 2.
Construction procedure: (1) first press usual method make diaphram wall 1 steel reinforcement cage, steel reinforcement cage top surface vertically between
Multiple rows of fixture 4 is set every 1.5m, fixture 4 is u shape reinforcing bar, a diameter of 8mm of u shape reinforcing bar, and transversely spacing is fixture 4
1.0m, passes through between the vertical reinforcement 3 of fixture 4 and diaphram wall 1 to be welded and fixed, then channel-section steel 5 is laid on fixture 4
On, channel-section steel 5 and fixture 4 firm welding;(2) the interior polystyrene board of u shape groove of channel-section steel 5 is filled up;(3) pour by usual method
Build diaphram wall;(4) soil body stage excavation in foundation ditch, often excavates one layer of earthwork, diaphram wall 1 inner surface is carried out clearly
Wash, diaphram wall 1 inner surface additional soil is cleaned up, and the polystyrene board of filling in the u shape groove of channel-section steel 5 is removed;(5)
U shape dowel 6 is set in the u shape groove of every channel-section steel 5, and dowel 6 and channel-section steel 5 pass through to be welded and fixed, a diameter of 10mm of dowel 6,
Transversely spacing is 200mm;(6) when pouring underground structure inwall, the u shape slot space of channel-section steel 5 is filled up by concrete, so that
The other end of dowel 6 anchors in the concrete of underground structure inwall 2.
Between underground structure inwall 2 and diaphram wall 1, superposed surfaces are in addition to having the coarse superposed surfaces of nature, in underground
Form some concavo-convex shearing resistance tongue and grooves and dowel 6 between diaphragm wall 1 and underground structure inwall 2;Diaphram wall 1 and underground structure
Inwall 2 forms overall force structure component.
Embodiment 3
Diaphram wall 1 has been performed, from underground structure top board top surface to underground structure bottom plate outside underground structure inwall 2
Between bottom surface, inside diaphram wall 1, level is provided with some channel-section steels 5, and channel-section steel 5 is hot rolling thin-wall channel, channel-section steel 5 height
100mm, width 46mm, vertically spacing is 2.0m to channel-section steel 5, and every channel-section steel 5 is vertical with diaphram wall by some fixtures 4
Reinforcing bar 3 firm welding, channel-section steel 5 compound plate outer surface has 5mm distance with diaphram wall 1 inner side vertical reinforcement 3 surface;Wherein, Gu
Determining part 4 is u shape reinforcing bar.
Construction procedure: (1) first press usual method make diaphram wall 1 steel reinforcement cage, steel reinforcement cage top surface vertically between
Multiple rows of fixture 4 is set every 2.0m, fixture 4 is u shape reinforcing bar, a diameter of 8mm of u shape reinforcing bar, and transversely spacing is fixture 4
1.0m, passes through between the vertical reinforcement 3 of fixture 4 and diaphram wall 1 to be welded and fixed, then channel-section steel 5 is laid on every row solid
Determine on part 4, channel-section steel 5 and fixture 4 firm welding;(2) the interior plank of u shape groove of channel-section steel 5 fills up;(3) pour by usual method
Build diaphram wall;(4) soil body stage excavation in foundation ditch, often excavates one layer of earthwork, diaphram wall 1 inner surface is carried out clearly
Wash, diaphram wall 1 inner surface additional soil is cleaned up, and the plank of filling in channel-section steel 5 is removed;(5) pour underground structure
During inwall 2, the u shape slot space of channel-section steel 5 is filled up by concrete.
Between underground structure inwall 2 and diaphram wall 1, superposed surfaces, in addition to having the coarse superposed surfaces of nature, connect in underground
Form some concavo-convex shearing resistance tongue and grooves between continuous wall and underground structure inwall 2;Diaphram wall 1 and underground structure inwall 2 shape
Integral force structure component.
Embodiment 4
Diaphram wall 1 has been performed, from underground structure top board top surface to underground structure bottom plate outside underground structure inwall 2
Between bottom surface, inside diaphram wall 1, level is provided with some channel-section steels 5, and channel-section steel 5 is clod wash channel-section steel, clod wash channel-section steel height 80mm,
Width 35mm, steel plate thickness 3mm, vertically spacing is 1.5m to channel-section steel 5, and every channel-section steel 5 is continuous with underground by some fixtures 4
Wall vertical reinforcement 3 firm welding, channel-section steel 5 compound plate outer surface has 5mm spacing with diaphram wall 1 inner side vertical reinforcement 3 surface,
It is provided with u shape dowel 6, one end of dowel 6 and channel-section steel 5 weld and its other end anchors in underground structure in the u shape groove of channel-section steel 5
In the concrete of chemise 2.
Construction procedure: (1) first press usual method make diaphram wall 1 steel reinforcement cage, steel reinforcement cage top surface vertically between
Multiple rows of fixture 4 is set every 1.5m, fixture 4 is u shape reinforcing bar, a diameter of 8mm of u shape reinforcing bar, and transversely spacing is fixture 4
1.5m, passes through between the vertical reinforcement 3 of fixture 4 and diaphram wall 1 to be welded and fixed, then channel-section steel 5 is laid on fixture 4
On, channel-section steel 5 and fixture 4 firm welding;(2) the interior plank of u shape groove of channel-section steel 5 fills up;(3) pour underground by usual method
Diaphragm wall;(4) soil body stage excavation in foundation ditch, often excavates one layer of earthwork, diaphram wall 1 inner surface is carried out, will
Diaphram wall 1 inner surface additional soil cleans up, and the plank of filling in the u shape groove of channel-section steel 5 is removed;(5) in every channel-section steel 5
U shape groove in setting u shape dowel 6, dowel 6 and channel-section steel 5 by being welded and fixed, a diameter of 10mm of dowel 6, transversely spacing be
200mm;(6) when pouring underground structure inwall, the u shape slot space of channel-section steel 5 is filled up by concrete, so that the other end of dowel 6
Anchor in the concrete of underground structure inwall 2.
Between underground structure inwall 2 and diaphram wall 1, superposed surfaces, in addition to having the coarse superposed surfaces of nature, connect in underground
Form some concavo-convex shearing resistance tongue and grooves and dowel 6 between continuous wall 1 and underground structure inwall 2;In diaphram wall 1 and underground structure
Chemise 2 forms overall force structure component.
Above 4 embodiments of the present utility model are described in detail, but described content is only of the present utility model
Preferred embodiment is it is impossible to be considered for limiting practical range of the present utility model.All made according to this utility model application range
Impartial change and improvement etc., all should still belong within patent covering scope of the present utility model.
Claims (5)
1. a kind of underground structure inwall and diaphram wall overlapping surface construction it is characterised in that: include underground structure inwall
And diaphram wall, perform diaphram wall outside described underground structure inwall as its building enclosure, described underground is even
Continuous wall leans on horizontal direction on underground structure inwall side to be provided with channel-section steel, and described channel-section steel passes through inside fixture and diaphram wall
Firmly, the u shape groove of described channel-section steel is filled up reinforcement welding by the concrete of underground structure inwall.
2. a kind of underground structure inwall according to claim 1 and diaphram wall overlapping surface construction it is characterised in that:
Described reinforcing bar is vertical reinforcement or transverse steel.
3. a kind of underground structure inwall according to claim 1 and diaphram wall overlapping surface construction it is characterised in that:
Described fixture is u shape reinforcing bar.
4. a kind of underground structure inwall according to claim 1 and diaphram wall overlapping surface construction it is characterised in that:
It is provided with dowel, one end of described dowel is welded with channel-section steel and its other end anchors into underground structure in the u shape groove of described channel-section steel
In the concrete of inwall.
5. a kind of underground structure inwall according to claim 4 and diaphram wall overlapping surface construction it is characterised in that:
Described dowel is u shape dowel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620375451.8U CN205894061U (en) | 2016-04-28 | 2016-04-28 | Underground structure interior lining wall and underground continuous wall coincide face structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620375451.8U CN205894061U (en) | 2016-04-28 | 2016-04-28 | Underground structure interior lining wall and underground continuous wall coincide face structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205894061U true CN205894061U (en) | 2017-01-18 |
Family
ID=57764993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620375451.8U Active CN205894061U (en) | 2016-04-28 | 2016-04-28 | Underground structure interior lining wall and underground continuous wall coincide face structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205894061U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780758A (en) * | 2016-04-28 | 2016-07-20 | 中铁隧道勘测设计院有限公司 | Underground structure liner wall and underground continuous wall superposed surface structure and construction method thereof |
CN115182383A (en) * | 2022-08-16 | 2022-10-14 | 上海市城市建设设计研究总院(集团)有限公司 | Deep-buried large-span open-cut tunnel structure in soft soil water-rich area and construction method thereof |
-
2016
- 2016-04-28 CN CN201620375451.8U patent/CN205894061U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105780758A (en) * | 2016-04-28 | 2016-07-20 | 中铁隧道勘测设计院有限公司 | Underground structure liner wall and underground continuous wall superposed surface structure and construction method thereof |
CN115182383A (en) * | 2022-08-16 | 2022-10-14 | 上海市城市建设设计研究总院(集团)有限公司 | Deep-buried large-span open-cut tunnel structure in soft soil water-rich area and construction method thereof |
CN115182383B (en) * | 2022-08-16 | 2024-02-02 | 上海市城市建设设计研究总院(集团)有限公司 | Deep-buried large-span open cut tunnel structure in soft soil water-rich area and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105714831A (en) | Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile | |
CN207109795U (en) | A kind of recyclable HC engineering methods steel diaphram wall | |
CN204738302U (en) | Multi -storey frame formula double row pile supporting construction | |
CN201250408Y (en) | Recovery type steel structure foundation pit exterior-protected device | |
CN205894061U (en) | Underground structure interior lining wall and underground continuous wall coincide face structure | |
CN112144509A (en) | Construction method of underground continuous wall, joint and connection structure thereof | |
CN107355008B (en) | Prefabricated connection structure and method for newly added concrete filled steel tubular column and existing structure | |
CN206941597U (en) | A kind of HSCW engineering methods pile pit supporting construction | |
CN106245654A (en) | Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method | |
CN108729927B (en) | A kind of existing tunnel reorganization and expansion is the mid-board construction method of multiple-arch tunnel | |
CN105780758A (en) | Underground structure liner wall and underground continuous wall superposed surface structure and construction method thereof | |
CN105862912A (en) | Construction method of protective walls of concrete antiskid piles | |
CN211340808U (en) | Pile foundation pit supporting construction behind preceding wall | |
CN100473787C (en) | Connecting structure for use in piled anchor supporting system and construction method thereof | |
CN111155535A (en) | Underground continuous wall and foundation slab's pre-buried steel sheet connection structure | |
CN106677795B (en) | Border on the sea high hydraulic pressure tunnel single layer steel plate concrete composite lining structure and mounting process | |
CN206503601U (en) | Border on the sea high hydraulic pressure tunnel individual layer steel plate concrete composite lining structure | |
CN215252932U (en) | Deep foundation pit PC steel pipe combination Larsen steel sheet pile double row pile supporting system | |
CN205676899U (en) | A kind of foundation ditch permanent support structure based on double bored concrete pile | |
CN211948464U (en) | Underground continuous wall and foundation slab's pre-buried steel sheet connection structure | |
CN210714720U (en) | Large-section tunnel composite lining | |
CN111894036B (en) | Construction method for additionally arranging basement on strip-shaped foundation building | |
CN205421276U (en) | Strut heterotypic double row pile of foundation ditch lateral wall | |
CN212958663U (en) | Connecting structure of preliminary bracing and mid-board of multi-arch tunnel | |
CN205046549U (en) | Prefabricated diaphragm wall unit and underground continuous wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180608 Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88. Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD. Address before: 300000 Hongqiao District, Tianjin City, Bridge South East Road Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd. |
|
TR01 | Transfer of patent right |