CN205893927U - Stride across highway protection rack - Google Patents

Stride across highway protection rack Download PDF

Info

Publication number
CN205893927U
CN205893927U CN201620873691.0U CN201620873691U CN205893927U CN 205893927 U CN205893927 U CN 205893927U CN 201620873691 U CN201620873691 U CN 201620873691U CN 205893927 U CN205893927 U CN 205893927U
Authority
CN
China
Prior art keywords
crossbeam
fixed
railing
insulation board
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620873691.0U
Other languages
Chinese (zh)
Inventor
闵树梁
赵琦
张立柱
于铁正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201620873691.0U priority Critical patent/CN205893927U/en
Application granted granted Critical
Publication of CN205893927U publication Critical patent/CN205893927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Stride across highway protection rack relates to one kind and execute the protection rack of doing bridge foundation and the use of pier shaft in -process in the highway central authorities median that has the high -voltage line to pass through. Influence traffic scheduling problem design when doing bridge foundation and pier shaft construction for solving to execute at present in the highway central authorities median that has the high -voltage line to pass through. It includes the rack basis, has the stand on the rack basis, is connected with bridging between two stands, and the both ends of crossbeam are fixed on the stand, are connected with the longeron between the crossbeam, lay the wire netting on the longeron, and wooden footboard is established to the wire netting top, has the railing on the crossbeam, and the railing has close curtain net outward, and electric cable tube and mud pipe and water pipe are laid to the railing inboard, the insulation board is connected with the insulation board support column, and the insulation board support column passes through the connecting sleeve with the railing to be connected, and there is the nut clamp bolt mounting hole outside on the connecting sleeve, and clamp bolt stretches into in nut and the clamp bolt mounting hole, people's bank of china's cat ladder is established to the crossbeam both sides. The advantage does not influence the traffic.

Description

A kind of acrossing highway protecting canopy frame
Technical field:
This utility model be related to a kind of perform in the highway center isolated area having high-voltage line to pass through bridge foundation and The protecting canopy frame that can repeatedly use during pier shaft.
Background technology:
At present, in the especially big bridge construction of China, especially in the especially big bridge construction of high-speed railway, inevitably need Cross over existing highway, then then need to apply basis and the pier shaft of bridge in the isolation strip of highway, typically take Construction technology be to close a width track, Transport Machinery goods and materials, in isolation strip, dig mud pit in isolation strip simultaneously, profit With mud of technological requirement, mud is transported by freeway toll station, carry out drilled pile construction, do so is larger on traffic circulation impact, right Environment can pollute, and is unfavorable for creating Green civilization environmental protection building site.Particularly, we are frequently encountered, and change because three electricity move Work is unfavorable, and some high-voltage lines above bridge cannot migrate in time, and the safety of construction more cannot ensure.
Content of the invention:
Technical problem to be solved in the utility model be provide a kind of the highway central having high-voltage line to pass through every Do not interfere with traffic during performing bridge foundation and pier shaft in band, can guarantee that the acrossing highway protection canopy of construction safety Frame.
Above-mentioned purpose is achieved in that it includes two frame bases, and two described frame bases are respectively provided at height Outside the corrugated guardrail of fast highway one width road surface both sides, it is fixed with two columns on the basis of each frame, on the basis of two frames The corresponding setting of two columns, be fixed between two columns on the basis of same frame and be connected with bridging, also include Two crossbeams, one end of two crossbeams be separately fixed at a frame on the basis of two columns on, the other end of two crossbeams It is separately fixed on two columns on the basis of another frame, be connected with some longerons between two crossbeams, on longeron Laying prevents the wire gauze that article fall, and sets wooden pedal, fix some on two crossbeams at wooden pedal two ends above wire gauze Individual railing, is fixed with close curtain net, is also fixed with close curtain net, in institute outside the railing on another crossbeam outside the railing on a crossbeam State laying cable tube and mud tube and water pipe inside the railing on two crossbeams;
Also include insulation board, insulation board be respectively fixed at two ends with several insulation board support columns, insulation board one end exhausted Listrium support column is connected by branch sleeve with the railing on a crossbeam, and branch sleeve is provided with several hold-down bolts and installs Hole, the outside of each hold-down bolt installing hole is fixed with a nut, and hold-down bolt extend into nut and hold-down bolt is installed In the hole, realizes compression and reinforces;Set People's Bank of China's cat ladder in crossbeam both sides respectively, the top of Liang Ge People's Bank of China cat ladder is separately fixed at crossbeam Both sides.
The utility model has the advantages that: overcome the highway that high-voltage line passes through and perform bridge in isolation strip at its center The problem of traffic construction safety and environmental conservation during beam basis and pier shaft.This apparatus structure is easy, and speed of application is fast, matter Amount is easily controlled, improves the speed of bridge foundation and pier construction it is ensured that construction safety.
Brief description:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the i i view of Fig. 1;
Fig. 3 is the mplifying structure schematic diagram at a in Fig. 1.
Specific embodiment:
With reference to Figure 13, it includes two frame bases 1, and two described frame bases are respectively provided at highway one width Outside the corrugated guardrail of road surface both sides, on the basis of each frame, it is fixed with two columns 2, two columns on the basis of two frames Corresponding setting, is fixed between two columns on the basis of same frame and is connected with bridging 3, also include two crossbeams 4, One end of two crossbeams be separately fixed at a frame on the basis of two columns on, the other end of two crossbeams is separately fixed at On two columns on the basis of another frame, between two crossbeams, it is connected with some longerons 5, set up defences only thing on longeron upper berth The wire gauze 6 that product fall, sets wooden pedal 7 above wire gauze, fix several railings 8 on two crossbeams at wooden pedal two ends, It is fixed with close curtain net 9 outside railing on a piece crossbeam, outside the railing on another crossbeam, is also fixed with close curtain net, at described two Laying cable tube and mud tube and water pipe inside railing on crossbeam;
Also include insulation board 10, insulation board be respectively fixed at two ends with several insulation board support columns 11, insulation board one end Insulation board support column be connected by branch sleeve 12 with the railing on a crossbeam, branch sleeve be provided with several compress spiral shell Bolt installing hole, the outside of each hold-down bolt installing hole is fixed with a nut 13, and hold-down bolt 14 extend into nut and pressure In tight bolt mounting holes, realize compression and reinforce;Set People's Bank of China's cat ladder 15 in crossbeam both sides respectively, the top of Liang Ge People's Bank of China cat ladder is respectively It is fixed on the both sides of crossbeam.

Claims (1)

1. a kind of acrossing highway protecting canopy frame, is characterized in that: includes two frame bases (1), described two frame bases Plinth is respectively provided at outside the corrugated guardrail of highway one width road surface both sides, is fixed with two columns (2) on the basis of each frame, The corresponding setting of two columns on the basis of two frames, is fixed between two columns on the basis of same frame and is connected with Bridging (3), also includes two crossbeams (4), one end of two crossbeams be separately fixed at a frame on the basis of two columns On, the other end of two crossbeams be separately fixed at another frame on the basis of two columns on, be connected between two crossbeams Some longerons (5), on longeron, laying wire gauze (6), sets wooden pedal (7), at two of wooden pedal two ends above wire gauze Several railings (8) are fixed on crossbeam, outside the railing on a crossbeam, is fixed with close curtain net (9), the railing on another crossbeam Also it is fixed with close curtain net outward, laying cable tube and mud tube and water on the wooden pedal inside the railing on described two crossbeams Pipe;
Also include insulation board (10), insulation board be respectively fixed at two ends with several insulation board support columns (11), insulation board one end Insulation board support column be connected by branch sleeve (12) with the railing on a crossbeam, branch sleeve be provided with several compression Bolt mounting holes, the outside of each hold-down bolt installing hole is fixed with a nut (13), and hold-down bolt (14) extend into spiral shell In the hole installed by female and hold-down bolt;Set People's Bank of China's cat ladder (15) in crossbeam both sides respectively, the top of Liang Ge People's Bank of China cat ladder is fixed respectively Both sides in crossbeam.
CN201620873691.0U 2016-08-14 2016-08-14 Stride across highway protection rack Active CN205893927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620873691.0U CN205893927U (en) 2016-08-14 2016-08-14 Stride across highway protection rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620873691.0U CN205893927U (en) 2016-08-14 2016-08-14 Stride across highway protection rack

Publications (1)

Publication Number Publication Date
CN205893927U true CN205893927U (en) 2017-01-18

Family

ID=57780699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620873691.0U Active CN205893927U (en) 2016-08-14 2016-08-14 Stride across highway protection rack

Country Status (1)

Country Link
CN (1) CN205893927U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620259A (en) * 2017-09-30 2018-01-23 中铁二局第四工程有限公司 Construction protection method for bridge under a kind of high-voltage line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620259A (en) * 2017-09-30 2018-01-23 中铁二局第四工程有限公司 Construction protection method for bridge under a kind of high-voltage line

Similar Documents

Publication Publication Date Title
CN205977243U (en) A platform truck for tunnel water proofing board is laid and reinforcement
CN204401997U (en) A kind of suspension type ceiling construction scaffold
CN201762663U (en) Reinforced concrete superposed beam wing board support
CN104499434A (en) Movable formwork for casting of wide-body box girder and construction method
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN205893927U (en) Stride across highway protection rack
CN204000932U (en) Lower channel in safety in a kind of deep foundation pit construction operation
CN203213622U (en) Construction material handling equipment
CN104213511B (en) A kind of bridge construction platform structure and building method thereof
CN106677076A (en) Simple and rapid method and device for mounting box girder at the top of adjacent bent cap by using span pier gantry crane
CN206438411U (en) A kind of moving hanging basket device of bridge longitudinal drainage pipeline mounting construction
CN202882377U (en) Hanging scaffold for integral hanging construction of truss
CN202543812U (en) Measure bracket for hanging ceilings on roofs of platform layers of rail traffic elevated station
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN103225411B (en) Both wired protection canopy
CN205955268U (en) Construction is with interim stair step board and stair structure thereof
CN205976573U (en) Large -span stand cable protection canopy
CN206376880U (en) A kind of roadway construction workbench
CN204162999U (en) A kind of bridge construction platform structure
CN205421031U (en) Stride busy electric Railway's of stranded protection and bearing support to one side
CN205188823U (en) Construction of light rail prestressing force bent cap and end -blocking work platform
CN203878450U (en) Novel ropeway bridge
CN202809497U (en) Novel tower
CN106088638A (en) A kind of special building method for high-voltage line protection safety frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant