CN204162999U - A kind of bridge construction platform structure - Google Patents

A kind of bridge construction platform structure Download PDF

Info

Publication number
CN204162999U
CN204162999U CN201420572400.5U CN201420572400U CN204162999U CN 204162999 U CN204162999 U CN 204162999U CN 201420572400 U CN201420572400 U CN 201420572400U CN 204162999 U CN204162999 U CN 204162999U
Authority
CN
China
Prior art keywords
main bone
steel
bridge
cable wire
screw thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420572400.5U
Other languages
Chinese (zh)
Inventor
杜东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Weida Construction Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420572400.5U priority Critical patent/CN204162999U/en
Application granted granted Critical
Publication of CN204162999U publication Critical patent/CN204162999U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of bridge construction platform structure, it is characterized in that: comprise multiple horizontal and vertical uniform layout and be connected to cable wire on bridge, the reinforcement steel pipe one that can be interconnected and fixed longitudinally is arranged between cable wire, and main bone is connected to strengthens steel pipe one two ends, and checkered plates is laid between main bone and forms platform; Bottom reinforced pipe to be arranged between main bone and in parallel, uniformly above the reinforced pipe of described bottom has steel tube screw thread hole, has the steel plate screwed hole corresponding with steel tube screw thread hole above described checkered plates.The utility model has the advantages that: directly fixed above bridge by cable wire, and be connected to below erection construction platform by it, do not need to build layer by layer from ground, reusable edible, environmental protection, speed of simultaneously building is fast, the structure adopted is few, and cost is low, and platform safety is reliable.

Description

A kind of bridge construction platform structure
Technical field
The utility model belongs to technical field of bridge engineering, is specifically related to a kind of bridge construction platform structure and building method thereof.
Background technology
Scaffold refers to that job site is the various supports that operative also solves vertically and horizontal transport is set up.The generic term on building circle, refers to building site be used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height.Work up and down mainly for constructor or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc., be exactly plainly build a framework, scaffold makes material to be had usually: bamboo and wood, steel pipe or synthetic materials etc.Some engineering is also worked as template with scaffold and is used, and the department such as this external advertising, municipal administration, traffic road and bridge, mine is also extensively used.
If an application number is 200910190917.1, in the Chinese invention patent application of applying date 2009.09.21, application publication number CN 101696566 A, disclose a kind of construction method of mutilevel overpass scaffold,
A, set up bottom layer scaffold, bottom layer scaffold is erected with the steelframe door opening for vehicles and pedestrians, sets up quality inspection to scaffold, then in bottom layer scaffold, installs DEFORMATION MONITORING SYSTEM, carries out cargo pressure testing to bottom layer scaffold;
B, in bottom layer scaffold, set up at least two-layer bridge scaffold, bridge scaffold building has for bridge construction case Liangmen hole used, after whole bridge scaffold building is complete, whole scaffold building quality is checked, DEFORMATION MONITORING SYSTEM is installed in case Liangmen hole, and carry out comprehensive cargo pre-compression test, in order to check setting up quality and verifying the calculating before setting up of scaffold, check that the distortion of scaffold and shaped steel is whether within code requirement.
And for example an application number is CN201210102996.8, applying date 2012.04.10, a kind of pulley-clip scaffold is disclosed in the Chinese invention patent application of application publication number CN102644371A, comprise some vertical rods and cross bar, it is characterized in that: described vertical rod is provided with wheel button dish, described button dish of taking turns is provided with interface, and the end of cross bar is provided with plugboard, described plugboard inserts interface place, cross bar and vertical rod is linked up.
Existing bridge construction scaffold is all upwards build from level to level from ground, loses time very much like this in work progress, and simultaneously the component that needs of this scaffold is many, and cost is very large, and some river course bridge pier surroundings set up affect by orographic condition larger.
When some arch bridges are built, because the height of arch is very high, scaffold is set up very large to its end face cost from ground, the simple and easy scaffold of some simple bamboo and woods, composition is directly taken in some construction site above, such workman danger when constructing is very large, also can affect the traffic below it simultaneously.
Summary of the invention
The utility model is for above shortcoming, and the scaffold of constructing used based on solution existing highway bridge needs the time of building layer by layer from ground long, and cost is high, the problem that high-rise simple and easy scaffold safety is low.Propose a kind of bridge construction platform structure and building method thereof, this platform structure does not need to build layer by layer from ground, and can meet the construction requirement of each structure of bridge, build required time short, structural safety is reliable and stable simultaneously.
For realizing the purpose of this utility model, the technical solution adopted in the utility model is:
A kind of bridge construction platform structure, it is characterized in that: comprise multiple horizontal and vertical uniform layout and be connected to cable wire on bridge, the reinforcement steel pipe one that can be interconnected and fixed longitudinally is arranged between cable wire, and main bone is connected to strengthens steel pipe one two ends, and checkered plates is laid between main bone and forms platform; Bottom reinforced pipe to be arranged between main bone and in parallel, uniformly above the reinforced pipe of described bottom has steel tube screw thread hole, has the steel plate screwed hole corresponding with steel tube screw thread hole above described checkered plates.
Preferentially, in order to not rock fixing for checkered plates, also comprise fastening connection piece, described fastening connection piece screws in steel tube screw thread hole and steel plate screwed hole corresponding thereto, and its top is provided with sleeve.Also be installed with between sleeve and can be interconnected and fixed and the top reinforced pipe vertical with main bone.Such checkered plates is thoroughly fixed up and down, simultaneously the holding together of whole platform.
Described main bone is T-steel, and T sheet is upwards installed, and its two ends are laid with perforate to center.
The utility model additionally provides a kind of fast construction method of said apparatus, it is characterized in that, comprises the following steps,
(1) for the bridge being about to construction, be connected and fixed cable wire from horizontal and vertical uniform laying, install between longitudinal laying cable wire and strengthen steel pipe one;
(2) T-shaped main bone is arranged between the cable wire laterally laid, strengthens steel pipe one two ends and penetrate in the perforate at main its two ends of bone, and fix in the nut check of platform edges place;
(3) uniform laying checkered plates between main bone;
(4) utilize crane on bridge, below checkered plates, reinforced pipe is installed, also can utilize above the checkered plates manually standing in and complete and reinforced pipe is held, and find locating hole, fastening connection piece is screwed in steel plate screwed hole and steel tube screw thread hole makes bottom reinforced pipe be connected and fixed;
(5) penetrate in sleeve by the connection of multiple tops reinforced pipe, single platform builds end;
(6) repeat step (1)-(5), continuous lengthening broadening platform, until meet construction demand;
(7) strengthen steel pipes one by two of adjacent installation to be wrapped locking by steel pipe fastening part, and cover the shield be fastened between cable wire in the above;
(8) buckle protective screening by being between the horizontal cable wire laid in edge, whole platform building terminates.
Compared with prior art, the utility model has the advantages that: directly fixed above bridge by cable wire, and be connected to below erection construction platform by it, do not need to build layer by layer from ground, reusable edible, environmental protection, speed of simultaneously building is fast, the structure adopted is few, and cost is low, and platform safety is reliable.
Accompanying drawing explanation
The following accompanying drawing by means of embodiment carries out brief description to the utility model now.In accompanying drawing:
Fig. 1 shows the schematic diagram of the utility model bridge construction platform structure;
Fig. 2 shows the schematic diagram of another view direction of Fig. 1;
Fig. 3 shows Fig. 2 bottom upward schematic diagram;
Fig. 4 shows the utility model and to be connected the structural representation of fitting;
Fig. 5 shows the utility model first embodiment building structure schematic diagram;
Fig. 6 shows the utility model second embodiment building structure schematic diagram.
In figure: 1, shield, 2, cable wire, 3, checkered plates, 4, steel tube screw thread hole, 5, bottom reinforced pipe, 6, steel plate screwed hole, 7, fastening connection piece, 71, sleeve, 8, steel pipe fastening part, 9, steel pipe one, 10, main bone is strengthened, 12, top reinforced pipe, 16, bridge, 17, temporary platform, 18, bridge pier, 19, arch arm.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in detail.Following examples will contribute to those skilled in the art and understand the utility model further, but not limit the utility model in any form.It should be pointed out that to those skilled in the art, without departing from the concept of the premise utility, some distortion and improvement can also be made.These all belong to protection domain of the present utility model.
Embodiment 1
A kind of bridge construction platform structure, comprise multiple horizontal and vertical uniform layout and be connected to cable wire 2 on bridge 16, the reinforcement steel pipe 1 that can be interconnected and fixed longitudinally is arranged between cable wire 2, strengthens adopting screw thread mutually to screw in connection between steel pipe 1; Main bone 10 is connected to strengthens steel pipe 1 two ends, and checkered plates 3 is laid between main bone 10 and forms platform; Main bone 10 is T-steel, and T sheet is upwards installed, and its two ends are laid with perforate to center, and pitch-row is 1m.
Bottom reinforced pipe 5 to be arranged between main bone 10 and in parallel, and described bottom reinforced pipe 5 is uniform above has steel tube screw thread hole 4, and described checkered plates 3 has the steel plate screwed hole 6 corresponding with steel tube screw thread hole 4 above.
In addition, also comprise fastening connection piece 7, described fastening connection piece 7 screws in steel tube screw thread hole 4 and steel plate screwed hole 6 corresponding thereto, and its top is provided with sleeve 71.Also be installed with between sleeve 71 and can be interconnected and fixed and the top reinforced pipe 12 vertical with main bone 10.
Based on said structure, following steps method is adopted to build to the maintenance of box-type bridge beam body or construction:
(1) first temporary platform 17 set up by bridge pier, and be connected and fixed cable wire 2 from horizontal and vertical uniform laying from temporary platform 17 simultaneously, cable wire 2 one end is penetrated box-type bridge beam body inside and fixes or be connected and fixed (as shown in Figure 5) by boring installation hook, between horizontal and vertical cable wire 2, spacing is 3m, is longitudinally laying the reinforcement steel pipe 1 installing the long multiple connections of 3m between cable wire 2;
(2) be arranged on by long for 3m T-shaped main bone 10 between the cable wire 2 laterally laid, strengthen steel pipe 1 two ends and penetrate in the perforate at main its two ends of bone 10, and strengthen steel pipe 1 end at platform edges place with nut check is fixing, main like this bone is set up complete;
(3) uniform laying checkered plates 3 between main bone 10, checkered plates 3 is the diamond plate of steel grating bottom adopting, and length is 2990mm, and width is 995mm;
(4) utilize crane on bridge, below checkered plates 3, reinforced pipe 5 is installed, fastening connection piece 7 is screwed in steel plate screwed hole 6 and steel tube screw thread hole 4 makes bottom reinforced pipe 5 be connected and fixed;
(5) penetrate in sleeve 71 by the connection of multiple tops reinforced pipe 12, between top reinforced pipe 12, connected mode is identical with reinforcement steel pipe 1 mode, and employing is threaded, and such single platform builds end;
(6) repeat above-mentioned steps (1)-(5), continuous lengthening broadening platform, until meet construction demand;
(7) strengthen steel pipes 1 by two of adjacent installation to be wrapped locking by steel pipe fastening part 8, securing member 8 adopts the larynx hoop that market can have been bought, and cover the shield 1 be fastened between cable wire 2 in the above, whole like this operation platform surface is thoroughly sealed, and gapless, there will not be ledge articles to drop to injure by a crashing object the situation of below personnel;
(8) buckle protective screening by being between the horizontal cable wire 2 laid in edge, prevent personnel from falling from the side, whole platform building terminates.
Embodiment 2
A kind of bridge construction platform structure, comprise multiple horizontal and vertical uniform layout and be connected to cable wire 2 on bridge 16, the reinforcement steel pipe 1 that can be interconnected and fixed longitudinally is arranged between cable wire 2, strengthens adopting screw thread mutually to screw in connection between steel pipe 1; Main bone 10 is connected to strengthens steel pipe 1 two ends, and checkered plates 3 is laid between main bone 10 and forms platform; Main bone 10 is T-steel, and T sheet is upwards installed, and its two ends are laid with perforate to center, and pitch-row is 1m.
Bottom reinforced pipe 5 to be arranged between main bone 10 and in parallel, and described bottom reinforced pipe 5 is uniform above has steel tube screw thread hole 4, and described checkered plates 3 has the steel plate screwed hole 6 corresponding with steel tube screw thread hole 4 above.
In addition, also comprise fastening connection piece 7, described fastening connection piece 7 screws in steel tube screw thread hole 4 and steel plate screwed hole 6 corresponding thereto, and its top is provided with sleeve 71.Also be installed with between sleeve 71 and can be interconnected and fixed and the top reinforced pipe 12 vertical with main bone 10.
Based on said structure, following steps method is adopted to build to the maintenance of arch bridge eminence or construction:
(1) cable wire 2 is connected and fixed from horizontal and vertical uniform laying, cable wire 2 one end is fixed on above the large bridge arch arm 19 of arch (as shown in Figure 6), the other end is installed and is kept the identical of level height, between horizontal and vertical cable wire 2, spacing is 3m, is longitudinally laying the reinforcement steel pipe 1 installing the long multiple connections of 1m between cable wire 2;
(2) be arranged on by the T-shaped main bone 10 that 3m is long between the cable wire 2 laterally laid, strengthen steel pipe 1 two ends and penetrate in the perforate at main its two ends of bone 10, and strengthen steel pipe 1 end at platform edges place with nut check is fixing, main like this bone is set up complete;
(3) uniform laying checkered plates 3 between main bone 10, checkered plates 3 is the diamond plate of steel grating bottom adopting, and length is 2990mm, and width is 995mm;
(4) utilize and manually stand in the checkered plates 3 completed and above reinforced pipe 5 is held, and find locating hole, fastening connection piece 7 is screwed in steel plate screwed hole 6 and steel tube screw thread hole 4 makes bottom reinforced pipe 5 be connected and fixed;
(5) penetrate in sleeve 71 by the connection of multiple tops reinforced pipe 12, between top reinforced pipe 12, connected mode is identical with reinforcement steel pipe 1 mode, and employing is threaded, and such single platform builds end;
(6) repeat above-mentioned steps (1)-(5), continuous lengthening broadening platform, until meet construction demand;
(7) strengthen steel pipes 1 by two of adjacent installation to be wrapped locking by steel pipe fastening part 8, securing member 8 adopts the larynx hoop that market can have been bought, and cover the shield 1 be fastened between cable wire 2 in the above, whole like this operation platform surface is thoroughly sealed, and gapless, there will not be ledge articles to drop to injure by a crashing object the situation of below personnel;
(8) buckle protective screening by being between the horizontal cable wire 2 laid in edge, prevent personnel from falling from the side, whole platform building terminates.

Claims (4)

1. a bridge construction platform structure, it is characterized in that: comprise multiple horizontal and vertical uniform layout and be connected to cable wire (2) on bridge (16), the reinforcement steel pipe one (9) that can be interconnected and fixed longitudinally is arranged between cable wire (2), main bone (10) is connected to strengthens steel pipe one (9) two ends, and checkered plates (3) is laid between main bone (10) and forms platform; Bottom reinforced pipe (5) to be arranged between main bone (10) and in parallel, described bottom reinforced pipe (5) is uniform above has steel tube screw thread hole (4), and described checkered plates (3) has the steel plate screwed hole (6) corresponding with steel tube screw thread hole (4) above.
2. bridge construction platform structure according to claim 1, it is characterized in that, also comprise fastening connection piece (7), described fastening connection piece (7) screws in steel tube screw thread hole (4) and steel plate screwed hole (6) corresponding thereto, and its top is provided with sleeve (71).
3. bridge construction platform structure according to claim 2, is characterized in that, is also installed with and can be interconnected and fixed and the top reinforced pipe (12) vertical with main bone (10) between described sleeve (71).
4. bridge construction platform structure according to claim 1, is characterized in that, described main bone (10) is T-steel, and T sheet is upwards installed, and its two ends are laid with perforate to center.
CN201420572400.5U 2014-10-02 2014-10-02 A kind of bridge construction platform structure Expired - Fee Related CN204162999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420572400.5U CN204162999U (en) 2014-10-02 2014-10-02 A kind of bridge construction platform structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420572400.5U CN204162999U (en) 2014-10-02 2014-10-02 A kind of bridge construction platform structure

Publications (1)

Publication Number Publication Date
CN204162999U true CN204162999U (en) 2015-02-18

Family

ID=52536704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420572400.5U Expired - Fee Related CN204162999U (en) 2014-10-02 2014-10-02 A kind of bridge construction platform structure

Country Status (1)

Country Link
CN (1) CN204162999U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213511A (en) * 2014-10-02 2014-12-17 杜东升 Bridge construction platform structure and building method of bridge construction platform structure
CN108755425A (en) * 2018-06-20 2018-11-06 刘玲玲 A kind of building arch bridge construction equipment and its build construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213511A (en) * 2014-10-02 2014-12-17 杜东升 Bridge construction platform structure and building method of bridge construction platform structure
CN104213511B (en) * 2014-10-02 2016-01-13 成都华川公路建设集团有限公司 A kind of bridge construction platform structure and building method thereof
CN108755425A (en) * 2018-06-20 2018-11-06 刘玲玲 A kind of building arch bridge construction equipment and its build construction method
CN108755425B (en) * 2018-06-20 2019-12-17 广州市卓爵建筑工程有限公司 Building arched bridge construction equipment and construction method thereof

Similar Documents

Publication Publication Date Title
CN105019639B (en) Overhead cantilever formwork and its construction method
CN104213511B (en) A kind of bridge construction platform structure and building method thereof
CN104131688B (en) The special external hanging type job platform of assembled architecture and method of operating thereof
CN110259090B (en) Construction method of novel pull-up type overhanging scaffold
CN106115417A (en) The attachment structure that in lowering or hoisting gear, elevator is basic with attachment
CN105350759A (en) Suspended scaffold
CN204162999U (en) A kind of bridge construction platform structure
CN103523665B (en) A kind of transport device and method of high pedestal jib crane
CN204001653U (en) The special-purpose external hanging type job platform of assembled architecture
CN103225411B (en) Both wired protection canopy
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN205296927U (en) Steel bar machining shed
CN205369866U (en) Assembled steel ladder
CN204531441U (en) The support frame structure levelling for concrete pavement and tool-type leveling system
CN104060832B (en) A kind of method and device improving discharging platform safety
CN203795842U (en) Ring-buckling and direct-inserting type steel pipe support
CN105735662B (en) A kind of prefabrication is collapsible to throw net and installation method
CN111236603A (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN202990386U (en) Externally-suspended scaffold
CN104612166B (en) The combination supporting device of a kind of supporting hole wall and method for protecting support
CN110386232B (en) Scaffold erecting method for container ship side cabin mouth surrounding area
CN205893927U (en) Stride across highway protection rack
CN204510769U (en) Segment type guide rail
CN204139634U (en) The safe enclosed construction in a kind of fast-type hole
CN211817853U (en) A operation platform for steel construction engineering construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160307

Address after: 311200 Hangzhou, Zhejiang Province, Xiaoshan District Road, No. 59

Patentee after: Zhejiang Weida Construction Engineering Co., Ltd.

Address before: 223800 Suqian City, Jiangsu province Tu Yuan Xiang Sheng he Cun, Sucheng District Hu Wei Group No. 9

Patentee before: Du Dongsheng

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20191002