CN205875654U - Novel scaffold frame device - Google Patents

Novel scaffold frame device Download PDF

Info

Publication number
CN205875654U
CN205875654U CN201620841468.8U CN201620841468U CN205875654U CN 205875654 U CN205875654 U CN 205875654U CN 201620841468 U CN201620841468 U CN 201620841468U CN 205875654 U CN205875654 U CN 205875654U
Authority
CN
China
Prior art keywords
scaffold frame
scaffold
frame module
steel pipe
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620841468.8U
Other languages
Chinese (zh)
Inventor
张永敏
张斌
逄凯
刘远庆
高义磊
杨锦韬
古浴
王艺霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Port Engineering Group Co Ltd
Original Assignee
China State Construction Port Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Port Engineering Group Co Ltd filed Critical China State Construction Port Engineering Group Co Ltd
Priority to CN201620841468.8U priority Critical patent/CN205875654U/en
Application granted granted Critical
Publication of CN205875654U publication Critical patent/CN205875654U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a novel scaffold frame device, including scaffold frame module, scaffold steel pipe, the fastener, scaffold frame module is built and is adopted the horizontal pole head and the tail to weld the effect that forms the bottom square and play stabilising arrangement each other, rethread pole setting and down tube and bottom square welding formation scaffold frame module each other play supporting role, after scaffold frame module is built and is accomplished, utilize fastener and scaffold steel pipe to splice on the basis of scaffold frame module, thereby accomplish the installation of scaffold frame, after the construction finishes, need not to dismantle after the blocking of scaffold frame module, the handling of accessible hoisting accessory recycles, shortened and demolishd, installation time, the labour cost is reduced, it changes simple and direct to have reached scaffold frame ann, it is high -efficient, disassemble the convenience, swiftly, construction structures safe and reliable's mesh.

Description

A kind of new type scaffold device
Technical field
This utility model patent relates to the scaffold device in a kind of project under construction, and particularly relating to is a kind of new type scaffold Device.
Background technology
Scaffold is widely used in project under construction, and at present mostly project under construction all exists that the duration is tight, task heavily etc. is executed A work difficult problem, the work of setting up and remove simplifying scaffold highlights weight for the industrialized production and reduction energy consumption realizing project construction Want meaning.Generally, setting up and dismounting time and scaffold height and set up the product of length and be directly proportional of scaffold, because of This is during practice of construction, and efficiency of construction is determined by labour force's efficiency and mechanization degree.And tradition scaffold construction exists Workload is big, and labor intensive is many, and efficiency of construction is low, extends the problems such as engineering time.
Summary of the invention
Main purpose of the present utility model is to improve a kind of new type scaffold device, uses cross bar head and the tail to be welded to each other shape Become bottom square to play the effect of stabilising arrangement, be welded to each other formation scaffold mould by vertical rod and brace with bottom square Block plays a supportive role, and recycling fastener and scaffolding steel pipe splice on the basis of scaffold module, thus complete foot hands Frame is installed, and after having constructed, without dismounting after in bulk of scaffold module, can be recycled by boom hoisting handling, contracting Short remove, the set-up time, reduce labor cost, reached scaffold peace and turned simple and direct, efficient, disassembled convenient, fast, execute The reliable purpose of work structural safety.
The purpose of this utility model is realized by techniques below scheme, devises a kind of new type scaffold device, including Scaffold module, scaffolding steel pipe, fastener, scaffolding steel pipe is connected in scaffold module by fastener, scaffold module bag Including cross bar, vertical rod, brace, cross bar is positioned in the plane of bottom, and 4 cross bar head and the tail welding form bottom square, the one of vertical rod End is welded on foursquare summit, bottom, and its other end carries out being fixedly welded on one end of brace, and the brace other end is welded in On the summit that bottom square is corresponding.
Preferably, described scaffolding steel pipe, cross bar, vertical rod, brace are shaped as hollow cylinder, and material is ferrous materials.
Preferably, a length of 2.5-3.5m of described cross bar.
This utility model uses cross bar, vertical rod and brace welding to form scaffold module, in conjunction with fastener and scaffolding steel pipe Splice on the basis of scaffold module, meanwhile, use boom hoisting that scaffold module is carried out in different job locations Handling recycles, and then shortens the set-up time, reduces labor cost, has reached scaffold peace and has turned simple and direct, efficient, has torn open Solve convenient, fast, the purpose that constructing structure is safe and reliable.
Accompanying drawing explanation
Fig. 1 is the top view of this utility model a kind of new type scaffold device.
Fig. 2 is the schematic perspective view of this utility model a kind of new type scaffold device.
In figure, labelling is illustrated as: 1-scaffold module;2-scaffolding steel pipe;3-fastener;4-cross bar;5-vertical rod;6-brace; 7-bottom square.
Detailed description of the invention
Below in conjunction with specific embodiment, this utility model is described in detail.
As shown in Figure 1-2, a kind of new type scaffold device provided according to this utility model, including scaffold module 1, foot Hand cradle steel pipe 2, fastener 3, scaffolding steel pipe 2 is connected in scaffold module 1 by fastener 3, scaffold module 1 include cross bar 4, Vertical rod 5, brace 6, cross bar 4 is positioned in the plane of bottom, and 4 cross bar 4 head and the tail welding form bottom square 7, one end of vertical rod 5 Being welded on the summit of bottom square 7, its other end carries out being fixedly welded on one end of brace 6, and brace 6 other end is welded in On the summit of bottom square 7 correspondences.
Described scaffolding steel pipe 2, cross bar 4, vertical rod 5, brace 6 are shaped as hollow cylinder, and material is ferrous materials.
The described a length of 2.5-3.5m of cross bar 4.
During use, first construction site is carried out smooth, utilizes 4 cross bars 4 to carry out ending welding and form bottom square 7, Respectively weld a vertical rod 5 on 4 summits of bottom square 7, the other end of vertical rod 5 is welded, tiltedly with one end of brace 6 The other end of bar 6 is then welded on the corresponding end points of bottom square 7 constitute a scaffold module 1, and scaffold module 1 is welded After completing, by fastener 3, scaffolding steel pipe 2 is fixed in scaffold module 1, carries out scaffold subsequent installation.During dismounting, right Scaffolding steel pipe 2 and fastener 3 are removed, and scaffold module 1 Integral lifting is clicked on by recycling boom hoisting to next construction Row is reinstalled.

Claims (3)

1. a new type scaffold device, it is characterised in that described device include scaffold module (1), scaffolding steel pipe (2), Fastener (3), described scaffolding steel pipe (2) is connected in scaffold module (1) by fastener (3), and described scaffold module (1) is wrapped Including cross bar (4), vertical rod (5), brace (6), described cross bar (4) is positioned in the plane of bottom, and 4 cross bar (4) head and the tail welding are formed Bottom square (7), one end of described vertical rod (5) is welded on the summit of bottom square (7), and it is solid that its other end carries out welding Due to one end of brace (6), described brace (6) other end is welded on the summit that bottom square (7) is corresponding.
A kind of new type scaffold device the most according to claim 1, it is characterised in that described scaffolding steel pipe (2), cross bar (4), vertical rod (5), brace (6) be shaped as hollow cylinder, material is ferrous materials.
A kind of new type scaffold device the most according to claim 1, it is characterised in that described cross bar (4) a length of 2.5- 3.5m。
CN201620841468.8U 2016-08-05 2016-08-05 Novel scaffold frame device Expired - Fee Related CN205875654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620841468.8U CN205875654U (en) 2016-08-05 2016-08-05 Novel scaffold frame device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620841468.8U CN205875654U (en) 2016-08-05 2016-08-05 Novel scaffold frame device

Publications (1)

Publication Number Publication Date
CN205875654U true CN205875654U (en) 2017-01-11

Family

ID=57702557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620841468.8U Expired - Fee Related CN205875654U (en) 2016-08-05 2016-08-05 Novel scaffold frame device

Country Status (1)

Country Link
CN (1) CN205875654U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620456A (en) * 2017-10-17 2018-01-23 安徽建诚国际经济技术合作有限公司 The construction scaffold and its installation method of a kind of reusable edible
CN108442343A (en) * 2018-05-21 2018-08-24 中国水利水电第十四工程局有限公司 A kind of standard module combined support device
CN110239691A (en) * 2019-05-29 2019-09-17 中船澄西船舶修造有限公司 A kind of chemical tanker oil cargo tank tool scaffold
CN115726553A (en) * 2022-11-30 2023-03-03 上海宝冶集团有限公司 Pre-assembling erection method for high and large disc buckle type scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620456A (en) * 2017-10-17 2018-01-23 安徽建诚国际经济技术合作有限公司 The construction scaffold and its installation method of a kind of reusable edible
CN108442343A (en) * 2018-05-21 2018-08-24 中国水利水电第十四工程局有限公司 A kind of standard module combined support device
CN110239691A (en) * 2019-05-29 2019-09-17 中船澄西船舶修造有限公司 A kind of chemical tanker oil cargo tank tool scaffold
CN110239691B (en) * 2019-05-29 2024-03-19 中船澄西船舶修造有限公司 Chemical tanker cargo oil tank frock scaffold
CN115726553A (en) * 2022-11-30 2023-03-03 上海宝冶集团有限公司 Pre-assembling erection method for high and large disc buckle type scaffold

Similar Documents

Publication Publication Date Title
CN205875654U (en) Novel scaffold frame device
CN202416184U (en) Construction device for formwork for longitudinal wet joint of box girder
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN203905425U (en) Elevator shaft construction-tool operating platform and safety protection integrated structure
CN103669875B (en) Device and preparation method are smash in helping of a kind of concreting
CN203462736U (en) Operating platform for lift shaft structural steel construction
CN210738053U (en) Turnover operation platform suitable for elevator counterweight installation
CN216809608U (en) Wet seam template piece supporting device
CN208197153U (en) Pre-stress stretching device and pipe pile die assembly
CN207361652U (en) The mobile device of large-scale steel pipe
CN206034887U (en) I -steel cantilever beam of suspension type scaffold frame
CN203347237U (en) Tool type supporting frame for movable template
CN210676780U (en) Movable support for manufacturing steel reinforcement framework mesh
CN205206278U (en) Construction is with combination gallows operation platform
CN212561215U (en) Back cage platform channel device
CN211947968U (en) Integral assembling type construction platform for high-altitude pier column construction
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN210888118U (en) Building faces limit structure post construction protection frame
CN102704692A (en) Reinforcement hanging stool and using method of reinforcement hanging stool
CN210440044U (en) Movable telescopic multilayer working trolley in small-section tunnel
CN208815876U (en) A kind of fixed device of detachable suspended scaffold upright rod load
CN102704691A (en) Whole-bundle disanchoring device and disanchoring method adopting same
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN206144128U (en) Safe laborsaving pole setting of fixing a position
CN206448167U (en) The recyclable template of continuous beam with high-pier transverse prestress stretching notch closure

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20210805