CN205875654U - Novel scaffold frame device - Google Patents
Novel scaffold frame device Download PDFInfo
- Publication number
- CN205875654U CN205875654U CN201620841468.8U CN201620841468U CN205875654U CN 205875654 U CN205875654 U CN 205875654U CN 201620841468 U CN201620841468 U CN 201620841468U CN 205875654 U CN205875654 U CN 205875654U
- Authority
- CN
- China
- Prior art keywords
- scaffold frame
- scaffold
- frame module
- steel pipe
- cross bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a novel scaffold frame device, including scaffold frame module, scaffold steel pipe, the fastener, scaffold frame module is built and is adopted the horizontal pole head and the tail to weld the effect that forms the bottom square and play stabilising arrangement each other, rethread pole setting and down tube and bottom square welding formation scaffold frame module each other play supporting role, after scaffold frame module is built and is accomplished, utilize fastener and scaffold steel pipe to splice on the basis of scaffold frame module, thereby accomplish the installation of scaffold frame, after the construction finishes, need not to dismantle after the blocking of scaffold frame module, the handling of accessible hoisting accessory recycles, shortened and demolishd, installation time, the labour cost is reduced, it changes simple and direct to have reached scaffold frame ann, it is high -efficient, disassemble the convenience, swiftly, construction structures safe and reliable's mesh.
Description
Technical field
This utility model patent relates to the scaffold device in a kind of project under construction, and particularly relating to is a kind of new type scaffold
Device.
Background technology
Scaffold is widely used in project under construction, and at present mostly project under construction all exists that the duration is tight, task heavily etc. is executed
A work difficult problem, the work of setting up and remove simplifying scaffold highlights weight for the industrialized production and reduction energy consumption realizing project construction
Want meaning.Generally, setting up and dismounting time and scaffold height and set up the product of length and be directly proportional of scaffold, because of
This is during practice of construction, and efficiency of construction is determined by labour force's efficiency and mechanization degree.And tradition scaffold construction exists
Workload is big, and labor intensive is many, and efficiency of construction is low, extends the problems such as engineering time.
Summary of the invention
Main purpose of the present utility model is to improve a kind of new type scaffold device, uses cross bar head and the tail to be welded to each other shape
Become bottom square to play the effect of stabilising arrangement, be welded to each other formation scaffold mould by vertical rod and brace with bottom square
Block plays a supportive role, and recycling fastener and scaffolding steel pipe splice on the basis of scaffold module, thus complete foot hands
Frame is installed, and after having constructed, without dismounting after in bulk of scaffold module, can be recycled by boom hoisting handling, contracting
Short remove, the set-up time, reduce labor cost, reached scaffold peace and turned simple and direct, efficient, disassembled convenient, fast, execute
The reliable purpose of work structural safety.
The purpose of this utility model is realized by techniques below scheme, devises a kind of new type scaffold device, including
Scaffold module, scaffolding steel pipe, fastener, scaffolding steel pipe is connected in scaffold module by fastener, scaffold module bag
Including cross bar, vertical rod, brace, cross bar is positioned in the plane of bottom, and 4 cross bar head and the tail welding form bottom square, the one of vertical rod
End is welded on foursquare summit, bottom, and its other end carries out being fixedly welded on one end of brace, and the brace other end is welded in
On the summit that bottom square is corresponding.
Preferably, described scaffolding steel pipe, cross bar, vertical rod, brace are shaped as hollow cylinder, and material is ferrous materials.
Preferably, a length of 2.5-3.5m of described cross bar.
This utility model uses cross bar, vertical rod and brace welding to form scaffold module, in conjunction with fastener and scaffolding steel pipe
Splice on the basis of scaffold module, meanwhile, use boom hoisting that scaffold module is carried out in different job locations
Handling recycles, and then shortens the set-up time, reduces labor cost, has reached scaffold peace and has turned simple and direct, efficient, has torn open
Solve convenient, fast, the purpose that constructing structure is safe and reliable.
Accompanying drawing explanation
Fig. 1 is the top view of this utility model a kind of new type scaffold device.
Fig. 2 is the schematic perspective view of this utility model a kind of new type scaffold device.
In figure, labelling is illustrated as: 1-scaffold module;2-scaffolding steel pipe;3-fastener;4-cross bar;5-vertical rod;6-brace;
7-bottom square.
Detailed description of the invention
Below in conjunction with specific embodiment, this utility model is described in detail.
As shown in Figure 1-2, a kind of new type scaffold device provided according to this utility model, including scaffold module 1, foot
Hand cradle steel pipe 2, fastener 3, scaffolding steel pipe 2 is connected in scaffold module 1 by fastener 3, scaffold module 1 include cross bar 4,
Vertical rod 5, brace 6, cross bar 4 is positioned in the plane of bottom, and 4 cross bar 4 head and the tail welding form bottom square 7, one end of vertical rod 5
Being welded on the summit of bottom square 7, its other end carries out being fixedly welded on one end of brace 6, and brace 6 other end is welded in
On the summit of bottom square 7 correspondences.
Described scaffolding steel pipe 2, cross bar 4, vertical rod 5, brace 6 are shaped as hollow cylinder, and material is ferrous materials.
The described a length of 2.5-3.5m of cross bar 4.
During use, first construction site is carried out smooth, utilizes 4 cross bars 4 to carry out ending welding and form bottom square 7,
Respectively weld a vertical rod 5 on 4 summits of bottom square 7, the other end of vertical rod 5 is welded, tiltedly with one end of brace 6
The other end of bar 6 is then welded on the corresponding end points of bottom square 7 constitute a scaffold module 1, and scaffold module 1 is welded
After completing, by fastener 3, scaffolding steel pipe 2 is fixed in scaffold module 1, carries out scaffold subsequent installation.During dismounting, right
Scaffolding steel pipe 2 and fastener 3 are removed, and scaffold module 1 Integral lifting is clicked on by recycling boom hoisting to next construction
Row is reinstalled.
Claims (3)
1. a new type scaffold device, it is characterised in that described device include scaffold module (1), scaffolding steel pipe (2),
Fastener (3), described scaffolding steel pipe (2) is connected in scaffold module (1) by fastener (3), and described scaffold module (1) is wrapped
Including cross bar (4), vertical rod (5), brace (6), described cross bar (4) is positioned in the plane of bottom, and 4 cross bar (4) head and the tail welding are formed
Bottom square (7), one end of described vertical rod (5) is welded on the summit of bottom square (7), and it is solid that its other end carries out welding
Due to one end of brace (6), described brace (6) other end is welded on the summit that bottom square (7) is corresponding.
A kind of new type scaffold device the most according to claim 1, it is characterised in that described scaffolding steel pipe (2), cross bar
(4), vertical rod (5), brace (6) be shaped as hollow cylinder, material is ferrous materials.
A kind of new type scaffold device the most according to claim 1, it is characterised in that described cross bar (4) a length of 2.5-
3.5m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620841468.8U CN205875654U (en) | 2016-08-05 | 2016-08-05 | Novel scaffold frame device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620841468.8U CN205875654U (en) | 2016-08-05 | 2016-08-05 | Novel scaffold frame device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875654U true CN205875654U (en) | 2017-01-11 |
Family
ID=57702557
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620841468.8U Expired - Fee Related CN205875654U (en) | 2016-08-05 | 2016-08-05 | Novel scaffold frame device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875654U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107620456A (en) * | 2017-10-17 | 2018-01-23 | 安徽建诚国际经济技术合作有限公司 | The construction scaffold and its installation method of a kind of reusable edible |
CN108442343A (en) * | 2018-05-21 | 2018-08-24 | 中国水利水电第十四工程局有限公司 | A kind of standard module combined support device |
CN110239691A (en) * | 2019-05-29 | 2019-09-17 | 中船澄西船舶修造有限公司 | A kind of chemical tanker oil cargo tank tool scaffold |
CN115726553A (en) * | 2022-11-30 | 2023-03-03 | 上海宝冶集团有限公司 | Pre-assembling erection method for high and large disc buckle type scaffold |
-
2016
- 2016-08-05 CN CN201620841468.8U patent/CN205875654U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107620456A (en) * | 2017-10-17 | 2018-01-23 | 安徽建诚国际经济技术合作有限公司 | The construction scaffold and its installation method of a kind of reusable edible |
CN108442343A (en) * | 2018-05-21 | 2018-08-24 | 中国水利水电第十四工程局有限公司 | A kind of standard module combined support device |
CN110239691A (en) * | 2019-05-29 | 2019-09-17 | 中船澄西船舶修造有限公司 | A kind of chemical tanker oil cargo tank tool scaffold |
CN110239691B (en) * | 2019-05-29 | 2024-03-19 | 中船澄西船舶修造有限公司 | Chemical tanker cargo oil tank frock scaffold |
CN115726553A (en) * | 2022-11-30 | 2023-03-03 | 上海宝冶集团有限公司 | Pre-assembling erection method for high and large disc buckle type scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205875654U (en) | Novel scaffold frame device | |
CN202416184U (en) | Construction device for formwork for longitudinal wet joint of box girder | |
CN202937005U (en) | Cast-in-situ concrete beam lateral template reinforcement device | |
CN203905425U (en) | Elevator shaft construction tool type operation platform and safety protection integrated structure | |
CN103669875B (en) | Device and preparation method are smash in helping of a kind of concreting | |
CN203462736U (en) | Operating platform for lift shaft structural steel construction | |
CN210738053U (en) | Turnover operation platform suitable for elevator counterweight installation | |
CN205777489U (en) | A kind of support system of high and big die plate | |
CN216809608U (en) | Wet seam template piece supporting device | |
CN206034887U (en) | I -steel cantilever beam of suspension type scaffold frame | |
CN203347237U (en) | Tool type supporting frame for movable template | |
CN210676780U (en) | Movable support for manufacturing steel reinforcement framework mesh | |
CN205206278U (en) | Construction is with combination gallows operation platform | |
CN212561215U (en) | Back cage platform channel device | |
CN211947968U (en) | Integral assembling type construction platform for high-altitude pier column construction | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN210888118U (en) | Building faces limit structure post construction protection frame | |
CN208815876U (en) | A kind of fixed device of detachable suspended scaffold upright rod load | |
CN102704691A (en) | Whole-bundle disanchoring device and disanchoring method adopting same | |
CN102704692A (en) | Reinforcing steel bar hanging stool and using method thereof | |
CN207642213U (en) | Bored concrete pile steel reinforcement cage spiral stirrup location auxiliary device | |
CN203626212U (en) | Pier stud construction operation platform quick to disassemble and assemble | |
CN206144128U (en) | Safe laborsaving pole setting of fixing a position | |
CN203755666U (en) | Finished grade beam binding mold | |
CN206448167U (en) | The recyclable template of continuous beam with high-pier transverse prestress stretching notch closure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20210805 |