CN110239691A - A kind of chemical tanker oil cargo tank tool scaffold - Google Patents

A kind of chemical tanker oil cargo tank tool scaffold Download PDF

Info

Publication number
CN110239691A
CN110239691A CN201910458291.1A CN201910458291A CN110239691A CN 110239691 A CN110239691 A CN 110239691A CN 201910458291 A CN201910458291 A CN 201910458291A CN 110239691 A CN110239691 A CN 110239691A
Authority
CN
China
Prior art keywords
cargo tank
scaffold
module
anchor ear
oil cargo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910458291.1A
Other languages
Chinese (zh)
Other versions
CN110239691B (en
Inventor
孙建洪
奚雁飞
郁军海
刘震飞
赵巍
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengxi Shipyard Co Ltd
Original Assignee
Chengxi Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengxi Shipyard Co Ltd filed Critical Chengxi Shipyard Co Ltd
Priority to CN201910458291.1A priority Critical patent/CN110239691B/en
Publication of CN110239691A publication Critical patent/CN110239691A/en
Application granted granted Critical
Publication of CN110239691B publication Critical patent/CN110239691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C5/00Equipment usable both on slipways and in dry docks
    • B63C5/02Stagings; Scaffolding; Shores or struts
    • B63C2005/025Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The invention discloses a kind of chemical tanker oil cargo tank tool scaffolds, scaffold module is hung upside down including surrounding bulkhead scaffold module and top, the surrounding bulkhead scaffold module includes a number of angle bracket being connected on surrounding bulkhead eye plate, erects a number of supported rod erecting being arranged in pairs being arranged on angle bracket, interval is connected with a number of Frame for supporting parallel pipes from bottom to up between every a pair of supported rod erecting, and Frame for supporting parallel pipes is mutually fixed with surrounding bulkhead eye plate;The junction of Frame for supporting parallel pipes and supported rod erecting is fixed by two-tube anchor ear module;It includes a number of hook bar being spaced apart hung on the hanging ring of cargo tank interior compartment top, the horizontal support rail for being articulated in the hook bar lower end that scaffold module is hung upside down at top, and the both ends of support rail are fixedly connected by two-tube anchor ear module with the supported rod erecting.The present invention improves the convenience of painting operation and the efficiency of painting operation inside oil cargo tank.

Description

A kind of chemical tanker oil cargo tank tool scaffold
Technical field
The present invention relates to shipbuilding technical fields, and in particular to a kind of chemical tanker oil cargo tank tool scaffold.
Background technique
It needs to carry out extraordinary coating inside the oil cargo tank of giant chemical product ship, specifically first oil cargo tank interior surface is carried out Sanding processing, then lacquer special type paints again.Since oil cargo tank inner space is big, need to set up foot inside oil cargo tank before coating Hand cradle.Traditional scaffold building method is to need steel pipe scaffolding standing on the bilge when setting up, due to the bilge using foot hand is completely taken On arrange more steel pipe scaffolding, cause sanding paint cannot once complete, need scaffold remove after carry out secondary beat It is longer to thereby result in the oil cargo tank spy painting period, and sailing date is caused to be affected for sand oil paint.
Summary of the invention
To solve the above-mentioned problems, the present invention proposes a kind of chemical tanker oil cargo tank tool scaffold, it is intended to improve Cargo Oil The convenience of painting operation inside cabin, and improve the efficiency of painting operation.
Specific technical solution is as follows:
Scaffold mould is hung upside down at a kind of chemical tanker oil cargo tank tool scaffold, including surrounding bulkhead scaffold module and top Block, the surrounding bulkhead scaffold module include along surrounding bulkhead arrangement and a number of angle that is connected on surrounding bulkhead eye plate Steel bracket, a number of supported rod erecting being arranged in pairs that is arranged on the angle bracket of setting, every a pair of supported rod erecting it Between from bottom to up interval be connected with a number of Frame for supporting parallel pipes, the Frame for supporting parallel pipes is mutually fixed with surrounding bulkhead eye plate;The steel The junction of pipe carrier and the supported rod erecting is double by that can simultaneously clamp on the Frame for supporting parallel pipes and the supported rod erecting Pipe anchor ear module is fixed;It includes several numbers hung on the hanging ring of cargo tank interior compartment top that scaffold module is hung upside down at the top The hook bar being spaced apart, the horizontal support rail for being articulated in the hook bar lower end are measured, the both ends of the support rail pass through The two-tube anchor ear module that the support rail and supported rod erecting can be simultaneously clamped on is fixedly connected with the supported rod erecting.
In above-mentioned technical proposal, setting two modules for tool scaffold, (surrounding bulkhead scaffold module and top are fallen Suspended scaffold module), using the eye plate on former oil cargo tank surrounding bulkhead as the fixed point of surrounding bulkhead scaffold module, utilize Cabin top hanging ring on former oil cargo tank interior compartment top hangs upside down the hitch point of scaffold module as top, thus forms and facilitates coating The hanging scaffold of construction, the surrounding bulkhead of its oil cargo tank, the sanding on interior compartment top and the bilge and coating can when painting operation It is disposable to complete.Compared with traditional scaffold building mode, the convenience of painting operation inside oil cargo tank is greatly improved Property, and improve the efficiency of painting operation.
In addition, the connection in the present invention between scaffolding steel pipe (body of rod), which uses two-tube anchor ear module, is clamped company It connects, connection operation is more convenient, adaptability is good.And the adjoining of scaffold module is hung upside down at surrounding bulkhead scaffold module and top Part is fixed also by two-tube anchor ear module, to improve the firmness and safety in utilization of entire tool scaffold.
The specific structure of two-tube anchor ear module in the present invention are as follows: the two-tube anchor ear module includes both ends with flange flange Positioning column, a pair of anchor ear seat backwards to arrangement for being rotatably connected in the positioning column outer circle respectively, on the anchor ear seat point Clamp arm Zhuan Dong be provided with and clamp stud, the front end of the clamp arm is provided with stud construction opening slot, the clamping spiral shell Column is connected in the stud construction opening slot and realizes the clamping to the body of rod by washer and nut.
The setting of a pair of rotatable anchor ear seat, enables two-tube anchor ear module to connect not in above-mentioned two-tube anchor ear module With the body of rod of angle arrangement, adaptability and flexibility are good, and operate more convenient.
Preferably, the clamp arm and the mutually clip-on position of anchor ear seat point are located on the clamp arm and anchor ear seat It is not provided with the clamping arc surface justified in vitro for clamping bar.
As a preferred solution of the present invention, the lower end of the supported rod erecting is also connected with by two-tube anchor ear module and is faced When support rod.
Above-mentioned temporary support bar sets up the fastness and safety for further enhancing tool scaffold, and assembly and disassembly side Just.As needed, the reinforcing that temporary support bar carries out scaffold can be used when construction personnel is in the operation of the oil cargo tank upper half, Temporary support bar can be flexibly removed when construction personnel is in the operation of oil cargo tank bottom, to both improve the fastness of scaffold And safety, and it is able to achieve the disposable completion of sanding coating.
In the present invention, the lower end of the hook bar is provided with several U-shaped hooks, and the upper end of the hook bar is provided with inversion U-shaped hook.
In the present invention, the top hangs upside down and is provided with horizontally disposed insurance steel cable, the hook in scaffold module The upper end of bar is additionally provided with lacing hole, and the insurance steel cable, which passes through, to be connected in the lacing hole.
Insurance steel cable is set in scaffold module by hanging upside down at top, facilitates construction worker for safety belt system It is on insurance steel cable and movable in a certain range.
As a further improvement of the present invention, the supported rod erecting, support rail are the supported rod erecting made of round tube And support rail, and the axially spaced lamp cap peace that a number of perforation round tube inner hole is distributed in the outer circle of the round tube Hole is filled, it is axially connecting on the inner hole wall of the round tube to there is the lamp cap of LED light strip and the LED light strip to be placed in the lamp cap installation In hole, and transparent flexible glue is packaged in the lamp cap mounting hole.
Preferably, the inner hole of the round tube is equipped with the battery for connecting the LED light strip.
Preferably, the battery is rechargeable battery.
Preferably, the LED light strip quantity in the round tube has 3 and circumferentially uniformly divides on the inner hole wall of the round tube Cloth.
The setting of LED light strip in the body of rod of above-mentioned tool scaffold provides good illumination, and LED for construction operation Light bar is placed in the inside of round tube, and the lamp cap of LED light strip is placed in lamp cap mounting hole and has transparent flexible glue to protect, either tooling Scaffold set up or sanding when construction operation, will not all damage LED light strip.
In addition, by the way that LED light strip is arranged in the body of rod of tool scaffold, so that not needing in addition to set up again in oil cargo tank The drawbacks of headlamp and drawing illuminate electric wire, electric wire and lamps and lanterns may be destroyed when thus avoiding sanding, safety is good.
The beneficial effects of the present invention are:
First, tool scaffold is set two modules by a kind of chemical tanker oil cargo tank tool scaffold of the invention (scaffold module is hung upside down at surrounding bulkhead scaffold module and top), using the eye plate on former oil cargo tank surrounding bulkhead as surrounding The fixed point of bulkhead scaffold module hangs upside down scaffold module as top using the cabin top hanging ring on former oil cargo tank interior compartment top Hitch point, thus form the hanging scaffold for facilitating coating decoration, the surrounding bulkhead of its oil cargo tank, inside when painting operation The sanding and coating of cabin top and the bilge can be completed disposably.Compared with traditional scaffold building mode, increase substantially The convenience of painting operation inside oil cargo tank, and improve the efficiency of painting operation.
Second, a kind of chemical tanker oil cargo tank tool scaffold of the invention, the connection between scaffolding steel pipe (body of rod) It is clamped connection using two-tube anchor ear module, connection operation is more convenient, adaptability is good.And surrounding bulkhead scaffold mould The adjacent part that scaffold module is hung upside down at block and top is fixed also by two-tube anchor ear module, to improve entire tooling The firmness and safety in utilization of scaffold.
Third, a kind of chemical tanker oil cargo tank tool scaffold of the invention are a pair of rotatable in two-tube anchor ear module The setting of anchor ear seat enables two-tube anchor ear module to connect the body of rod of different angle arrangement, and adaptability and flexibility are good, and It operates more convenient.
4th, a kind of chemical tanker oil cargo tank tool scaffold of the invention, setting up for temporary support bar further enhances The fastness and safety of tool scaffold, and be convenient to mount and dismount.As needed, when construction personnel is in the operation of the oil cargo tank upper half When can be used temporary support bar carry out scaffold reinforcing, can flexibly be removed when construction personnel is in the operation of oil cargo tank bottom Temporary support bar to not only improve the fastness and safety of scaffold, but also is able to achieve the disposable completion of sanding coating.
5th, a kind of chemical tanker oil cargo tank tool scaffold of the invention, by being hung upside down in scaffold module at top Insurance steel cable is set, facilitates construction worker and ties up to safety belt on insurance steel cable and activity in a certain range.
6th, a kind of chemical tanker oil cargo tank tool scaffold of the invention, LED light strip in the body of rod of tool scaffold Setting, provides good illumination for construction operation, and LED light strip is placed in the inside of round tube, the lamp cap of LED light strip is placed in lamp cap In mounting hole and there is transparent flexible glue to protect, either tool scaffold set up or sanding when construction operation, all will not Damage LED light strip.
7th, a kind of chemical tanker oil cargo tank tool scaffold of the invention, by being set in the body of rod of tool scaffold LED light strip is set, so that not needing in addition to set up headlamp again in oil cargo tank and drawing illumination electric wire, is thus avoided possible when sanding The drawbacks of destroying electric wire and lamps and lanterns, safety is good.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of chemical tanker oil cargo tank tool scaffold of the invention;
Fig. 2 is the structural schematic diagram (enlarged view) of the two-tube anchor ear module in Fig. 1;
Fig. 3 is the structural schematic diagram of the Frame for supporting parallel pipes in Fig. 1;
Fig. 4 is the structural schematic diagram of the angle bracket in Fig. 1;
Fig. 5 is the structural schematic diagram of the hook bar in Fig. 1;
Fig. 6 is the structural schematic diagram that LED light strip is arranged on the round tube of supported rod erecting and support rail.
In figure: 1, surrounding bulkhead scaffold module, 2, the projecting scaffold module in top, 3, surrounding bulkhead eye plate, 4, angle steel Bracket, 5, supported rod erecting, 6, Frame for supporting parallel pipes, 7, two-tube anchor ear module, 8, hook bar, 9, support rail, 10, flange flange, 11, Positioning column, 12, anchor ear seat, 13, clamp arm, 14, clamping stud, 15, stud construction opening slot, 16, washer, 17, nut, 18, Clamping arc surface, 19, temporary support bar, 20, U-shaped hook, 21, inverted U-shaped hook, 22, insurance steel cable, 23, lacing hole, 24, round tube, 25, lamp cap mounting hole, 26, LED light strip, 27, battery, 28, transparent flexible glue, 29, cover board, 30, cabin top hanging ring.
Specific embodiment
With reference to the accompanying drawings and examples, further description of the specific embodiments of the present invention.Following embodiment is only For clearly illustrating technical solution of the present invention, and not intended to limit the protection scope of the present invention.
It is as shown in Figures 1 to 6 a kind of embodiment of chemical tanker oil cargo tank tool scaffold of the invention, including surrounding cabin Scaffold module 2 is hung upside down at skirt hand cradle module 1 and top, and the surrounding bulkhead scaffold module 1 includes along surrounding bulkhead arrangement And be connected on surrounding bulkhead eye plate 3 a number of angle bracket 4, erect several numbers for being arranged on the angle bracket 4 The supported rod erecting 5 being arranged in pairs is measured, is spaced from bottom to up between every a pair of supported rod erecting 5 and is connected with a number of Frame for supporting parallel pipes 6, The Frame for supporting parallel pipes 6 is fixed with 3 phase of surrounding bulkhead eye plate;The junction of the Frame for supporting parallel pipes 6 and the supported rod erecting 5 passes through energy It is enough that the Frame for supporting parallel pipes 6 and the two-tube anchor ear module 7 that the supported rod erecting 5 simultaneously clamps on are fixed;The top is projecting Scaffold module 2 includes a number of hook bar 8 being spaced apart hung on cargo tank interior compartment top hanging ring 30, horizontal mounting Support rail 9 in hook 8 lower end of bar, the both ends of the support rail 9 are by that by the support rail 9 and can support The two-tube anchor ear module 7 that upright bar 5 simultaneously clamps on is fixedly connected with the supported rod erecting 5.
In above-mentioned technical proposal, setting two modules for tool scaffold, (surrounding bulkhead scaffold module 1 and top are fallen Suspended scaffold module 2), using the eye plate 3 on former oil cargo tank surrounding bulkhead as the fixed point of surrounding bulkhead scaffold module 1, The hitch point that scaffold module 2 is hung upside down using the cabin top hanging ring 30 on former oil cargo tank interior compartment top as top, is thus formed Facilitate the hanging scaffold of coating decoration, the surrounding bulkhead of its oil cargo tank when painting operation, the sanding on interior compartment top and the bilge and Coating can be completed disposably.Compared with traditional scaffold building mode, it is greatly improved to apply inside oil cargo tank and pretends The convenience of industry, and improve the efficiency of painting operation.
It is clamped in addition, the connection in the present embodiment between scaffolding steel pipe (body of rod) uses two-tube anchor ear module 7 Connection, connection operation is more convenient, adaptability is good.And scaffold module 2 is hung upside down at surrounding bulkhead scaffold module 1 and top Adjacent part is fixed also by two-tube anchor ear module 7, to improve the firmness of entire tool scaffold and using peace Quan Xing.
The specific structure of two-tube anchor ear module 7 in the present embodiment are as follows: the two-tube anchor ear module 7 includes that both ends have flange The positioning column 11 of flange 10, a pair of anchor ear seat 12 backwards to arrangement being rotatably connected in 11 outer circle of positioning column respectively, institute It states to rotate respectively on anchor ear seat 12 and is provided with clamp arm 13 and clamps stud 14, the front end of the clamp arm 13 is provided with stud peace Open slot 15 is filled, the clamping stud 14 is connected in the stud construction opening slot 15 and realizes by washer 16 and nut 17 Clamping to the body of rod.
The setting of a pair of rotatable anchor ear seat 12, enables two-tube anchor ear module 7 to connect in above-mentioned two-tube anchor ear module 7 The body of rod of different angle arrangement is connect, adaptability and flexibility are good, and operate more convenient.
Preferably, the clamp arm 13 and the opposite folder of the anchor ear seat 12 are located on the clamp arm 13 and anchor ear seat 12 Position be separately provided for 18 face of clamping circular arc that clamping bar is justified in vitro.
As a kind of preferred embodiment of the present embodiment, the lower end of the supported rod erecting 5 is also connected by two-tube anchor ear module 7 There is temporary support bar 19.
Above-mentioned temporary support bar 19 sets up the fastness and safety for further enhancing tool scaffold, and assembly and disassembly side Just.As needed, temporary support bar 19 can be used when construction personnel is in the operation of the oil cargo tank upper half and carry out adding for scaffold Gu temporary support bar 19 can be flexibly removed when construction personnel is in the operation of oil cargo tank bottom, to both improve scaffold Fastness and safety, and it is able to achieve the disposable completion of sanding coating.
In the present embodiment, the lower end of the hook bar 8 is provided with several U-shaped hooks 20, the upper end setting of the hook bar 8 There is inverted U-shaped hook 21.
In the present embodiment, the top hangs upside down and is provided with horizontally disposed insurance steel cable 22 in scaffold module 2, described The upper end of hook bar 8 is additionally provided with lacing hole 23, and the insurance steel cable 22, which passes through, to be connected in the lacing hole 23.
By hanging upside down setting insurance steel cable 22 in scaffold module 2 at top, facilitating construction worker will be safe Band ties up on insurance steel cable 22 and movable in a certain range.
As further improvement of this embodiment, the supported rod erecting 5, support rail 9 are the branch made of round tube 24 Upright bar and support rail are supportted, and axially spaced in the outer circle of the round tube 24 is distributed in a number of perforation round tube 24 The lamp cap mounting hole 25 in hole, the axially connecting lamp for having LED light strip 26 and the LED light strip 26 on the inner hole wall of the round tube 24 Head is placed in the lamp cap mounting hole 25, and is packaged with transparent flexible glue in the lamp cap mounting hole 25.
Preferably, the inner hole of the round tube 24 is equipped with the battery 27 for connecting the LED light strip 26.
Preferably, the battery 27 is rechargeable battery.
Preferably, 26 quantity of LED light strip in the round tube 24 have 3 and on the inner hole wall of the round tube 24 circumferentially It is uniformly distributed.
The setting of LED light strip 26 in the body of rod of above-mentioned tool scaffold provides good illumination for construction operation, and LED light strip 26 is placed in the inside of round tube 24, and the lamp cap of LED light strip 26 is placed in lamp cap mounting hole 25 and has transparent flexible glue to go bail for Shield, either tool scaffold set up or sanding when construction operation, will not all damage LED light strip.
In addition, by the way that LED light strip 26 is arranged in the body of rod of tool scaffold, so that not needing other frame again in oil cargo tank If the drawbacks of headlamp and drawing illuminate electric wire, electric wire and lamps and lanterns may be destroyed when thus avoiding sanding, safety is good.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of chemical tanker oil cargo tank tool scaffold, which is characterized in that fallen including surrounding bulkhead scaffold module and top Suspended scaffold module, the surrounding bulkhead scaffold module include along surrounding bulkhead arrangement and being connected on surrounding bulkhead eye plate The a number of supported rod erecting being arranged in pairs that a number of angle bracket, setting are arranged on the angle bracket, every a pair Interval is connected with a number of Frame for supporting parallel pipes from bottom to up between supported rod erecting, and the Frame for supporting parallel pipes is mutually solid with surrounding bulkhead eye plate It is fixed;The junction of the Frame for supporting parallel pipes and the supported rod erecting is by can be by the Frame for supporting parallel pipes and the supported rod erecting simultaneously The two-tube anchor ear module clamped is fixed;It includes hanging on the hanging ring of cargo tank interior compartment top that scaffold module is hung upside down at the top The a number of hook bar being spaced apart, the horizontal support rail for being articulated in the hook bar lower end, the support rail Both ends are fixed by the two-tube anchor ear module that can simultaneously clamp on the support rail and supported rod erecting with the supported rod erecting Connection.
2. a kind of chemical tanker oil cargo tank tool scaffold according to claim 1, which is characterized in that the two-tube anchor ear Module includes a pair of arrangement backwards that both ends have the positioning column of flange flange, are rotatably connected in the positioning column outer circle respectively Anchor ear seat, rotation is provided with clamp arm and clamps stud respectively on the anchor ear seat, and the front end of the clamp arm is provided with spiral shell Column construction opening slot is realized in the clamping Stud connection to the stud construction opening slot and by washer and nut to the body of rod Clamping.
3. a kind of chemical tanker oil cargo tank tool scaffold according to claim 2, which is characterized in that in the clamp arm It is separately provided for what clamping bar was justified in vitro with the mutually clip-on position of anchor ear seat with the clamp arm is located on anchor ear seat Clamp arc surface.
4. a kind of chemical tanker oil cargo tank tool scaffold according to claim 1, which is characterized in that the supported rod erecting Lower end temporary support bar is also connected with by two-tube anchor ear module.
5. a kind of chemical tanker oil cargo tank tool scaffold according to claim 1, which is characterized in that the hook bar Lower end is provided with several U-shaped hooks, and the upper end of the hook bar is provided with inverted U-shaped hook.
6. a kind of chemical tanker oil cargo tank tool scaffold according to claim 5, which is characterized in that the top is projecting Horizontally disposed insurance steel cable is provided in scaffold module, the upper end of the hook bar is additionally provided with lacing hole, the guarantor Dangerous wirerope, which passes through, to be connected in the lacing hole.
7. a kind of chemical tanker oil cargo tank tool scaffold according to claim 1, which is characterized in that the support is vertical Bar, support rail are the supported rod erecting and support rail made of round tube, and axially spaced point in the outer circle of the round tube It is furnished with the lamp cap mounting hole of a number of perforation round tube inner hole, it is axially connecting on the inner hole wall of the round tube to have LED light The band and lamp cap of the LED light strip is placed in the lamp cap mounting hole, and transparent flexible glue is packaged in the lamp cap mounting hole.
8. a kind of chemical tanker oil cargo tank tool scaffold according to claim 7, which is characterized in that the round tube it is interior Hole is equipped with the battery for connecting the LED light strip.
9. a kind of chemical tanker oil cargo tank tool scaffold according to claim 8, which is characterized in that the battery is can Rechargeable battery.
10. a kind of chemical tanker oil cargo tank tool scaffold according to claim 7, which is characterized in that in the round tube LED light strip quantity have 3 and be uniformly distributed circumferentially on the inner hole wall of the round tube.
CN201910458291.1A 2019-05-29 2019-05-29 Chemical tanker cargo oil tank frock scaffold Active CN110239691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910458291.1A CN110239691B (en) 2019-05-29 2019-05-29 Chemical tanker cargo oil tank frock scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910458291.1A CN110239691B (en) 2019-05-29 2019-05-29 Chemical tanker cargo oil tank frock scaffold

Publications (2)

Publication Number Publication Date
CN110239691A true CN110239691A (en) 2019-09-17
CN110239691B CN110239691B (en) 2024-03-19

Family

ID=67885532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910458291.1A Active CN110239691B (en) 2019-05-29 2019-05-29 Chemical tanker cargo oil tank frock scaffold

Country Status (1)

Country Link
CN (1) CN110239691B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481990A (en) * 2021-07-30 2021-10-08 广船国际有限公司 Method for assembling and disassembling scaffold for single-pile conical section

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001206484A (en) * 2000-01-25 2001-07-31 Mitsubishi Heavy Ind Ltd Universally swinging arm type scaffolding device in cargo tank of lng vessel
JP2006273037A (en) * 2005-03-28 2006-10-12 Sumitomo Heavy Industries Marine & Engineering Co Ltd Fixed scaffold for inspection of bulk carrier
CN201442646U (en) * 2009-08-26 2010-04-28 大连船舶重工集团有限公司 Scaffold erection tool for special coating of finished-oil shipload tank
CN204151692U (en) * 2014-10-16 2015-02-11 中交二航局第四工程有限公司 A kind of modular assembly formula connection system for guide rail
KR20150033315A (en) * 2013-09-24 2015-04-01 삼성중공업 주식회사 System foot hold for a ship's tank
CN205875654U (en) * 2016-08-05 2017-01-11 中建筑港集团有限公司 Novel scaffold frame device
CN206220459U (en) * 2016-11-04 2017-06-06 南京南化建设有限公司 Restricted clearance modularization scaffold cat ladder
CN107444582A (en) * 2017-07-31 2017-12-08 广船国际有限公司 A kind of hyperboloid line style cabin scaffold device erection method
CN109319040A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A kind of scaffold building method for hull turn of the bilge region
CN210437363U (en) * 2019-05-29 2020-05-01 中船澄西船舶修造有限公司 Chemical tanker cargo oil tank tooling scaffold

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001206484A (en) * 2000-01-25 2001-07-31 Mitsubishi Heavy Ind Ltd Universally swinging arm type scaffolding device in cargo tank of lng vessel
JP2006273037A (en) * 2005-03-28 2006-10-12 Sumitomo Heavy Industries Marine & Engineering Co Ltd Fixed scaffold for inspection of bulk carrier
CN201442646U (en) * 2009-08-26 2010-04-28 大连船舶重工集团有限公司 Scaffold erection tool for special coating of finished-oil shipload tank
KR20150033315A (en) * 2013-09-24 2015-04-01 삼성중공업 주식회사 System foot hold for a ship's tank
CN204151692U (en) * 2014-10-16 2015-02-11 中交二航局第四工程有限公司 A kind of modular assembly formula connection system for guide rail
CN205875654U (en) * 2016-08-05 2017-01-11 中建筑港集团有限公司 Novel scaffold frame device
CN206220459U (en) * 2016-11-04 2017-06-06 南京南化建设有限公司 Restricted clearance modularization scaffold cat ladder
CN107444582A (en) * 2017-07-31 2017-12-08 广船国际有限公司 A kind of hyperboloid line style cabin scaffold device erection method
CN109319040A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A kind of scaffold building method for hull turn of the bilge region
CN210437363U (en) * 2019-05-29 2020-05-01 中船澄西船舶修造有限公司 Chemical tanker cargo oil tank tooling scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113481990A (en) * 2021-07-30 2021-10-08 广船国际有限公司 Method for assembling and disassembling scaffold for single-pile conical section
CN113481990B (en) * 2021-07-30 2022-10-28 广船国际有限公司 Method for assembling and disassembling scaffold for single-pile conical section

Also Published As

Publication number Publication date
CN110239691B (en) 2024-03-19

Similar Documents

Publication Publication Date Title
US20070211479A1 (en) Temporary lighting support assembly for scaffolding system
CN209066843U (en) A kind of steel structural overhead construction one-man service's nacelle device
CN101396596A (en) Combination type multifunctional fire-fighting truck
CN110239691A (en) A kind of chemical tanker oil cargo tank tool scaffold
CN209050366U (en) The connecting rod bearing shell mounting tool of marine diesel
CN107856823A (en) A kind of lifebuoy support frame on ship
CN109048299A (en) The connecting rod bearing shell mounting tool and method of marine diesel
CN208919959U (en) A kind of solar street light of energy-saving waterproof
CN210437363U (en) Chemical tanker cargo oil tank tooling scaffold
CN110961820A (en) Assembly welding process and turnover tool for storage box body with common-bottom structure
CN105896411A (en) Cable retainer, wind energy generator set, and cable mounting method
CN205938632U (en) Portable lift outdoor lighting lamps and lanterns
CN208919958U (en) A kind of solar street light of energy-saving safety
KR20130090494A (en) Lamp equipment mounting structure of ship
CN112460558A (en) Ship projection lamp bracket
CN101963001B (en) Multi-function platform workshop for fault correction of submarine cable fibers
CN210088558U (en) Floor lamp for indoor design
CN211914329U (en) Novel automobile parts surface spray gun frame
CN210391518U (en) Be applied to marine life buoy installation device of ordinary railing department outside cabin
CN205366011U (en) Beta structure of marine signal lamp pole
CN206191449U (en) Bundling street lamp support
CN209872164U (en) Suspension structure for hanging rotary cab of port machinery
CN220169339U (en) Hanging pipe type lamp
CN210675639U (en) Novel universal clamp
CN217835471U (en) Portal frame structure for loading outboard engine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant