Prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure
Technical field
This utility model belongs to building engineering field, be specifically related to a kind of prefabricated PC concrete core slab with
Cast-in-situ Beam integrated construction structure, it is be applicable to prefabricated concrete hollow slab application floor, superstructure engineering, the suitableeest
For prefabricated concrete hollow slab and Cast-in-situ Beam integrated construction.
Background technology
At present, in building engineering, floor, the construction of superstructure mostly use cast-in-place concrete hollow floor slab, and it has right
The good adaptability of large span, big load and large spatial structure, but there is also many defects, as it is at most products simultaneously
Belong to patent, it is necessary to design and construct drawing according to product, relatively difficult in cost control, this type of cast-in-situ hollow floor plate simultaneously
Demand to mould material is also quite big, and cost performance ratio is relatively low.
At present the bottleneck of prefabricated concrete hollow slab application is essentially consisted in: prefabricated concrete hollow slab material fragility
Relatively big, hoisting process easily produces longitudinal crack;It is difficult to ensure that precast construction and cast-in-place structural have good connectivity;
Needing first to pour collar tie beam, just can carry out the construction of precoated plate after collar tie beam reaches some strength by the time, speed of application is slow;Prestressing force
Concrete core slab is lifted on its horizontal aspect of guarantee great difficulty, and base plate easily produces the obvious discrepancy in elevation, affects construction quality.
In consideration of it, it is fast to need utility model one speed of application at present badly, both can guarantee that prefabricated concrete hollow slab was installed
Quality can rationally strengthen again prefabricated PC concrete core slab and the Cast-in-situ Beam one that precast construction is connected with cast-in-place structural
Change construction method.This utility model arranges flitch, plastic cement pad at cradle top, it is ensured that the quality of cored slab lifting, reduces
Damage;By arranging fixation steel plate and screw rod, precast construction and cast-in-place structural are connected to become an entirety;Achieve prestressing force
Cored slab and Cast-in-situ Beam integrated construction, have good economic technology benefit.
Utility model content
The purpose of this utility model is to provide a kind of speed of application fast, both can guarantee that prefabricated concrete hollow slab was installed
Quality can rationally be strengthened again prefabricated PC that precast construction is connected with cast-in-place structural, that have good economic technology benefit and mix
Solidifying soil cored slab and Cast-in-situ Beam integrated construction structure.
For achieving the above object, this utility model have employed techniques below scheme:
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, including prestressed concrete
Cored slab support system, beam form reinforcement system and prefabricated concrete hollow slab, described prefabricated concrete hollow slab includes foot
Hand cradle and be arranged on the jack at scaffold top, described beam form reinforcement system includes beam steel, beam side, beam bottom board, double steel
Pipe main joist and secondary joist flitch, it is characterised in that the top of described scaffold is provided with jackscrew bolt, above described jackscrew bolt
Being welded with jacking, arrange flitch and plastic cement pad with prefabricated concrete hollow slab contact position, described prestressed concrete is empty
Core be arranged over fixation steel plate.
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, it is characterised in that described
The reinforcement system of beam forms, with connection part of templates anyhow to being respectively arranged with flitch and plastic cement pad.
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, it is characterised in that described
Prefabricated concrete hollow slab side is provided with dowel, and is connected with body pillar reinforcing bar binding.
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, it is characterised in that described
Both sides, beam steel top are respectively welded pre-embedded steel slab, are provided with peg bottom described pre-embedded steel slab.
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, it is characterised in that described
It is provided with pre embedded bolt inside beam form reinforcement system and closes together with body pillar reinforcing bar binding and with concreting.
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, it is characterised in that described
Fixation steel plate is fastenedly connected with pre embedded bolt by nut, and its surface pours layer concrete surface layer a pre-stressed concrete hollow
Plate holds together.
Described prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structure, it is characterised in that described
Prefabricated concrete hollow slab seam crossing is provided with steel wire.
The beneficial effects of the utility model:
1. during hard-shelf branch-mould, the jackscrew bolt at its top is adjustable, follows the tracks of construction, unified tune by technical staff
Flat, straightening, makes irregular common quality defect phenomenon at the bottom of plate obtain effectively preventing, for the construction of rear one procedure, creates good
Good condition;
2. at the internal pre embedded bolt of beam body and fixation steel plate is set at its top, by precast construction and cast-in-place structural effectively
It is connected as an entirety, enhances stress-bearing capability and the globality of structure.
3. eliminate on beam, smear cement mortar screeding layer, the operation such as the plate end pea gravel concreten cementation of fissures, it is achieved that integration
Construction, has saved cost, has created good economic benefit.
4. use hard-shelf branch-mould due to prestressed cored slab, in construction, the strength of mould stripping of concrete and lifting intensity
Not directly affecting the construction of next process, this just shortens the engineering time of every Rotating fields, accelerates project progress.
Accompanying drawing explanation
Fig. 1 is prefabricated PC concrete core slab and Cast-in-situ Beam integrated construction structural representation;
Fig. 2 is plate crack structure schematic diagram;
In figure: 1-prefabricated concrete hollow slab, 2-jackscrew bolt, 3-flitch, 4-plastic cement pad, 5-scaffold, 6-bowl
Button, 7-pre-embedded steel slab, 8-pre embedded bolt, 9-beam steel, 10-beam side, the double steel pipe main joist of 11-, 12-timber wedge, 13-is spacing
Block, 14-diagonal brace, 15-beam bottom board, 16-Cast-in-situ Beam, 17-nut, 18-fixation steel plate, 19-concrete topping, 20-steel wire,
21-peg, 22-jack, 23-dowel.
Detailed description of the invention
Welding procedure, bolt connection construction technique, reinforcing bar binding technique and concreting involved by present embodiment
Not stating tired in these enforcements such as construction technology, emphasis illustrates that this utility model relates to the embodiment of structure.
With reference to shown in Fig. 1-2, this utility model prefabricated PC concrete core slab is tied with Cast-in-situ Beam integrated construction
Structure include prefabricated concrete hollow slab 1, jackscrew bolt 2, flitch 3, plastic cement pad 4, scaffold 5, bowl buckle 6, pre-embedded steel slab 7,
Pre embedded bolt 8, beam steel 9, beam side 10, double steel pipe main joist 11, timber wedge 12, limited block 13, diagonal brace 14, beam bottom board 15, existing
Water beam 16, nut 17, fixation steel plate 18, concrete topping 19, steel wire 20, peg 21, jack 22 and dowel 23 to constitute,
Described prefabricated concrete hollow slab 1 support system top is provided with scalable jackscrew bolt 2, above scalable jackscrew bolt 2
It is welded with jacking;Flitch 3 and plastic cement pad 4 are set with prefabricated concrete hollow slab 1 contact point.Described prestressed concrete is empty
Core 1 support system simultaneously as the reinforcement system of beam forms, its with connection part of templates anyhow to being respectively arranged with flitch 3 and moulding
Glue gasket 4.Dowel 23 is left in described prefabricated concrete hollow slab 1 side, with Cast-in-situ Beam 16 body pillar reinforcing bar 9 colligation even
Connect.Both sides, described beam steel 9 top are respectively welded pre-embedded steel slab 7, as one of prefabricated concrete hollow slab 1 support system
Point, it is provided with peg 21 bottom it.The internal pre embedded bolt 8 of described beam is together with body pillar reinforcing bar 9 colligation, and concreting is sealed
Close.Described prefabricated concrete hollow slab 1 is provided with fixation steel plate 18 with beam intersection, is fastened with pre embedded bolt 8 by nut 17
Connecting, its surface pours a layer concrete surface layer 19, holds together with prefabricated concrete hollow slab 1.Described prestressing force
Concrete core slab 1 seam crossing is equipped with steel wire 20, is positioned at concrete cushion 19 internal.Described limited block 13 is for foot hands
The spacing of frame 5 is fixed.
Embodiment
Scaffold uses bowl to detain 6 formulas connections, and the strong point is located at plate end 300-400mm, vertical pole's span 600mm, and presses water
Flat 400mm spacing arranges diagonal brace 14, and support system bottom of upright rod is all provided with elongated chock;
Scaffold top arranges adjustable jackscrew bolt 2, and lays 100mm100mm flitch 3, manually cannot regulate jackscrew
During bolt 2, jack 22 is used to assist;
Rebar sizes determines according to design load, and both sides, beam steel top are respectively welded 16mm thickness pre-embedded steel slab 7, uses segmentation
Formula, pre-embedded steel slab 7 bottom welding has peg 21;
The M50 pre embedded bolt 8 of long 40cm is installed in direction along beam at a certain distance, pre embedded bolt 8 tied silk and main body
Beam steel 9 colligation is fixed;
During lifting, steel wire rope cannot be less than 50 with the angle of plate, and such angle cannot meet requirement, should utilize Rohdea japonica
Auxiliary;
Prefabricated concrete hollow slab 1 plate seam is suitable for reading for 50mm(), plate slit die plate uses the method for iron wire dead-wood side, flitch
Must chamfer 15mm, flitch and prefabricated concrete hollow slab 1 contact surface glue sealing strip, and flitch recessed plate seam 10mm is limited;
At floor surrounding formwork erection, pour 2cm thickness concrete topping 19, by fixation steel plate 18 and prefabricated concrete hollow slab
1 is cast in together.Casting process connects laying steel wire 20 at 1 seam at prefabricated concrete hollow slab.